2021-08-16 General Committee Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
AGENDA
General
Committee Meeting
Monday, 16 August 2021
commencing at 10am
Council Chambers, 9 Pelican Street, Tewantin
Committee: Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener
“Noosa Shire – different by nature”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 54 (of 92)
Section 2
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
TABLE OF CONTENTS
ITEM PAGE
1 ATTENDANCE & APOLOGIES 3
2 CONFIRMATION OF MINUTES 3
3 PRESENTATIONS 3
4 DEPUTATIONS 3
5 ITEMS REFERRED FROM COMMITTEES 3
1 MCU21/0054 - DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF
USE – SHORT TERM ACCOMMODATION AT 30 KINGFISHER DRIVE,
PEREGIAN BEACH 3
2 MCU21/0079 - DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF
USE – SHORT TERM ACCOMMODATION AT 4 TEAL STREET, PEREGIAN
BEACH 3
3 CLIMATE CHANGE RESPONSE PLAN AND COMMUNITY CONSULTATION
SUBMISSIONS 3
4 NOOSA TRAIL MASTERPLAN UPDATE 3
5 FRYING PAN PUBLIC FORESHORE INFRASTRUCTURE 4
6 NOOSA NORTH SHORE FERRY UPDATE AND PROPOSED LEASE
EXTENSION 4
6 REPORTS DIRECT TO GENERAL COMMITTEE 5
7 MCU20/0072 – APPLICATION FOR MATERIAL CHANGE OF USE –
EDUCATIONAL ESTABLISHMENT - AT 115 EUMUNDI-NOOSA ROAD,
NOOSAVILLE 5
8 OPERATIONAL PLAN PROGRESS REPORT – 4TH QUARTER 2020-21 27
9 BUDGET REVIEW 1 (BR1) FOR THE 2021/22 FINANCIAL YEAR 44
10 FINANCIAL PERFORMANCE REPORT – JULY 2021 63
11 UPDATE ON COASTAL HAZARDS ADAPTATION PLAN (CHAP) 76
12 YEAR IN REVIEW – 2020-21 79
7 CLOSED SESSION 92
Page 2 of 92
Section 3
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
1 ATTENDANCE & APOLOGIES
2 CONFIRMATION OF MINUTES
The Minutes of the General Committee Meeting held on 12 July 2021 be received and
confirmed.
3 PRESENTATIONS
Nil.
4 DEPUTATIONS
Nil.
5 ITEMS REFERRED FROM COMMITTEES
PLANNING & ENVIRONMENT COMMITTEE
1 MCU21/0054 - DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE
– SHORT TERM ACCOMMODATION AT 30 KINGFISHER DRIVE, PEREGIAN
BEACH
(Planning & Environment Committee Agenda, 10 August 2021, Item 4, Page 48)
Reason for referral – Significance of the issue
2 MCU21/0079 - DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE
– SHORT TERM ACCOMMODATION AT 4 TEAL STREET, PEREGIAN BEACH
(Planning & Environment Committee Agenda, 10 August 2021, Item 5, Page 65)
Reason for referral – Significance of the issue
3 CLIMATE CHANGE RESPONSE PLAN AND COMMUNITY CONSULTATION
SUBMISSIONS
(Planning & Environment Committee Agenda, 10 August 2021, Item 7, Page 84)
Reason for referral – Significance of the issue
4 NOOSA TRAIL MASTERPLAN UPDATE
(Planning & Environment Committee Agenda, 10 August 2021, Item 8, Page 96)
Reason for referral – Significance of the issue
Page 3 of 92
Section 4
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
5 FRYING PAN PUBLIC FORESHORE INFRASTRUCTURE
(Planning & Environment Committee Agenda, 10 August 2021, Item 9, Page 109)
Reason for referral – For further consideration
SERVICES & ORGANISATION COMMITTEE
6 NOOSA NORTH SHORE FERRY UPDATE AND PROPOSED LEASE EXTENSION
(Services & Organisation Committee Agenda, 10 August 2021, Item 1, Page 4)
Reason for referral – Significance of the issue
Page 4 of 92
Section 5
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
6 REPORTS DIRECT TO GENERAL COMMITTEE
7 MCU20/0072 – APPLICATION FOR MATERIAL CHANGE OF USE – EDUCATIONAL
ESTABLISHMENT - AT 115 EUMUNDI-NOOSA ROAD, NOOSAVILLE
Author Coordinator Planning, Patrick Murphy
Environment and Sustainable Development Department
Index ECM/ Application/ MCU20/0072
Attachments 1. Proposal Plans
2. Existing and Proposed carparking plans
3. Deed of Agreement (Attachment provided separately to this report)
APPLICATION DETAILS
Applicant Good Shepherd Lutheran College
Proposal Material Change of Use - Educational establishment
Properly Made Date 3 August 2020
Information Request Date 31 August 2020
Information Response Date 10 September 2020
Decision Due Date 20 August 2021
PROPERTY DETAILS
Property Address 115 Eumundi Noosa Road Noosaville Qld 4566
RP Description Lot 1 SP 228052
Lot 30 SP 170751
Land Area 56,755m²
5,014m²
Existing Use of Land Educational Establishment
STATUTORY DETAILS
SEQRP Designation Urban Footprint
Zone Community Facilities (6 – Educational Establishment)
Precinct Not applicable
Local Plan Area Noosaville
Overlays Land Subject to Acid Sulfate Soils
Assessment Type Code
Page 5 of 92
Section 6
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
RECOMMENDATION
That Council note the report by the Coordinator Planning to the General Committee Meeting dated
16 August 2021 regarding MCU20/0072 for a Development Permit for Material Change of Use –
Educational Establishment, situated at 115 Eumundi-Noosa Road Noosaville and:
A. Approve the application subject to the following conditions:
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the use
continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with
the approved plans of development. The approved plans are listed in the following table
unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
SK-01 P1 Location Plan prepared by Burling Brown Architects 01.07.2020
SK-02 P3 Proposed Site Plan prepared by Burling Brown 20.07.2020
Architects
A-000 I Schedules – Building Shell (MQB) prepared by 15.07.2020
Ausco Modular
A-001 I Site Plan (MQB) prepared by Ausco Modular 15.07.2020
A-100 I Site Plan (MQB) prepared by Ausco Modular 15.07.2020
A-101 I Roof Plan (MQB) prepared by Ausco Modular 15.07.2020
A-200 I Elevations (MQB) prepared by Ausco Modular 15.07.2020
Concept plan detailing upgrade of the existing drop-
off/pick-up / carpark configuration
Plan detailing options for internal vehicular link
Amenity
3. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the creation of
excessive noise, lighting nuisance or other emissions.
4. Any advertising sign or device is to comply with the provisions of Council's policies on
advertising.
Nature and Extent of Approved Use
5. The approved demountable buildings must only be used to service current enrolments
and must not be used to facilitate an increase in enrolments.
6. The number of students must not exceed 1105.
7. A minimum of 328 car parking spaces must be provided on site.
Page 6 of 92
Section 7
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Currency Period
8. This development approval lapses if the use has not happened by 20 August 2027,
unless an application to extend the currency period is approved by Council.
Land Amalgamation
9. Lot 1 on SP228052 and Lot 30 on SP170751 must be amalgamated.
Traffic
10. The drop off/pick up/ carpark configuration, accessed from the Goodchap
Street/Eumundi Noosa Road roundabout entry, as detailed in the approved plans must
be upgraded in accordance with an Operational Works approval.
11. An internal one-way vehicular link from the new staff car park to the Goodchap
Street/Eumundi Noosa Road roundabout exit as detailed in the approved plans must be
provided in accordance with an Operational Works approval.
12. The applicant will comply with the requirements of any deed of agreement entered into
with Council with respect to:
a. The upgrade of the drop off/pick up/ carpark configuration accessed from the
Goodchap Street/Eumundi Noosa Road roundabout entry; and
b. The provision of an internal one-way vehicular link from the new staff car park to
the Goodchap Street/Eumundi Noosa Road roundabout exit.
ENGINEERING
Stormwater Drainage
13. The site must be provided with a stormwater drainage system connecting to the existing
school drainage system and the lawful point of discharge.
14. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
B. Enter into a Deed of Agreement with the applicant that provides for the carrying out of upgrade
works to the drop off/pick up/ carpark configuration accessed from the Goodchap
Street/Eumundi Noosa Road roundabout entry and an internal vehicular link.
C. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
REPORT
1. PROPOSAL
The application seeks approval for a Material Change of Use - Educational establishment.
The applicant submits the following:
The proposal involves relocation of an existing demountable and a new additional
demountable. An additional 290m2 of GFA is proposed. The demountable buildings are
Page 7 of 92
Section 8
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
intended to fulfil a temporary role while other development applications for new permanent
buildings are pursued and which will require demolition of some existing buildings.
The additional demountables will not be used to facilitate an increase in enrolments but rather
to service current enrolments more appropriately. The demountables will be located within the
existing central staff carparking area, which will become surplus once the new staff carpark is
completed.
The demountable buildings will proceed once the new staff carpark is operational.
The new staff carpark is the first step in the proposed plans by GSLC for refurbishment and
upgrade to the existing campus. We again confirm this is not intended to facilitate increased
enrolment, but rather to provide a more modern and comprehensive learning facility.
The applicant has also advised:
The demountable buildings are required due to two areas of need, temporary replacement of
some existing buildings which will be demolished with future construction, and to provide
sufficient suitable spaces for current demand. While the demountables are intended to fulfil a
dual role, they are required to fill an immediate need and will therefore be required until that
need has been replaced with permanent structures.
The masterplan included with the application details the current intent for future works on the
site. Planned works over the next 8 years include a Performing Arts building, a new
Administration building and a new classroom building. The current construction program will
require the demolition of an approximately 200m2 administration building in 2021. The
administration functions within that space will be moved to two existing classrooms, the
demountable building will be used to house those two displaced classes.
The locality and proposal plan are included below.
Figure 1 – Locality
Page 8 of 92
Section 9
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Figure 2 – Master Plan
Figure 3 – Site Plan
Page 9 of 92
Section 10
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Figure 4 – Floor Plan
Figure 5 – Elevations – New Demountable Building
Page 10 of 92
Section 11
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Figure 6 - 3-D Renderings – New Demountable Building
2. SITE DETAILS
2.1. Background
A number of development applications exist over the site. An overview of the site history is included
below.
Development Applications
MCU18/0097 Education Type 2 School (Car park)
MCU17/0073 Wellbeing Type 3 Worship
05/0355 Change to Existing Approval – new temporary administration building
and classroom
REC15/0022 Reconfiguration of a lot
MCU15/0095 Vehicle Uses Type 5 – Service Station & Retail Business Type 2 Shop
07/1466 Education Type 1 - Childcare
05/0355 Change Relevant Period, Change to Development Approval,
Condition to a Condition of Approval
05/0355 Extension to Educational Establishment
23134 DA Educational Establishment, Place of Worship & Industrial Uses with
Staged Lot Reconfiguration
When Council approved the application for the car park on the corner of Eumundi Noosa Road and
Walter Hay Drive Council resolved to: advise the applicant that any proposed layout (as indicated in
the submitted masterplan – Attachment 3) which seeks to move the primary vehicle access to the
site from the Goodchap Street roundabout to Walter Hay Drive and fails to provide an appropriate
internal link between the existing and proposed car park areas, is considered to result in a highly
undesirable traffic outcome and is unlikely to be supported by Council as a result.
It is noted from the school’s master plan that the school still intends move the primary vehicle access
and not provide the desired internal link.
Page 11 of 92
Section 12
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
2.2. Site Description
The site comprises two parcels of land (Lot 30 SP170751 & Lot 1 SP228052) both known as 115
Eumundi Noosa Road. The smaller 5,014m2 vacant parcel of land, Lot 30 SP170751, is used for the
new staff car park. The larger 56,755.06m2 parcel of land contains the existing Good Shepard
Lutheran College school development. The proposed additional demountable buildings are
proposed on the larger lot.
2.3. Surrounding Land Uses
The site is surrounded by industrial, residential, community and open space recreation land uses.
3. ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
State Planning Policy;
South East Queensland Regional Plan;
Planning Regulation 2017;
Noosa Plan 2020.
The following codes from the Noosa Plan are applicable to this development:
Noosaville Local Plan Code
Community Facilities Zone Code
Community Activities Code
Works Codes
The subject site is located in the Noosaville Locality and is zoned Community Facilities. The
proposed use is identified as a consistent use within the zone and is required to follow a code
assessable application process.
The application has been found to generally comply with all applicable statutory instruments. The
pertinent issues arising out of the assessment are discussed below:
Criteria Planning Scheme Proposal Complies
Site Area N/A 56,755.06m²
5,014m²
Gross floor area Individual buildings to not Approx. 290m2
exceed 1,000m²
Site cover 50% max Approx. 43 %
Landscaped open space 15% min >15%
Building height
storeys 2 storeys max 1 storey
metres 8 metres Approx. 4 metres
Page 12 of 92
Section 13
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Criteria Planning Scheme Proposal Complies
Boundary setbacks
Frontage 6 metres min > 6 metres
Side 3 metres min > 6 metres
Side 3 metres min > 6 metres
Rear 3 metres min > 3 metres
Length of wall 30 metres max 30.850 metres X
Carparking 182 required 278 proposed
Car parking/Vehicle circulation/Impact on local road network
The primary issue associated with the proposal is that the location of the demountable buildings and
relocation of the administration building results in the loss of existing car parking accessed from the
Goodchap Street roundabout and the opportunity for vehicle circulation which this area provides for.
The loss of internal circulation within the site has the potential to result in additional queuing at the
Goodchap Street roundabout and exacerbate the existing impacts on the local road network.
When the application was made the existing carparking on site comprised 226 spaces. The applicant
advises that the proposed carparking now comprises 278 spaces, after addition of the new 153
space staff carpark (MCU18/0097) and proposed removal of the existing 94 space staff carpark and
other minor changes to car parking on the site. The applicant has based this figure on the loss of car
parking that would be associated with development in accordance with its Master Plan.
The applicant maintains that the traffic engineering report submitted with the application
demonstrates that the proposed carparking provision of 278 spaces (which includes 255 college
carks, plus 8 setdown and 15 child care spaces) complies with both Council and TMR requirements
and actual parking demand analysis.
The proposed location of the demountable building does not require the removal of all 94 car parking
spaces, and review of the plans indicates that at least 50 car parking spaces can be retained in this
area. It is recommended that a condition be included requiring the maintenance of these 50 spaces
via the provision of at least 328 car parking spaces. The loss of additional spaces should be
addressed as part of any future applications which seek to develop the site.
When reviewing the proposal Council’s consulting traffic engineer advised:
i. My previous site inspections have indicated operational issues at the main set-down / pick-up
area accessed via the Goodchap Street roundabout, with queuing from the set-down / pick-up
area extending back into the roundabout for extended periods (more than 15 minutes) and this
impacting negatively on its operation. The Hayes Traffic Engineering (HTE) report of June
2020 suggests that this no longer occurs, presumably due to management measures
implemented by the college.
ii. It is evident from the detailed traffic count and parking information contained in the HTE report
that there is substantial set-down / pick-up activity that occurs in the existing informal parking
area that will soon be formalised as staff parking, and in particular that when the main set-
down / pick-up facility reaches capacity, that the set-down / pick-up activity then transfers
further down the road to that existing informal area. When the existing informal parking area
is converted to formal staff parking, that overflow pick-up / set-down activity from the main area
off the Goodchap St roundabout will then need to be accommodated on other parts of the site.
Page 13 of 92
Section 14
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
iii. My concern is that without satisfactory improvements to the existing formal set-down / pick-up
areas / zones on the site and how they operate, that the increased peak period set-down /
pick-up activity at the main area off the Goodchap Street roundabout, as a result of the informal
area no longer being available, will again cause queuing to extend back unsatisfactorily into
the Goodchap Street roundabout.
iv. Those concerns would likely be overcome if the existing internal staff parking area is retained
and used for overflow set-down / pick-up activity, or if improvements to the existing main set-
down / pick-up area are implemented along the lines of those suggested in Section 7 of the
HTE report together with preparation and implementation of an appropriate operational
management plan detailing how the set-down / pick-areas would be managed to ensure that
queuing back into the Goodchap St roundabout does not occur.
v. If Council agrees to elimination of the internal staff parking area, without appropriate
improvements to on-site set-down / pick-up areas together with implementation of an
appropriate parking and set-down area management plan, then the opportunity to have those
improvements implemented in the future will likely be lost. This is because the College could
at the time of future applications then simply say that they are not increasing the on-site student
population such that the then existing parking and set-down areas do not need to be modified
/ improved. That is, the most appropriate time for Council to seek improvements to the existing
set-down / pick-up areas and on-site parking management, is prior to removal of the existing
on-site staff parking area.
In response to this request and subsequent to discussions between Council’s consulting traffic
engineer and the applicant’s traffic engineer the applicant agreed to undertake works to upgrade the
drop off/pick up/ carpark configuration accessed from the Goodchap Street/Eumundi Noosa Road
roundabout entry and for the provision of an internal one way vehicular link from the new staff car
park to the Goodchap Street/Eumundi Noosa Road roundabout exit. The following images detail the
concept drawing for the upgrade works and the two options for the internal one way vehicular link.
Figure 7 – Concept drawing for upgrade to the drop off/pick up/ carpark configuration accessed from the
Goodchap St/Eumundi Noosa Rd roundabout entry
Page 14 of 92
Section 15
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Figure 8 – Proposed options for internal one way vehicular link
The applicant has requested that a timeframe of 18 months, from the commencement of the use of
the demountable buildings, be allowed for the completion of the upgrade works on the basis that:
The upgrade works require the preparation of additional material for an Operational Works
application for the works; and
The timeframe for obtaining an Operational Works application will add further delay to the
delivery of the works.
The commencement of the use of the demountable buildings is required to facilitate future
development of the site as anticipated by the Master Plan (further approvals required).
A period of 18 months has also been requested to implement the internal one-way vehicular link.
Furthermore, the applicant has requested that within 12 months from the commencement of the use
of the demountable buildings that they be permitted to submit a detailed traffic impact assessment
prepared by a suitably qualified RPEQ (traffic engineer) in accordance with any applicable planning
scheme requirements to support a request to delete the requirement to complete the internal
vehicular link. The applicant requests this as they do not consider the internal link is desirable or
necessary for management of the school’s traffic.
It is necessary to enter of Deed of Agreement to facilitate the 18 month delay and further review as
requested by the applicant. Furthermore, entering into a Deed of Agreement provides certainty that
the works and requirements of the deed and related conditions within the Development Approval are
met. Accordingly, a Deed of Agreement has been prepared which has been executed by the
applicant. The deed sets out the terms of agreement between the parties as to the scope of the
works, timeframe for completion of these works and the provision of a $900,000 security for the
performance of the works, being 1.5 times the cost of the works.
Page 15 of 92
Section 16
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
In this instance the applicant’s proposed delay and request for further review are supported on the
basis that this will allow a traffic study to be completed and determine the actual functioning and
impacts of the new carpark on the corner of Eumundi Noosa Road and Walter Hay Drive. In the
circumstances where Council does not agree to delete the requirement the applicant must complete
the works in accordance with the terms of the deed within the timeframe stipulated...
Built Form
Acceptable Outcome AO18.2 of the Community Facilities Zone Code seeks for the maximum length
of a wall to be 30 metres. The proposed demountable buildings have a length of 30.85 metres.
Despite exceeding the Acceptable Outcome the proposal is considered to comply with the relevant
Performance Outcome as:
The demountable buildings are not inconsistent with the scale and bulk of surrounding
development noting that the site includes a number of larger buildings, as would be expected
for an education facility as it needs to accommodate a significant number of students;
The low form of the demountable buildings and the setbacks to surrounding properties means
that the proposal will not present an appearance of bulk to adjacent properties, roads or other
areas in the vicinity of the site;
Significant screening vegetation is located to the Walter Hay Drive frontage which screens
views of the area where the demountable buildings are to be located; and
The demountable buildings are to be located on an existing hardstand area and will not require
the removal of vegetation
4. CONSULTATION
4.1. Referral Agencies
The applicant was referred to the following Referral Agencies:
Energex - the Department is a referral agency for Electrical Infrastructure
The Department has responded advising that it has no requirements.
4.2. Internal Council Referrals
The application was forwarded to the following internal Council officers:
Coordinator, Development Engineering
The application was also referred to an external traffic consultant and planning solicitor.
5. CONCLUSION & REASONS FOR DECISION
The application seeks to utilise an existing car parking area for the purpose of placing demountable
buildings including the relocation of an existing administration building. The demountable buildings
are intended to fulfil a temporary role while other development applications for new permanent
buildings are pursued and which will require demolition of some existing buildings. Whilst a new staff
car park has recently been constructed at the corner of Eumundi-Noosa Road and Walter Hay Drive
the loss of the car parking area within the site raises concerns. The concerns relate to the impact
the loss of this area will have on vehicle circulation and how resultant queuing at the Goodchap
Street roundabout may impact on the local road network. Accordingly, conditions have been included
which require upgrade of the drop off/pick up/ carpark configuration accessed from the Goodchap
Street/Eumundi Noosa Road roundabout entry and for the provision of an internal one way vehicular
link from the new staff car park to the Goodchap Street/Eumundi Noosa Road roundabout exit. A
Deed of Agreement has been prepared and executed by the applicant to allow for an 18 month
deferral of the works and the opportunity for a traffic report to be submitted demonstrating that the
operation of the new staff car no longer requires the creation of the internal one way vehicle link.
Page 16 of 92
Section 17
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer Community Development Financial Services
Executive Support Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
Executive Services x Environment & Sustainable Development Infrastructure Services
Community Engagement Building & Plumbing Services Asset Management
Customer Service x Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 17 of 92
Section 18
ATTACHMENT 1
Page 18 of 92
ATTACHMENT 1
2, n. a iA . PY ae} a (~=\ ; ecrmett Te +«. a
a — iy a i. -. 4 a 2 a — tp , — 2
nt ee ‘S . eg | fe a & = Ferm ge. .
ee. Wath esas Dhadteteedl ot Nah
y Y ; ‘~ . ; 4
Cc} AM oe ee ost D2 eee be =
rir| _ ~ oe Seat “7
f im a ae a An Le —* we PE Li ae < fie Sy S
eee | ie eee [le ae
Lee a et a Rg git ee
2 bai a. | AN i os | \ VY 4 / . » ie ve so ko
— he ALY % so me LY We Z . a =. _e ts
) Se wm 2163s ys Me a 5 2 ; Hi “f. | pe
_ Sag” NEN alles or
a ee oe | ae
oS he RO alae
he a Obie is ! 7 Lone ey ~
eee. i
Pa eS . ee ee us ee iS | ne ih i
ssemmunat —— ao sa i Oe ae, |
PROPOSED DEMOUNTABLE BUILDINGS p A| Sem
PROPOSED DEMOUNTABLE BUILDINGS i |
IN: |NOOSAVILLE_QLD_4566 .
Page 18 of 92Section 19
Page 19 of 92
26 40 6| abe
rz 99S
5 1 1 1 2 3 2848 267 32 16 49 O10
5 1 1 1 2 4 2898 267 115 16 24 JTIIAYSOON
5 1 1 1 2 5 3029 267 33 16 85 STT
5 1 1 1 2 6 3081 267 102 16 32 :NOTL¥I01
4 1 1 1 3 0 300 263 2880 93 -1
5 1 1 1 3 1 300 263 90 92 77 El
5 1 1 1 3 2 1594 288 258 68 0 women
5 1 1 1 3 3 1955 287 342 52 23 XOANIDTING
5 1 1 1 3 4 2321 287 483 52 7 FIEAVINNOWAG
5 1 1 1 3 5 2828 287 352 52 36 GaSOd0”’d
4 1 1 1 4 0 332 328 2851 56 -1
5 1 1 1 4 1 332 356 94 28 24 NOTLONYLSNOD
5 1 1 1 4 2 1383 328 49 52 20 COI
5 1 1 1 4 3 1443 335 17 10 49 =
5 1 1 1 4 4 1469 332 57 24 49 Va
5 1 1 1 4 5 1538 332 131 24 41 ONILSIXS
5 1 1 1 4 6 1679 332 57 24 46 GAL
5 1 1 1 4 7 1794 328 38 50 40 Ta
5 1 1 1 4 8 2823 350 104 17 39 SONIQTING
5 1 1 1 4 9 2944 350 129 17 23 JIS¥LNNOWSG
5 1 1 1 4 10 3090 350 93 17 0 G3SOd04d
4 1 1 1 5 0 368 371 1484 41 -1
5 1 1 1 5 1 368 371 58 41 34 pee
5 1 1 1 5 2 1100 376 234 25 11 SNOILVINDT1V9
5 1 1 1 5 3 1342 376 60 25 34 VAD
5 1 1 1 5 4 1412 376 69 25 94 MAN
5 1 1 1 5 5 1489 376 22 24 69 8
5 1 1 1 5 6 1522 376 138 25 82 ONILSIXS
5 1 1 1 5 7 1670 376 182 25 26 G3LV901SY
4 1 1 1 6 0 332 413 85 11 -1
5 1 1 1 6 1 332 413 85 11 0 AMUNINDTaad
4 1 1 1 7 0 2788 433 317 21 -1
5 1 1 1 7 1 2788 436 24 11 34 wse
5 1 1 1 7 2 2944 437 14 11 88 st
5 1 1 1 7 3 3016 433 9 21 27 ol
5 1 1 1 7 4 3099 437 6 10 61 $
4 1 1 1 8 0 552 493 2623 73 -1
5 1 1 1 8 1 323 524 25 31 55 BE
5 1 1 1 8 2 384 523 42 30 26 28s
5 1 1 1 8 3 552 517 202 49 3 aera
5 1 1 1 8 4 886 528 2 2 0 .
5 1 1 1 8 5 1008 512 36 52 39 >)
5 1 1 1 8 6 1072 524 41 32 20 Vas
5 1 1 1 8 7 1156 513 101 47 45 Pr
5 1 1 1 8 8 1278 510 58 43 4 Se
5 1 1 1 8 9 1432 493 226 71 0 iGaiae
5 1 1 1 8 10 1692 521 43 12 43 ay
5 1 1 1 8 11 1747 521 35 13 36 a
5 1 1 1 8 12 1790 511 34 51 29 at
5 1 1 1 8 13 1871 519 5 6 38 aaa
5 1 1 1 8 14 1953 527 9 10 37 ia
5 1 1 1 8 15 2008 530 72 10 40 ae
5 1 1 1 8 16 2161 520 55 35 1 ee
5 1 1 1 8 17 2258 520 123 35 24 ee
5 1 1 1 8 18 2842 519 78 25 20 NW1d
5 1 1 1 8 19 2932 519 65 25 71 SUS
5 1 1 1 8 20 3007 520 168 24 12 daSOd0ud
4 1 1 1 9 0 323 538 2041 55 -1
5 1 1 1 9 1 323 555 25 29 63 BE
5 1 1 1 9 2 384 554 42 30 69 328
5 1 1 1 9 3 545 555 43 27 23 a
5 1 1 1 9 4 679 549 60 40 11 ne
5 1 1 1 9 5 791 565 3 1 0 :
5 1 1 1 9 6 858 552 33 30 36 So
5 1 1 1 9 7 1044 562 16 15 24 \
5 1 1 1 9 8 1168 553 90 33 36 Rite
5 1 1 1 9 9 1386 570 1 8 0 J
5 1 1 1 9 10 1419 566 216 18 0 —Peaowel
5 1 1 1 9 11 1529 551 20 38 51 aq
5 1 1 1 9 12 1554 551 33 38 81 0}
5 1 1 1 9 13 1586 566 48 18 73 3243
5 1 1 1 9 14 1656 566 73 18 8 Bunsixe
5 1 1 1 9 15 1910 572 2 2 49 4
5 1 1 1 9 16 2029 538 33 55 0 y
5 1 1 1 9 17 2107 565 11 16 22 pie
5 1 1 1 9 18 2281 562 3 3 75 f
5 1 1 1 9 19 2354 563 10 14 68 é
4 1 1 1 10 0 338 604 2041 37 -1
5 1 1 1 10 1 338 608 10 21 63 &
5 1 1 1 10 2 381 608 45 22 41 oe
5 1 1 1 10 3 548 608 90 22 28 Tie
5 1 1 1 10 4 731 610 67 16 58 Pos
5 1 1 1 10 5 1184 614 18 5 27 af
5 1 1 1 10 6 1457 604 6 36 0 hs
5 1 1 1 10 7 1598 613 2 3 71 |
5 1 1 1 10 8 1678 605 59 36 0 UELUA
5 1 1 1 10 9 1743 614 27 16 30 O}
5 1 1 1 10 10 2023 608 32 11 32 Vint
5 1 1 1 10 11 2073 609 6 9 22 oi
5 1 1 1 10 12 2086 612 37 7 0 Sawiy
5 1 1 1 10 13 2159 614 60 5 36 Gunan
5 1 1 1 10 14 2289 616 5 1 47 7
5 1 1 1 10 15 2377 619 2 5 0 é
4 1 1 1 11 0 384 620 1860 26 -1
5 1 1 1 11 1 384 632 42 14 22 Bel
5 1 1 1 11 2 539 627 47 10 0 <Q
5 1 1 1 11 3 688 626 46 13 0 Vibih.
5 1 1 1 11 4 766 633 1 3 24 2,
5 1 1 1 11 5 883 626 6 6 11 5
5 1 1 1 11 6 1398 639 26 6 52 =
5 1 1 1 11 7 1671 628 46 17 39 anon
5 1 1 1 11 8 1982 625 75 18 0 ulead
5 1 1 1 11 9 2065 625 21 16 57 0}
5 1 1 1 11 10 2093 625 55 16 25 sees}
5 1 1 1 11 11 2155 620 89 23 76 Bunsixe
4 1 1 1 12 0 384 595 2537 97 -1
5 1 1 1 12 1 384 634 36 53 35 ase
5 1 1 1 12 2 543 661 8 8 15 2
5 1 1 1 12 3 578 595 96 87 42 ge
5 1 1 1 12 4 715 636 74 34 27 urea
5 1 1 1 12 5 791 636 24 34 56 0}
5 1 1 1 12 6 914 632 53 60 61 \
5 1 1 1 12 7 1053 664 15 15 27 a
5 1 1 1 12 8 1292 668 23 3 20 napa
5 1 1 1 12 9 1354 632 34 40 30 aaa
5 1 1 1 12 10 1599 651 122 5 0 _MaVdHVS
5 1 1 1 12 11 1729 629 107 43 0 ONLLSDA
5 1 1 1 12 12 2118 648 205 22 0 —_——
5 1 1 1 12 13 2564 650 13 19 0 Ss
5 1 1 1 12 14 2847 661 2 2 27 :
5 1 1 1 12 15 2919 668 2 2 0 s
4 1 1 1 13 0 384 658 2673 37 -1
5 1 1 1 13 1 384 671 43 13 74 ene
5 1 1 1 13 2 564 670 14 13 36 =
5 1 1 1 13 3 923 677 12 9 0 ~
5 1 1 1 13 4 1101 658 58 37 37 Ps
5 1 1 1 13 5 1212 665 14 26 0 ~*~
5 1 1 1 13 6 1232 669 90 18 43 =a
5 1 1 1 13 7 1359 665 21 26 49 ae
5 1 1 1 13 8 1537 672 36 4 16 i=
5 1 1 1 13 9 1753 677 4 4 22 nl
5 1 1 1 13 10 1788 665 14 26 23 pa
5 1 1 1 13 11 1817 680 39 3 21 ns
5 1 1 1 13 12 1944 681 1 4 51 |
5 1 1 1 13 13 1977 684 6 2 31 ng
5 1 1 1 13 14 2612 679 2 2 4 i
5 1 1 1 13 15 2680 665 21 26 0 Pg
5 1 1 1 13 16 2874 673 6 6 21 ae
5 1 1 1 13 17 2916 674 15 14 25 a
5 1 1 1 13 18 3046 672 11 16 17 if
4 1 1 1 14 0 384 663 2692 71 -1
5 1 1 1 14 1 384 672 39 46 24 e285
5 1 1 1 14 2 544 670 80 51 26 we
5 1 1 1 14 3 656 663 71 55 0 ONAv
5 1 1 1 14 4 734 709 16 5 0 Ia
5 1 1 1 14 5 766 663 88 55 9 SRLSIX
5 1 1 1 14 6 925 687 50 16 49 a>
5 1 1 1 14 7 1087 678 61 46 87 =
5 1 1 1 14 8 1248 676 134 20 33 Se
5 1 1 1 14 9 1616 682 102 19 32 ee
5 1 1 1 14 10 1737 686 61 16 18 ee
5 1 1 1 14 11 1823 672 12 43 25 Ss
5 1 1 1 14 12 1845 689 61 22 22 Sn
5 1 1 1 14 13 1916 688 70 19 19 oe
5 1 1 1 14 14 1982 676 220 33 38 ee
5 1 1 1 14 15 2284 690 81 16 35 Sy
5 1 1 1 14 16 2456 674 107 38 28 a
5 1 1 1 14 17 2580 685 47 49 81 4
5 1 1 1 14 18 2681 672 35 42 19 ce
5 1 1 1 14 19 2846 684 31 26 22 ao
5 1 1 1 14 20 2908 690 39 28 15 Ae
5 1 1 1 14 21 3012 695 68 18 18 os
4 1 1 1 15 0 384 696 2589 70 -1
5 1 1 1 15 1 384 710 42 27 44 aaa
5 1 1 1 15 2 552 696 184 70 48 IPN
5 1 1 1 15 3 742 711 67 36 37 Bee
5 1 1 1 15 4 826 710 30 29 36 Pe
5 1 1 1 15 5 1066 704 54 54 67 SS
5 1 1 1 15 6 1387 706 40 32 32 oe
5 1 1 1 15 7 1587 705 66 38 0 uewa.
5 1 1 1 15 8 1656 705 29 38 23 Oy
5 1 1 1 15 9 1808 706 11 41 39 he
5 1 1 1 15 10 1902 722 10 7 6 “
5 1 1 1 15 11 2023 714 118 18 0 —speyjoq
5 1 1 1 15 12 2149 710 89 22 63 Bunsixe
5 1 1 1 15 13 2408 711 48 4 22 foe
5 1 1 1 15 14 2571 728 8 9 17 —_—
5 1 1 1 15 15 2691 716 36 11 20 ce
5 1 1 1 15 16 2801 705 14 35 41 ks
5 1 1 1 15 17 2901 717 8 5 0 ”
5 1 1 1 15 18 2958 718 2 2 0 Si
4 1 1 1 16 0 384 732 2718 51 -1
5 1 1 1 16 1 384 747 40 21 21 abe
5 1 1 1 16 2 547 732 246 51 37 OSS
5 1 1 1 16 3 1223 739 227 30 26 poe
5 1 1 1 16 4 1520 739 224 22 0 Nozsngene
5 1 1 1 16 5 1915 752 51 21 49 |
5 1 1 1 16 6 2000 736 308 36 6 Se
5 1 1 1 16 7 2501 772 11 1 23 :
5 1 1 1 16 8 2826 738 128 21 18 as
5 1 1 1 16 9 3097 764 5 5 4 ,
4 1 1 1 17 0 416 760 2550 52 -1
5 1 1 1 17 1 416 770 10 5 46 -
5 1 1 1 17 2 552 763 119 33 8 ey.
5 1 1 1 17 3 720 760 73 42 36 i
5 1 1 1 17 4 821 775 36 20 29 nf
5 1 1 1 17 5 947 772 10 8 33 3
5 1 1 1 17 6 1069 772 21 11 64 =
5 1 1 1 17 7 1221 778 4 15 0 H
5 1 1 1 17 8 1329 768 33 20 19 =
5 1 1 1 17 9 1466 774 140 25 0 ——=208'06
5 1 1 1 17 10 1673 784 3 2 50 :
5 1 1 1 17 11 1823 777 34 19 11 ST,
5 1 1 1 17 12 1897 777 7 2 36 ce
5 1 1 1 17 13 1951 769 12 15 20 ein
5 1 1 1 17 14 2058 765 48 47 26 Fo
5 1 1 1 17 15 2527 788 8 4 65 -
5 1 1 1 17 16 2949 771 17 23 28 4
4 1 1 1 18 0 561 777 2368 55 -1
5 1 1 1 18 1 558 791 59 33 38 NA
5 1 1 1 18 2 781 797 10 21 23 ae
5 1 1 1 18 3 973 794 55 22 21 See
5 1 1 1 18 4 1091 792 14 30 23 |
5 1 1 1 18 5 1223 799 553 23 36 el
5 1 1 1 18 6 2468 794 73 29 39 =
age
= vide he ale SOO = ening | i
a ava We | | LX Parcs, | & I & | ise | ' | ‘| : ; SNILSIXA Tm? * Roc 2
o ae ee ee ee! ee SI “S Sea A ral | } | r , eee
= , MS Efe | Se oy eee i i LUD! 0} A . ‘ 2 ie ae
a Ci urea! o} x \ aes Se Vi A sf eee f | e 100d PN ii | Fig |e eS sas
? 5 as a q/ NW SL QaesS = ui eit i. ne + = gee La
SNICIING ONLLSDG ae oo ES oe | SU ELAM Wega Succ i a
A | a | pm ® iy) ) gees ee ee
“aia : . apse fo { i He pili ge
€e Pa Wok «of roa i a Ve faa ss be Neate 408
q \ ‘ Ent Y 8, [x00 J is j 7 s Pears! ey. hath
20189 \ yews a Vi - Wes 8 A A af fe hee 3 l ee Met se
H we | oe mel A r s —! art Ceecreniemrrare =~. (iy
a2 oa \ aa y~ BE ae | Os ee
4 S - ba fescusof Ff Pe me) f {aes
TD a =m \I ! ml ef iz Miviiee Mes sc 8
; Do aga ~ - tty tN. fet ie Peet ge
. Sse ey - ; Ps aes Br
; wes \ — \_Buripying uogeysiuupe y Rae hse ft Mpa eta
Bish Vel / — Guysixe soy uoyeoo| pasodoid } nts pars oat ye
\ en ody at OP ence a ihe
ve ih oi aaee . é
) sues S usuos Pe icone canis — *
SNICTING ONILSIXA = ONICTING ONILSIXA | ueUas Oy a e
\ Do ye 9NICTING ONILSDA | ,
4 gly / © p ~~ la Poh: | Se a Sate
4 4 4 | ee # ‘
Wars / _——_— —_— EN . te 5
ey . Cs . fo [7 ; i aR) eee Jat, ‘-
” \urewas = : = & ZA ONieo tid aunInd ; f MY
pe \ SNiating 3 me SN | i mt ; 7
\ ONILSIXa = ok a \ ¢
4 << \ payea0je! 39 Oy v a alia :
n” Ay . Le S Be .
a | e {6uipying uoneysiuiupe Gunsixe i. | > e teeter |) ey
4 2 a ta . he % art Vi a) = ———— nd } 2
2 —- 5 ‘ ae _ = ee Pa é —! ae | i; | ci rv a 5 ‘ om = ;
= : \ B ‘ ; “ se ~ | ee i a Ree aemar oS) /Ya ? aes,
, . y.* S foie) en bo pe ; “2
t - L o A oh ae a x4 ccs Avg -* 4 iS as BO EB ne ;
oH \ Se eae as be | PMP EL? * megrceae
ureLUa4 0} f ueLUa4 Oy \eay ee ey a a J = GS pe
gNigting \ oniating Nuspa = Ye ai 9 oF +2 oe OE Het fon oe!” eae ae
ONS rt io) re Bae fo ee ae
a ee 2 a UeLUEs 0} 3 ee MES lice Pye Be
R a fo > \ eniating Niispa Qo ern. | a Maes) bo ae i g
: \ eel ’ re? ban wuve v0 ONUSICA ye OE oe eh
o 1 \ ‘TB eee , mK “ SAT 9 Cee Re or os
Nm ry ee s wee ee =F ws if bene wey! . Reece eH i ae
* . & _ 2) a Caeeg PPE,
- TPN / Ye - — ~— = \ si are - Ey v- = . Bi AAWSection 20
Page 20 of 92
Wid IS00u OzoZZaSL So
‘ 23 is
8 5 3 = |i
£25 2 a ee ===> caus oe a |= :—= 1: O
s : « Ne 1 z
8 =o &§ tofe 2 fgge 28s Be » |= i
2 Sue § &Pea 8 3883 244) 4 a) 5 Ti lw = O13 oS
$o 828 & ESE 2 aang 3) ae c ites i
3 ss 2.5238 a = <i = 4 < Vila a
aes & Bre ° o | | es c i oO:
238 Pes pigSuse 2S a Q MS |x af 3 o o = |e 3°)!
257 SNL SoGgeofe oa GO & % z ai = U: Ss = = o 18 9 mall
ees eu8sEe ge 8Sery a) af g 2 Re oO 282 Bo o “162 ia <b}
geagerss BEagzee Fs eg Sle e\lel| W Fi. 3 £& age |* dD)
Zes2s5ee C8 cL28=S 2 G = Zig lc a. 2 | 5 |g szs a c 3 aja!
SEG ase0#2 wPSG5fE a 8 = SS 5 52 5 3 8 a 55s _ = 3 =[= |: oC
SEVZ5S2e se Pagge gas zg mola | |&s Ele Bide Eso ' a § a a7|z ou.
Osera ths F£sseas§ $F & m= |, |s 86 eile 4 |% 52 Wn = 5
32 @ 3 HO BER S > 2 2.288 # | iz a |i] z2 Co 4 ed
SSELBSER Eves oes g ~—- —~2 e j2sS85 : = 8 | 5: Oo G a) oa) =
gfRAIEIG a2=s22 ge 8 0 “4 BErEceges Eh ee 22 = ee a a),51 6
$5285 $25 agie S65 nuff 84 = Balls £13 9 alge el oc 85 se ano Ww 2 2/6
Seescess stpagosc2ts 88 . . 85518 315 3 fete [710 as = VA oy sshs| 8
HSSpeese Ses S2eSean FO FE gaze 33] | oe 2205 5a yw =—K1 5
§SesEseese hogy sszass = Be 3 8 Zsasssees Besse ge £2 2 a of al.=
2SesSeeonesiesecf2n22— § &¢ 2 Te §i4 tial ait Sse 82 FO 8 5 a6 29 log len 2
SSGGHtSH0C SEIGEGessg 2 5 2 2G ets e eset Cogs lealy a~Awn 8:08 27 |22|O/5 1
Oo. . . . o* SS£& o52¢6 4 @ \4 2 2 2 é 2 £ é
§ g3 é Elggg3
= a as & ai2333
5 at Be g\eeac
3 ee Z8 3 See <
= ig Be 2) 3 |} __ £
| ze EIsS Zln\— nin g
2 ls i els 2 6 € 3
zg 2 ries Ss) liz
= |= > ys = & | 8 Ey
me ie = P/e% | 3 = 5
= £ Ela~e o2on —— as
Zz oO << Elio @sen- ——F 1 _¥
Pe it is} 2/ ¢ S2ko —- =
pm £e.|g 2 O55f Pest A
iS, St5\§ g % a see Fe am
aa Eel . 2| € 3 Se == - or
8 ES\2 $ £ £ = Ss »aR SF =
2 23 S of alle § eee =
@ 32 oe) 2c 3 g5 Bay = =)
2 aig © se oj) 2 6 FrSs
gig Bo Qe 2° gee rr b
5 Sola 2 & $= = a= aa 2 222 =| assy
gi 2 658 | (8) (es) gulls cA
Bq te 8 z fas
285. 5 gee “ a
gee a| ey 8) ale4) f2aleé i; I
ce fSes c@ e290 € <2 PI =
aSias ie se Ss 239 = 8% y C
Eyes cai E\2: seca § Ze =| =
ale : F/ez a5 o 98 i
gge ge 30 215 5 Zonk BS =—
Bele iad a 8 68s BB ip =
erie geek | 2/85 re pet
“sigs SE a ££ *
gr lar © 53° ia: 3 See =
felfe Weoes!| |B] & ate Ge iit
SES Sees! |S gas ae ea at
FEE Feat) [S| € 833
ie oe | meee 3 ose ay co —
2s 9 2S s a| sasife | s ~~ I
Es fa Ee SE Zee alae B
un r
Glocclaealey lala a oat
3\3 3 Bageae |g3 Be \99/g)) (Bagg g 222222 5
a3 gee ge |e 8 § 8 8\8 esis (8 | 5 2
Bla 2 Bigaigd gz #e 22/8 Siz ziz |Z a2a2224 48 Lal
alse Blazaala laa] Bis lea Blsala |3| Pee EE RS | im
Br Beas es i° ee 5 i
é & 8 Bloale 2 _&
2 3s . ge
ii 2 2 3 3E2 g a
Ss = ot £3. Jew z £s\5 g 4 = 5
s & at 5 x 5
& eo le | (ae =| lexis ele 5 13 =
5 5 |S 2 8) ese Sie 22 28 & =
i 8 e Ee S| (88/5 Bette 8 § ;
2 4 ja |S = 3 563 Sle i zga®? i— ie 1}
B a |26 2) 88 $5 82825 wy J
3 & sf) |S - my) leek SeEES F a ; —
3 ? gic] fa is me |e 3/2 eeses #@& =y ar
ii “|S fgee) |e & Plsig se #4332 8 at |
1 2 Bal g 2 8 — RE mig G9 BES P i -
Bg jek S 2\Bes 3g: t io) Y
§ S\5 Fel2slSs| |§ Se |, gs Bie 318 SR PBBE aa)
= 8 .s sess] 18 Se [eels] |S/8/= Sis 5 BReE8 eS =
3 Big sabes Bf: gels Bes B2iiit 8 =.
i. g&sozls 2 ela jos gele Se = = - ze
23] | lel seeesel] |e as ezeiai iit | |elee 33g é ||
3 i Bs clBalg Baie 28a Bec csc ee to
a°| . gia tzé 5 gca fie cl |z ra —
2 eS ea |8 & le <3) Esie 8 WH ems
E ie8 Feels 5 B ale egle 8
aa £85 slegaa Fae Fea is) ly? F s & Be
és sof sls 3|5 8 veg §|8 3\e |3 $2222 68 faa]
& = = & > sl lS é¢ & m 5
t& | 68 8 ale |s 6 _ 8282s 22548 eR GES 95 7 _—"
als 8 Bs ge gie aio Ds aisgie is ~ - EEE Se 5 a é
Fee] | |FRSESR a) | Fe BER] (Bese & | |p 8 2b 2 25 A
ua aE
abt H alk ls | ——}
:
c as! Ss 33
a a a alge ale ik slgiz| |g als J 4
2 8 & § 3 3 6
§ 2 ob 5 & 5|23 ot |e |e ge elge € Ele wi
3 = 3% 323% bg 2g |g |g 2 8/8/8) |B BIE J
g _ 8B SeeR ee |e le 5 algig a a|5 i |
2.2 5 22 |2 Ogee fee bl
iS = 3 3
“le sas a |s if sles a ale
E B38 22 8 gS = |B SB
5 bo BS es s |a |e s|E\E EEE z
jo Pe ff & g lg 8 ele |e EEE.
i Se £ ete e\B Szlasl as B18 18 iB BiB S
iz SEE ESE =|8 93 ba/5 2/5 3 sles leslie
re SS a $s Beas Soe 3\8/3) 8 13
ze “zg Bp gee =o 25 sileFni gis\s| |e 3|8
Sis 8 ¢& seg Ze g2ls2\5 I
58 Bf, 222; #4| 32 ee oee3lé2 2} |2z|2
gio Sead Beso ff|,35 ee wal] ae $/8|8 & 8)8
£3 8282 #338 a\""|823 pelolo) joalo
gle a = Bx glee |§ |E & sels EEE
te 4 glBge |2 [2 © zle/2 E Ele
el zi gal § eee lee fees [esis
ee oe v2 Erle G2 aziz 2 elle rele
a | la] Uk oO od BT at
&S 2} > oh 3 2 Ee |e |p slg) |e gle
* ’ © oe oe Bla £6 |6 |6 ' gle\s ele
D> >| 5 as as 5 y 5
BB 2) 5 cs 83 os 2 2 22\2| j22i2ss
2 <8 mS 235 = 3% a | ge |e ls =
S| ° &5_& &3 SB | 2 a iA ® g
g g zege reg] |g e2 — |
2 2 gpd #98 : z 3 Ee |e le 5 pI
2 2 sade 32 28 sj?) | ia my
3 _ Seas Sea ag 2] = \@ 8 elale| pele
3 = eB) Fe ie § s8\8) gale ele
iB Ey 5 SEF Fre as
ta 3 _ = xy 5%
E 56 = zg ig g RE REEL
; HS 8 8 8 ze i alsa) sala giz
§ 2 x8 [2 lg eg B/E Be cle cle cle c
gle 3, 2 F £ 2/8 2/9 alg ale =|s 8
Fils Ee € F 7: i @ sisisik Silesia cies
3 = E EE = 2 le |B Z\z iz
E gz i Ele Z howler helelels
ee gE # & # sig 8 5 63 Riele
ee = ee Sig z Slt =
me Ee gs i as 2 |& we SiS\8E EE EVE ElEE
es eG EG est i Blea s aie bls Sip a
Es picts Ssi5 x 222% sizisi8 ais gia 48s
NS Eig
5 1 1 1 160 3 472 3110 66 33 14 Hig
5 1 1 1 160 4 681 3102 29 43 54 ald
5 1 1 1 160 5 876 3110 31 19 40 ae
5 1 1 1 160 6 1143 3108 15 13 1 i
4 1 1 1 161 0 209 3117 767 44 -1
5 1 1 1 161 1 209 3130 11 13 22 E
5 1 1 1 161 2 223 3117 8 44 42 3
5 1 1 1 161 3 378 3120 59 32 0 S3ek
5 1 1 1 161 4 471 3120 60 32 33 Ses)
5 1 1 1 161 5 682 3135 34 20 53 AA
5 1 1 1 161 6 896 3130 11 16 31 a
5 1 1 1 161 7 932 3130 9 16 31 ib
5 1 1 1 161 8 966 3130 10 13 30 EF
4 1 1 1 162 0 209 3140 1011 35 -1
5 1 1 1 162 1 209 3144 9 31 22 3
5 1 1 1 162 2 379 3150 27 21 24 Bb
5 1 1 1 162 3 418 3150 25 21 24 Bo
5 1 1 1 162 4 474 3150 26 21 81 Bo
5 1 1 1 162 5 512 3150 24 21 54 Fo
5 1 1 1 162 6 671 3140 41 32 68 alg
5 1 1 1 162 7 966 3149 10 12 89 =
5 1 1 1 162 8 1105 3155 31 8 5 ela!
5 1 1 1 162 9 1151 3140 27 32 29 |-
5 1 1 1 162 10 1181 3140 39 32 29 ale
4 1 1 1 163 0 209 3164 1011 34 -1
5 1 1 1 163 1 209 3172 31 14 46 Ss
5 1 1 1 163 2 379 3169 67 22 43 2323
5 1 1 1 163 3 474 3169 66 22 64 2223
5 1 1 1 163 4 690 3164 22 34 26 ie
5 1 1 1 163 5 1082 3171 11 26 38 #
5 1 1 1 163 6 1107 3169 29 28 48 5/5)
5 1 1 1 163 7 1170 3169 8 19 51 6
5 1 1 1 163 8 1190 3169 30 19 17 S/6
4 1 1 1 164 0 209 3179 1115 49 -1
5 1 1 1 164 1 209 3184 31 32 48 23
5 1 1 1 164 2 378 3189 69 27 0 ESS
5 1 1 1 164 3 471 3189 69 27 38 S228
5 1 1 1 164 4 668 3179 42 49 68 ale
5 1 1 1 164 5 876 3186 29 20 58 as
5 1 1 1 164 6 1079 3187 183 38 0 sie\eeele
5 1 1 1 164 7 1226 3180 41 49 0 sly
5 1 1 1 164 8 1271 3180 25 49 86 |
5 1 1 1 164 9 1315 3197 9 28 79 ¢
4 1 1 1 165 0 378 3214 884 22 -1
5 1 1 1 165 1 378 3231 11 5 80 5
5 1 1 1 165 2 1107 3207 71 36 2 glgiels
5 1 1 1 165 3 1190 3207 30 36 33 gle
5 1 1 1 165 4 1232 3214 30 14 28 38
4 1 1 1 166 0 186 3225 1138 32 -1
5 1 1 1 166 1 186 3232 34 22 15 a3
5 1 1 1 166 2 355 3229 71 24 69 58
5 1 1 1 166 3 471 3229 12 22 75 3
5 1 1 1 166 4 509 3229 12 23 80 3
5 1 1 1 166 5 684 3235 13 16 47 2
5 1 1 1 166 6 879 3235 28 16 68 RS
5 1 1 1 166 7 1107 3225 217 32 19 giglels
5 1 1 1 166 8 1180 3219 42 42 57 slg
5 1 1 1 166 9 1222 3219 42 42 38 bla
5 1 1 1 166 10 1264 3219 42 42 26 aly
5 1 1 1 166 11 1306 3219 21 42 26 =
4 1 1 1 167 0 183 3244 1141 34 -1
5 1 1 1 167 1 183 3244 57 33 44 Flea
5 1 1 1 167 2 351 3252 38 16 74 FS
5 1 1 1 167 3 415 3252 11 16 42 3
5 1 1 1 167 4 471 3251 49 17 56 35
5 1 1 1 167 5 677 3245 17 33 22 Bi
5 1 1 1 167 6 876 3249 31 13 42 Ee
5 1 1 1 167 7 1104 3247 54 33 0 S|a|5
5 1 1 1 167 8 1167 3258 11 12 9 a
5 1 1 1 167 9 1185 3247 35 33 6 35\a
5 1 1 1 167 10 1229 3247 33 33 0 o|o
5 1 1 1 167 11 1271 3247 33 33 27 4/8
5 1 1 1 167 12 1312 3251 12 20 0 &Section 21
Page 21 of 92
Notes & Disclaimers
7 f GYMNASIUM “= Fe 2 * a ome Z i Me e 2) ‘gj . yt i . : >, . WallCelingiRoof frames built to Ausco
y f ‘., Re ” 7 wn ge = 37 uf Backbone framing design standards.
\ . % &, v2 Pa" as ao a3 a + Building chassis designed to Ausco
‘ . ae wet f ot Standard Chassis drawings.
.. pa : Fi Meg co tan oe “yn Lt ae 2-AlWoik mise be dare tr eosetadree wih
oF x | oe OE YA See Sore ieee
. e XI me “ ; ae or ww , fard(s) and tl ional Construction
> a \p 225, j = 1a QS % = Fa or Ley ap7 SS: on . tin a Code.
F a e , f es a xn aha od oeqstnias Aerize i oe | Kat rie ov ~~ + Furniture, plumbing, & electrical
- » ~S ic nce ye TPR PR eee aes AR: ‘i. i) <a representations are indicative. Appearance
>. x SS ed a s Ge rae ce ithe Sakae o. — may vary depending on supplier.
~ : ‘N ie iS BN See EE. i een ate = 3 + Loose items to be packed for transport.
: Fi . } NS NAA te be ips ms AK * a . Ste star, famp ar buidog starting a
i - ale
5 1 1 1 15 4 2017 469 2 3 0 y
5 1 1 1 15 5 2091 460 9 15 70 A
5 1 1 1 15 6 2162 468 41 3 25 hot
5 1 1 1 15 7 2273 459 12 20 21 ki
5 1 1 1 15 8 2483 461 63 11 18 meee
5 1 1 1 15 9 2898 455 41 30 53 licati
5 1 1 1 15 10 3001 475 3 3 57 .
5 1 1 1 15 11 3025 463 27 19 77 Size,
5 1 1 1 15 12 3053 455 35 31 91 fall
5 1 1 1 15 13 3089 467 9 11 93 and
5 1 1 1 15 14 3115 455 74 31 76 location
5 1 1 1 15 15 3188 455 23 31 95 to
4 1 1 1 16 0 356 458 2887 74 -1
5 1 1 1 16 1 356 481 70 19 25 PR
5 1 1 1 16 2 1032 468 42 42 25 ae
5 1 1 1 16 3 1233 480 18 27 33 Ny
5 1 1 1 16 4 1353 465 35 42 29 “2
5 1 1 1 16 5 1415 466 24 48 23 as
5 1 1 1 16 6 1615 481 48 26 26 OM
5 1 1 1 16 7 1780 461 66 56 10 andl
5 1 1 1 16 8 1913 477 47 29 42 cay
5 1 1 1 16 9 1998 467 23 43 30 ff
5 1 1 1 16 10 2031 458 184 74 47 Le
5 1 1 1 16 11 2252 465 52 47 17 ed
5 1 1 1 16 12 2431 496 2 2 0 ;
5 1 1 1 16 13 2514 462 48 55 69 a
5 1 1 1 16 14 2835 491 14 14 71 a
5 1 1 1 16 15 2882 459 125 51 0 ceaaamione,
5 1 1 1 16 16 3014 485 229 20 95 Constructed
5 1 1 1 16 17 3116 471 21 40 96 to
5 1 1 1 16 18 3143 485 61 20 96 comply
5 1 1 1 16 19 3206 471 35 40 95 with
4 1 1 1 17 0 365 486 2752 65 -1
5 1 1 1 17 1 365 493 61 43 29 Sn
5 1 1 1 17 2 455 507 28 23 27 SS
5 1 1 1 17 3 924 502 11 9 19 a
5 1 1 1 17 4 982 530 23 11 28 WE
5 1 1 1 17 5 1099 506 57 30 30 ay
5 1 1 1 17 6 1182 520 23 12 50 gt
5 1 1 1 17 7 1331 509 71 30 29 ar)
5 1 1 1 17 8 1545 505 161 32 15 eS
5 1 1 1 17 9 1918 518 76 25 20 bes
5 1 1 1 17 10 2009 509 21 29 10 We
5 1 1 1 17 11 2078 486 73 65 50 sha
5 1 1 1 17 12 2177 492 29 45 22 le
5 1 1 1 17 13 2264 507 38 31 20 ok
5 1 1 1 17 14 2417 511 17 25 4 i
5 1 1 1 17 15 2499 508 20 39 49 us
5 1 1 1 17 16 2526 505 23 38 59 AL
5 1 1 1 17 17 2559 510 7 5 50 MIN
5 1 1 1 17 18 2874 503 89 44 11 eee
5 1 1 1 17 19 3114 533 3 3 0 ;
4 1 1 1 18 0 489 523 2679 33 -1
5 1 1 1 18 1 489 535 17 13 0 —~
5 1 1 1 18 2 966 535 18 15 20 +185
5 1 1 1 18 3 1025 544 12 3 48 _
5 1 1 1 18 4 1115 542 3 2 34 a
5 1 1 1 18 5 1180 532 23 12 20 ra
5 1 1 1 18 6 1332 523 16 32 25 oe
5 1 1 1 18 7 1564 544 50 8 21 sappy
5 1 1 1 18 8 1623 527 17 32 36 ar
5 1 1 1 18 9 1663 541 44 12 0 RORROT
5 1 1 1 18 10 1731 549 5 5 14 cee
5 1 1 1 18 11 2002 530 9 33 43 Bb
5 1 1 1 18 12 2151 530 61 25 16 DS
5 1 1 1 18 13 2187 524 57 35 29 ae
5 1 1 1 18 14 2243 534 55 17 2 OT
5 1 1 1 18 15 2428 548 3 6 0 s
5 1 1 1 18 16 2492 541 28 14 41 ING
5 1 1 1 18 17 2639 546 12 10 12 hes
5 1 1 1 18 18 2678 535 50 15 20 eer
5 1 1 1 18 19 2867 530 185 16 96 Manufactured
5 1 1 1 18 20 2980 523 27 32 96 to
5 1 1 1 18 21 3007 523 48 32 96 Wind
5 1 1 1 18 22 3058 523 59 32 95 Speed:
5 1 1 1 18 23 3124 523 44 32 75 8190
4 1 1 1 19 0 268 531 2788 58 -1
5 1 1 1 19 1 268 545 6 11 32 1
5 1 1 1 19 2 363 532 27 52 10 we
5 1 1 1 19 3 431 556 3 2 6 :
5 1 1 1 19 4 517 553 14 12 54 ~
5 1 1 1 19 5 852 554 10 9 0 S
5 1 1 1 19 6 954 554 22 11 39 sa}
5 1 1 1 19 7 987 548 79 18 0 sales,
5 1 1 1 19 8 1129 560 4 3 92 4
5 1 1 1 19 9 1198 539 16 35 42 Wi,
5 1 1 1 19 10 1370 556 98 10 0 _qnarine
5 1 1 1 19 11 1475 539 82 46 0 uncgpraent
5 1 1 1 19 12 1567 552 24 15 0 EN
5 1 1 1 19 13 1591 539 54 46 0 EST
5 1 1 1 19 14 1721 546 35 18 38 ae
5 1 1 1 19 15 1801 532 36 35 31 ee
5 1 1 1 19 16 1949 554 19 11 35 at
5 1 1 1 19 17 2075 531 64 58 25 sp
5 1 1 1 19 18 2135 539 25 20 30 a
5 1 1 1 19 19 2250 541 48 35 56 LY)
5 1 1 1 19 20 2427 550 108 20 24 RELOCATED
5 1 1 1 19 21 2691 551 34 14 0 -
5 1 1 1 19 22 2867 552 115 15 92 Manufactured
5 1 1 1 19 23 2988 555 17 12 91 in:
5 1 1 1 19 24 3014 552 42 15 60 MOB
4 1 1 1 20 0 290 555 2979 76 -1
5 1 1 1 20 1 290 583 11 10 24 Psa
5 1 1 1 20 2 444 571 38 22 42 SNS
5 1 1 1 20 3 542 572 30 20 22 Sa
5 1 1 1 20 4 737 579 35 35 63 \
5 1 1 1 20 5 841 564 29 33 42 an
5 1 1 1 20 6 918 568 62 10 0 ee
5 1 1 1 20 7 984 562 216 34 11 Rll
5 1 1 1 20 8 1264 555 96 44 46 ye
5 1 1 1 20 9 1511 563 51 31 23 a
5 1 1 1 20 10 1706 586 7 8 0 ’
5 1 1 1 20 11 1803 565 15 27 48 a
5 1 1 1 20 12 1926 569 39 28 8 ae
5 1 1 1 20 13 2005 555 162 55 31 LT
5 1 1 1 20 14 2248 567 26 39 24 ae
5 1 1 1 20 15 2459 586 2 2 18 a
5 1 1 1 20 16 2481 562 35 69 13 Cs
5 1 1 1 20 17 2517 560 44 47 8 zh
5 1 1 1 20 18 2679 573 17 12 7 a
5 1 1 1 20 19 2867 574 72 15 89 Intended
5 1 1 1 20 20 2946 574 75 15 96 Location:
5 1 1 1 20 21 3028 574 90 18 94 Noosaville,
5 1 1 1 20 22 3125 574 41 15 91 QLD
4 1 1 1 21 0 312 578 2957 89 -1
5 1 1 1 21 1 312 602 36 28 2 >
5 1 1 1 21 2 402 603 32 27 0 ~S
5 1 1 1 21 3 491 600 37 29 22 SS
5 1 1 1 21 4 806 601 54 28 11 eee
5 1 1 1 21 5 1062 618 16 11 48 Br
5 1 1 1 21 6 1108 597 28 43 15 sy
5 1 1 1 21 7 1173 607 38 36 21 +
5 1 1 1 21 8 1221 615 6 4 54 =
5 1 1 1 21 9 1268 597 87 37 8 Se
5 1 1 1 21 10 1415 591 113 49 16 “XS
5 1 1 1 21 11 1567 600 62 31 13 ae
5 1 1 1 21 12 1639 598 3 3 0 :
5 1 1 1 21 13 1661 598 14 40 0 e-
5 1 1 1 21 14 1716 611 57 26 23 a
5 1 1 1 21 15 1862 578 429 89 33 Pl
5 1 1 1 21 16 2330 622 29 18 23 re
5 1 1 1 21 17 2408 603 42 37 0 i
5 1 1 1 21 18 2505 602 58 39 39 We
5 1 1 1 21 19 2606 604 40 9 41 af
5 1 1 1 21 20 2856 606 66 34 40 Client
5 1 1 1 21 21 2921 606 86 34 96 Approval
5 1 1 1 21 22 3268 606 1 34 84 |
4 1 1 1 22 0 369 627 2840 59 -1
5 1 1 1 22 1 369 637 20 26 33 ~~
5 1 1 1 22 2 467 639 24 28 46 DS
5 1 1 1 22 3 561 649 4 2 0 -
5 1 1 1 22 4 788 664 4 3 0 .
5 1 1 1 22 5 933 639 39 34 33 og
5 1 1 1 22 6 990 637 32 30 41 aN
5 1 1 1 22 7 1080 638 37 32 30 ee
5 1 1 1 22 8 1134 636 3 5 36 :
5 1 1 1 22 9 1166 646 26 21 33 a
5 1 1 1 22 10 1220 635 12 16 17 e
5 1 1 1 22 11 1302 638 11 11 0 1
5 1 1 1 22 12 1320 638 45 22 1 iaie
5 1 1 1 22 13 1383 649 8 11 49 0
5 1 1 1 22 14 1396 649 32 11 45 Goer
5 1 1 1 22 15 1451 646 45 23 18 nial
5 1 1 1 22 16 1559 646 32 37 21 a
5 1 1 1 22 17 1617 643 26 31 19 co
5 1 1 1 22 18 1681 635 19 23 15 ?
5 1 1 1 22 19 1792 641 32 26 5 oS
5 1 1 1 22 20 1836 643 63 43 14 Son
5 1 1 1 22 21 1901 627 34 47 28 “a
5 1 1 1 22 22 1987 657 2 2 0 ;
5 1 1 1 22 23 2052 656 53 14 27 een
5 1 1 1 22 24 2220 642 7 40 0 t
5 1 1 1 22 25 2306 635 27 39 30 fp
5 1 1 1 22 26 2332 639 68 30 42 Mee
5 1 1 1 22 27 2410 643 30 25 7 —'
5 1 1 1 22 28 2635 640 11 19 13 ‘
5 1 1 1 22 29 2866 658 38 11 13 client
5 1 1 1 22 30 2928 642 55 33 82 Good
5 1 1 1 22 31 2987 642 71 33 95 Shepard
5 1 1 1 22 32 3057 642 80 33 96 Lutheran
5 1 1 1 22 33 3139 642 70 33 90 College
4 1 1 1 23 0 303 664 2233 20 -1
5 1 1 1 23 1 303 664 9 6 0 ~
5 1 1 1 23 2 374 664 37 13 39 =~
5 1 1 1 23 3 497 670 8 5 52 =
5 1 1 1 23 4 863 676 3 2 43 .
5 1 1 1 23 5 1157 666 16 7 33 ae
5 1 1 1 23 6 1461 666 31 14 13 Non
5 1 1 1 23 7 1657 669 37 11 50 >.
5 1 1 1 23 8 1848 676 20 6 0 RE
5 1 1 1 23 9 1932 667 13 6 35 a
5 1 1 1 23 10 1978 667 97 15 40 Sees
5 1 1 1 23 11 2131 680 4 4 43 >
5 1 1 1 23 12 2226 683 3 1 23 3
5 1 1 1 23 13 2292 675 2 3 0 o
5 1 1 1 23 14 2316 667 135 15 24 See
5 1 1 1 23 15 2498 672 14 12 13 7
5 1 1 1 23 16 2519 667 12 13 60 he
4 1 1 1 24 0 317 675 2641 39 -1
5 1 1 1 24 1 317 675 35 29 33 =
5 1 1 1 24 2 370 681 3 2 0 ;
5 1 1 1 24 3 409 677 45 29 44 OA
5 1 1 1 24 4 485 689 5 7 30 fa
5 1 1 1 24 5 509 688 24 14 32 ho
5 1 1 1 24 6 698 679 28 21 51 »
5 1 1 1 24 7 875 681 16 30 34 Ss
5 1 1 1 24 8 946 685 29 17 44 2m
5 1 1 1 24 9 1013 677 22 27 62 3
5 1 1 1 24 10 1168 677 86 24 27 ae.
5 1 1 1 24 11 1444 701 16 7 86 &
5 1 1 1 24 12 1470 678 9 7 43 5
5 1 1 1 24 13 1499 681 44 24 17 bP
5 1 1 1 24 14 1676 681 17 29 86 >
5 1 1 1 24 15 1715 687 21 16 0 ——
5 1 1 1 24 16 1798 687 53 21 7 ra.
5 1 1 1 24 17 1873 681 73 24 27 noe
5 1 1 1 24 18 1977 681 50 26 31 ae
5 1 1 1 24 19 2050 678 77 32 8 Sa
5 1 1 1 24 20 2157 702 30 7 32 —
5 1 1 1 24 21 2244 682 48 22 2 ie
5 1 1 1 24 22 2307 676 18 29 0 e
5 1 1 1 24 23 2367 687 12 19 0 |
5 1 1 1 24 24 2468 676 38 34 27 oe
5 1 1 1 24 25 2866 684 64 30 96 Approved
5 1 1 1 24 26 2929 684 29 30 95 by:
4 1 1 1 25 0 276 677 2993 83 -1
5 1 1 1 25 1 276 710 29 23 23 SS
5 1 1 1 25 2 342 700 167 43 0 SSORL.
5 1 1 1 25 3 721 696 46 55 22 ~‘,
5 1 1 1 25 4 829 697 76 44 30 as
5 1 1 1 25 5 940 720 41 18 11 ie
5 1 1 1 25 6 1046 716 123 42 11 a
5 1 1 1 25 7 1304 699 92 29 27 ee
5 1 1 1 25 8 1542 677 58 63 18 ee
5 1 1 1 25 9 1689 706 71 7 6 i
5 1 1 1 25 10 1817 706 26 28 34 a
5 1 1 1 25 11 1829 706 48 34 33 a
5 1 1 1 25 12 2135 711 37 27 48 ee
5 1 1 1 25 13 2183 692 98 68 16 ae
5 1 1 1 25 14 2302 685 84 70 21 BN
5 1 1 1 25 15 2453 711 26 25 31 ca
5 1 1 1 25 16 2523 695 33 50 0 \y
5 1 1 1 25 17 2854 712 77 43 87 Company
4 1 1 1 26 0 229 730 3040 57 -1
5 1 1 1 26 1 229 735 307 34 22 SONAL
5 1 1 1 26 2 610 757 4 1 26 ON
5 1 1 1 26 3 696 732 163 55 51 OS
5 1 1 1 26 4 869 726 12 65 28 _
5 1 1 1 26 5 1395 750 4 4 33 ee
5 1 1 1 26 6 1454 736 161 38 36 ESS
5 1 1 1 26 7 1966 737 373 41 33 eee
5 1 1 1 26 8 2452 741 129 34 33 SS
5 1 1 1 26 9 2867 764 56 13 27 whith
5 1 1 1 26 10 3268 745 1 26 79 |
4 1 1 1 27 0 285 745 2284 79 -1
5 1 1 1 27 1 285 772 88 17 29 Ne
5 1 1 1 27 2 728 762 163 49 22 ay
5 1 1 1 27 3 900 745 218 79 34 «XN
5 1 1 1 27 4 1141 761 257 46 39 ee
5 1 1 1 27 5 1475 772 56 30 47 US
5 1 1 1 27 6 1557 771 338 37 38 Dei
5 1 1 1 27 7 1868 741 88 87 33 ee
5 1 1 1 27 8 1964 768 113 50 17 Ce
5 1 1 1 27 9 2430 772 88 44 34 a8
5 1 1 1 27 10 2867 800 65 16 44 <a
4 1 1 1 28 0 228 783 2708 80 -1
5 1 1 1 28 1 228 810 11 33 0 s
5 1 1 1 28 2 331 811 9 21 20 es
5 1 1 1 28 3 478 810 4 4 0 ,
5 1 1 1 28 4 553 822 2 2 30 ;
5 1 1 1 28 5 688 817 8 8 10 2
5 1 1 1 28 6 738 785 89 53 31 eer
5 1 1 1 28 7 858 809 14 24 47 A
5 1 1 1 28 8 879 804 16 20 27 ~
5 1 1 1 28 9 947 807 33 32 12 a
5 1 1 1 28 10 988 783 106 80 14 ag
5 1 1 1 28 11 1163 813 2 2 0 !
5 1 1 1 28 12 1336 832 11 16 59 7
5 1 1 1 28 13 1387 814 26 24 15 a
5 1 1 1 28 14 1600 802 82 23 8 eae
5 1 1 1 28 15 1814 805 36 47 13 ie
5 1 1 1 28 16 1865 811 43 27 19 ta
5 1 1 1 28 17 1967 803 36 13 35 bons
5 1 1 1 28 18 2090 807 48 43 45 ey
5 1 1 1 28 19 2146 808 15 37 54 A
5 1 1 1 28 20 2194 806 20 33 32 i
5 1 1 1 28 21 2283 795 17 48 40 re
5 1 1 1 28 22 2424 802 65 46 0 Rs
5 1 1 1 28 23 2511 807 15 11 24 —
5 1 1 1 28 24 2628 814 5 6 25 $a
5 1 1 1 28 25 2934 810 2 2 25 :
4 1 1 1 29 0 345 821 2924 39 -1
5 1 1 1 29 1 345 838 24 11 51 SS
5 1 1 1 29 2 514 839 6 5 57 y
5 1 1 1 29 3 689 838 33 13 34 port
5 1 1 1 29 4 841 836 28 18 34 As
5 1 1 1 29 5 960 835 22 9 15 ng
5 1 1 1 29 6 990 834 62 19 23 HEE
5 1 1 1 29 7 1168 853 3 1 0 :
5 1 1 1 29 8 1310 836 43 16 42 an
5 1 1 1 29 9 1547 821 17 39 0 “,
5 1 1 1 29 10 1792 837 67 17 41 ES
5 1 1 1 29 11 1880 838 79 19 33 ee
5 1 1 1 29 12 2093 844 54 15 20 Cf
5 1 1 1 29 13 2165 837 37 23 22 ONS
5 1 1 1 29 14 2225 825 51 39 0 Reger
5 1 1 1 29 15 2420 835 50 25 33 ae
5 1 1 1 29 16 2674 840 17 6 88 ~
5 1 1 1 29 17 2854 850 415 3 0 ————
5 1 1 1 29 18 3259 829 14 39 60 |
4 1 1 1 30 0 377 866 2867 75 -1
5 1 1 1 30 1 377 907 7 8 29 :
5 1 1 1 30 2 595 862 20 75 23 te
5 1 1 1 30 3 808 889 180 28 38 a
5 1 1 1 30 4 1079 894 75 23 30 A
5 1 1 1 30 5 1203 884 355 36 39 Nt
5 1 1 1 30 6 1714 892 94 40 37 Ta
5 1 1 1 30 7 1931 901 19 20 0 *
5 1 1 1 30 8 2067 905 4 4 24 Zhe
5 1 1 1 30 9 2121 884 178 42 30 spe).
5 1 1 1 30 10 2326 896 3 8 50 ben
5 1 1 1 30 11 2371 891 61 50 57 &
5 1 1 1 30 12 2433 875 69 57 25 uy:
5 1 1 1 30 13 2852 888 26 52 87 [
5 1 1 1 30 14 2869 899 80 24 91 Sheet
5 1 1 1 30 15 2938 888 27 52 68 |
5 1 1 1 30 16 3037 902 74 15 22 __Content
5 1 1 1 30 17 3208 902 36 15 95 Rev
4 1 1 1 31 0 265 935 2962 35 -1
5 1 1 1 31 1 265 951 4 5 35 .
5 1 1 1 31 2 459 941 70 19 51 oy
5 1 1 1 31 3 590 936 77 24 48 wy
5 1 1 1 31 4 876 935 174 27 37 eS
5 1 1 1 31 5 1201 949 10 8 57 «
5 1 1 1 31 6 1415 943 111 19 0 ~—e
5 1 1 1 31 7 1648 961 2 2 0 :
5 1 1 1 31 8 1759 960 21 4 33 a
5 1 1 1 31 9 1930 936 28 37 14 ee
5 1 1 1 31 10 1962 940 109 14 24 ye
5 1 1 1 31 11 2222 939 78 31 44 A
5 1 1 1 31 12 2328 941 32 18 28 ee
5 1 1 1 31 13 2466 955 13 7 40 th.
5 1 1 1 31 14 2888 949 39 12 14 001
5 1 1 1 31 15 2941 937 33 36 45 |Site
5 1 1 1 31 16 2980 937 33 36 74 Plan
5 1 1 1 31 17 3224 949 3 13 40 1
4 1 1 1 32 0 267 967 2983 47 -1
5 1 1 1 32 1 267 979 7 19 9 -
5 1 1 1 32 2 363 988 21 14 17 ae
5 1 1 1 32 3 472 982 23 17 29 >
5 1 1 1 32 4 567 980 15 18 51 yf
5 1 1 1 32 5 664 977 9 10 9 YD
5 1 1 1 32 6 694 982 42 24 29 3h
5 1 1 1 32 7 861 974 15 37 2 ee
5 1 1 1 32 8 873 978 144 27 17 beat
5 1 1 1 32 9 1044 983 86 13 11 otter.
5 1 1 1 32 10 1255 984 19 14 17 8
5 1 1 1 32 11 1329 988 45 15 33 Fn
5 1 1 1 32 12 1386 975 42 37 31 Pas
5 1 1 1 32 13 1491 977 107 16 41 Se
5 1 1 1 32 14 1657 988 28 20 40 rs
5 1 1 1 32 15 1748 967 94 47 34 SS
5 1 1 1 32 16 1860 977 49 33 52 ae
5 1 1 1 32 17 2048 990 2 2 40 “
5 1 1 1 32 18 2156 982 112 29 19 oer.
5 1 1 1 32 19 2283 984 50 24 27 eB
5 1 1 1 32 20 2360 993 43 14 13 OK
5 1 1 1 32 21 2636 993 2 2 38 P
5 1 1 1 32 22 2888 988 39 16 58 A401
5 1 1 1 32 23 2940 977 89 34 38 |RoofPin
5 1 1 1 32 24 3068 977 114 34 5 SSCS
4 1 1 1 33 0 275 994 2405 41 -1
5 1 1 1 33 1 275 994 43 38 11 =
5 1 1 1 33 2 498 1002 21 15 86 >
5 1 1 1 33 3 623 1001 4 5 0 :
5 1 1 1 33 4 837 1016 19 4 7 yo
5 1 1 1 33 5 1159 1011 60 14 16 i
5 1 1 1 33 6 1278 1005 77 20 27 OIG,
5 1 1 1 33 7 1535 1008 68 17 38 att
5 1 1 1 33 8 1659 1005 44 24 28 ie
5 1 1 1 33 9 1744 1004 101 27 30 Oa
5 1 1 1 33 10 2024 1021 4 3 0 :
5 1 1 1 33 11 2126 1008 54 24 29 Bo
5 1 1 1 33 12 2205 1011 37 21 35 a
5 1 1 1 33 13 2357 1017 7 10 27 ke
5 1 1 1 33 14 2496 1024 4 3 36 4
5 1 1 1 33 15 2638 1016 42 13 21 oe
4 1 1 1 34 0 235 1015 3016 53 -1
5 1 1 1 34 1 235 1043 6 6 38 ;
5 1 1 1 34 2 319 1024 75 31 28 SN
5 1 1 1 34 3 519 1019 22 17 45 my
5 1 1 1 34 4 628 1019 70 38 32 Les
5 1 1 1 34 5 814 1043 88 8 24 i
5 1 1 1 34 6 907 1034 77 16 38 a
5 1 1 1 34 7 1218 1021 155 32 28 eee
5 1 1 1 34 8 1459 1033 95 21 2 eee
5 1 1 1 34 9 1573 1028 129 25 12 ree
5 1 1 1 34 10 1729 1026 118 42 26 ete
5 1 1 1 34 11 2034 1026 91 29 30 es
5 1 1 1 34 12 2204 1027 202 24 26 Ee:
5 1 1 1 34 13 2454 1029 34 25 40 ae
5 1 1 1 34 14 2640 1025 28 36 15 ees
5 1 1 1 34 15 2839 1038 2 2 1 [300
5 1 1 1 34 16 2945 1020 59 44 1 |ereuna
5 1 1 1 34 17 3003 1020 45 44 0 Ficor
5 1 1 1 34 18 3047 1020 45 44 46 ee
4 1 1 1 35 0 390 1036 2456 53 -1
5 1 1 1 35 1 390 1038 46 51 16 SS
5 1 1 1 35 2 548 1054 8 5 33 ~
5 1 1 1 35 3 599 1065 7 8 40 7
5 1 1 1 35 4 665 1061 25 17 0 ¢f4
5 1 1 1 35 5 793 1052 32 25 6 se
5 1 1 1 35 6 864 1050 48 29 18 OR
5 1 1 1 35 7 954 1036 32 43 0 S
5 1 1 1 35 8 1040 1053 10 18 0 “,
5 1 1 1 35 9 1497 1053 107 28 0 RELOCATION
5 1 1 1 35 10 1629 1049 34 34 0 OR
5 1 1 1 35 11 1682 1050 131 32 28 L302
5 1 1 1 35 12 1827 1054 53 27 8 Sar)
5 1 1 1 35 13 2041 1054 62 28 42 Pe
5 1 1 1 35 14 2203 1054 65 26 41 NS
5 1 1 1 35 15 2420 1059 24 20 38 ae
5 1 1 1 35 16 2603 1057 54 28 39 Pin
5 1 1 1 35 17 2797 1073 3 5 18 or
4 1 1 1 36 0 406 1072 2439 47 -1
5 1 1 1 36 1 406 1079 21 20 2 \
5 1 1 1 36 2 558 1074 13 10 0 ~
5 1 1 1 36 3 590 1075 19 25 47 /
5 1 1 1 36 4 831 1074 72 32 24 ON
5 1 1 1 36 5 961 1072 104 32 23 OE
5 1 1 1 36 6 1143 1083 9 15 13 CCL,
5 1 1 1 36 7 1358 1084 52 23 40 le
5 1 1 1 36 8 1446 1080 124 26 22 rs
5 1 1 1 36 9 1579 1080 89 29 19 oe
5 1 1 1 36 10 1692 1079 72 28 5 ae
5 1 1 1 36 11 1779 1079 37 21 6 eine
5 1 1 1 36 12 1852 1081 12 27 4 Ze
5 1 1 1 36 13 2022 1078 121 19 24 a
5 1 1 1 36 14 2372 1080 42 29 56 a
5 1 1 1 36 15 2627 1087 48 19 8 yee
5 1 1 1 36 16 2757 1076 88 43 31 Sr
4 1 1 1 37 0 396 1079 2434 66 -1
5 1 1 1 37 1 396 1089 51 44 18 SS
5 1 1 1 37 2 459 1106 44 36 55 SS
5 1 1 1 37 3 626 1098 11 42 0 “a
5 1 1 1 37 4 706 1106 16 25 17 fae
5 1 1 1 37 5 845 1095 22 25 0 f
5 1 1 1 37 6 898 1118 53 17 13 ey
5 1 1 1 37 7 1078 1110 15 18 36 a
5 1 1 1 37 8 1162 1111 57 26 0 SSocoar
5 1 1 1 37 9 1267 1109 4 4 0 Oh
5 1 1 1 37 10 1282 1110 67 28 4 xum,
5 1 1 1 37 11 1453 1125 29 10 41 eee
5 1 1 1 37 12 1567 1111 111 30 30 Se
5 1 1 1 37 13 1702 1100 68 40 30 ok
5 1 1 1 37 14 1792 1103 35 33 5 az
5 1 1 1 37 15 1847 1106 17 27 0 SS
5 1 1 1 37 16 1958 1130 9 8 0 -
5 1 1 1 37 17 2067 1135 6 3 42 2
5 1 1 1 37 18 2347 1114 17 12 23 ae
5 1 1 1 37 19 2588 1079 47 66 0 ist
5 1 1 1 37 20 2645 1111 9 14 0 ‘
5 1 1 1 37 21 2776 1122 1 13 4 a
4 1 1 1 38 0 464 1120 2352 68 -1
5 1 1 1 38 1 464 1135 110 27 31 Oe
5 1 1 1 38 2 600 1137 65 26 45 2.
5 1 1 1 38 3 682 1130 13 47 23 Le
5 1 1 1 38 4 755 1149 19 12 0 -
5 1 1 1 38 5 833 1136 3 3 20 y
5 1 1 1 38 6 886 1135 66 34 25 a
5 1 1 1 38 7 1020 1124 68 40 11 LZ
5 1 1 1 38 8 1206 1134 69 18 14 ye
5 1 1 1 38 9 1355 1142 9 6 0 -
5 1 1 1 38 10 1492 1131 96 53 11 inti:
5 1 1 1 38 11 1687 1146 6 5 12 Zp
5 1 1 1 38 12 1722 1120 90 46 28 CN
5 1 1 1 38 13 1839 1129 79 59 0 ONC
5 1 1 1 38 14 1993 1145 14 26 34 >.
5 1 1 1 38 15 2079 1163 2 2 0 y
5 1 1 1 38 16 2604 1140 44 26 12 Pas
5 1 1 1 38 17 2692 1127 15 55 0 oe
5 1 1 1 38 18 2777 1137 39 29 31 LAS
4 1 1 1 39 0 516 1145 2322 62 -1
5 1 1 1 39 1 516 1151 83 45 69 SS
5 1 1 1 39 2 660 1164 23 26 20 Oh
5 1 1 1 39 3 708 1145 145 43 29 Phe
5 1 1 1 39 4 946 1163 72 36 12 BPE
5 1 1 1 39 5 1220 1160 38 31 9 ont
5 1 1 1 39 6 1575 1164 148 24 60 AGES
5 1 1 1 39 7 1732 1167 70 27 8 I
5 1 1 1 39 8 1915 1163 52 30 18 oO
5 1 1 1 39 9 2008 1146 77 61 33 bile
5 1 1 1 39 10 2321 1162 25 11 59 ~
5 1 1 1 39 11 2638 1171 68 12 5 a
4 1 1 1 40 0 453 1179 2352 63 -1
5 1 1 1 40 1 453 1179 245 39 39 TONS
5 1 1 1 40 2 769 1195 25 18 41 OW
5 1 1 1 40 3 836 1181 134 37 39 See
5 1 1 1 40 4 984 1182 70 60 28 a
5 1 1 1 40 5 1329 1200 6 4 26 ee:
5 1 1 1 40 6 1514 1210 9 5 0 .
5 1 1 1 40 7 1611 1185 141 34 40 Kip
5 1 1 1 40 8 1848 1186 119 43 42 a
5 1 1 1 40 9 2636 1196 6 14 0 :
5 1 1 1 40 10 2727 1191 32 11 26 hae
4 1 1 1 41 0 258 1199 2545 64 -1
5 1 1 1 41 1 230 1217 38 31 35 hs
5 1 1 1 41 2 469 1217 129 37 30 et)
5 1 1 1 41 3 630 1199 335 64 10 Gs?
5 1 1 1 41 4 1055 1194 55 73 15 ee
5 1 1 1 41 5 1164 1218 329 32 1 Se
5 1 1 1 41 6 1512 1218 339 35 20 fees.
5 1 1 1 41 7 1927 1217 97 33 19 OS
4 1 1 1 42 0 383 1233 2467 60 -1
5 1 1 1 42 1 488 1245 115 35 11 San
5 1 1 1 42 2 613 1244 173 49 38 RO
5 1 1 1 42 3 830 1266 16 10 10 ety
5 1 1 1 42 4 908 1256 76 29 24 hat
5 1 1 1 42 5 1004 1233 34 41 96 4
5 1 1 1 42 6 1272 1249 118 28 19 SO
5 1 1 1 42 7 1459 1248 202 36 54 KI
5 1 1 1 42 8 1875 1264 34 16 36 eee
5 1 1 1 42 9 2831 1245 19 19 54 =
4 1 1 1 43 0 384 1264 2885 48 -1
5 1 1 1 43 1 384 1294 5 5 19 :
5 1 1 1 43 2 470 1279 19 16 84 \
5 1 1 1 43 3 514 1275 24 6 13 i
5 1 1 1 43 4 593 1274 116 25 33 ees
5 1 1 1 43 5 771 1271 61 28 0 ex.
5 1 1 1 43 6 893 1276 46 36 12 Jf
5 1 1 1 43 7 968 1268 14 42 42 abe
5 1 1 1 43 8 1275 1293 4 2 60 >
5 1 1 1 43 9 1316 1279 19 16 28 *
5 1 1 1 43 10 1452 1286 30 23 26 FO
5 1 1 1 43 11 1532 1278 185 27 0 ONFIIZ
5 1 1 1 43 12 1694 1272 35 41 55 A
5 1 1 1 43 13 1742 1265 71 36 48 MM
5 1 1 1 43 14 1847 1264 65 48 1 NN
5 1 1 1 43 15 1962 1278 7 25 70 NS
5 1 1 1 43 16 2506 1266 74 36 26 a
5 1 1 1 43 17 2871 1293 4 9 74 1
5 1 1 1 43 18 2889 1274 63 38 0 feeicon
5 1 1 1 43 19 2955 1291 52 12 21 ais
5 1 1 1 43 20 3009 1274 20 38 0 win
5 1 1 1 43 21 3162 1293 57 13 32 (aa
5 1 1 1 43 22 3242 1290 27 12 35 a]
4 1 1 1 44 0 232 1285 3037 60 -1
5 1 1 1 44 1 232 1287 26 50 32 Ee
5 1 1 1 44 2 396 1311 4 3 49 :
5 1 1 1 44 3 788 1297 3 4 36 PRR
5 1 1 1 44 4 885 1292 57 31 31 MOL
5 1 1 1 44 5 1105 1299 27 10 23 TE
5 1 1 1 44 6 1297 1310 3 12 3 ;
5 1 1 1 44 7 1420 1306 31 22 23 SF
5 1 1 1 44 8 1518 1295 217 30 42 NYE
5 1 1 1 44 9 1764 1293 31 22 41 EX
5 1 1 1 44 10 1870 1302 105 24 31 eS
5 1 1 1 44 11 2447 1294 18 51 0 p
5 1 1 1 44 12 2869 1310 7 10 23 i
5 1 1 1 44 13 3242 1304 27 16 43 a
4 1 1 1 45 0 307 1341 2962 46 -1
5 1 1 1 45 1 307 1343 127 33 29 i
5 1 1 1 45 2 456 1349 86 27 24 OS
5 1 1 1 45 3 892 1347 30 24 4 Ba?
5 1 1 1 45 4 987 1364 31 12 36 ee
5 1 1 1 45 5 1051 1360 45 19 44 fens
5 1 1 1 45 6 1109 1343 97 26 14 STORM
5 1 1 1 45 7 1413 1352 30 28 0 q
5 1 1 1 45 8 1583 1351 118 16 0 Nie
5 1 1 1 45 9 1704 1352 80 9 43 og
5 1 1 1 45 10 1876 1351 145 36 26 toe
5 1 1 1 45 11 2402 1341 24 29 41 &
5 1 1 1 45 12 2660 1355 21 6 38 =
5 1 1 1 45 13 2901 1365 23 13 0 —
5 1 1 1 45 14 2998 1353 166 26 8 Se
4 1 1 1 46 0 436 1365 2833 34 -1
5 1 1 1 46 1 436 1367 14 31 0 Ss
5 1 1 1 46 2 493 1378 15 6 20 =
5 1 1 1 46 3 561 1375 14 11 0 ~
5 1 1 1 46 4 758 1381 9 3 5 ir
5 1 1 1 46 5 918 1365 32 33 89 SS
5 1 1 1 46 6 1001 1376 98 15 30 Sf.
5 1 1 1 46 7 1457 1380 38 11 0 uenee
5 1 1 1 46 8 1496 1373 53 26 0 Carport
5 1 1 1 46 9 1585 1378 123 15 22 Ne
5 1 1 1 46 10 1756 1365 35 34 0 dt
5 1 1 1 46 11 1911 1377 91 16 0 Neer
5 1 1 1 46 12 2393 1366 19 33 7 Ly
5 1 1 1 46 13 2871 1382 4 9 4 1b
5 1 1 1 46 14 2886 1373 44 26 0 |oateg
5 1 1 1 46 15 2931 1373 8 26 37 of
5 1 1 1 46 16 2942 1373 39 26 0 RAdnge
5 1 1 1 46 17 2981 1373 23 26 44 andl
5 1 1 1 46 18 3005 1373 31 26 1 zyn.ts.
5 1 1 1 46 19 3040 1373 41 26 0 Relorstee
5 1 1 1 46 20 3085 1373 25 26 0 fcr
5 1 1 1 46 21 3172 1382 47 9 0 iMoxes—tacauy
5 1 1 1 46 22 3224 1373 10 26 52 |
5 1 1 1 46 23 3242 1382 10 9 50 ae
4 1 1 1 47 0 450 1375 2819 40 -1
5 1 1 1 47 1 450 1388 5 5 32 ~
5 1 1 1 47 2 508 1396 5 3 30 7
5 1 1 1 47 3 585 1397 3 2 24 .
5 1 1 1 47 4 721 1377 46 23 23 Ot
5 1 1 1 47 5 947 1386 17 17 27 oe
5 1 1 1 47 6 1100 1390 39 12 39 a
5 1 1 1 47 7 1420 1375 68 40 19 mes
5 1 1 1 47 8 1498 1392 24 5 0 Papert
5 1 1 1 47 9 1593 1392 19 7 21 tN
5 1 1 1 47 10 1643 1382 72 24 11 cin
5 1 1 1 47 11 1758 1386 38 10 39 tt.
5 1 1 1 47 12 1893 1389 63 14 21 ea
5 1 1 1 47 13 1945 1376 21 40 29 ae
5 1 1 1 47 14 2380 1392 6 10 10 P
5 1 1 1 47 15 2869 1400 67 10 0 +_feets
5 1 1 1 47 16 3171 1395 98 15 27 ee
4 1 1 1 48 0 235 1396 3034 33 -1
5 1 1 1 48 1 235 1415 20 7 56 =
5 1 1 1 48 2 574 1401 78 16 9 a,
5 1 1 1 48 3 787 1401 49 23 34 Sy,
5 1 1 1 48 4 942 1403 44 19 34 SOIR
5 1 1 1 48 5 1142 1401 44 11 25 oon
5 1 1 1 48 6 1205 1415 47 9 15 en
5 1 1 1 48 7 1406 1417 5 4 51 Deck
5 1 1 1 48 8 1576 1397 54 29 3 SON
5 1 1 1 48 9 1740 1396 34 17 0 aiaal
5 1 1 1 48 10 1898 1404 8 18 9 Ve
5 1 1 1 48 11 1940 1400 85 25 43 ee
5 1 1 1 48 12 2386 1395 23 43 27 de
5 1 1 1 48 13 2865 1422 16 7 0
as ee SEAS : Fi. 35 Deck." y f ‘ [Ne EN Ensring Autaicy , a]
3 : aa so os = Sy Classfoo A Mi oo ane ae des 4 = Z . fio FOR APPROVAL
—< ’ Re re ee Mg RN 8 5 oe. Ay, We find or ; |
ie Pe Oe 2 SSS non apt. QE Bit] as ED | AX Ausco
\ nr ee pon ne ma fl LIOR hee ; Shas
© : ait SC OR RS 5 PO TIE Ea 3 ey MATH ae ve
TP eee rs a ‘ SI 4 OS on Pee? Lar < SS ae a ‘COPRIGET USSD MOL LA FTFLTD, THEDSCL MENT M8407 EL
ed te ee Soe P| wo 2. Breakout Room 1 wet Pie. bum fer as: TEPRTMCED SBMAGEESCCRTHRTSCHMEED WTTCLT ATER
‘i : “ss ’ 5 we GS aes ° ; af eS es le i STAFF -
- Beret RR, MAD SES ‘._. /Bteakoiit Réom 3__ Arai oe 7% SSB oR .
es ae OR OR RR a EES Meee aoe ~~ — Site Plan (MQB)
Le... > . - y _~ “eS Th, BOS Ce pe ge ‘eet, a] r~ —_—
= Ton is BO NS pa SO. Se bcm. AY ge see, : —
= “a cee % ¥ Se a Ons Ne 1) i} Room eR fi <
— So ORO RA ot a
Se 4 = _ SCY for ts x Cue Diiieet Sein b ts hoe a
i : ; = oe a eo. ee, ; ee FP pay eating : . ~
, rr) S , oe SE! SS See a Fo so. ‘ tao _
id ~ aS . 7 ae ae OS Se or) i ia 30.85x12m Learning Centre- |
F fs «= F > 7 5 1 1 1 68 8 1210 1840 7 2 38 =
5 1 1 1 68 9 1219 1842 26 2 26 TO
5 1 1 1 68 10 1300 1838 7 7 32 a
5 1 1 1 68 11 1451 1833 13 7 32 Se
5 1 1 1 68 12 1571 1832 3 4 0 rk
5 1 1 1 68 13 1605 1839 2 2 0 an
5 1 1 1 68 14 2002 1834 8 4 13 iy
5 1 1 1 68 15 2038 1844 12 4 7 he
5 1 1 1 68 16 2437 1842 14 8 49 Ay
5 1 1 1 68 17 2505 1841 3 3 0 -
4 1 1 1 69 0 233 1815 2755 97 -1
5 1 1 1 69 1 233 1835 21 18 69 fe
5 1 1 1 69 2 278 1864 6 8 36 4
5 1 1 1 69 3 348 1849 4 4 35 wns
5 1 1 1 69 4 414 1868 6 4 13 8
5 1 1 1 69 5 474 1816 137 65 16 as,
5 1 1 1 69 6 667 1855 13 8 0 -
5 1 1 1 69 7 864 1854 31 18 14 ——
5 1 1 1 69 8 1054 1857 2 3 31 see
5 1 1 1 69 9 1077 1840 76 32 0 eu
5 1 1 1 69 10 1209 1843 30 30 0 —
5 1 1 1 69 11 1246 1833 93 61 34 ean
5 1 1 1 69 12 1405 1854 8 7 7 $
5 1 1 1 69 13 1511 1854 2 2 31 5
5 1 1 1 69 14 1527 1815 101 97 35 Sa
5 1 1 1 69 15 1678 1864 2 5 26 ;
5 1 1 1 69 16 1834 1840 24 41 34 i
5 1 1 1 69 17 1938 1869 7 6 0 F
5 1 1 1 69 18 1969 1836 56 43 54 ant
5 1 1 1 69 19 2055 1847 10 7 36 *
5 1 1 1 69 20 2375 1832 38 35 26 a
5 1 1 1 69 21 2473 1851 11 31 34 3
5 1 1 1 69 22 2478 1843 41 54 6 P|
5 1 1 1 69 23 2578 1849 28 37 0 e
5 1 1 1 69 24 2721 1860 67 25 43 on
5 1 1 1 69 25 2871 1848 31 20 92 SG
5 1 1 1 69 26 2929 1848 59 20 86 (B190
4 1 1 1 70 0 271 1864 2614 58 -1
5 1 1 1 70 1 271 1869 6 18 0
(wie
5 1 1 1 70 3 566 1877 43 19 15 i
5 1 1 1 70 4 621 1869 9 31 27 oa
5 1 1 1 70 5 811 1872 97 17 27 ae
5 1 1 1 70 6 1081 1882 2 2 0 :
5 1 1 1 70 7 1197 1889 2 2 19 ‘
5 1 1 1 70 8 1225 1871 44 28 0 ..-
5 1 1 1 70 9 1289 1875 39 20 34 a
5 1 1 1 70 10 1352 1872 34 27 26 >.
5 1 1 1 70 11 1471 1871 11 34 59 bes
5 1 1 1 70 12 1533 1881 14 13 0 FON
5 1 1 1 70 13 1569 1876 51 22 13 ete
5 1 1 1 70 14 1656 1895 3 2 0 O>.
5 1 1 1 70 15 1803 1885 12 16 28 ft
5 1 1 1 70 16 1834 1874 4 4 0 .
5 1 1 1 70 17 1975 1872 18 7 25 it
5 1 1 1 70 18 2393 1864 20 58 0 ,
5 1 1 1 70 19 2454 1877 22 20 0 >
5 1 1 1 70 20 2641 1883 35 6 45 _
5 1 1 1 70 21 2767 1877 6 23 20 |
5 1 1 1 70 22 2798 1875 46 27 8 a*
5 1 1 1 70 23 2860 1880 25 9 35 Tent
4 1 1 1 71 0 312 1871 2851 62 -1
5 1 1 1 71 1 312 1904 23 21 0 NS
5 1 1 1 71 2 383 1877 53 39 0 we
5 1 1 1 71 3 467 1922 6 6 53 r
5 1 1 1 71 4 580 1893 11 9 7 a
5 1 1 1 71 5 655 1890 22 43 0 eS
5 1 1 1 71 6 787 1892 27 35 10 4
5 1 1 1 71 7 893 1897 75 32 49 —
5 1 1 1 71 8 1042 1912 7 5 0 D
5 1 1 1 71 9 1327 1923 9 8 40 OS
5 1 1 1 71 10 1453 1890 63 39 29 oe
5 1 1 1 71 11 1574 1884 54 46 18 RD
5 1 1 1 71 12 1724 1902 98 23 28 me
5 1 1 1 71 13 2436 1895 5 11 25 pat
5 1 1 1 71 14 2548 1871 33 59 47 7
5 1 1 1 71 15 2776 1900 33 33 52 x.
5 1 1 1 71 16 2871 1899 64 23 77 Good
5 1 1 1 71 17 2945 1899 100 28 95 Shepard
5 1 1 1 71 18 3056 1899 107 23 95 Lutheran
4 1 1 1 72 0 301 1905 2659 80 -1
5 1 1 1 72 1 301 1932 20 35 35 oN
5 1 1 1 72 2 358 1905 186 66 17 ie
5 1 1 1 72 3 824 1930 191 55 41 a
5 1 1 1 72 4 1330 1932 17 33 35 SED
5 1 1 1 72 5 1632 1930 60 29 21 ns
5 1 1 1 72 6 2025 1933 75 31 86 HPE
5 1 1 1 72 7 2112 1934 12 30 86 /
5 1 1 1 72 8 2137 1933 113 31 96 HOME
5 1 1 1 72 9 2657 1922 182 62 49 ZX
5 1 1 1 72 10 2871 1936 89 28 22 colteee
4 1 1 1 73 0 295 1965 2533 28 -1
5 1 1 1 73 1 295 1965 26 11 10 PS
5 1 1 1 73 2 353 1968 63 15 25 Oe
5 1 1 1 73 3 636 1979 3 3 0 ,
5 1 1 1 73 4 712 1965 11 5 0 -
5 1 1 1 73 5 825 1967 25 23 27 ic
5 1 1 1 73 6 915 1967 63 23 33 ae
5 1 1 1 73 7 1054 1975 3 2 0 p
5 1 1 1 73 8 1262 1974 10 8 44 >
5 1 1 1 73 9 1335 1969 38 19 0 iF
5 1 1 1 73 10 1676 1984 2 2 21 ‘
5 1 1 1 73 11 2708 1971 1 3 74 j
5 1 1 1 73 12 2817 1969 11 24 17 pi
4 1 1 1 74 0 296 1957 2545 80 -1
5 1 1 1 74 1 296 1975 109 60 50 Peta
5 1 1 1 74 2 418 1957 68 62 10 So
5 1 1 1 74 3 584 1979 83 58 2 St
5 1 1 1 74 4 757 2003 18 10 26 eae
5 1 1 1 74 5 834 1986 229 33 45 Se
5 1 1 1 74 6 1447 1988 186 25 29 eee
5 1 1 1 74 7 1853 2004 10 9 20 .
5 1 1 1 74 8 2024 1975 50 31 85 EC
5 1 1 1 74 9 2086 1977 13 29 85 /
5 1 1 1 74 10 2112 1977 164 31 96 ENGLISH
5 1 1 1 74 11 2723 1981 118 44 36 Veale
4 1 1 1 75 0 316 2002 2953 59 -1
5 1 1 1 75 1 316 2016 128 43 15 ae
5 1 1 1 75 2 594 2015 17 33 42 ae
5 1 1 1 75 3 838 2002 41 40 0 a
5 1 1 1 75 4 895 2051 6 4 31 .
5 1 1 1 75 5 1031 2002 75 54 21 ra
5 1 1 1 75 6 1188 2041 19 10 18 5
5 1 1 1 75 7 1417 2030 24 14 4 ie
5 1 1 1 75 8 1619 2026 173 31 25 Bi,
5 1 1 1 75 9 2022 2019 121 31 37 STAFF
5 1 1 1 75 10 2723 2028 116 33 0 NORTH
5 1 1 1 75 11 2860 2044 43 12 27 es
5 1 1 1 75 12 2943 2044 51 11 5 jrwron
5 1 1 1 75 13 3025 2045 23 10 39 se
5 1 1 1 75 14 3088 2014 27 51 40 |
5 1 1 1 75 15 3123 2053 15 7 16 a
4 1 1 1 76 0 343 2033 2918 77 -1
5 1 1 1 76 1 343 2053 97 36 0 wide
5 1 1 1 76 2 527 2033 75 71 29 as
5 1 1 1 76 3 942 2046 30 35 57 >
5 1 1 1 76 4 1047 2058 2 2 46 :
5 1 1 1 76 5 1063 2047 112 58 0 Tee
5 1 1 1 76 6 1248 2081 5 2 62 ;
5 1 1 1 76 7 1453 2057 193 15 0 Ocean
5 1 1 1 76 8 1927 2035 286 75 43 a
5 1 1 1 76 9 2406 2056 11 31 38 f
5 1 1 1 76 10 2889 2063 16 16 39 ic
5 1 1 1 76 11 2928 2050 14 41 44 |
5 1 1 1 76 12 2942 2050 41 41 71 Mar
5 1 1 1 76 13 2993 2063 20 16 92 18
5 1 1 1 76 14 3033 2063 59 16 44 1250
5 1 1 1 76 15 3100 2039 2 55 45 |
5 1 1 1 76 16 3113 2035 69 63 28 GE
5 1 1 1 76 17 3211 2055 50 32 79 AD
4 1 1 1 77 0 287 2084 2982 40 -1
5 1 1 1 77 1 287 2088 42 18 16 et
5 1 1 1 77 2 537 2092 3 3 11 BR
5 1 1 1 77 3 741 2103 15 15 28 %
5 1 1 1 77 4 822 2108 2 2 29 ;
5 1 1 1 77 5 928 2086 103 28 0 ~~.
5 1 1 1 77 6 1113 2084 125 37 35 ee
5 1 1 1 77 7 1318 2114 2 2 0 ;
5 1 1 1 77 8 1467 2090 32 32 13 SR,
5 1 1 1 77 9 1607 2087 33 13 55 xm
5 1 1 1 77 10 1734 2090 23 24 0 b
5 1 1 1 77 11 1995 2093 66 26 18 pc
5 1 1 1 77 12 2406 2091 1 3 43 .
5 1 1 1 77 13 2690 2096 62 28 49 >
5 1 1 1 77 14 2782 2113 12 9 36 ae
5 1 1 1 77 15 2860 2099 51 12 0 cmceoty
5 1 1 1 77 16 2943 2099 49 11 1 |oestse
5 1 1 1 77 17 3005 2088 20 39 75 |
5 1 1 1 77 18 3035 2088 113 39 34 DIMENSIONS
5 1 1 1 77 19 3153 2104 33 15 22 ARE
5 1 1 1 77 20 3194 2104 16 15 22 IN
5 1 1 1 77 21 3218 2104 34 15 52 MM
4 1 1 1 78 0 339 2092 2930 92 -1
5 1 1 1 78 1 363 2115 42 49 17 ali
5 1 1 1 78 2 562 2099 37 74 22 gs
5 1 1 1 78 3 639 2102 101 82 18 re
5 1 1 1 78 4 804 2152 13 6 70 £
5 1 1 1 78 5 871 2107 108 49 29 MES
5 1 1 1 78 6 1008 2127 147 30 22 Ps
5 1 1 1 78 7 1176 2092 133 78 33 eo.
5 1 1 1 78 8 1327 2138 3 5 0 .
5 1 1 1 78 9 1456 2120 137 39 8 So
5 1 1 1 78 10 1684 2132 70 27 36 ari
5 1 1 1 78 11 1968 2117 125 44 13 awe
5 1 1 1 78 12 2344 2133 84 26 25 ———
5 1 1 1 78 13 2536 2147 11 28 10 ,
5 1 1 1 78 14 2567 2111 98 31 25 Se
5 1 1 1 78 15 2692 2132 57 26 9 ma
5 1 1 1 78 16 2860 2118 55 48 38 ae
5 1 1 1 78 17 2946 2118 67 16 51 MARIS
5 1 1 1 78 18 3066 2131 41 34 61 DO
5 1 1 1 78 19 3107 2115 41 54 60 NOT
5 1 1 1 78 20 3147 2115 59 54 60 SCALE
5 1 1 1 78 21 3268 2100 1 42 92 |
4 1 1 1 79 0 236 2137 3033 99 -1
5 1 1 1 79 1 236 2160 4 5 80 2
5 1 1 1 79 2 360 2160 33 56 40 4.
5 1 1 1 79 3 423 2173 44 25 7 Site
5 1 1 1 79 4 621 2163 14 7 0 pian
5 1 1 1 79 5 656 2162 13 47 0 ‘\
5 1 1 1 79 6 676 2157 39 51 61 Js
5 1 1 1 79 7 783 2157 27 68 10 7
5 1 1 1 79 8 986 2160 19 33 29 a
5 1 1 1 79 9 1034 2167 68 31 22 a,
5 1 1 1 79 10 1192 2168 28 5 15 eT
5 1 1 1 79 11 1231 2137 198 86 17 Se
5 1 1 1 79 12 1453 2164 56 30 0 —
5 1 1 1 79 13 1529 2164 39 40 64 Qe
5 1 1 1 79 14 1638 2157 75 79 20 ue)
5 1 1 1 79 15 1727 2163 50 59 0 ¥
“= ce ee oC Eon i 0240100047 [ |
gE 7a PON : a : “AS <> ee. aeack oe ae ee reetnontete -—t n come sea me
Seat | oe & age — 4 ~ o = s ree eee ee a 1 |
be a = y + 2S ri x2 \ ee a 5 ~ WSS 5 1 1 1 82 16 1580 2241 48 21 41 Tee
5 1 1 1 82 17 1767 2226 18 36 32 aT
5 1 1 1 82 18 1895 2250 35 8 31 we
5 1 1 1 82 19 2044 2228 40 33 0 3
5 1 1 1 82 20 2162 2260 15 3 18 ee
5 1 1 1 82 21 2276 2240 28 4 44 tee
5 1 1 1 82 22 2625 2259 6 6 67 x
5 1 1 1 82 23 2877 2242 12 6 43 ~
5 1 1 1 82 24 3098 2228 94 28 92 A-001
5 1 1 1 82 25 3229 2230 7 26 90 |
4 1 1 1 83 0 2981 2288 289 44 -1
5 1 1 1 83 1 2981 2288 105 44 96 Page
5 1 1 1 83 2 3102 2288 42 34 96 21
5 1 1 1 83 3 3166 2288 42 35 96 of
5 1 1 1 83 4 3222 2288 48 35 96 92Section 22
Page 22 of 92
ee 2) 3) (4) (5) fe) @) “8 ) (9) 40)
ML Kor s) & 5) 080 \8 iT Re i 10)
13650 3450 13750 |
| *
116 3224 176 4sB7 100 8497 16 6674 176 6724 116
i 4 A y 1 i
DR _© _ 04 A Sone wo2 wo2 Wot Ie Boxe °% wai BBB B Ios xB 073 Cpr 8 A —2 3 & Te
Meee = a “ ~~ ay ay. a ie a | ay * a - a a =
| Breakout ha 1 | |
8 \ | 39.64 m? | | » |
g wot ala 61m 2
op
o a
WLI ir 2
02 2 WLo3 Breakout Room 3 FLO? WLO3, WLOS
47.00 m? ! | | S P
g -i« WLO1 f=] 5
ay on om
ne | Classtoom 2 Clasgroom 1 > & a
eS Staff Room 62.90 m? 63.B7 m? a i
8 30.38 m? = - » ine 8) g
ai Jem FLO1 WLo2 Fuot <q Fuo4 a| =
Breakout Room 2 | | ] 3
8 wor HS 23.25 m? wor Deck B
$ . | 15.82 m* p
4
7 FLOt |
B \ of ade caluy we 4 wos Above Wiwo4 Aboys itvo4 stigve | 4% wo4 Above
a pe aaa ——s |$—___.——__] peers ce I ees
Nea z° La = WOT -Do2 ‘|| pooz ' wor wo wo2 p02 | bpo2 wi02 81 5B |
g— 5 weos, — webs = Wks ;
& I | Deck | | | | 8
= Say 3
8 _— 65.31 m? | _ &
ro A i i
(Cc —— Yay fj + + 1 +e it ee
Sn Plas wor |” Los fF io Ethe ise LE —frss
| WLo2 ae | | | | aaa
| a )
3400 3400 3450 3400 3450 3400 3450 3450 3450 |
| p—_ dg __. hk a ____ (faeces ed, nar cn “aaa | a
Module 1 Module 2 Module 3 Module 4 Module 5 Module & Module 7 Module 8 Mod] Drawings-Architectural | —_t_{wststthaun soneie |
5 =
Sheet Content Rev + feeiatedtaingtacatend aaM aad Aces |
A000 Schedules - Builcing Shell \ sien
1. |Ground Floor 4001 |Site Pen 1 frostieget tangs mt zy.re Relates Pcs itenes aay | ae
| A100 [GroundFlow Plan || Speen a Te
4-100 ae +] = Bs
A200 Elevations 1 FOR APPROVAL
Manufacturing_Doors ; Manufacturing - Floor es 4QAuUSCcO
Size Finish Tag Type Frame Crs. _ Pan Material Insulation eneral Notes & Disclaimers mS TASS 5 PTLTD, THIEDSCLIAE AT MAN HOT
] Frame | Frame FLO? Particleboard, 22mm, F11 flocring grade, LC150 joists 400 0.35mm Galv Steel Pan [R15 Glass Wod + Wall/Ceiling/Roof frames built to Ausco PRIMER oa DoE ao
Tag | Qty.| Style/Type | Leaf1|Leef2] H | KR) |W(R)| Head | Glazing Type Finis [Leaf Finish Accessories FLO2 Decking, NMothrood 23mm “4a0 E 7 Backbone framing design standards. OT
ny eee | Aominiom |Biucktane (Osean) [eben Standard Chassis drawings Ground Floor Plan
‘Swing Dear e200 2040 [Clear = Aluminium Clear Timber SC [Half Glazed, lever escape set + Building chassis designed to Ausco
| aa Anadi vd (Deer (Satin Chr } hol cor
ss -Avckmatiesee receccgwh
= ee Frame Standard(s) and the National Canstruction ( Q )
the relevant AustraliawNew Zealand
Si Finish
Manufact oe Tag Qty. Styie/Type H_|HiRi W_ |WiR} Head | Glazing Type Finish Accessories Code. :
ring wor 15 | NalfSlideriindsw | 1075 | 1900 1800 | 1e10 | 2275 | Gey Aluminium Crest Foregass Wesh Aluminium Fiyscreen + Furniture, plumbing, & electrical Me
Name Area | Perim. Floor Covering Skirting Cornice Anodised |(Black} representations are indicative. Appearance —Pwie:t 7
Breakout Room 1 Nol Placed|Not Placed|Carpel Tiles __—_—_—_‘[Alurniniumm skit 100mm (Clear Anodisedl | 8mm Set plaster comice REE) | SRR | aces tee | tone See (eee | BE AR Ee eee ere ee reer may vary depencing on supplier. 30.85x12m Learning Centre-
Breakout Room 2 Not Placed|Not Placed| Carpet Tiles ‘Aluminium skirt 100mm (Clear Anodised) [55mm Set plaster comice Wa 8 |WindowwiSide Lowes | 482 | 467 1800 | 1810 | 612 | Gey Aluminum | Clear _|Fibregase Mesh Aluminum Fiysereen + Loose items to be packed for transport SG (B190)
‘Anadioed |(Blacky * Site, stairs, ramp and building skirting =
Breakout Room 1 29.61 m* | 25.32m | indicative only. Size, fall and location to suit “""
Breakout Room 2-23.25 me | 19.30m walls site conditions Constructed ta comply with © Good Shepard Lutheran
Breakout Room 2 47.00 m= [28.82 m | Carpet Ties [Alumniniom skirt 100mm (Clear Anodisedi |SSmm Set plester comice Manufacturing - 5 AS1428.1.
(Classroom 4 63.37 m? | 32:30 m [Carpet Tiles [Aluminium skirt 100mm (Clear Anodisedh |SSmm Set plaster comice Frame Manufactured to Wind Speed: B190 College
Classroom 2 €2.90m? | 3220m | Carpet Tiles Aluminium skirt 100mm (Clear Anodisedh [55mm Set plaster comice Tag Frame crs. Cladding Lining Insulation Manufactured in: MQB
Deck 15.82 m? | 16.14 m_|Modwood NA, INA, WLO1 Engineered steel frame, 75mm, 00 = Plasterboard, 10mm, TSF r Intended Location: Noosaville, QLD
“Lipped C" section (Blenc}
staf! Room 30.38m?_| 25.30. YP v02 Engines stec! frame, 75mm, 400 ‘Scyon Matrix Panel (Deep Ocean & Plasterboard, 10mm. TSF R2.0 glasswool Client Approval trumty | Ov we | sere ¥
“Lipped C" section Papertark. refer elvations, express joint |(Blanc} batts oa a AR ; Bo A2
painted black) Client’ Good Shepard Lutheran Callege (C | MAR 18) 1-100) ‘prt
WLO3 Engineered steel frame, 75mm, 400 3.6mm Raugh Ply Plasterboard, 10mm. TSF R2.0 glasswool coe cates
5 1 1 1 80 2 1376 2105 71 19 0 Liped C"section . oe |(Blanc). one side only — bats Approved ty oveab | MAR 1g| DIMENSIONS AREINMM
WLO3 Engineered steel frame, 75mm, 400 Seyon Matrix Panel (Deep Ocean & Plasterboard, 10mm, TSF R2.0 glasswool 7 DO NOT SCALE i
“Lipped C" section Paperbark refer elvations, express joint |(Blanc) batts Company Project ho. Ore ho. '
painted black} | Sale tdlacinan 0240100047 | ‘s ‘
res erg a w(t
Signaty :
- A-100 | :Section 23
Page 23 of 92
a we ra oN ane fas fax ow eas ASS
(1) (2) (3; .4) 5} (6; (7) (8; (9) (10:
30850
| | | | |
| | | | |
ee ss... 8s... SS
@ TUN ETE CO TL LT CYL LI ri UN TIE LI) oom
| | | |
| | |
| | |
8 | | | | a
Q
| I RFI g
| | |
(B> . UI | | ul MEET A Ll Hl | (BY
Ne willl | | anni mink ee)
x x
“sn | is
(C+4—~ im (Cc)
Si 4 iat 4 sey
| | | | | =
|
3400 3400 3450 3400 3450 3400 3450 3450 3450 pases eesetaesete 6 ntensaipe ransom
a oe eg 1 oescc aa aades co, arcu aie |e
Module 1 Module 2 Module 3 Module 4 Module 5 Module 6 Module 7 Module 8 Module & Hes Sa ieoe Le
i =
sare
(1) 2} (3; 4) 5) (6; (7) (8; 9) (10: eal ect 1 |
LX. T™é xo ee fo fon os rar a Se ate ems Aragon “We
_ “a er = = = i = sail = 3 By
| 1. |Ground Floor Roof ___FORAPPROVAL
ay | 4-100 4\.AuUSCcO
MODULAR
General Notes & Discinimers COPPRIE AUS MOLL LS. PT LTB. THE DSCLASENT Mite 40" BL
+ WalliCeiling/Roof frames built to Ausco SESE SRRAWE'SCGRTHRTS EGED MOLT WITTER
Backbone framing design standards 7.“
+ Building chassis designed to Ausco
Standard Chassis drawings Roof Plan (MQB)
+ All work must be done in accordance with
the relevant Australia/New Zealand
Standard(s) and the National Construction
Code,
* Furniture, plumbing. & electrical
representations are indicative. Appearance — Pret 7m
may vary depending on supplier. 30.85x12m Learning Centre-
+ Loose items to be pecked for transport. SG (B190
* Site, stairs, ramp and building skirting SG (BI90)00
indicative only. Size, fall and location to suit"
site conditions. Constructed ta comply with Good Shepard Lutheran
AS1428.1.
Manufactured to Wind Speed: B190 College
Manufactured in: MQB
Intended Location: Noosaville, QLD
—— — Client Approval Temnty — | teawnse | sce
Frame] si [sheet | —_Content [Rev] ies: Good SteperdLuteranGalege HC | MARA) 1100] “SY AD
Cladding Lining | ule
5 1 1 1 59 5 1966 2074 20 57 63 |
5 1 1 1 59 6 2020 2097 40 11 0 a
5 1 1 1 59 7 2413 2105 66 16 81 Approved
5 1 1 1 59 8 2485 2106 14 15 96 by
5 1 1 1 59 9 2818 2094 50 11 0 tweety
5 1 1 1 59 10 2901 2094 48 9 0 |Get
5 1 1 1 59 11 2964 2088 18 36 50 |
5 1 1 1 59 12 2992 2098 112 15 84 DIMENSIONS
5 1 1 1 59 13 3110 2098 32 15 95 ARE
5 1 1 1 59 14 3150 2098 16 15 88 IN
5 1 1 1 59 15 3174 2098 34 15 88 MM
4 1 1 1 60 0 2020 2112 1028 27 -1
5 1 1 1 60 1 2020 2117 39 12 0 A001
5 1 1 1 60 2 2086 2117 24 13 34 |Site
5 1 1 1 60 3 2117 2117 28 12 94 Plan
5 1 1 1 60 4 2835 2112 38 15 88 AAD
5 1 1 1 60 5 2880 2108 19 28 88 |
5 1 1 1 60 6 2903 2112 40 15 93 MAR
5 1 1 1 60 7 2951 2112 19 15 93 18
5 1 1 1 60 8 3036 2125 12 14 55 Di
4 1 1 1 61 0 1358 2125 1804 30 -1
5 1 1 1 61 1 1358 2131 113 15 82 Engineeredsteel
5 1 1 1 61 2 1495 2131 32 12 66 1100
5 1 1 1 61 3 1577 2131 50 12 15 [Custom
5 1 1 1 61 4 1626 2121 31 33 87 Orb
5 1 1 1 61 5 1663 2121 38 33 93 (Deep
5 1 1 1 61 6 1852 2131 30 12 22 Ri.0
5 1 1 1 61 7 1888 2131 38 12 72 Glass
5 1 1 1 61 8 1930 2131 33 12 87 Wod
5 1 1 1 61 9 2020 2139 40 12 47 ica
5 1 1 1 61 10 2086 2139 49 12 23 laa
5 1 1 1 61 11 2413 2141 66 14 0 Saae
5 1 1 1 61 12 3049 2125 13 15 52 1
5 1 1 1 61 13 3069 2125 37 15 93 NOT
5 1 1 1 61 14 3111 2125 51 15 96 SCALE
4 1 1 1 62 0 1357 2136 1025 41 -1
5 1 1 1 62 1 1357 2148 122 23 33 a.”
5 1 1 1 62 2 1577 2148 48 15 5 P=
5 1 1 1 62 3 1852 2148 22 12 49 oad
5 1 1 1 62 4 2002 2136 380 41 14 see
5 1 1 1 62 5 2818 2148 46 11 0 ~Sao100087
5 1 1 1 62 6 3023 2148 41 10 55 |
Tame Z m4
rer ee 200 [Elevations Date (dd-mm-yyyyi 0240100047 | -
4200 _|Ground Floor RCP Signature Derghn. vee | tee
[4500 |Section &Detats Pt] jn A-101 ISection 24
Page 24 of 92
et as Res AN pan fs Pes, fe aay Re General Notes & Disclaimers
(1) 2; 3h 4: 6} 6; 17 (8: 9) 10; + Wall/Ceiling/Roof frames buill to Ausco
: 3400 3400 4B 8400 4B OD 3450 ~~ 3450 3450 Backbone framing design standards.
_,_ = |, ee Te Ee re * Building chassis designed to Ausco.
Standard Chassis drawings.
| | + All work must be done in accordance with
| Standard(s) and the National Construction
the relevant Australian/New Zealand
SS a = = ———<— = SSS Ceiling Pitch Point wr Sate, ‘
Ee] oe peed | owt | ew : re em teeta ald
— eee | ee | a a | i al | ar05 files ple er sy ee
Te ool) Ol oe) le Sere
a - be eae —— - | — mw ST nd om as — Tak may vary depending on supplier.
7 : ba a uh | = | Hl | Lect a | 2405 + Site, stairs, ramp and building skirting
indicative only. Size, fall and location to suit
g i | | | mi | | i Q Ground Floor Ww . site conditions. Constructed to comply with
a eer = ——— = ee g AS1428.1.
——_——— oo ey ee, eee ee Manufactured to Wind Speed: B190
soot woe Ty. } Bee ee sites ale -_-—----— “ye ey S ~ Datum Ww Manufactured in: MOB
zi ; ne es Sane r
ae ---—- | -600 Intended Location: Noosaville, QLD
Client Approval
. client. Good Shepard Lutheran Coll
2. Project South Client, Good Shepai eran College
A200 1: 120 eee
Compeny
{ A , Bi Cc: é Cc f B : { A) Date {dd-rom-yyyy}:
- 9800 =“ 2400 = aagg pone a Signature
2%. MD_ Ft yi OF {
a . oe . Drawings - Architectural
Ww Ceiling Pitch Point Ceiling Pitch Point_ Wy Sheet Content Rev
2705 . eo i 7 = # 2705 4-000 |Schedules - Building Shell 1
ia TT me Ee / 3 A001 |Site Plan \
SW Deck Colling °— — —— ae aa en eae Ot Po Des Colnl
7408 | |- Ir 240s is [oom !
i l 5) Ti in = 1 iT T TO T il T 5
, 8-200 _|Elevations \
YW _Ground Floor | hs it | | Ground Floor wr &-500_|Section & Details \
>. zx —~—==e i OE sf} )6)~SCti<‘<‘ié—SO
w Datum, P jaa ae Datum wr
600 -600
5. Project West 3. Project East
A-200 1:120 A-200 1:120
weit ee nr ets ast ei yen S. —_ iy | |wescdiarp, soca ccch. sis 8 wrcawe Ear
“10° £93 iB} i7} (6} (5) o<) (3) ee (1) eee ae
ar) | 3450 | 3450 D 3400 } 3450 | 3400 } 3450 | 3400 1 3400 } 1 |adycrsd Wu deg nce ade Ui rors | BCaC:8
/ =
| bo sesare fe teegeardisya tlc: Hihetiowes Assit
Existing Admin Building Ox ae
Ww Ceiling Pitch Point FOR APPROVAL
|
2705».
vices ee eT Ta aD TTT nee
ed a a a fl
2405 ae = = LN ye = a — (COPYRIGHT.AUS00 MODUS PTYLTD, THISOCCUMERT MAY YOT SE
WoPMOLUGLE CRG ISLCN UA EW ILGLE'® THOU 6 LA
ww GroundFloor 9 eile es ee + o Te id
0 eee == SSS 7 ——=——=_ =. -—_ -—-—--—-- Elevations (MQB)
w Datum » “1261 l F Li =
Pr mn i ase
See ge
-600 EG Se eg UN al fie pees ps a —s
—— Ground Level as per suveryors drawing ee ee
oar 30.85x12m
5 1 1 1 65 3 3000 1799 75 22 96 Learning
5 1 1 1 65 4 3116 1800 13 21 96 Cent
4 1 1 1 66 0 723 1805 2485 59 -1
5 1 1 1 66 1 723 1812 24 23 57 4.
5 1 1 1 66 2 781 1810 96 31 82 Project
5 1 1 1 66 3 889 1810 73 25 96 North
5 1 1 1 66 4 2446 1806 44 23 89 w
5 1 1 1 66 5 2853 1817 35 42 18 a
5 1 1 1 66 6 2900 1805 39 59 48 ret
5 1 1 1 66 7 2942 1805 47 58 40 a
5 1 1 1 66 8 3013 1805 94 20 93 earning
5 1 1 1 66 9 3132 1805 76 16 92 Centre-
4 1 1 1 67 0 2237 1843 560 15 -1
5 1 1 1 67 1 2237 1845 53 13 92 GL-FFL
5 1 1 1 67 2 2304 1846 36 12 94 +2078
5 1 1 1 67 3 2460 1843 11 14 96 4
5 1 1 1 67 4 2696 1845 53 13 77 GL-FFL
5 1 1 1 67 5 2755 1846 42 12 76 +1261
4 1 1 1 68 0 711 1848 2155 30 -1
5 1 1 1 68 1 711 1858 53 16 84 A200
5 1 1 1 68 2 780 1859 20 15 34 1:
5 1 1 1 68 3 803 1842 36 43 34 120
5 1 1 1 68 4 2296 1848 7 8 0
Nee
Kile: — Good Shepard Lutheran
Ao 3&2 College
“ 5 .
GL-FFL +1755, B i? EB GL-FFL +773
mes i Teawn Ry Trews Tate a BA
pe os ic |maris, AS | ot] AD
oe ach aa ; y-phA-200 indicate:
:xisting Admin Building . ? ie ij Checked Rs Deve ee
Sh } ? aD | MAR1g DIMENSIONS AREIN MIM
~~ fag DO NOT SCALI i
i Pea f Pint 40. ‘owe i
sdf 0240100047 | - :
end Crawirn 4a. Set tave i
s A-200 | |
Page 24 of 92Section 25
ATTACHMENT 2
Page 25 of 92
26 $0 GZ abed
” wo * DB “99S? 01D @TTrAescoy py TpUNENZ STI NOTLYIO] :NOILYIOT
“ Pio NV 1d YALSVIA
N eSeTT oO} wezey3N] preydays poog
hea ae YSOON 3931103 com
iq it wement nace eo nacatev SOME ure oe sause ua focenica hen iapamaes tal covenaom a “
is fis a a
ag 2 a - fig 7 \
eH ee fre tr | wid i=
ep [oe | eee | oe] oe i Ay
tie | ema | vanes] oe ig 4 i
a ,
low | Om | | | : , : oe
- @Ppoo Bupyeg ze9 pue skem enlg ‘uel BSOON OUL wa 2 <
) -. ” S
. = — & SA Wem
= emnrgn ee preme te) , , a i .
2 oes — Aer .
a wed =D Peproig ROL ; = “ ;
Ps wurde ‘bow meweL b . om P MEO ce arr,
ae Ju | samamrencssoomen | | anesorne | v4 5 hey Nee ss
wos] fax] wer nnee | | ae TF nn Re Pe PR Ty, 8 a
o jf ‘ . : — ;
sjooups 38 aunjonyseyuy odsues ayes 40) BulUUe|d ae a id re Ss oe % a /
ye , c +. é | by H
Bupjied 429 Buyspey sjooyss 4 es a
5 1 1 1 26 8 1919 1379 78 98 30 14
5 1 1 1 26 9 2075 1399 175 27 15 zs
5 1 1 1 26 10 2314 1407 33 30 40 Aw,
5 1 1 1 26 11 2498 1376 90 64 16 Cf
5 1 1 1 26 12 2609 1396 61 64 44 =
5 1 1 1 26 13 2691 1412 63 48 48 os
5 1 1 1 26 14 2798 1408 113 31 69 =
4 1 1 1 27 0 693 1460 2222 75 -1
5 1 1 1 27 1 693 1475 74 34 41 S30vdS
5 1 1 1 27 2 769 1475 75 34 0 SNDIHVd
5 1 1 1 27 3 843 1475 41 34 34 HWS
5 1 1 1 27 4 895 1491 6 3 59 -
5 1 1 1 27 5 907 1487 28 15 32 bz
5 1 1 1 27 6 987 1463 63 63 34 ©
5 1 1 1 27 7 1410 1492 54 24 27 a
5 1 1 1 27 8 1520 1470 65 65 9 sa
5 1 1 1 27 9 2096 1470 59 58 25 Ce
5 1 1 1 27 10 2154 1470 30 58 17 no
5 1 1 1 27 11 2219 1488 4 4 2 i
5 1 1 1 27 12 2370 1460 20 62 44 3
5 1 1 1 27 13 2451 1468 26 52 7 “y
5 1 1 1 27 14 2536 1513 8 9 31 ‘
5 1 1 1 27 15 2593 1490 23 38 0 i}
5 1 1 1 27 16 2748 1467 14 55 35 me
5 1 1 1 27 17 2832 1470 46 42 0 od
5 1 1 1 27 18 2901 1493 14 15 0 :
4 1 1 1 28 0 949 1494 1999 97 -1
5 1 1 1 28 1 949 1505 101 86 39 “es
5 1 1 1 28 2 1422 1496 99 74 0 eo
5 1 1 1 28 3 1871 1564 183 2 24 ae
5 1 1 1 28 4 2053 1549 238 10 49 Ce
5 1 1 1 28 5 2318 1509 269 56 31 oe
5 1 1 1 28 6 2589 1529 64 55 29 a
5 1 1 1 28 7 2838 1533 38 32 29 gee
4 1 1 1 29 0 1395 1564 1541 21 -1
5 1 1 1 29 1 1395 1566 4 6 0 .
5 1 1 1 29 2 2267 1572 15 6 47 wy
5 1 1 1 29 3 2356 1564 44 10 23 ee
5 1 1 1 29 4 2562 1564 69 15 56 a
5 1 1 1 29 5 2787 1575 2 2 0 ,
5 1 1 1 29 6 2891 1571 7 10 14 ~_—
4 1 1 1 30 0 397 1557 2547 71 -1
5 1 1 1 30 1 397 1563 22 42 25 5
5 1 1 1 30 2 701 1572 74 35 22 S3OvdS
5 1 1 1 30 3 777 1572 76 35 21 ONDIHVd
5 1 1 1 30 4 852 1572 36 35 29 HYD
5 1 1 1 30 5 903 1590 6 3 83 -
5 1 1 1 30 6 915 1586 17 13 60 Si
5 1 1 1 30 7 994 1557 37 71 51 eS
5 1 1 1 30 8 1346 1580 37 31 48 aN
5 1 1 1 30 9 1393 1575 8 7 28 a
5 1 1 1 30 10 1503 1576 3 2 0 ,
5 1 1 1 30 11 1590 1585 15 9 1 es
5 1 1 1 30 12 1664 1562 47 43 24 re
5 1 1 1 30 13 1730 1572 29 32 63 »
5 1 1 1 30 14 1842 1595 42 14 22 _
5 1 1 1 30 15 2064 1585 3 1 20 :
5 1 1 1 30 16 2080 1582 33 31 0 w]
5 1 1 1 30 17 2139 1570 48 51 37 <a
5 1 1 1 30 18 2214 1584 26 16 12 a
5 1 1 1 30 19 2364 1580 2 2 17 i
5 1 1 1 30 20 2565 1574 61 44 42 nd
5 1 1 1 30 21 2709 1580 30 35 40 les
5 1 1 1 30 22 2798 1569 27 53 0 .
5 1 1 1 30 23 2889 1572 38 42 4 oy
5 1 1 1 30 24 2942 1592 2 2 0 ;
4 1 1 1 31 0 1573 1584 1366 71 -1
5 1 1 1 31 1 1573 1614 3 1 31 PO
5 1 1 1 31 2 1790 1584 371 71 49 rae.
5 1 1 1 31 3 2461 1632 20 16 28 ey,
5 1 1 1 31 4 2571 1607 114 44 16 ©
5 1 1 1 31 5 2765 1611 174 39 16 7s
4 1 1 1 32 0 397 1634 2536 49 -1
5 1 1 1 32 1 397 1639 22 29 46 2
5 1 1 1 32 2 1325 1635 49 48 0 c%
5 1 1 1 32 3 1988 1655 6 8 90 7
5 1 1 1 32 4 2045 1634 34 44 45 bg
5 1 1 1 32 5 2232 1646 20 7 35 a
5 1 1 1 32 6 2286 1644 5 6 0 ¢
5 1 1 1 32 7 2383 1649 17 20 31 [a
5 1 1 1 32 8 2509 1653 117 28 23 em
5 1 1 1 32 9 2822 1636 43 32 24 ea
4 1 1 1 33 0 397 1656 2453 75 -1
5 1 1 1 33 1 397 1669 22 13 49 5
5 1 1 1 33 2 965 1656 81 42 20 onzon1
5 1 1 1 33 3 1261 1667 76 31 48 DS
5 1 1 1 33 4 1767 1696 4 3 20 es:
5 1 1 1 33 5 1874 1673 57 20 41 Se
5 1 1 1 33 6 2139 1669 57 31 32 74
5 1 1 1 33 7 2323 1670 185 36 18 FN
5 1 1 1 33 8 2581 1669 21 15 33 i
5 1 1 1 33 9 2668 1673 79 48 60 Ms
5 1 1 1 33 10 2775 1670 42 61 28 rs
5 1 1 1 33 11 2842 1677 8 10 0 y
4 1 1 1 34 0 397 1674 2432 97 -1
5 1 1 1 34 1 397 1704 22 27 73 2
5 1 1 1 34 2 820 1688 223 47 6 3uNLONYLSVUSNI
5 1 1 1 34 3 1251 1674 111 92 28 <3
5 1 1 1 34 4 1765 1702 13 23 20 J
5 1 1 1 34 5 1837 1674 35 84 30 |
5 1 1 1 34 6 2138 1716 46 15 2 SHE
5 1 1 1 34 7 2372 1704 1 32 42 8
5 1 1 1 34 8 2409 1697 43 48 43 |
5 1 1 1 34 9 2482 1707 70 54 34 eu
5 1 1 1 34 10 2593 1724 71 19 61 CD
5 1 1 1 34 11 2728 1733 2 3 34 fay
5 1 1 1 34 12 2798 1682 31 89 0 °
4 1 1 1 35 0 397 1726 2451 61 -1
5 1 1 1 35 1 397 1734 22 44 0 *
5 1 1 1 35 2 879 1726 162 46 8 LYOdSNVUL
5 1 1 1 35 3 1254 1728 15 58 20 NS
5 1 1 1 35 4 1767 1754 1 3 0 ’
5 1 1 1 35 5 1848 1744 59 25 43 ae
5 1 1 1 35 6 1985 1766 19 10 28 =
5 1 1 1 35 7 2231 1765 10 14 1 :
5 1 1 1 35 8 2333 1742 10 11 0 ‘
5 1 1 1 35 9 2465 1764 34 23 18 =
5 1 1 1 35 10 2545 1745 66 37 33 TL
5 1 1 1 35 11 2641 1732 82 50 48 PG
5 1 1 1 35 12 2845 1778 3 4 81 ‘
4 1 1 1 36 0 397 1757 2448 71 -1
5 1 1 1 36 1 397 1783 22 26 28 z
5 1 1 1 36 2 1246 1810 3 3 0 Py
5 1 1 1 36 3 1338 1794 61 21 24 hat
5 1 1 1 36 4 1670 1810 4 2 8 :
5 1 1 1 36 5 1747 1796 10 17 28 |
5 1 1 1 36 6 1837 1774 66 54 32 ‘>
5 1 1 1 36 7 1977 1801 10 12 0 Py
5 1 1 1 36 8 2057 1792 50 23 26 a
5 1 1 1 36 9 2213 1815 4 4 23 —__,
5 1 1 1 36 10 2317 1797 21 18 56 a
5 1 1 1 36 11 2433 1806 6 11 33 -
5 1 1 1 36 12 2452 1786 37 10 47 Sd
5 1 1 1 36 13 2502 1779 46 40 50 A
5 1 1 1 36 14 2657 1757 29 57 17 .
5 1 1 1 36 15 2779 1789 23 30 47 >
5 1 1 1 36 16 2830 1780 15 17 31 »
4 1 1 1 37 0 398 1800 2238 32 -1
5 1 1 1 37 1 398 1811 21 13 28 z
5 1 1 1 37 2 1247 1813 28 8 66 Ge
5 1 1 1 37 3 1343 1800 50 28 10 oe
5 1 1 1 37 4 1621 1824 4 3 42 P
5 1 1 1 37 5 1741 1817 6 8 0 P
5 1 1 1 37 6 1832 1818 63 13 62 ig,
5 1 1 1 37 7 2307 1820 7 6 12 ?
5 1 1 1 37 8 2439 1801 59 28 31 Me
5 1 1 1 37 9 2518 1827 6 5 15 ie
5 1 1 1 37 10 2635 1823 1 5 33 ;
4 1 1 1 38 0 397 1814 2307 57 -1
5 1 1 1 38 1 397 1828 22 13 0 o
5 1 1 1 38 2 1206 1830 19 24 24 ®
5 1 1 1 38 3 1340 1826 81 26 30 eee)
5 1 1 1 38 4 1493 1832 48 17 4 fs
5 1 1 1 38 5 1684 1814 59 38 31 ea
5 1 1 1 38 6 1944 1847 8 9 0 :
5 1 1 1 38 7 2461 1833 55 27 18 re
5 1 1 1 38 8 2623 1838 9 17 27 ii
4 1 1 1 39 0 397 1839 2137 57 -1
5 1 1 1 39 1 397 1842 22 30 26 =
5 1 1 1 39 2 1158 1862 4 3 31 we
5 1 1 1 39 3 1278 1839 286 57 3 ePLET
5 1 1 1 39 4 1598 1810 47 92 3 Ft
5 1 1 1 39 5 1899 1857 87 14 0 a
5 1 1 1 39 6 2041 1868 31 9 19 a
5 1 1 1 39 7 2379 1847 155 33 30 b=
4 1 1 1 40 0 1215 1860 1428 73 -1
5 1 1 1 40 1 1215 1872 60 26 47 Pak.
5 1 1 1 40 2 1361 1873 49 60 59 a+
5 1 1 1 40 3 1433 1883 21 15 43 af
5 1 1 1 40 4 1469 1879 106 38 6 yds
5 1 1 1 40 5 1592 1876 50 28 17 |
5 1 1 1 40 6 1662 1869 19 43 50 7
5 1 1 1 40 7 1780 1860 13 47 26 Ss
5 1 1 1 40 8 1967 1875 24 33 0 S
5 1 1 1 40 9 2080 1879 32 20 21 aS
5 1 1 1 40 10 2236 1891 4 15 0 ’
5 1 1 1 40 11 2437 1878 13 29 31 f
5 1 1 1 40 12 2470 1905 3 5 0 ':
5 1 1 1 40 13 2594 1870 49 58 55 isp
4 1 1 1 41 0 1208 1877 1284 71 -1
5 1 1 1 41 1 1208 1877 424 71 22 POEL
5 1 1 1 41 2 1949 1902 121 41 34 LF
5 1 1 1 41 3 2168 1899 20 24 17 i)
5 1 1 1 41 4 2233 1827 146 147 11 tae
5 1 1 1 41 5 2410 1931 82 11 44 (|
4 1 1 1 42 0 1225 1922 1236 87 -1
5 1 1 1 42 1 1225 1943 67 11 19 St
5 1 1 1 42 2 1345 1938 30 24 26 Set
5 1 1 1 42 3 1495 1948 18 15 42 “5
5 1 1 1 42 4 1712 1936 28 28 40 ae
5 1 1 1 42 5 1761 1924 129 58 20 ee)
5 1 1 1 42 6 1977 1940 29 69 21 |
5 1 1 1 42 7 2179 1965 3 2 68 J
5 1 1 1 42 8 2205 1922 130 86 34 IANS
5 1 1 1 42 9 2400 1940 61 26 25 Bo
4 1 1 1 43 0 1472 1962 1120 27 -1
5 1 1 1 43 1 1472 1962 38 18 12 2.
5 1 1 1 43 2 1544 1964 3 4 34 ik
5 1 1 1 43 3 1691 1963 91 19 41 aS
5 1 1 1 43 4 2173 1967 51 13 46 aoe
5 1 1 1 43 5 2322 1967 117 20 45 i:
5 1 1 1 43 6 2588 1983 4 6 31 j
4 1 1 1 44 0 1382 1956 1210 95 -1
5 1 1 1 44 1 1506 1981 138 36 43 ae
5 1 1 1 44 2 1678 1977 86 53 41 =.
5 1 1 1 44 3 1797 1994 25 5 31 =
5 1 1 1 44 4 1857 1961 42 59 25 4
5 1 1 1 44 5 1922 2007 12 15 0 ~
5 1 1 1 44 6 1988 1956 76 95 28 Lb
5 1 1 1 44 7 2304 1986 51 34 14 eg
5 1 1 1 44 8 2505 2019 21 7 45 —
4 1 1 1 45 0 397 2014 2111 60 -1
5 1 1 1 45 1 397 2021 22 28 78 2
5 1 1 1 45 2 1571 2022 30 6 8 CO,
5 1 1 1 45 3 1715 2046 3 6 9 /
5 1 1 1 45 4 1760 2014 28 27 33 ar
5 1 1 1 45 5 1845 2041 3 1 50 -
5 1 1 1 45 6 1887 2022 5 2 0 5
5 1 1 1 45 7 1902 2027 21 13 27 a
5 1 1 1 45 8 2000 2046 4 4 3 os
5 1 1 1 45 9 2171 2044 39 27 0 é
5 1 1 1 45 10 2296 2029 18 34 61 k
5 1 1 1 45 11 2321 2026 6 29 0 F
5 1 1 1 45 12 2339 2034 38 40 5 eX
5 1 1 1 45 13 2400 2041 2 2 12 ¥
5 1 1 1 45 14 2500 2043 8 10 31 pe
4 1 1 1 46 0 397 2039 2095 57 -1
5 1 1 1 46 1 397 2056 22 22 36 &
5 1 1 1 46 2 1804 2058 2 3 0 :
5 1 1 1 46 3 1871 2058 18 37 26 ie
5 1 1 1 46 4 1923 2039 105 56 0 Ds
5 1 1 1 46 5 2132 2054 27 41 27 le
5 1 1 1 46 6 2272 2060 20 37 0 me
5 1 1 1 46 7 2341 2052 13 29 0 \
5 1 1 1 46 8 2383 2056 23 44 44 eC
4 1 1 1 47 0 397 2083 2016 46 -1
5 1 1 1 47 1 397 2083 22 11 91 =
5 1 1 1 47 2 1982 2099 42 19 77 w
5 1 1 1 47 3 2048 2091 148 38 49 ins
5 1 1 1 47 4 2234 2089 32 33 30 a
5 1 1 1 47 5 2371 2095 42 33 21 Ian
4 1 1 1 48 0 397 2164 22 22 -1
5 1 1 1 48 1 397 2164 22 22 63 Ba
4 1 1 1 49 0 238 2202 354 35 -1
5 1 1 1 49 1 238 2203 23 34 36 é
5 1 1 1 49 2 275 2202 317 35 72 LNAWHOVLLVSection 26
Page 26 of 92
ba
a A eile EP 9
aif aE ae —_— & se
_- - a = * eo w”
Se > a LAP oe ee
7 ye if : 2 ee cy ter ‘ ¢ 2
eer 74 F a Se ad ee oer 5
ZR SS. Hes de :
> fe Tf Ss J 4 ie 4 Ae TRANSPORT .
e mY i . > *> 98 s* ? # J . > INFRASTRUCTURE S
cS ee <Y 5 ' mS i Re vai S
Ya aS pee 1 \ 4 =
» rae “he : * ; s zi a © 6 283 - CAR PARKING SPACES
till bh yy | Sf *% ~ y
ep S las * wW a Schools Proposed Car Parking
pe y Fee We wy} oS Va Planning for Safe Transport Infrastructure at Schools
e oN . v4 SCR bad (OE (a I Koos
a eS ay ~ P Sf N
' oe Nz ail, FO Re P= |ncneene pee
, 3 S ED ae Rts es
: ee hl Oh Cd:
ty = fs y 4 ; nd 7 fn , Total Req. CorParks
sae n cS 1 jf e.. ae P Fe oy Total Prowded Car Paks 248 pid
Ses FN — oe a Receeane” =
= oo ier ce The Noosa Pian, Drive Ways and Car Parking Code a
ee ; * ‘ A E gL [xtamsaoaes [SEN | i
MS a pwr [ome ee | i
‘ ‘ = ; ae o. ng 378
; ae a
Va ws oe ee ii fs
NS e —— si OE
tie “a TT METber have been generated by using the ratic of the crrert ata rarioer Tierney rect bette coe ae the incmamein #35 Ht
8 prep sdrt ge rn yuo hs ot i Se:
an COLLEGE NOOSA
Good Shepherd Lutheran College N ——
MASTER PLAN Ofhro4 Gi
LOCATION: LOCATION 115 Eueundi Rd__Woosaville OLD 4566. as -
Page 26 of 92Section 27
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
8 OPERATIONAL PLAN PROGRESS REPORT – 4TH QUARTER 2020-21
Author Chief Executive Officer, Brett de Chastel
CEO’s Office
Index ECM/ Subject/ Corporate Planning
Attachments 1. Operational Plan Progress
2. Key Performance Indicators
3. Amended Operational Plan 2021/22
(Attachment provided separately to this report)
EXECUTIVE SUMMARY
Not applicable.
RECOMMENDATION
That Council note the report by the Chief Executive Officer to the General Committee Meeting dated
16 August 2021 regarding the 2020-21 and 2021-22 Operational Plans and:
A. Note the progress with the implementation of the 2020-21 Operational Plan to 30 June 2021
provided as Attachment 1 to the report;
B. Note Council’s Key Performance Indicators provided as Attachment 2 to the report; and
C. Adopt the amended Operational Plan 2021/22 provided as Attachment 3 to the report.
REPORT
The purpose of this report is to provide Council with an overview of progress in implementing the
annual Operational Plan, provide details of Council’s quarterly Key Performance Indicators (KPIs)
and present an updated 2021/22 Operational Plan which corrects some errors identified in the
version adopted by Council at the Special Meeting on 30 June 2021.
To provide context about how our organisational reporting to Council works, the following graphic is
provided:
Page 27 of 92
Section 28
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
1. 2020-21 OPERATIONAL PLAN UPDATE
Only the major initiatives are included in the Operational Plan with day to day “business as usual”
activities included in Branch Plans.
The Branch Plans are being used by Managers to manage day to day activities. They are an
effective tool for ensuring that all of the “business as usual” activities are undertaken and that any
minor projects are followed through. They are reported to Council by Directors on a quarterly basis
and those reports are on this round of Council meetings.
Details of each Operational Plan project is set out in Attachment 1 with an assessment of whether
the issue in completed, on track or behind schedule. Comments are also provided for the information
of Councillors about the status of each issue. It is important to note that this is “as at 30 June” i.e.
the end of the fourth quarter and in some instances, the multi-year actions have been advanced
further since that time.
There are 35 initiatives in the 2020/21 Operational Plan. The current status of those projects is:
Status Quarter 1 Quarter 2 Quarter 3 Quarter 4
(July – Sept 2020) (Oct – Dec 2020) (Jan – Mar 2021) (Mar – June 2021)
Not started 4 3 0 0
Behind Schedule 7 6 8 9
On Track 23 25 26 9
Completed 1 1 1 17
Note - some of these initiatives are multi-year projects and have been identified as “on track” where
the initiative will be completed in the next financial year.
The table below highlights some specific Operational Plan issues that may be of interest to Council
with a particular emphasis on some projects that are behind schedule.
Initiatives Comment
Complete asset management plans The pathways and boardwalks AMP has been completed and
for pathways and boardwalks and for adopted by Council. The remaining AMP for parks and playgrounds
parks and playgrounds. has been delayed due to staff changes. It is expected to be
completed in December 2021.
Establish a place making team and Internal governance arrangements were put in place in November
commence a pilot project 2020 but more work needs to be done for organisational readiness
to make this a success. A workshop is planned with Councillors to
progress further in the coming weeks.
Design and construction of stage 3 of Construction is now progressing well after the initial delays caused
the Rufous Street project including the by the previous contractor going into liquidation.
construction of the new Peregian
Beach Community House
Finalising the design of the Peregian Plans have now been drawn up and the Fire Tech funding of
Digital Hub extension approximately $800k will support additional high-tech fitout. This
project was delayed due to the delays in the Peregian Beach
community house project (see above)
Undertake an evaluation of Council’s This has been delayed due to other priorities (including the latest
response to the Covid19 pandemic lockdown). The intent is to undertake a review of what went well,
including its impact on Council what can be learnt from our Covid response etc.
Page 28 of 92
Section 29
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Initiatives Comment
Continue to partner with The Nature Engineering and bathymetric analysis has been completed and the
Conservancy to implement the Oyster State assessment and referral agency has identified no significant
Reef Restoration Project in the Noosa obstacles to approvals. Staff will report to Council once we receive
River the TNC annual report and KPIs on this project.
Deliver economic stimulus projects Most of these projects have been completed but there are a couple
funded by the Commonwealth and that will carry over to the first few months of 2021/22. Arrangements
State government Covid19 grants are being put in place with the relevant government agencies to
ensure that time and cost extensions are approved.
Review of Council’s Corporate Plan With the planned retirement of the CEO, the development of a new
corporate plan will be undertaken in early 2022 once the new CEO is
on board.
2. KEY PERFORMANCE INDICATORS
As Council would be aware, KPIs were first developed for our organisation at the beginning of
2014/15. 16 of those KPIs are reported to Council on a quarterly basis. The KPIs are included in
Attachment 2.
As advised previously, the Executive Team has undertaken a review of these KPIs and will transition
those KPIs which are at a Departmental Level into the relevant quarterly department update reports
to Council from the first quarter of the 2021/22 year.
The key issues arising from an assessment of the KPIs are as follows:
Our People
Given that this is the end of financial year KPI report, there are a couple of “annual type” KPIs
worth noting. The first of these is staff turnover. Staff turnover in 2020/2021 is the lowest it has
been in the last 7 years ie 6.6%. For the information of Council, our historical staff turnover
has been as per the table below:
Year Staff turnover rate
(percentage)
2014/15 11.06%
2015/16 13.06%
2016/17 8.9%
2017/18 8.2%
2018/19 10.9%
2019/20 9.6%
2020/21 6.6%
In relation to Workplace Health and Safety, our Lost Time Injury Duration results have been
quite variable over the last 12 months. There have been a number of longer term issues which
have impacted on the statistics.
Personal leave shows that personal leave had been reducing compared to previous years but
there has been a significant increase in the number of long-term illnesses. This was
particularly the case in relation to personal leave greater than 5 days reflecting some long-term
illnesses of some staff.
Page 29 of 92
Section 30
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Accrued annual leave has continued to increase as staff are constrained in options to travel
for leave and many staff have also been too busy to take leave (reflecting high workloads).
This peaked in May 2021 as many staff worked on try to finalise projects before the end of the
financial year and Council budgets. Staff burnout remains a risk due to high workloads and
staff are encouraged to take leave to refresh and recharge.
Our Customers
The number of customer requests has continued to increase and is at an all-time high. This
has presented some challenges with meeting customer requests within the target dates and
our management team is currently refocusing on this issue. One of our Infrastructure Services
Managers is leading a project looking at how we can better manage customer requests across
the organisation. This includes looking at new monitoring provisions which allows for escalation
of requests if not addressed within certain timeframes.
While the number of customer requests is increasing, the response time for our front line staff
in answering telephone calls and dealing with matters in the first instance is still quite good.
For building, plumbing and development applications, we are seeing record application
numbers. This is not a Noosa phenomenon with other local governments reporting similar
record application numbers. Further, all councils are competing for limited resources with town
planners and building surveyors in particular being in short supply in south-east Queensland.
This is no doubt as a result of the various government stimulus programs to encourage building
development across the country and also reflecting the high demand for new housing as a
result of the influx of interstate migrants. For the development assessment area, they are also
dealing with the additional superseded planning scheme applications which could be made up
to 31 July 2021. Now that no further superseded planning scheme applications can be made,
the branch will be able to work through to clear the backlog over time. Other councils are
facing similar issues but we have the added burden of the superseded planning scheme
applications at this point in time.
Our Finances
Our financial KPIs measure solvency, investment performance and outstanding rates. All of
these KPIs continue to be on track and in particular, there is no significant change in trend for
rate arrears. Our ratepayers are paying their rates at the same level as pre-pandemic times.
Council receives a financial performance report at the end of each month which provides a
more detailed analysis of Council’s financial position. Council receives a detailed report on
Capital Works progress every quarter.
Our Systems and Processes
The use of online services continues to increase year on year. The proportion of payments
continues to be high as cash payments are being limited due to the COVID-19 pandemic.
Page 30 of 92
Section 31
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
3. AMENDMENT TO 2021/22 OPERATIONAL PLAN
Council adopted the 2021/22 Operational Plan as part of the suite of budget documents at a Special
Meeting on 30 June 2021. Following that meeting, three errors were identified as well as some
formatting and other minor changes required to finesse the document. The three errors that require
correction are:
1. Page 13 - A change to the Outcome for the Operational Initiative “Implement the Noosa
Bushland Reserve Strategic Management Plan and Fire Management Plan” to replace the
current text with: “Clear prioritisation of resources towards bushland management and active
involvement of the community in the restoration of degraded bushland areas” and assign
Environmental Services as the Responsible Area.
2. Page 14 – Replace the Operational Initiative “Noosa Heads Main Beach SEMP” with
“Implement Noosa River SEMP”.
3. Page 20 - A change to the Outcome for the Operational Initiative “Continue to implement the
WFP strategy across operational areas” to replace the current text with “Current and future
workforce needs are identified to ensure Council has the resources needed to meet service
delivery outcomes”.
The amended Operational Plan is provided at Attachment 3.
4. CLOSED SESSION ITEMS
At the request of Councillors, this part of the report identifies whether or not there have been any
matters dealt with in confidential session within Council or Committee meetings which have
subsequently been made public. There were none in this quarter. The community can keep up-to-
date with this information by checking Council's website – https://www.noosa.qld.gov.au/decision-
making
Previous Council Consideration
Quarterly reports are provided to Council outlining our progress with the Operational Plan.
Finance
The projects within the Operational Plan are reviewed and funded as part of Council’s annual budget
process.
Risks & Opportunities
A failure to achieve the outcomes set out in the Operational Plan would be problematic. In some
cases, projects may take longer than anticipated to achieve the best outcome.
Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
The details of each of the Operational Plan activities have been provided by relevant Departments.
Page 31 of 92
Section 32
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Departments/Sections Consulted:
X Chief Executive Officer X Community Services X Corporate Services
Executive Support Director Director
Community Development Financial Services
Community Facilities Fleet
Libraries & Galleries ICT
Local Laws Procurement
Waste & Environmental Health Property
Revenue Services
X Executive Services X Environment & Sustainable Development X Infrastructure Services
X Director Director Director
Community Engagement Building & Plumbing Services Asset Management
Customer Service Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 32 of 92
Section 33
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
ATTACHMENT 1
Page 33 of 92
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
ATTACHMENT 1
OPERATIONAL PLAN 2020-21 PROGRESS REPORT
THE NOOSA ENVIRONMENT
No. Project Responsibility Detect AT Ered
1 Continue the implementation of Council's Fire Director Environment & Sustainable Council is currently implementing on-ground actions related to our existing Completed @
Management Plans Development fire management plans. A new Bushland Reserve Fire Management Plan
was endorsed by Council in June 2021. Site-specific multi-agency plans for
some of our highest risk sites are also being developed, to further
complement and strengthen our existing actions. Advertising for the new
position of Fire Management Officer will be undertaken in July 2021.
2 Implement the Noosa Environment Strategy Environmental Services Manager With an adopted Environment Strategy, appropriate monitoring mechanisms Completed oO
are now being put in place for implementation and actions are progressing.
The first annual report on the progress of the Implementation Plan of the
Environment Strategy was reported to Council in August 2020.
3. Adopt the Noosa River Management Plan and Environmental Services Manager Feedback from both previous Draft River Plan consultation periods has been On track oO
commence implementation collated and was reported to Council in January 2021. The Noosa River
Stakeholder Advisory Committee has been formed with 14 local
representatives following an open EOI process, and met for the first time in
April. This stakeholder group will support the finalisation and implementation
of the Plan, as well as the resolution of other long-standing issues
associated with the Noosa River.
4 Continue to implement and undertake a review of Zero Director Environment & Sustainable The Climate Change Response Plan was open for public comment 19 March On track oO
Emissions Noosa (ZEN) Strategy and Action Plan Development to 30 April 2021. The CCRP is currently being finalised for the August 2021
Council meetings.
5 Finalise the strategic review of landfill emission reduction Waste and Environmental Health Eleven additional methane extraction wells were installed in March 2021. On track @
opportunities Manager Methane capture has increase significantly over the 4th quarter. Extensive
capping works to prevent fugitive emissions to be completed as part of
capital works over the next 18 months. LFG contractor (LMS) currently
exploring options to utilise methane for power generation on site.
6 Continue to partner with The Nature Conservancy to Director Environment & Sustainable The Project Manager has had extensive one-on-one meetings with key Behind Schedule (@))
implement the Oyster Reef Restoration Project in the Development stakeholders. Engineering and bathymetry works have been completed and
Noosa River a pre-lodgement meeting with SARA (State Assessment and Referral
Agency) was held in early June, which identified no significant obstacles to
appovals. TNC are currently working to provide the required follow-up
information following this meeting, prior to final submission of permit
applications.
7 Continue the implementation of the Yurol and Ringtail Chief Executive Officer The Transition Committee met on 7 July 2021. The project is continuing well Completed oO
Forestry Project with timber plantation harvesting continuing and plans for revegetation being
finalized.
Page 33 of 92Section 34
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Page 34 of 92
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
OPERATIONAL PLAN 2020-21 PROGRESS REPORT
THE NOOSA COMMUNITY
No. Project Responsibility Ure AD Ftd
1 Support the community in the ongoing recovery efforts Director Community Services Support from across organisation continuing for businesses, residents and Completed ©
from COVID-19 community organisations. Successful festive season particuarly the
Christmas Convoy. Ongoing work through Community Grants program and
vanous Council teams particularly Community Development, Economic
Development and Environmental Health.
2 Support the community in the ongoing recovery efforts Director Community Services Appointment of temp. Community Development Officer - Recovery, has been Completed @
from the bushfires made. Work plan developed and a number of initiatives completed inc First
Year Anniversary events at Peregian, Cooroibah and North Shore. Cat C and
D projects well underway.
3. Continue with the design and construction of Stage 3 of Director Community Services Tender for new Community House and Greenspace closed. Evaluation of Behind Schedule ¢))
the Rufous Street project including the construction of tender responses complete. Tender report adoped by Council. Construction
the new Peregian Beach Community House commenced and on track. Design of refurb for old Community House
underway.
4 — Review options for mobile/outreach library services Libraries & Galleries Manager Replacement plan endorsed by Council in February. Tender awarded for new Completed ©
vehicle in July. [TQ for kiosks released in July.
5 Progress implementation of Master Plans for the Noosa Community Development Manager Noosa District - Preliminary plans for link road complete; detailed design Completed ©
District Sports Complex and the Cooroy Sports Complex commenced; concept plans for wellbeing hub developed; lighting installed at
Cricket, Rugby League and Touch Football; second field relocated for Rugby
League. Cooroy - extemal funding sought for lighting; consultation with clubs
on amenities/clubhouse redevelopment.
6 Implement a new Heritage Portal Heritage Coordinator New Heritage Portal site now live. Completed @
7 Develop a new Waste Management Strategy Waste and Environmental Health Contract to develop strategy awarded to Mike Ritchie and Associates. Ontrack @
Manager Scoping of staging of strategy production has been agreed and relevant
Council data provided. Work on the draft strategy currently underway.
Kerbside component of the Strategy is nearing completion following two
Councillor workshops. Final development of strategy will be driven by the
Page 34 of 92Section 35
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Page 35 of 92
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
OPERATIONAL PLAN 2020-21 PROGRESS REPORT
THE NOOSA ECONOMY
No. Project Responsibility Deter AS Ets
1 Support business recovery efforts post COVID-19 Economic Development Manager Most Business Precincts in the Noosa Shire report a strong recovery. The Completed ©
accommodation sector is particularly strong, and the evidence points to high
demand for remote workers relocating from metro areas.
2 Undertake a review of the Local Economic Plan and Economic Development Manager Following workshop sessions with Councillors and Business Roundtable Ontrack @
develop a new five year Plan members an Economic Strategy 2021 Discussion Paper is under
development.
3. Continue to progress Council’s Industry Development Economic Development Manager Noosa Council is continuing to facilitate the Noosa Education and Training Completed @
Program across our priority sectors focussing on digital, Alliance, with this group now an incorporated group. The Peregian Digital
education and training, and rural enterprise Hub is operating at capacity. FireTech Living Lab program will continue to be
rolled out over next 18 months.
4 Finalise the design of the Peregian Digital Hub extension Economic Development Manager The Digital Hub expansion plans have been drawn-up and the FireTech Behind Schedule 0
(refit of Community House) as part of the Stage 3 Rufous datalab funding of approximately $800k will support additional high-tech fitout
Street project of the old community house.
5 Deliver economic stimulus projects funded by Director Infrastructure Services The majority of projects are on track for completion within the guidelines of Ontrack @
Commonwealth and State Government COVID-19 grants the grant funding and negotiations with State Govemment have commenced
on those projects that may require time and cost extensions. Quotes have
been awarded for remaining projects to be completed in 4th Quarter.
Page 35 of 92Section 36
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Page 36 of 92
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
OPERATIONAL PLAN 2020-21 PROGRESS REPORT
LONG TERM PLANNING FOR NOOSA SHIRE
No. Project Responsibility Uren Ry Est
1 Finalise the Climate Change Adaptation Plan and initiate Director Environment & Sustainable Draft Coastal Hazards Adaptation Plan public consultation is complete. On track @
implementation of actions Development Review of submissions and further targetted consultation via a newly formed
CHAP Roundtable underway. Whole of Shire Climate Change Response
Plan has completed consultation and will be reported to Council in August.
2 Continue to implement the Noosa Transport Strategy Director Infrastructure Services Go Noosa program continuing as business as usual for peak holidays, Completed o
priority actions as determined by Council electric bus negotiation with TransLink continuing, in principle agreement
from TransLink for Free Weekend Buses all year and for Kin Kin Flexi Link
cabs. Car park supply and management and Noosa Heads bus stop analysis
in progress. Investigating Noosa National Park bus for peak holidays and
funding review of new transport initiatives.
3. Finalise the adoption of the new Noosa Planning Director Environment & Sustainable Noosa Plan 2020 commenced 31 July and has already had one Completed @
Scheme Development administrative amendment. Wide range of supporting material is available
on line. Special interest presentations have occurred. Further draft
amendments are in progress.
4 Establish a Placemaking Team and commence pilot Director Environment & Sustainable Commenced internal governance structure in Nov 2020 and continuing with = Behind Schedule 0
project Development with organisational readiness program and developing, evaluation and
monitoring criteria.
5 Finalise the development of the Walking and Cycling Director Infrastructure Services The Noosa Cycling and Walking Strategy and Implementation Plan adopted Completed ©
Strategy by Council in July 2021.
6 Complete Asset Management Plans for pathways and Director Infrastructure Services The Pathways and Boardwalk Asset Management Plan has been adopted by Behind Schedule eo
boardwalks and for parks and playgrounds Council. The Parks and Playgrounds Asset Management Plan is delayed due
to staffing constraints within the Asset Management Branch. Expected
completion December 2021.
7 Implement recommendations arising from the Noosa Spit Director Infrastructure Services Submission for permits and approvals completed. Additional information Ontrack @
Shoreline Erosion Management Plan (SEMP) requested by the State that will involve further investigation. Detailed
specification and drawings have been completed. Tender to be advertised in
line with approval conditions when received. Expected to commence project
in winter 2022.
8 Review the Noosa Council Corporate Plan Chief Executive Officer Councillors determined to delay the review of the Corporate Plan until the Behind Schedule 0
commencement of the new CEO in early 2022.
Page 36 of 92Section 37
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Page 37 of 92
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
OPERATIONAL PLAN 2020-21 PROGRESS REPORT
EXCELLENCE AS A COUNCIL
No. Project Responsibility Deter ASE tre)
1. Continue to develop a Workforce Planning Strategy Director Executive Services Conintued focus is on succession planning for key positions and the Behind Schedule ())
inclusion of workforce planning within Branch Plans ahead of revised
broader strategy to be developed in 2021/22.
2 Continue the transition to Technology One CiAnywhere Director Corporate Services E-recruitment project completed. Early adopter project for fees and charges Completed ©
for Council's enterprise management system completed and incorporated in budget system. Corporate performance
management system implementation planning underway. Review of CIA
request management system implementation in progress to identify
improvement opportunities. Procure to Pay stage 2 project underway.
3. Review Council's Community Engagement Strategy Director Executive Services Given the change in timing for the development of the new Corporate Plan, Behind Schedule ¢))
action will be taken to commence the review of the strategy in 2021/22. A
project plan is to be developed and a workshop with Council is planned for
August/September 21.
4 Undertake an evaluation of Council's response to the Chief Executive Officer This will commence shortly and look at what went well in our Covid response Behind Schedule o
COVID-19 pandemic including its impact on Council and lessons learnt that can be incorporated into future responses.
5 Undertake the biennial Community Satisfaction Survey Director Executive Services The Survey was undertaken in April this year. The final report is expected in Completed @
July and the results will be formally reported to a future meeting of Council.
6 Continue to develop our staff through leadership/ People & Culture Manager Training needs identified for the commencement of the development of Completed ©
supervisor development programs and the employee 2021/22 programs. Leadership Group session held in Q4 as a continuation
training program of those held earlier in 2020/21.
7 Review Business Continuity Plans based on COVID-19 Relevant Directors Council's Pandemic Management Sub-Plan reviewed and updated based on Ontrack @
experience learnings over previous 12 months. ICT Business Continuity Plan updated
and reviewed.
8 Monitor and continue to improve workplace health and Director Executive Services Continuing to implement the deliverables from the Workplace Health & Completed @
safety performance Safety Management System Plan (April 2020-March 2021)
Page 37 of 92Section 38
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
ATTACHMENT 2
Page 38 of 92
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
ORGANISATIONAL PERFORMANCE REPORTING ATTACHMENT 2
OUR PEOPLE
Measure Measure
Council % of LGW
Safety of the workplace
30 3%
25 “=
ae
2 @
* *
15 : s | ae ee
.
oF 3. Poe
“Tm | PS ‘tt ht ha hae eS
ABR eeee
(Paes
o a 0%
July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June 20145 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21
Comment
Duration is defined as the average days lost per lost time injury. The formula is No. of
work days lost / No. of lost time injuries.
Measure Measure
Personal leave total days x month Accrued Annual Leave weeks (median
500 rs 6
7%
400 of . 5
oh OER, .
oo AEE EOE pee | og
See INES tities
100 i 1 2 | \ ~ i . 2 1 a
CORRES Oa
July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June BERR
. 0
Sick leave <Sdays Carers leave <Sdays Personal leave >5 days July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June
Page 38 of 92
2018/19 data is shown by dotted purple line. 2019/20 data is shown by black lineSection 39
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Page 39 of 92
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Measure
Staff turnover rate as percentage of establishment level
Purpose
0 track staff tumover over time and identify trends
6%
4%
at?%,
=a ee eee “fey,
2%
0%
Sept Dec Mar June
Comment
2020/21 - 6.6%; 2019/20 - 9.6%; 2018/19 - 10.9%; 2017/18 - 8.2%; 2016/17 - 8.9%;
2015/16 - 13.06%; 2014/15 - 11.06%.
Data recorded on a quarterly basis.
2018/19 data is shown by dotted purple line. 2019/20 data is shown by black line
Page 39 of 92Section 40
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Page 40 of 92
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
OUR CUSTOMERS
Measure
Number of requests received x month % of requests completed within target date x month
Level of customer demand & whether service levels appropriat Indicator of whether service levels are satisfacto
2500 100%
2250
me a A cox
1750 a A See call rl
oo? ee eee ee ee 60% —
oo ff oe ee oe
ae eet ees om
co. fe ne ee oe ee ee
20 HII
e = a 20%
July Aug Sept Oct Nov Dec Jan Feb March Apr May June
@ All others @ Local Laws u@ Parks 0%
Waste Management #™ Works Operations @ Environmental Health July Aug Sept Oct Nov Dec Jan Feb March Apr May June
Comment
Categories show the 'Work Groups' that on average receive the highest number of
requests each month.
Measure
Average seconds of “wait” time in phone queue Number of planning applications decided within statutory timeframe
Service timeliness / capacity to respond Service timeliness
60 . lm Not decided
a 30 wa Decided
we, —— April applications
Rte “ oe%e, ——May applications
* * 7
40 os pr — 5 1 1 1 30 6 1619 1621 9 2 65 -
4 1 1 1 31 0 873 1620 1677 182 -1
5 1 1 1 31 1 873 1620 37 169 21 ;
5 1 1 1 31 2 956 1620 36 169 0 ,
5 1 1 1 31 3 1201 1645 36 144 0 :
5 1 1 1 31 4 1283 1624 37 165 21 ;
5 1 1 1 31 5 1358 1620 42 169 26 N
5 1 1 1 31 6 1545 1649 48 31 58 1
5 1 1 1 31 7 1777 1646 31 21 28 :
5 1 1 1 31 8 2364 1654 186 148 34 NO
4 1 1 1 32 0 578 1675 2158 218 -1
5 1 1 1 32 1 578 1746 44 58 37 20
5 1 1 1 32 2 791 1688 35 101 0 -
5 1 1 1 32 3 1037 1691 38 98 47 i
5 1 1 1 32 4 1119 1675 37 114 87 [
5 1 1 1 32 5 1446 1731 37 58 50 a
5 1 1 1 32 6 1527 1726 36 63 49 a
5 1 1 1 32 7 1779 1781 26 21 36 to
5 1 1 1 32 8 1952 1768 185 99 47 SJ
5 1 1 1 32 9 2236 1753 61 39 6 a
5 1 1 1 32 10 2381 1721 355 172 6 Pe
4 1 1 1 33 0 607 1938 2059 39 -1
5 1 1 1 33 1 607 1946 15 21 51 0
5 1 1 1 33 2 1887 1938 52 39 53 Mey
5 1 1 1 33 3 2195 1943 22 20 61 %
5 1 1 1 33 4 2340 1943 23 20 59 %
5 1 1 1 33 5 2490 1938 30 39 54 by
5 1 1 1 33 6 2630 1942 36 22 54 Rp
4 1 1 1 34 0 663 1938 2241 71 -1
5 1 1 1 34 1 663 1978 50 26 93 July
5 1 1 1 34 2 744 1978 49 26 93 Aug
5 1 1 1 34 3 823 1978 57 25 94 Sept
5 1 1 1 34 4 912 1978 43 21 94 Oct
5 1 1 1 34 5 991 1978 48 21 95 Nov
5 1 1 1 34 6 1073 1978 48 21 95 Dec
5 1 1 1 34 7 1156 1978 43 21 94 Jan
5 1 1 1 34 8 1237 1978 46 21 84 Feb
5 1 1 1 34 9 1304 1978 75 21 96 March
5 1 1 1 34 10 1402 1978 44 25 91 Apr
5 1 1 1 34 11 1480 1978 52 26 91 May
5 1 1 1 34 12 1557 1978 60 21 96 June
5 1 1 1 34 13 2049 1938 107 70 10 “ne
5 1 1 1 34 14 2213 1948 50 60 18 tote
“ot, wet,
Comment
June total applications - 87. Not decided in timeframe - 9.
May total applications - 64. Not decided in timeframe - 8.
April total applications - 67. Not decided in timeframe - 11.
2018/19 data is shown by dotted purple line. 2019/20 data is shown by black line Page 40 of 92Section 41
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Page 41 of 92
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Measure Measure
% of building information requests completed within statutory time frame
Service timeliness Level of activity & service
20
100% “Wecanest?™
60% 10
40%
5
20% ,
0% 0
July Aug Sept Oct Nov Dec Jan Feb March Apr May June July Aug Sept Oct Nov Dec Jan Feb March Apr May June
Comment
Legislation introduced on 1 July 2019 has reduced the statutory time from 20 days to 10
days
2018/19 data is shown by dotted purple line. 2019/20 data is shown by black line
Page 41 of 92Section 42
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Page 42 of 92
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
OUR FINANCES
Measure Measure
Investment return 0.25% above benchmark (UBS Bank Bill index) Rate arrears ratio <5%
Purpose Purpose
Performance of invested ratepayer funds Measures the efficiency of Council's collection of rates and charges
1.0% 15%
*
*
*
0.8% 3
*, + ° ooo, : 10% ~~
0.6% + fo vs “ - °
. + ’ >
0.4% se a, : a “Gar «
. e * .
gs OS * >
Saninin | Ln
0.0% 0%
July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June
Measure
Working capital ratio > 2 (times)
Purpose
Measures Council's ongoing solvency
8 «
a?
& “ee, serene
6 < “tune o* — 4%
*
—/ i i
. 7 7 7 : 7 i; 7 l
2 -
July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June
2018/19 data is shown by dotted purple line. 2019/20 data is shown by black line Page 42 of 92Section 43
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Page 43 of 92
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
OUR SYSTEMS & PROCESSES
Measure eee Measure eee
Identify growth of online services Identify growth of online services
50% 100%
* | ae =A
90% —] i - — = a8) .* = re ete = deae a ~
oo ee ea ee ™ Oooo ooo
non moa
= THEE
10% ; = ——— ad rd ~ | + a 30%
Wi i i lh ox LPT
0% oe LIL LL LLL
July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June oy Lo a a a a
WE requests @ Email (incl. requests via mobile applications) July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June
Comment
This KP! includes all payments made to Council via electronic means (including BPAY, direct
debit, via Council's website, at Australia Post outlets etc)
2018/19 data is shown by dotted purple line. 2019/20 data is shown by black line
Page 43 of 92Section 44
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
9 BUDGET REVIEW 1 (BR1) FOR THE 2021/22 FINANCIAL YEAR
Author Manager Financial Services, Trent Grauf
Corporate Services Department
Index ECM/ Subject/ 7.29 – 2021-2022 Budget
Attachments 1. Proposed Operating Budget Submissions
2. Proposed Capital Budget Submissions
3. Revised Capital Program
4. Revised Statement of Income and Expenditure
5. Revised Budget Financial Statements
EXECUTIVE SUMMARY
The Local Government Act 2009 and Local Government Regulation 2012 require Council to
undertake regular reviews of the adopted budget to ensure it remains reflective of planned activities
to be funded through the financial year. This first budget review for the 2021/22 financial year (BR1)
incorporates:
Any capital or operating projects that were incomplete with unspent budgets at the close of the
2020/21 financial year and are eligible for carryover into the current budget year.
Any new or emergent actions arising from Council resolution, Executive Team or Capital Works
Executive action since the adoption of the original budget in June 2021.
In summary the budget review is proposing to decrease Council’s operating position by $1.0 million;
reducing from a $309k surplus down to a $692k deficit. Capital grant revenue has increased by $4.4
million and the revised capital expenditure program has increased by $6.8 million to $53.7 million.
Item Original Budget Adjustments Proposed Budget
($’000) ($’000) (BR1) ($’000)
Operating Revenue $106,634 $614 $107,248
Operating Expenditure $106,325 $1,616 $107,941
Operating Result $309 ($1,002) ($692)
Capital Grants and Contributions Revenue $20,562 $4,421 $24,984
Capital Works Expenditure $46,897 $6,797 $53,694
RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee Meeting
dated 16 August 2021 and approve the proposed changes to the budget for the 2021/22 financial
year as outlined in the Revised Budget Financial Statements attached to the report.
Page 44 of 92
Section 45
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
REPORT
Section 170(3) of the Local Government Regulation 2012 allows Council, by resolution, to amend
the budget at any time before the end of the financial year.
The key criteria for budget reviews include:
1. Council must aim for compliance with its Financial Sustainability Policy.
2. Any eligible capital or operating project must be underway with a commitment to deliver and
complete the project.
3. Capital submissions will be reviewed and authorised by the Executive Team before inclusion
as a budget review submission, where the group will consider justification for the request,
deliverability as well as organisational and community priorities before endorsing any capital
works.
4. All operating and capital submissions for additional spend, reallocation of savings or additional
revenue will be confirmed by the Executive Team based on business risk assessment.
The revised statement of comprehensive income, included as Attachment 4, identifies the financial
statement line items that have been affected by the proposed budget adjustments. The budget
financial statements, included in Attachment 5, also identify the impact of the proposed budget
adjustments to Council’s financial sustainability indicators.
1. Operating Budget Adjustments
The proposed operational budget adjustments will result in a $1.0 million decrease to Council’s
operating position. The following table summarises the operational carryovers by type of funding,
with a detailed list contained in Attachment 1. It is noted that the majority of budget submissions are
grant or levy related programs and projects, where funds had already been received in prior years
and there is no long-term cash flow implication for Council (i.e. the expenditure is not recurring or
will be built into the base budget).
The financial statements in Attachments 4 and 5 also outline the revised budget position.
Type Submissions Expense Revenue
($’000) ($’000)
Grant Funded 17 1,421 (364)
Levy Funded 1 161 -
General Revenue Funded 1 33 -
Additional Revenue 1 - (250)
Total 8 1,616 (614)
2. Proposed Carryovers - Capital Expenditure Projects
To inform the determination of capital carryovers, the following table summarises the 2020/21 full
year financial result for the capital works program. It identifies a total unspent 2020/21 budget of $6.7
million, which is set as the target ceiling of funding available for carryover. This ensures that cash
reserves are not eroded in accordance with the Financial Sustainability Policy.
Item Amount
($’000)
Current Budget 2020/21 (BR3) $31,243
Total Expenditure 2020/21 $24,517
Total Unspent $6,725
Page 45 of 92
Section 46
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
A total of 50 existing projects have been proposed for carryover from the 2020/21 year with a total
value of $5.9 million. In addition, a total of 11 emergent works and variations with a project budget
of $0.9 million are proposed for inclusion in the revised budget. These works have been funded
through grants and subsidies as well as general reserves. The total proposed capital works
adjustment is $6.8 million.
The following table summarises the proposed revised 2021/22 capital budget by program, with the
full list contained in Attachment 2.
Item Amount
($’000)
Original Budget $46,897
Carryovers $5,868
Emergent Works and Variations $930
Proposed Revised Capital Expenditure Budget $53,694
The following table summarises the proposed revised 2021/22 capital budget by program, with the
full list contained in Attachment 2.
Program 2021/22 Carryovers Emergent Proposed
Original Items BR1 Total
Budget Budget
Capital Works
Bridges 7,461 134 - 7,595
Coastal Canals and Waterways 1,675 155 20 1,850
Cemeteries 180 - - 180
Community Facilities 4,209 1,915 - 6,124
Corporate Buildings 15 5 - 20
Environmental Assets, Tracks and Trails 1,441 259 - 1,700
Gravel Road Network 410 - - 410
Holiday Parks 0 (30) 70 40
Libraries and Galleries 475 347 - 822
Parks and Playgrounds 4,932 (227) - 4,704
Pathways and Boardwalks 2,771 648 155 3,574
Public Transport Infrastructure 275 77 - 352
Sealed Road Network 14,090 386 - 14,476
Sports Grounds and Facilities 50 - - 50
Stormwater Drainage 987 767 148 1,903
Transport and Infrastructure Management 675 42 501 1,218
Waste Management 2,360 200 - 2,560
Other Works
Fleet - Plant Replacement 1,685 1,042 36 2,763
Asset Management 750 26 - 776
ZEN 400 50 - 450
Information Technology 600 69 - 669
Planning 160 - - 160
Loan Redemption 1,297 - - 1,297
Grand Total 46,897 5,867 930 53,694
Page 46 of 92
Section 47
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Previous Council Consideration
The 2021/22 original budget was adopted by Council resolution on 30 June 2021 (Ref. Special
Meeting Minutes, 30 June 2021, Item 3, Page 3).
Finance
The financial sustainability ratios for asset sustainability and net financial liabilities are forecast to
meet the benchmark targets under the revised BR1 budget for 2021/22; however the operating
surplus ratio will fall below the target range.
Ratio Target Original Budget BR1
Operating Surplus 0 – 10% 0.3% (0.6%)
Net Financial Liabilities < 60% (8.1%) (4.9%)
Asset Sustainability > 90% 107.8% 121.9%
Risks & Opportunities
Council’s risk register includes a number of risks that could impact on ongoing financial sustainability.
Effective budget management and reporting is an important risk mitigation tool.
Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
Financial Services have been in contact with all Council branches. Directors of each department
have reviewed endorsed all submissions received. The Executive Team has also reviewed and
endorsed all submissions received.
Page 47 of 92
Section 48
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Departments/Sections Consulted:
X Chief Executive Officer X Community Services X Corporate Services
Executive Support Director X Director
Community Development X Financial Services
Community Facilities Fleet
Libraries & Galleries ICT
Local Laws Procurement
Waste & Environmental Health Property
Revenue Services
X Executive Services X Environment & Sustainable Development X Infrastructure Services
Director Director Director
Community Engagement Building & Plumbing Services Asset Management
Customer Service Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 48 of 92
Section 49
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
Page 49 of 92
GENERAL COMMITTEE MEETING AGENDA 16 AUGUST 2021
2021/22 Budget Review 1 - Operating Submissions ATTACHMENT 1
item tC“ tws~—~“‘Detai#s— = CC—“‘CNC#*drExpensse:*([Revenue | TOTAL
IGrantFunded | ——C—‘“‘—‘iT
Art Gallery and Butter Floating Land 2021. Planning work commenced in 2020/21 70,361 70,361
Factory funded via grants received in advance.
Library Services Be Connected Grant for Building Digital Skills program.
Funds received in 2020/21 but not fully expended.
Engaging Science 2020 grant program. Funds received in
2020/21 but not fully expended.
Indigenous Welcome Book grant. Funds received in 6,236
2020/21 but not fully expended.
Best Start / First Five Forever grant. Funds received in 22,170 22,170
2020/21 but not fully expended.
Community Development ‘| ActiveKIT Program. New grant approved for 2021-22 -100,000 Ff
COTA Queensland Seniors Connect grant. Funds
received in 2020/21 but not fully expended.
RADF (Various Areas) RADF 2020-21 program funds received but not fully
expended (Library Makerspace, Gallery Masterclass, Grow
Your Arts, etc.
Tourism and Economic FireTech Intemational Conference grant. Funds received 50,000 50,000
Development in 2020/21 but not fully expended.
FireTech Connect Conference 2020 (QLD Gov't). Funds 4.238
received in 2020/21 but not fully expended.
Transport and Traffic Community Road Safety Grant. Funds received in 9,361
Planning 2020/21 but not fully expended.
Environmental Services Conservation Projects on Council Land funded as part of 200,000) -100,000 100,000
the $4 million Community Stimulus Program
Final grant payment for Conservation Projects on Council -10,753 -10,753
Land undertaken in 2020/21 funded as part of the $1.8
million Works for Queensland program
Bushfire Recovery (Various |Cat D 2019 Bushfire Exceptional Assistance Funding - 634,086 634,086
Areas) carryover of unspent 2 year project funds
Cat C 2019 Bushfire Community Recovery Funding - 117,593 117,593
carryover of unspent 2 year project funds
Queensland Bushfires Cat C Grant - further funding for 76,000) -76,000
Aged Care Sector
Local Economic Recovery Grant (LER). Program 84.823] -77,478 7,345
underway
Grant Funded Total 424,714] -364,234] 1,057,484)
llevyFunded |
Tourism and Economic Levy | Balance of unspent historical LEP levy program restricted 161,000 161,000
cash applied into Economic Promotion and Industry
Assistance programs
Levy Funded Total pot 184,000] | 161,000
[AdditionalRevenue | —C—s—“—*‘“CSs‘“‘“‘iYSSC‘(;
Financial Services Eligibility and backlog of claims under Fuel Tax Credit -250,000} -250,000
system reviewed with catchup claim identified from the last
4 financial years, plus forecast revenue for 2021/22
AdditionalRevenueTotal | CC—“‘(‘CONOOOOO CI -250,000] -250,000)
General Rate Funded Pf
Beaches and Canals Noosa River and Canal Dredging program - additional
background work from 2020/21 required for permit
extension
GeneralRateFundedTotal] — C—“‘(‘SSOOOOOCOC(’NTCOCT 33,050] ——s|33,050)
Page 49 of 92Section 50
Page 50 of 92
Tewantin Doonella BridgeRenewal 980,000, 26,593} 1,976,593 | Multi-year project. Design underway, with construction scheduled for 2021-22 to 2022-23
Cooran Tablelands Road Bridge Renewal —=S=S=S*=*~“*~*~*~*~*~*sS~*~*S*S«~SSSTB| «NTS OTA|S*|~S*S*~*S*~YCS*S*« 88,650 Mlt-year project. Tender & grant funding negotiations underway
‘Kin Kin Wanpunga Lane Bridge Renewal SSSSS~SS~«wiSBHBZD|_—~=«DHSHS|SS*|S*S*~*™SCSCS*«S*S 80,877 Multi-year project Tender & grant funding negotiations underway.
Cooroy Belli Creek RoadBridgeRenewal 900,000 20,165) | 879,835) Mult-year project. Design underway, with construction scheduled for 2021-2200
Noosa Heads Garth ProwdBridgeRenewal 000,000 4314) | __ 1,004,314 | Multi-year project. Design underway, with construction scheduled for 2021-22 to 2022-23
Black Mountain Lawnville Road Bridge Renewal 1,470,874 16,914) | __ 1,453,960 Multi-year project. Design underway, with construction scheduled for 2021-22000
Cooroy Gumtree Drive PedestrianBridge Construction 130,000,800
Total Bridges 7,460,772 134,457 0 0 7,595,229
NoosaHeadsDogBeachSEMP 1,090,000, 1.547) | S| _«A,441,547 Mult-yearproject Works scheduledfor 2021-220
Noosa WatersRevetmentWall 80000 78.768} | __ 128,768 Construction currently underway for revetment wall works. Expected completion Qt.
Replace Dune Fencing atFirstCutting-Catb20190 800 | __25,000 Construction commencing August for dune fencing work. Expected completion Q1.
Renewal of revetment wall at O-Boats Gympie Tce, Noosaville 175,000 | | ____ 175,000 Project is design ready, with scope revised to also T-Boatsemergent works.
Noosa Heads Main Beach Sand Recycling System PipeworkRenewal 100,000, 100,000)
Noosa Main Beach Removable Sand Break Seating Structure 7500000
Noosa Main Beach Shower & Rock Wall Seating Improvements 185,000 885,000
Noosa Heads Main Beach AccessbityMat | |__| 20.000, 2.000 810K cing contrxton om Sandy Boon towards beach mat. Scope and timing tobe confirmed.
Total Coastal Canals and Waterways 1,675,000 155,315 0 20,000 1,850,315
Cooroy Cemetery Plant &EquipmentShed 180,000 80,000)
Total Cemeteries 180,000 0 0 0 180,000
Rufous St- Stage 3 Community House, Car Park & Landscape 2,100,000 1,346.91) (3,446,491 | Multyear project. Construction works underway,
Rufous St=Stage 3 Digital Hub Expansion = SS~S*~“‘~*~*~étS*~“‘dR‘SSG’~S~*~*~*~*~*~*~™S~S*~*~*~*~*~YSCS*S*SC«S SG Multyear project Construction works underway.
Rufous St-Stage 3Project Management _—=SSSS~=~<“—~*~—~sSSC*‘“‘CN!#(#Y!”SOWC#OONG7|~~~~OW*~*~=«S~SS~SS~*«Y~S~~«29,767|Muliyear project Construction works underway
NAC ReplacementofLightPoleFitings 8D} | |___59,500) Replacement works delayed to 2021-220
Pomona School of Arts Hall- Amenities Upgrade-W4Q 183,590) -70,000/ SS ____ 113,590 W40 funded project under construction, with grant time extension approved.
Tewantin Sports Complex-NavyCadets-W4Q0 134,391) 70,000, |__204,391 | W240 funded project under construction, with grant time extension approved.
NAC Switchboard Replacement 185,000 | ___135,000|Reptacment works delayed to 2021-220
Living Fire Tech Lab-DisasterRecCatD 963,000, -28,092) 1,934,908 | Multiyear project. Planning underunderway. Construction scheduled for 2021-22, 0
Peregian Beach Rufous St Public At-Catb20i9.~=~=~*~*~*~<“‘*”S*SC*OYS*« BBA] SS*S*S*~*~S:*S*~<“*‘“‘*SCS*«G, BG Fre Recovery Grant Project (CatD).Notyetcommenced —SSS~S
Sunshine Beach NAC Dosing ControlierRenewals 170008000
‘Sunshine Beach NAC PoolCleanerRenewal 98,000 28,000
Tewantin ReGen Wellbeing and Community Hub Feasability Study | 100.000, 000
Total Community Facilities 4,209,000 1,915,446 0 0 6,124,446
Corporate Buildings
Page 50 of 92Section 51
Page 51 of 92
Noosa Depot Roof Replacment 5000 5,000 Carryover of final invoice costs for depot works completed in 2020/21
Tewantin Emergency Generator 5000800
Total Corporate Buildings 15,000 5,000 0 0 20,000
Trails Master Plan and Implementation Plan 55S ____ 68,553) Multiyear project. Planning underunderway. Construction scheduled for 2021-22.
Trail 5 Upgrade 1,440,725 193440, ~~ | ~~~, _ 4,634,165) Multiyear project. Planning underunderway. Construction scheduled for 2021-22.
Total Environmental Assets, Bushland, Tracks and Trails 1,440,725 258,993 0 0 1,699,718
Shire Gravel Resheeting Annual Program 41000000 410,000)
Total Gravel Road Network 410,000 0 0 0 410,000
Boreen Point Campground Upgrade Works - U&R at -30171, 70000 39,829 U&R grant funded project under construction, with grant time extension approved.
Total Holiday Parks 0 (30,171) 70,000 0 39,829
Whole of Shire Mobile Library Service Solution 346916 696,916 Vehicle on order, with procurement underway for kiosks
New Regional Art Gallery Pre-Feasibility Study 125,000) 925000
Total Libraries & Galleries 475,000 346,916 0 0 821,916
Noosa Hinterland Priority Playground 421248, = | ~—————s«|_—s« 4,160,752) Multiyear project. Construction works underway. Scheduled for completion December.
Sunshine Beach Skate Park New Shade Structure - U&R ee) 130137, 0 130,137 |U&R funded project about to commence construction, with grant time extension approved.
Lake Cooroibah Foreshore - CatD2019 500008 50,000 Fire Recovery Grant Project (Cat D). Not yet commenced.
Replace Shade Shelters at Noosa Banks - CatD 2019 18,821) | 13,821 | Fire Recovery Grant Project (Cat D). Not yet commenced.
Sunshine Beach Metal Skate Ramp Renewal 380,000,500
Total Parks & Playgrounds 4,932,000 -227,290 0 0 4,704,710
Noosa Heads Noosa Parade Road Corridor Upgrade - Design «2,000,000 -152833,— 1,847,167 | Multiyear project. Planning underunderway. Construction scheduled for 2021-22 to 2022-23.
Cooroy Maple Street Raised Pedestrian Crossing - LGGSP 316,000 567407, = = ss 883,407 Multiyear project. Construction works underway. Scheduled for completion Q2.
Tewantin, Hilton Terrace CNLGGP & Ivory Palms ee) 69909 20,000, += =~—~—~—_ 89,909 Commencement of works delayed, with $20k variation identified.
Noosaville Sea Eagle Drive & Shire Drive Pathway Upgrades ee) 176418, 176,418 | Works underway, with reseal work to be finalised in Q1 2021-22 to finish project.
Peregian Beach Boardwalk - U&R en) 32371, 32,371 U&R funded project under construction, with grant time extension approved.
Noosa Heads First Point-Picture Point Lighting Renewal 80,0000) 80,000
Sunshine Beach Belmore Terrace Pathway Renewal 100,000) 100,000
Castaways Beach Flagship Ct Missing Pathway Link Expansion 000) 00
Cooroy Maple St Pathway Overtander Av to Bruce Hwy 190.0000 190,000)
Cooroy Tewantin Rd Missing Pathway Link 80,500) 80,500
Noosaville Bluebell Ct Missing Pathway Link 13,000) 13,00
Pomona Stan Topper Park Pathway Link 92,000) 92,000
Tewantin Tinaroo Place Missing Pathway Link 12,000) 92000
Page 51 of 92Section 52
Page 52 of 92
Project Description 2021-22 Carryover Variation Emergent 2021-22 Comments
Original Works Revised
Budget Budget BR1
Tewantin Poinciana Avenue Pathway 45,000 -45,000 0 Duplicate project proposed for removal. Forecast for 2022/23 ($150k budget)
Park Rd Boardwalk Renewal - Temporary Path Removal 135,000 135,000 | Council resolution in April 2021 to remove the temporary footpath and remediate site
Total Pathways & Boardwalks 2,770,500 648,272 20,000 135,000 3,573,772
Public Transport Infrastructure
Shire Bus Shelter Disabled Compliant Program Annual - PTIAP Delays with completing all scheduled bus shelter replacements for 2020-21; to be undertaken in
275,000 77,391 352,391 | 2021-22.
Total Public Transport Infrastructure 275,000 77,391 0 0 352,391
Sealed Roads Network
Shire Reseal & Rehabilitation Renewal Program Annual 5,290,000 273,112 5,563,112 LRCI grant funded reseal works currently underway
Tewantin Bypass Stage 1 8,800,000 113,379 8,913,379
Total Sealed Roads Network 14,090,000 386,491 0 0 14,476,491
Sports Ground and Facilities
Cooroy Sports Complex Master Plan Implementation 50,000 50,000
Total Sports Ground and Facilities 50,000 0 0 0 50,000
Stormwater Drainage
Gympie Terrace Stormwater 560,000 33,689 593,689
Shire Bioretention Basin Renewals Program Annual 75,000 75,000
Noosaville, Project Ave Stormwater Drainage Easement Upgrade 152,324 63,982 216,306
Sunrise Beach Sobraon Street Slope Stabilisation - W4Q &LRCI 0 669.677 669.677
Dath Henderson Culvert Repairs 148,248 148,248 Emergent renewal works to culverts on Dath Henderson Road
Noosaville Foreshore Park Stormwater Renewals 200,000 200,000
Total Stormwater Drainage 987,324 767,349 0 148,248 1,902,921
Transport and Infrastructure Management
Whole of Shire Forward Planning & Design Program 400,000 400,000
Tewantin, Hilton Tce & Emest St Intersection Upgrade 0 30,854 30,854 Late Unitywater invoice received for mains relocation on on Hilton Terrace
Transport Strategy, Walking & Cycling Strategy &CNLG Grant 0 42.054 42.054
Noosa Heads Bus Station Options Analysis and Concept Design 0 200,000 200,000 | TMR contribution for planning works (50/50 TMR & council contribution)
Tewantin Doonella St & Memorial Ave Intersection Upgrade 275,000 275,000
Successful grant funding for planning works (50/50 grant & council contribution) to occur over 2021-
Noosa Drive New Pathway Reef Hotel to Noosa Parade Planning & Design 270,000 270,000 22 and 2022-23
Total Transport and Infrastructure Management 675,000 42,054 30,854 470,000 1,217,908
Waste Management
500974 - Noosa Heads The
5 1 1 1 36 6 522 1942 97 22 96 Woods Bin Storage Enclosure 0 41,076 41,076 Completion of works delayed to 2021-22
500976 - Masterplan Landfill SW Controls & Design 0 63,356 63,356 Multiyear project. Construction to commence 2021-22.
510042 - Noosaville Eumundi Road Landfill Outbound Weighbridge 500,000 53,885 553,885 Multiyear project. Construction to commence 2021-22.
510043 - Noosaville Eumundi Road Landfill Liner, Cell capping design 1,610,000 22,462 1,632,462) Multiyear project. Construction to commence 2021-22.
510044 - Noosaville Eumundi Road Landfill Expansion of Resource Recov 250,000 18,727 268,727 Multiyear project. Construction to commence 2021-22.
Total Waste Management 2,360,000 199,506 0 0 2,559,506
Page 52 of 92Section 53
Page 53 of 92
Other Capital CES FRU Y 1,187,047 : 1th 6,115,238
Shire Bridge Annual Level 3 Inspections Annual 150,000 150,000
Zero Emssens Noosa fojet npsmeniaton Otc
et to be invoiced
Shire CCTV Drainage Condition Assessment Program Annual 200,000 200,000
Shire Road Infrastructure Asset Data Mgt & Condition Annual 200,000 200,000
Asset Management Systems Implementation 200,000 200,000
Noosa Junction Streetscape 87, 26,047 Levy funded planning and design work underway for Noosa Junction
Total Asset Management 1,150,000 76,047 0 0 ‘1,226,047
Plant and Fleet Replacement Progrz 4042000 = | | 2727.900| Carryover for plant and fieet due to delays in delivery
VHF Vehicle Installation - Cat D 2019 36,191} 36,191 | Reallocation of available Bushfire Recovery Grant to fund VHF
Total Fleet - Plant Replacement 1,685,000 1,042,000 0 36,191 2,763,192
Implementation of C1 Anywhere Functionality for TechnologyOne 600,000) — 69.0000 S| SS 669,000 Implentation of automated invoicing and Governance system review delayed from 2021-22
Total Information Technology 600,000 69,000 0 0 669,000
QTC Capital Debt Redemption 4,297,000, 0,297,000
Total Other 1,297,000 0 0 0 ‘1,297,000
Shire Project Place Spaced Approach - Placemaking Pilot Program 160,000 60,000
Total Planning Scheme Expansion 160,000 0 0 0 160,000
Grand Total 46,897,321 5,866,777 120,854 809,439 53,694,391
Page 53 of 92Section 54
Page 54 of 92
Noosa Shire Council
2021/22 Capital Budget Review 1 - Capital Program ATTACHMENT 3
Renewal Projects
Program ogi lel a) er ee a Te Loans _evy Reserves General Rates Total
Or ore ACen
__ Coastal Canals and Waterways | Noosa Heads Main Beach Sand Recycling System PipeworkRenewal | 100,000 | 100,000 |
__ Coastal Canals and Waterways | Noosaville Noosa Waters Lock & Weir Annual Renewal Progam CO 5,00] 0,000|
__Coastal Canals and Waterways | Noosaville Gympie Terrace Revetment Wall Renewal 175-000) 175,000
___Coastal Canals and Waterways ss [Noosa Waters Revetment Walle 8B) 78,768)
___Coastal Canals and Waterways _——————s«| Replace Dune Fencing at FirstCutting-CatD2019————(i 5,000) 25,000
Community Facilities =——SSs«| Sunshine Beach NAC - Dosing Controller Renewals 17,000} 17, 000 |
___Community Facilities -——SSs« Sunshine Beach NAC - Pool CleanerRenewal CO 29,000) 2, 000|
___Community Facilities SS INAC ReplacementofLightPole Fittings, 9500) 59,500
___Community Facilities =| Tewaantin Sports Complex - Navy Cadets-W4Q 00 204,391) 204,391 |
___Community Facilities SSS (NAC Switchboard Replacement: 185,000) 135,000 |
___GravelRoadNetwork = —C*Shife Gravel Resheeting Program 410,000) 410,000 |
__Libraries & Galleries ——C—CSCC*d Site Mil Library Service Solution, CC 96916} 896,916)
Parks & Playgrounds SSC Sunshine Beach Metal SkateRamp Renewal 350,000) 350,000
Parks & Playgrounds SSCs Replace Shade Shelters at NoosaBanks-CatD2019 0 1,821] 18,821
__Pathways &Boardwalks «| Sunshine Beach Belmore Terrace PathwayRenewal 100,000) 100, 000 |
__Pathways & Boardwalks SSCS NS Heads First Point - Picture PointLightingRenewal —(—si‘“‘L 80,000) 60,000
__Pathways & Boardwalks ——CSCSC#di Peefegian Beach Boardwalk-U&Ro 8237 82,871
__Pathways & Boardwalks —=——SSS—s«| Park Rd Boardwalk Renewal-TemporaryPathRemoval Ci‘ 135,000) 135,000
___Public Transport Infrastructure (| Shire Bus Shelter Disabled Compliant Program: Year8— CY 48 78,841) 327,391
___Sealed Roads Network «Shire Reseal Program 85478 8,708,376) 5,563,112 |
__Stormwater Drainage = Noosaville Gympie Terrace Stormwater Renewals 593,689} 593,689)
___Stormwater Drainage Cd Shite Bico-Retention Basin Renewals Program CC 000) 75,000
__Stormwater Drainage —SSCSCSC_—=C NOSville Noosaville Foreshore Park Stormwater Renewals 200,000) 200,000
__ Stormwater Drainage SSCS ath Henderson Culvert Works ———“‘“‘ WC 148248) 148,248 |
___Streetscapes and Road Corridors _—_—_—s|Noosa Heads Noosa Parade Corridor Upgrade 782,167) 1,847,167!
__ Transport and Infrastructure Management __| Shire Forward Planning & Design Program ConstructionReadyDesigns CO] 400,000) 400, 000|
Capital Works Tot 6550000, 11,865,271) 19,421,604
Other Capital
Asset Management Shire CCTV Drainage Program 200,000 200,000
Asset Management Shire Road Infrastructure Asset Data Management & Condition Program 0 200,000 200,000
Asset Management Shire Bridge Annual Level 3 Bridge & Structure Inspections 150,000 150,000
Fleet - Plant Replacement Council Fleet and Plant Replacement Program 2,727,000 2,727,000
Fleet - Plant Replacement VHF Vehicle Installation - Cat D 2019 36,191 36,191
ea ow pital Total , |! 7 , , 3,313,191 , 3,313,191
Grand Total 5,949,672 150,000 ihe rie Coy2 22,734,795
Page 54 of 92The text continues on section 55.