Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2021-08-16 General Committee Meeting Agenda

of 92

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


             General
         Committee Meeting


             Monday, 16 August 2021

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
             Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener



                    “Noosa Shire – different by nature”
Log in to download the original file

2021-08-16 General Committee Meeting Agenda(PDF, 8MB).pdf · 8.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 54 (of 92)

Section 2

GENERAL COMMITTEE MEETING AGENDA                                   16 AUGUST 2021


TABLE OF CONTENTS

ITEM                                                                        PAGE

1      ATTENDANCE & APOLOGIES                                                       3

2      CONFIRMATION OF MINUTES                                                      3

3      PRESENTATIONS                                                                3

4      DEPUTATIONS                                                                  3

5      ITEMS REFERRED FROM COMMITTEES                                               3

       1    MCU21/0054 - DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF
            USE – SHORT TERM ACCOMMODATION AT 30 KINGFISHER DRIVE,
            PEREGIAN BEACH                                                          3

       2    MCU21/0079 - DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF
            USE – SHORT TERM ACCOMMODATION AT 4 TEAL STREET, PEREGIAN
            BEACH                                                                   3

       3    CLIMATE CHANGE RESPONSE PLAN AND COMMUNITY CONSULTATION
            SUBMISSIONS                                                             3

       4    NOOSA TRAIL MASTERPLAN UPDATE                                           3

       5    FRYING PAN PUBLIC FORESHORE INFRASTRUCTURE                              4

       6    NOOSA NORTH SHORE FERRY UPDATE AND PROPOSED LEASE
            EXTENSION                                                               4

6      REPORTS DIRECT TO GENERAL COMMITTEE                                          5

       7    MCU20/0072 – APPLICATION FOR MATERIAL CHANGE OF USE –
            EDUCATIONAL ESTABLISHMENT - AT 115 EUMUNDI-NOOSA ROAD,
            NOOSAVILLE                                                              5

       8    OPERATIONAL PLAN PROGRESS REPORT – 4TH QUARTER 2020-21              27

       9    BUDGET REVIEW 1 (BR1) FOR THE 2021/22 FINANCIAL YEAR                44

       10   FINANCIAL PERFORMANCE REPORT – JULY 2021                            63

       11   UPDATE ON COASTAL HAZARDS ADAPTATION PLAN (CHAP)                    76

       12   YEAR IN REVIEW – 2020-21                                            79

7      CLOSED SESSION                                                     92




                                                                     Page 2 of 92

Section 3

GENERAL COMMITTEE MEETING AGENDA                                                 16 AUGUST 2021



1   ATTENDANCE & APOLOGIES




2   CONFIRMATION OF MINUTES

    The Minutes of the General Committee Meeting held on 12 July 2021 be received and
    confirmed.


3   PRESENTATIONS

    Nil.




4   DEPUTATIONS

    Nil.




5   ITEMS REFERRED FROM COMMITTEES

    PLANNING & ENVIRONMENT COMMITTEE

    1      MCU21/0054 - DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE
           – SHORT TERM ACCOMMODATION AT 30 KINGFISHER DRIVE, PEREGIAN
           BEACH
           (Planning & Environment Committee Agenda, 10 August 2021, Item 4, Page 48)
           Reason for referral – Significance of the issue


    2      MCU21/0079 - DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE
           – SHORT TERM ACCOMMODATION AT 4 TEAL STREET, PEREGIAN BEACH
           (Planning & Environment Committee Agenda, 10 August 2021, Item 5, Page 65)
           Reason for referral – Significance of the issue


    3      CLIMATE CHANGE RESPONSE PLAN AND COMMUNITY CONSULTATION
           SUBMISSIONS
           (Planning & Environment Committee Agenda, 10 August 2021, Item 7, Page 84)
           Reason for referral – Significance of the issue


    4      NOOSA TRAIL MASTERPLAN UPDATE
           (Planning & Environment Committee Agenda, 10 August 2021, Item 8, Page 96)
           Reason for referral – Significance of the issue



                                                                                        Page 3 of 92

Section 4

GENERAL COMMITTEE MEETING AGENDA                                              16 AUGUST 2021


   5   FRYING PAN PUBLIC FORESHORE INFRASTRUCTURE
       (Planning & Environment Committee Agenda, 10 August 2021, Item 9, Page 109)
       Reason for referral – For further consideration


   SERVICES & ORGANISATION COMMITTEE

   6   NOOSA NORTH SHORE FERRY UPDATE AND PROPOSED LEASE EXTENSION
       (Services & Organisation Committee Agenda, 10 August 2021, Item 1, Page 4)
       Reason for referral – Significance of the issue




                                                                                     Page 4 of 92

Section 5

GENERAL COMMITTEE MEETING AGENDA                                                          16 AUGUST 2021


6      REPORTS DIRECT TO GENERAL COMMITTEE


7      MCU20/0072 – APPLICATION FOR MATERIAL CHANGE OF USE – EDUCATIONAL
       ESTABLISHMENT - AT 115 EUMUNDI-NOOSA ROAD, NOOSAVILLE


Author                Coordinator Planning, Patrick Murphy
                      Environment and Sustainable Development Department

Index                 ECM/ Application/ MCU20/0072

Attachments           1.   Proposal Plans
                      2.   Existing and Proposed carparking plans
                      3.   Deed of Agreement (Attachment provided separately to this report)



    APPLICATION DETAILS

    Applicant                        Good Shepherd Lutheran College

    Proposal                         Material Change of Use - Educational establishment

    Properly Made Date               3 August 2020

    Information Request Date         31 August 2020

    Information Response Date        10 September 2020

    Decision Due Date                20 August 2021



    PROPERTY DETAILS

    Property Address                 115 Eumundi Noosa Road Noosaville Qld 4566

    RP Description                   Lot 1 SP 228052
                                     Lot 30 SP 170751

    Land Area                        56,755m²
                                     5,014m²

    Existing Use of Land             Educational Establishment



    STATUTORY DETAILS

    SEQRP Designation                Urban Footprint

    Zone                             Community Facilities (6 – Educational Establishment)

    Precinct                         Not applicable

    Local Plan Area                  Noosaville

    Overlays                         Land Subject to Acid Sulfate Soils

    Assessment Type                  Code



                                                                                               Page 5 of 92

Section 6

GENERAL COMMITTEE MEETING AGENDA                                                        16 AUGUST 2021


RECOMMENDATION
That Council note the report by the Coordinator Planning to the General Committee Meeting dated
16 August 2021 regarding MCU20/0072 for a Development Permit for Material Change of Use –
Educational Establishment, situated at 115 Eumundi-Noosa Road Noosaville and:
A.   Approve the application subject to the following conditions:
     PLANNING
           When Conditions must be Complied With
     1.    Unless otherwise stated, all conditions of this Decision Notice must be complied with
           prior to the use commencing, and then compliance maintained at all times while the use
           continues.
           Approved Plans
     2.    Development undertaken in accordance with this approval must generally comply with
           the approved plans of development. The approved plans are listed in the following table
           unless otherwise amended by these conditions.

             Plan No.    Rev.    Plan/Document Name                                       Date

             SK-01       P1      Location Plan prepared by Burling Brown Architects       01.07.2020

             SK-02       P3      Proposed Site Plan prepared by Burling Brown             20.07.2020
                                 Architects

             A-000       I       Schedules – Building Shell (MQB) prepared by             15.07.2020
                                 Ausco Modular

             A-001       I       Site Plan (MQB) prepared by Ausco Modular                15.07.2020

             A-100       I       Site Plan (MQB) prepared by Ausco Modular                15.07.2020

             A-101       I       Roof Plan (MQB) prepared by Ausco Modular                15.07.2020

             A-200       I       Elevations (MQB) prepared by Ausco Modular               15.07.2020

                                 Concept plan detailing upgrade of the existing drop-
                                 off/pick-up / carpark configuration

                                 Plan detailing options for internal vehicular link

           Amenity
     3.    The development must be undertaken and operated in a manner that causes no
           detrimental effect upon the amenity of the neighbourhood by reason of the creation of
           excessive noise, lighting nuisance or other emissions.
     4.    Any advertising sign or device is to comply with the provisions of Council's policies on
           advertising.
           Nature and Extent of Approved Use
     5.    The approved demountable buildings must only be used to service current enrolments
           and must not be used to facilitate an increase in enrolments.
     6.    The number of students must not exceed 1105.
     7.    A minimum of 328 car parking spaces must be provided on site.

                                                                                           Page 6 of 92

Section 7

GENERAL COMMITTEE MEETING AGENDA                                                 16 AUGUST 2021


           Currency Period
     8.    This development approval lapses if the use has not happened by 20 August 2027,
           unless an application to extend the currency period is approved by Council.
           Land Amalgamation
     9.    Lot 1 on SP228052 and Lot 30 on SP170751 must be amalgamated.
           Traffic
     10.   The drop off/pick up/ carpark configuration, accessed from the Goodchap
           Street/Eumundi Noosa Road roundabout entry, as detailed in the approved plans must
           be upgraded in accordance with an Operational Works approval.
     11.   An internal one-way vehicular link from the new staff car park to the Goodchap
           Street/Eumundi Noosa Road roundabout exit as detailed in the approved plans must be
           provided in accordance with an Operational Works approval.
     12.   The applicant will comply with the requirements of any deed of agreement entered into
           with Council with respect to:
           a.    The upgrade of the drop off/pick up/ carpark configuration accessed from the
                 Goodchap Street/Eumundi Noosa Road roundabout entry; and
           b.    The provision of an internal one-way vehicular link from the new staff car park to
                 the Goodchap Street/Eumundi Noosa Road roundabout exit.
     ENGINEERING
           Stormwater Drainage
     13.   The site must be provided with a stormwater drainage system connecting to the existing
           school drainage system and the lawful point of discharge.
     14.   Any damage caused to existing services and assets as a result of the development works
           must be repaired at no cost to the asset owner at the following times:
           a.    where the damage would cause a hazard to pedestrian or vehicle safety,
                 immediately; or
           b.    where otherwise, upon completion of the works associated with the development.
           Any repair work which proposes to alter the alignment or level of existing services and
           assets must first be referred to the relevant service authority for approval.
B.   Enter into a Deed of Agreement with the applicant that provides for the carrying out of upgrade
     works to the drop off/pick up/ carpark configuration accessed from the Goodchap
     Street/Eumundi Noosa Road roundabout entry and an internal vehicular link.
C.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.



REPORT
1.   PROPOSAL
The application seeks approval for a Material Change of Use - Educational establishment.
The applicant submits the following:
     The proposal involves relocation of an existing demountable and a new additional
     demountable. An additional 290m2 of GFA is proposed. The demountable buildings are



                                                                                      Page 7 of 92

Section 8

GENERAL COMMITTEE MEETING AGENDA                                                  16 AUGUST 2021


     intended to fulfil a temporary role while other development applications for new permanent
     buildings are pursued and which will require demolition of some existing buildings.
     The additional demountables will not be used to facilitate an increase in enrolments but rather
     to service current enrolments more appropriately. The demountables will be located within the
     existing central staff carparking area, which will become surplus once the new staff carpark is
     completed.
     The demountable buildings will proceed once the new staff carpark is operational.
     The new staff carpark is the first step in the proposed plans by GSLC for refurbishment and
     upgrade to the existing campus. We again confirm this is not intended to facilitate increased
     enrolment, but rather to provide a more modern and comprehensive learning facility.
The applicant has also advised:
     The demountable buildings are required due to two areas of need, temporary replacement of
     some existing buildings which will be demolished with future construction, and to provide
     sufficient suitable spaces for current demand. While the demountables are intended to fulfil a
     dual role, they are required to fill an immediate need and will therefore be required until that
     need has been replaced with permanent structures.
     The masterplan included with the application details the current intent for future works on the
     site. Planned works over the next 8 years include a Performing Arts building, a new
     Administration building and a new classroom building. The current construction program will
     require the demolition of an approximately 200m2 administration building in 2021. The
     administration functions within that space will be moved to two existing classrooms, the
     demountable building will be used to house those two displaced classes.
The locality and proposal plan are included below.




                                         Figure 1 – Locality




                                                                                       Page 8 of 92

Section 9

GENERAL COMMITTEE MEETING AGENDA                    16 AUGUST 2021




                           Figure 2 – Master Plan




                            Figure 3 – Site Plan




                                                       Page 9 of 92

Section 10

GENERAL COMMITTEE MEETING AGENDA                                     16 AUGUST 2021




                                Figure 4 – Floor Plan




                  Figure 5 – Elevations – New Demountable Building




                                                                       Page 10 of 92

Section 11

GENERAL COMMITTEE MEETING AGENDA                                                       16 AUGUST 2021




                          Figure 6 - 3-D Renderings – New Demountable Building


2.    SITE DETAILS
2.1. Background
A number of development applications exist over the site. An overview of the site history is included
below.

 Development Applications

 MCU18/0097       Education Type 2 School (Car park)

 MCU17/0073       Wellbeing Type 3 Worship

 05/0355          Change to Existing Approval – new temporary administration building
                  and classroom

 REC15/0022       Reconfiguration of a lot

 MCU15/0095       Vehicle Uses Type 5 – Service Station & Retail Business Type 2 Shop

 07/1466          Education Type 1 - Childcare

 05/0355          Change Relevant Period, Change to Development Approval,
                  Condition to a Condition of Approval

 05/0355          Extension to Educational Establishment

 23134 DA         Educational Establishment, Place of Worship & Industrial Uses with
                  Staged Lot Reconfiguration

When Council approved the application for the car park on the corner of Eumundi Noosa Road and
Walter Hay Drive Council resolved to: advise the applicant that any proposed layout (as indicated in
the submitted masterplan – Attachment 3) which seeks to move the primary vehicle access to the
site from the Goodchap Street roundabout to Walter Hay Drive and fails to provide an appropriate
internal link between the existing and proposed car park areas, is considered to result in a highly
undesirable traffic outcome and is unlikely to be supported by Council as a result.
It is noted from the school’s master plan that the school still intends move the primary vehicle access
and not provide the desired internal link.




                                                                                         Page 11 of 92

Section 12

GENERAL COMMITTEE MEETING AGENDA                                                   16 AUGUST 2021


2.2. Site Description
The site comprises two parcels of land (Lot 30 SP170751 & Lot 1 SP228052) both known as 115
Eumundi Noosa Road. The smaller 5,014m2 vacant parcel of land, Lot 30 SP170751, is used for the
new staff car park. The larger 56,755.06m2 parcel of land contains the existing Good Shepard
Lutheran College school development. The proposed additional demountable buildings are
proposed on the larger lot.
2.3. Surrounding Land Uses
The site is surrounded by industrial, residential, community and open space recreation land uses.
3.         ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
        State Planning Policy;
        South East Queensland Regional Plan;
        Planning Regulation 2017;
        Noosa Plan 2020.
The following codes from the Noosa Plan are applicable to this development:
        Noosaville Local Plan Code
        Community Facilities Zone Code
        Community Activities Code
        Works Codes
The subject site is located in the Noosaville Locality and is zoned Community Facilities. The
proposed use is identified as a consistent use within the zone and is required to follow a code
assessable application process.
The application has been found to generally comply with all applicable statutory instruments. The
pertinent issues arising out of the assessment are discussed below:

     Criteria                     Planning Scheme               Proposal               Complies

     Site Area                    N/A                           56,755.06m²
                                                                5,014m²

     Gross floor area             Individual buildings to not   Approx. 290m2          
                                  exceed 1,000m²

     Site cover                   50% max                       Approx. 43 %           

     Landscaped open space 15% min                              >15%                   

     Building height
          storeys                2 storeys max                 1 storey               
          metres                 8 metres                      Approx. 4 metres       


                                                                                     Page 12 of 92

Section 13

GENERAL COMMITTEE MEETING AGENDA                                                       16 AUGUST 2021



      Criteria                  Planning Scheme                 Proposal                      Complies

      Boundary setbacks
       Frontage                6 metres min                    > 6 metres                    
       Side                    3 metres min                    > 6 metres                    

       Side                    3 metres min                    > 6 metres                    

       Rear                    3 metres min                    > 3 metres                    

      Length of wall            30 metres max                   30.850 metres                 X

      Carparking                182 required                    278 proposed                  

Car parking/Vehicle circulation/Impact on local road network
The primary issue associated with the proposal is that the location of the demountable buildings and
relocation of the administration building results in the loss of existing car parking accessed from the
Goodchap Street roundabout and the opportunity for vehicle circulation which this area provides for.
The loss of internal circulation within the site has the potential to result in additional queuing at the
Goodchap Street roundabout and exacerbate the existing impacts on the local road network.
When the application was made the existing carparking on site comprised 226 spaces. The applicant
advises that the proposed carparking now comprises 278 spaces, after addition of the new 153
space staff carpark (MCU18/0097) and proposed removal of the existing 94 space staff carpark and
other minor changes to car parking on the site. The applicant has based this figure on the loss of car
parking that would be associated with development in accordance with its Master Plan.
The applicant maintains that the traffic engineering report submitted with the application
demonstrates that the proposed carparking provision of 278 spaces (which includes 255 college
carks, plus 8 setdown and 15 child care spaces) complies with both Council and TMR requirements
and actual parking demand analysis.
The proposed location of the demountable building does not require the removal of all 94 car parking
spaces, and review of the plans indicates that at least 50 car parking spaces can be retained in this
area. It is recommended that a condition be included requiring the maintenance of these 50 spaces
via the provision of at least 328 car parking spaces. The loss of additional spaces should be
addressed as part of any future applications which seek to develop the site.
When reviewing the proposal Council’s consulting traffic engineer advised:
i.       My previous site inspections have indicated operational issues at the main set-down / pick-up
         area accessed via the Goodchap Street roundabout, with queuing from the set-down / pick-up
         area extending back into the roundabout for extended periods (more than 15 minutes) and this
         impacting negatively on its operation. The Hayes Traffic Engineering (HTE) report of June
         2020 suggests that this no longer occurs, presumably due to management measures
         implemented by the college.
ii.      It is evident from the detailed traffic count and parking information contained in the HTE report
         that there is substantial set-down / pick-up activity that occurs in the existing informal parking
         area that will soon be formalised as staff parking, and in particular that when the main set-
         down / pick-up facility reaches capacity, that the set-down / pick-up activity then transfers
         further down the road to that existing informal area. When the existing informal parking area
         is converted to formal staff parking, that overflow pick-up / set-down activity from the main area
         off the Goodchap St roundabout will then need to be accommodated on other parts of the site.



                                                                                           Page 13 of 92

Section 14

GENERAL COMMITTEE MEETING AGENDA                                                             16 AUGUST 2021


iii.     My concern is that without satisfactory improvements to the existing formal set-down / pick-up
         areas / zones on the site and how they operate, that the increased peak period set-down /
         pick-up activity at the main area off the Goodchap Street roundabout, as a result of the informal
         area no longer being available, will again cause queuing to extend back unsatisfactorily into
         the Goodchap Street roundabout.
iv.      Those concerns would likely be overcome if the existing internal staff parking area is retained
         and used for overflow set-down / pick-up activity, or if improvements to the existing main set-
         down / pick-up area are implemented along the lines of those suggested in Section 7 of the
         HTE report together with preparation and implementation of an appropriate operational
         management plan detailing how the set-down / pick-areas would be managed to ensure that
         queuing back into the Goodchap St roundabout does not occur.
v.       If Council agrees to elimination of the internal staff parking area, without appropriate
         improvements to on-site set-down / pick-up areas together with implementation of an
         appropriate parking and set-down area management plan, then the opportunity to have those
         improvements implemented in the future will likely be lost. This is because the College could
         at the time of future applications then simply say that they are not increasing the on-site student
         population such that the then existing parking and set-down areas do not need to be modified
         / improved. That is, the most appropriate time for Council to seek improvements to the existing
         set-down / pick-up areas and on-site parking management, is prior to removal of the existing
         on-site staff parking area.
In response to this request and subsequent to discussions between Council’s consulting traffic
engineer and the applicant’s traffic engineer the applicant agreed to undertake works to upgrade the
drop off/pick up/ carpark configuration accessed from the Goodchap Street/Eumundi Noosa Road
roundabout entry and for the provision of an internal one way vehicular link from the new staff car
park to the Goodchap Street/Eumundi Noosa Road roundabout exit. The following images detail the
concept drawing for the upgrade works and the two options for the internal one way vehicular link.




       Figure 7 – Concept drawing for upgrade to the drop off/pick up/ carpark configuration accessed from the
                                Goodchap St/Eumundi Noosa Rd roundabout entry



                                                                                                 Page 14 of 92

Section 15

GENERAL COMMITTEE MEETING AGENDA                                                        16 AUGUST 2021




                      Figure 8 – Proposed options for internal one way vehicular link

The applicant has requested that a timeframe of 18 months, from the commencement of the use of
the demountable buildings, be allowed for the completion of the upgrade works on the basis that:
    The upgrade works require the preparation of additional material for an Operational Works
     application for the works; and
    The timeframe for obtaining an Operational Works application will add further delay to the
     delivery of the works.
    The commencement of the use of the demountable buildings is required to facilitate future
     development of the site as anticipated by the Master Plan (further approvals required).
A period of 18 months has also been requested to implement the internal one-way vehicular link.
Furthermore, the applicant has requested that within 12 months from the commencement of the use
of the demountable buildings that they be permitted to submit a detailed traffic impact assessment
prepared by a suitably qualified RPEQ (traffic engineer) in accordance with any applicable planning
scheme requirements to support a request to delete the requirement to complete the internal
vehicular link. The applicant requests this as they do not consider the internal link is desirable or
necessary for management of the school’s traffic.
It is necessary to enter of Deed of Agreement to facilitate the 18 month delay and further review as
requested by the applicant. Furthermore, entering into a Deed of Agreement provides certainty that
the works and requirements of the deed and related conditions within the Development Approval are
met. Accordingly, a Deed of Agreement has been prepared which has been executed by the
applicant. The deed sets out the terms of agreement between the parties as to the scope of the
works, timeframe for completion of these works and the provision of a $900,000 security for the
performance of the works, being 1.5 times the cost of the works.




                                                                                          Page 15 of 92

Section 16

GENERAL COMMITTEE MEETING AGENDA                                                    16 AUGUST 2021


In this instance the applicant’s proposed delay and request for further review are supported on the
basis that this will allow a traffic study to be completed and determine the actual functioning and
impacts of the new carpark on the corner of Eumundi Noosa Road and Walter Hay Drive. In the
circumstances where Council does not agree to delete the requirement the applicant must complete
the works in accordance with the terms of the deed within the timeframe stipulated...
Built Form
Acceptable Outcome AO18.2 of the Community Facilities Zone Code seeks for the maximum length
of a wall to be 30 metres. The proposed demountable buildings have a length of 30.85 metres.
Despite exceeding the Acceptable Outcome the proposal is considered to comply with the relevant
Performance Outcome as:
     The demountable buildings are not inconsistent with the scale and bulk of surrounding
      development noting that the site includes a number of larger buildings, as would be expected
      for an education facility as it needs to accommodate a significant number of students;
     The low form of the demountable buildings and the setbacks to surrounding properties means
      that the proposal will not present an appearance of bulk to adjacent properties, roads or other
      areas in the vicinity of the site;
     Significant screening vegetation is located to the Walter Hay Drive frontage which screens
      views of the area where the demountable buildings are to be located; and
     The demountable buildings are to be located on an existing hardstand area and will not require
      the removal of vegetation
4.    CONSULTATION
4.1. Referral Agencies
The applicant was referred to the following Referral Agencies:
Energex - the Department is a referral agency for Electrical Infrastructure
The Department has responded advising that it has no requirements.
4.2. Internal Council Referrals
The application was forwarded to the following internal Council officers:
    Coordinator, Development Engineering
The application was also referred to an external traffic consultant and planning solicitor.
5.    CONCLUSION & REASONS FOR DECISION
The application seeks to utilise an existing car parking area for the purpose of placing demountable
buildings including the relocation of an existing administration building. The demountable buildings
are intended to fulfil a temporary role while other development applications for new permanent
buildings are pursued and which will require demolition of some existing buildings. Whilst a new staff
car park has recently been constructed at the corner of Eumundi-Noosa Road and Walter Hay Drive
the loss of the car parking area within the site raises concerns. The concerns relate to the impact
the loss of this area will have on vehicle circulation and how resultant queuing at the Goodchap
Street roundabout may impact on the local road network. Accordingly, conditions have been included
which require upgrade of the drop off/pick up/ carpark configuration accessed from the Goodchap
Street/Eumundi Noosa Road roundabout entry and for the provision of an internal one way vehicular
link from the new staff car park to the Goodchap Street/Eumundi Noosa Road roundabout exit. A
Deed of Agreement has been prepared and executed by the applicant to allow for an 18 month
deferral of the works and the opportunity for a traffic report to be submitted demonstrating that the
operation of the new staff car no longer requires the creation of the internal one way vehicle link.

                                                                                        Page 16 of 92

Section 17

GENERAL COMMITTEE MEETING AGENDA                                                      16 AUGUST 2021




Departments/Sections Consulted:
     Chief Executive Officer          Community Services                      Corporate Services
     Executive Officer                Community Development                   Financial Services
     Executive Support                Community Facilities                    ICT
                                      Libraries & Galleries                   Procurement & Fleet
                                      Local Laws                              Property
                                      Waste & Environmental Health            Revenue Services

     Executive Services           x   Environment & Sustainable Development   Infrastructure Services
     Community Engagement             Building & Plumbing Services            Asset Management
     Customer Service             x   Development Assessment                  Buildings and Facilities
     Governance                       Economic Development                    Civil Operations
     People and Culture               Environmental Services                  Disaster Management
                                      Strategic Land Use Planning             Infrastructure Planning,
                                                                              Design and Delivery




                                                                                           Page 17 of 92

Section 18

ATTACHMENT 1




  Page 18 of 92

ATTACHMENT 1
      2, n. a iA .   PY   ae} a (~=\         ;              ecrmett Te +«.         a
    a — iy a i.  -.       4 a 2  a   —     tp    ,          —    2
    nt ee      ‘S     . eg |    fe   a      &     =     Ferm ge.         .
    ee. Wath esas Dhadteteedl ot Nah
       y     Y                       ;  ‘~       .              ;       4
     Cc}   AM        oe            ee ost         D2 eee be                        =
  rir|         _             ~     oe                      Seat “7
  f  im        a    ae     a An Le     —*     we PE Li     ae  < fie   Sy          S
  eee          | ie               eee         [le               ae
  Lee           a             et              a        Rg git          ee
  2 bai    a.  | AN i    os | \      VY 4   / . » ie        ve so      ko
  —      he ALY % so me LY        We Z       .  a           =.      _e  ts
      ) Se wm 2163s      ys        Me     a    5        2 ; Hi “f. | pe
  _ Sag” NEN                                   alles or
           a ee                                   oe       | ae
          oS        he           RO                            alae
    he    a        Obie  is      !   7   Lone                   ey                ~

  eee.                                                        i
  Pa        eS    .   ee ee us ee              iS            |        ne         ih i
  ssemmunat ——                     ao sa i Oe                       ae,            |
PROPOSED DEMOUNTABLE BUILDINGS p A|                                              Sem
PROPOSED DEMOUNTABLE BUILDINGS                                                    i |
  IN: |NOOSAVILLE_QLD_4566 .
                                                                                 Page 18 of 92

Section 19

Page 19 of 92

26 40 6| abe
       rz                                                                                                                                                                                          99S
5	1	1	1	2	3	2848	267	32	16	49	O10
5	1	1	1	2	4	2898	267	115	16	24	JTIIAYSOON
5	1	1	1	2	5	3029	267	33	16	85	STT
5	1	1	1	2	6	3081	267	102	16	32	:NOTL¥I01
4	1	1	1	3	0	300	263	2880	93	-1	
5	1	1	1	3	1	300	263	90	92	77	El
5	1	1	1	3	2	1594	288	258	68	0	women
5	1	1	1	3	3	1955	287	342	52	23	 XOANIDTING
5	1	1	1	3	4	2321	287	483	52	7	FIEAVINNOWAG
5	1	1	1	3	5	2828	287	352	52	36	GaSOd0”’d
4	1	1	1	4	0	332	328	2851	56	-1	
5	1	1	1	4	1	332	356	94	28	24	NOTLONYLSNOD
5	1	1	1	4	2	1383	328	49	52	20	COI
5	1	1	1	4	3	1443	335	17	10	49	=
5	1	1	1	4	4	1469	332	57	24	49	Va
5	1	1	1	4	5	1538	332	131	24	41	ONILSIXS
5	1	1	1	4	6	1679	332	57	24	46	GAL
5	1	1	1	4	7	1794	328	38	50	40	Ta
5	1	1	1	4	8	2823	350	104	17	39	SONIQTING
5	1	1	1	4	9	2944	350	129	17	23	JIS¥LNNOWSG
5	1	1	1	4	10	3090	350	93	17	0	G3SOd04d
4	1	1	1	5	0	368	371	1484	41	-1	
5	1	1	1	5	1	368	371	58	41	34	pee
5	1	1	1	5	2	1100	376	234	25	11	SNOILVINDT1V9
5	1	1	1	5	3	1342	376	60	25	34	VAD
5	1	1	1	5	4	1412	376	69	25	94	MAN
5	1	1	1	5	5	1489	376	22	24	69	8
5	1	1	1	5	6	1522	376	138	25	82	ONILSIXS
5	1	1	1	5	7	1670	376	182	25	26	G3LV901SY
4	1	1	1	6	0	332	413	85	11	-1	
5	1	1	1	6	1	332	413	85	11	0	AMUNINDTaad
4	1	1	1	7	0	2788	433	317	21	-1	
5	1	1	1	7	1	2788	436	24	11	34	wse
5	1	1	1	7	2	2944	437	14	11	88	st
5	1	1	1	7	3	3016	433	9	21	27	ol
5	1	1	1	7	4	3099	437	6	10	61	$
4	1	1	1	8	0	552	493	2623	73	-1	
5	1	1	1	8	1	323	524	25	31	55	BE
5	1	1	1	8	2	384	523	42	30	26	28s
5	1	1	1	8	3	552	517	202	49	3	aera
5	1	1	1	8	4	886	528	2	2	0	.
5	1	1	1	8	5	1008	512	36	52	39	>)
5	1	1	1	8	6	1072	524	41	32	20	Vas
5	1	1	1	8	7	1156	513	101	47	45	Pr
5	1	1	1	8	8	1278	510	58	43	4	Se
5	1	1	1	8	9	1432	493	226	71	0	iGaiae
5	1	1	1	8	10	1692	521	43	12	43	ay
5	1	1	1	8	11	1747	521	35	13	36	a
5	1	1	1	8	12	1790	511	34	51	29	at
5	1	1	1	8	13	1871	519	5	6	38	aaa
5	1	1	1	8	14	1953	527	9	10	37	ia
5	1	1	1	8	15	2008	530	72	10	40	ae
5	1	1	1	8	16	2161	520	55	35	1	ee
5	1	1	1	8	17	2258	520	123	35	24	ee
5	1	1	1	8	18	2842	519	78	25	20	NW1d
5	1	1	1	8	19	2932	519	65	25	71	SUS
5	1	1	1	8	20	3007	520	168	24	12	daSOd0ud
4	1	1	1	9	0	323	538	2041	55	-1	
5	1	1	1	9	1	323	555	25	29	63	BE
5	1	1	1	9	2	384	554	42	30	69	328
5	1	1	1	9	3	545	555	43	27	23	a
5	1	1	1	9	4	679	549	60	40	11	ne
5	1	1	1	9	5	791	565	3	1	0	:
5	1	1	1	9	6	858	552	33	30	36	So
5	1	1	1	9	7	1044	562	16	15	24	\
5	1	1	1	9	8	1168	553	90	33	36	Rite
5	1	1	1	9	9	1386	570	1	8	0	J
5	1	1	1	9	10	1419	566	216	18	0	—Peaowel
5	1	1	1	9	11	1529	551	20	38	51	aq
5	1	1	1	9	12	1554	551	33	38	81	0}
5	1	1	1	9	13	1586	566	48	18	73	3243
5	1	1	1	9	14	1656	566	73	18	8	Bunsixe
5	1	1	1	9	15	1910	572	2	2	49	4
5	1	1	1	9	16	2029	538	33	55	0	y
5	1	1	1	9	17	2107	565	11	16	22	pie
5	1	1	1	9	18	2281	562	3	3	75	f
5	1	1	1	9	19	2354	563	10	14	68	é
4	1	1	1	10	0	338	604	2041	37	-1	
5	1	1	1	10	1	338	608	10	21	63	&
5	1	1	1	10	2	381	608	45	22	41	oe
5	1	1	1	10	3	548	608	90	22	28	Tie
5	1	1	1	10	4	731	610	67	16	58	Pos
5	1	1	1	10	5	1184	614	18	5	27	af
5	1	1	1	10	6	1457	604	6	36	0	hs
5	1	1	1	10	7	1598	613	2	3	71	|
5	1	1	1	10	8	1678	605	59	36	0	UELUA
5	1	1	1	10	9	1743	614	27	16	30	O}
5	1	1	1	10	10	2023	608	32	11	32	Vint
5	1	1	1	10	11	2073	609	6	9	22	oi
5	1	1	1	10	12	2086	612	37	7	0	Sawiy
5	1	1	1	10	13	2159	614	60	5	36	Gunan
5	1	1	1	10	14	2289	616	5	1	47	7
5	1	1	1	10	15	2377	619	2	5	0	é
4	1	1	1	11	0	384	620	1860	26	-1	
5	1	1	1	11	1	384	632	42	14	22	Bel
5	1	1	1	11	2	539	627	47	10	0	<Q
5	1	1	1	11	3	688	626	46	13	0	Vibih.
5	1	1	1	11	4	766	633	1	3	24	2,
5	1	1	1	11	5	883	626	6	6	11	5
5	1	1	1	11	6	1398	639	26	6	52	=
5	1	1	1	11	7	1671	628	46	17	39	anon
5	1	1	1	11	8	1982	625	75	18	0	ulead
5	1	1	1	11	9	2065	625	21	16	57	0}
5	1	1	1	11	10	2093	625	55	16	25	sees}
5	1	1	1	11	11	2155	620	89	23	76	Bunsixe
4	1	1	1	12	0	384	595	2537	97	-1	
5	1	1	1	12	1	384	634	36	53	35	ase
5	1	1	1	12	2	543	661	8	8	15	2
5	1	1	1	12	3	578	595	96	87	42	ge
5	1	1	1	12	4	715	636	74	34	27	urea
5	1	1	1	12	5	791	636	24	34	56	0}
5	1	1	1	12	6	914	632	53	60	61	\
5	1	1	1	12	7	1053	664	15	15	27	a
5	1	1	1	12	8	1292	668	23	3	20	napa
5	1	1	1	12	9	1354	632	34	40	30	aaa
5	1	1	1	12	10	1599	651	122	5	0	_MaVdHVS
5	1	1	1	12	11	1729	629	107	43	0	ONLLSDA
5	1	1	1	12	12	2118	648	205	22	0	—_——
5	1	1	1	12	13	2564	650	13	19	0	Ss
5	1	1	1	12	14	2847	661	2	2	27	:
5	1	1	1	12	15	2919	668	2	2	0	s
4	1	1	1	13	0	384	658	2673	37	-1	
5	1	1	1	13	1	384	671	43	13	74	ene
5	1	1	1	13	2	564	670	14	13	36	=
5	1	1	1	13	3	923	677	12	9	0	~
5	1	1	1	13	4	1101	658	58	37	37	Ps
5	1	1	1	13	5	1212	665	14	26	0	~*~
5	1	1	1	13	6	1232	669	90	18	43	=a
5	1	1	1	13	7	1359	665	21	26	49	ae
5	1	1	1	13	8	1537	672	36	4	16	i=
5	1	1	1	13	9	1753	677	4	4	22	nl
5	1	1	1	13	10	1788	665	14	26	23	pa
5	1	1	1	13	11	1817	680	39	3	21	ns
5	1	1	1	13	12	1944	681	1	4	51	|
5	1	1	1	13	13	1977	684	6	2	31	ng
5	1	1	1	13	14	2612	679	2	2	4	i
5	1	1	1	13	15	2680	665	21	26	0	Pg
5	1	1	1	13	16	2874	673	6	6	21	ae
5	1	1	1	13	17	2916	674	15	14	25	a
5	1	1	1	13	18	3046	672	11	16	17	if
4	1	1	1	14	0	384	663	2692	71	-1	
5	1	1	1	14	1	384	672	39	46	24	e285
5	1	1	1	14	2	544	670	80	51	26	we
5	1	1	1	14	3	656	663	71	55	0	ONAv
5	1	1	1	14	4	734	709	16	5	0	Ia
5	1	1	1	14	5	766	663	88	55	9	SRLSIX
5	1	1	1	14	6	925	687	50	16	49	a>
5	1	1	1	14	7	1087	678	61	46	87	=
5	1	1	1	14	8	1248	676	134	20	33	Se
5	1	1	1	14	9	1616	682	102	19	32	ee
5	1	1	1	14	10	1737	686	61	16	18	ee
5	1	1	1	14	11	1823	672	12	43	25	Ss
5	1	1	1	14	12	1845	689	61	22	22	Sn
5	1	1	1	14	13	1916	688	70	19	19	oe
5	1	1	1	14	14	1982	676	220	33	38	ee
5	1	1	1	14	15	2284	690	81	16	35	Sy
5	1	1	1	14	16	2456	674	107	38	28	a
5	1	1	1	14	17	2580	685	47	49	81	4
5	1	1	1	14	18	2681	672	35	42	19	ce
5	1	1	1	14	19	2846	684	31	26	22	ao
5	1	1	1	14	20	2908	690	39	28	15	Ae
5	1	1	1	14	21	3012	695	68	18	18	os
4	1	1	1	15	0	384	696	2589	70	-1	
5	1	1	1	15	1	384	710	42	27	44	aaa
5	1	1	1	15	2	552	696	184	70	48	IPN
5	1	1	1	15	3	742	711	67	36	37	Bee
5	1	1	1	15	4	826	710	30	29	36	Pe
5	1	1	1	15	5	1066	704	54	54	67	SS
5	1	1	1	15	6	1387	706	40	32	32	oe
5	1	1	1	15	7	1587	705	66	38	0	uewa.
5	1	1	1	15	8	1656	705	29	38	23	Oy
5	1	1	1	15	9	1808	706	11	41	39	he
5	1	1	1	15	10	1902	722	10	7	6	“
5	1	1	1	15	11	2023	714	118	18	0	—speyjoq
5	1	1	1	15	12	2149	710	89	22	63	Bunsixe
5	1	1	1	15	13	2408	711	48	4	22	foe
5	1	1	1	15	14	2571	728	8	9	17	—_—
5	1	1	1	15	15	2691	716	36	11	20	ce
5	1	1	1	15	16	2801	705	14	35	41	ks
5	1	1	1	15	17	2901	717	8	5	0	”
5	1	1	1	15	18	2958	718	2	2	0	Si
4	1	1	1	16	0	384	732	2718	51	-1	
5	1	1	1	16	1	384	747	40	21	21	abe
5	1	1	1	16	2	547	732	246	51	37	OSS
5	1	1	1	16	3	1223	739	227	30	26	poe
5	1	1	1	16	4	1520	739	224	22	0	Nozsngene
5	1	1	1	16	5	1915	752	51	21	49	|
5	1	1	1	16	6	2000	736	308	36	6	Se
5	1	1	1	16	7	2501	772	11	1	23	:
5	1	1	1	16	8	2826	738	128	21	18	as
5	1	1	1	16	9	3097	764	5	5	4	,
4	1	1	1	17	0	416	760	2550	52	-1	
5	1	1	1	17	1	416	770	10	5	46	-
5	1	1	1	17	2	552	763	119	33	8	ey.
5	1	1	1	17	3	720	760	73	42	36	i
5	1	1	1	17	4	821	775	36	20	29	nf
5	1	1	1	17	5	947	772	10	8	33	3
5	1	1	1	17	6	1069	772	21	11	64	=
5	1	1	1	17	7	1221	778	4	15	0	H
5	1	1	1	17	8	1329	768	33	20	19	=
5	1	1	1	17	9	1466	774	140	25	0	——=208'06
5	1	1	1	17	10	1673	784	3	2	50	:
5	1	1	1	17	11	1823	777	34	19	11	ST,
5	1	1	1	17	12	1897	777	7	2	36	ce
5	1	1	1	17	13	1951	769	12	15	20	ein
5	1	1	1	17	14	2058	765	48	47	26	Fo
5	1	1	1	17	15	2527	788	8	4	65	-
5	1	1	1	17	16	2949	771	17	23	28	4
4	1	1	1	18	0	561	777	2368	55	-1	
5	1	1	1	18	1	558	791	59	33	38	NA
5	1	1	1	18	2	781	797	10	21	23	ae
5	1	1	1	18	3	973	794	55	22	21	See
5	1	1	1	18	4	1091	792	14	30	23	|
5	1	1	1	18	5	1223	799	553	23	36	el
5	1	1	1	18	6	2468	794	73	29	39	=

                                                                                                                                                                                                               age
         =                  vide        he                       ale          SOO                                                                                         =          ening |                          i
         a                   ava                                     We       |    |  LX Parcs, |         & I & |            ise |            '  | ‘|   :                 ;          SNILSIXA       Tm? *           Roc 2
         o                   ae                                         ee      ee  ee! ee SI            “S       Sea             A                ral            |      }     |              r      ,              eee
         =                  ,                                                 MS      Efe      |       Se                 oy      eee            i      i        LUD! 0}   A                           .      ‘     2 ie ae
         a               Ci                        urea! o}               x \   aes                              Se         Vi A sf eee         f   |   e   100d PN        ii                      |   Fig |e eS sas
                        ?            5                                         as     a     q/               NW              SL QaesS                   =      ui               eit              i.    ne   + = gee La
                                              SNICIING ONLLSDG               ae                       oo         ES          oe             |           SU  ELAM        Wega        Succ               i              a
                               A                                  |               a |     pm                                                ®      iy)                    )      gees                 ee           ee
          “aia          :                                         .               apse  fo                                                  {           i               He                             pili ge
                                                                   €e Pa       Wok    «of     roa                                           i              a              Ve                               faa ss    be Neate 408
                       q              \       ‘                     Ent Y           8, [x00 J        is                                     j    7     s         Pears!                               ey. hath
       20189           \   yews a   Vi                           - Wes 8             A A      af     fe                                    hee          3                     l                       ee   Met      se
                            H                                         we |        oe        mel A     r                                   s                                              —!        art    Ceecreniemrrare =~. (iy
           a2              oa                    \                      aa             y~                                                 BE                                             ae        | Os             ee
                       4              S                -                              ba fescusof Ff                                        Pe                                                     me)   f  {aes
                        TD     a            =m        \I                      !           ml ef                                          iz                                                         Miviiee     Mes sc 8
                 ;      Do  aga                 ~                                 -      tty tN.                                        fet                                                              ie Peet ge
                          .                                                                Sse                                          ey        -                                              ;     Ps aes Br
                 ;     wes                               \                                        —  \_Buripying uogeysiuupe            y                                                          Rae hse   ft Mpa eta
                       Bish                               Vel                           /             —  Guysixe soy uoyeoo| pasodoid         }                                                      nts pars     oat ye
                       \ en                                                               ody                      at                                                                            OP          ence a     ihe
                        ve                                                                                                                                                                           ih      oi aaee . é
                     )               sues                S              usuos              Pe          icone canis                                                                               —                *
                               SNICTING ONILSIXA =                 ONICTING ONILSIXA                                                    |                         ueUas Oy                              a      e
                      \                             Do                                    ye                                                                 9NICTING ONILSDA                    | ,
                        4                            gly       /              ©          p     ~~   la                                                                                              Poh:   | Se     a Sate
                       4                              4                                   4                                            |                                                          ee      #     ‘
                                                         Wars                            /                _——_—        —_—                                                                          EN     .  te        5
      ey                 .                          Cs      .                            fo   [7                                       ;                                                           i           aR) eee  Jat, ‘-
      ”                 \urewas                =                           :     =             &    ZA ONieo tid aunInd          ;                                                               f                       MY
     pe                 \ SNiating                                          3       me            SN                            |      i          mt                                            ;                        7
                        \ ONILSIXa                                          =         ok        a       \                                    ¢
      4                     <<           \                       payea0je! 39 Oy                          v               a        alia                                                                                     :
      n”                                  Ay                               .              Le                                     S           Be                                             .
      a                              |    e {6uipying uoneysiuiupe Gunsixe                i.   |           > e           teeter  |)          ey
                             4               2    a                   ta                   .                 he       %        art Vi         a)      =      ————                      nd   }                       2
      2                             —-      5 ‘    ae                      _  =              ee        Pa      é              —!                   ae          | i;  |   ci    rv    a 5      ‘ om                     =     ;
      =                :                    \ B                           ‘   ;                   “ se     ~                 |     ee                    i           a             Ree aemar oS) /Ya      ?             aes,
                          ,                                               .                   y.*                       S          foie)                            en           bo        pe                    ;      “2
                 t                                     -                  L     o                A                                      oh          ae a                     x4 ccs    Avg -* 4      iS as BO       EB ne ;
                                                   oH                         \ Se          eae      as                                   be                                   |           PMP EL? * megrceae
                          ureLUa4 0}          f               ueLUa4 Oy        \eay         ee ey                     a                       a           J                      =              GS         pe
                          gNigting                      \ oniating Nuspa = Ye               ai     9                    oF                    +2                 oe                        OE  Het fon      oe!” eae       ae
                          ONS                                                    rt                                                           io)                  re                     Bae       fo             ee ae
      a                                  ee                                         2      a                UeLUEs 0}         3                ee                                        MES   lice              Pye     Be
      R                               a                                       fo                 >    \ eniating Niispa    Qo                             ern.               |  a     Maes)    bo       ae         i       g
      :                               \                    eel                      ’         re?                               ban                   wuve v0 ONUSICA                     ye OE         oe            eh
      o          1   \                                  ‘TB                        eee              ,                       mK                                                 “      SAT 9 Cee   Re       or           os
      Nm                                           ry ee                s          wee ee   =F      ws                   if                bene              wey!     .         Reece    eH         i                 ae
                                             *             .             &                 _                                                                                           2)          a       Caeeg     PPE,
                                        -           TPN            /    Ye     -        —     ~—       =  \            si                are  -          Ey                        v-    =          .       Bi      AAW

Section 20

Page 20 of 92

Wid IS00u OzoZZaSL So
                      ‘                                                                                                                 23              is
                8     5                               3                                                                                             = |i
           £25  2     a                               ee ===>                    caus oe               a                                    |=     :—=  1:   O
           s        :                                «                                                 Ne              1                           z
  8     =o      &§ tofe             2                                            fgge 28s              Be              »                |=              i
  2     Sue     §  &Pea            8                                             3883   244) 4       a)                5                Ti lw =     O13     oS
   $o   828     &  ESE             2                                             aang 3)             ae     c                            ites           i
   3    ss      2.5238        a                    =                                         <i        =    4                <          Vila a
  aes     &        Bre     °        o                                               |     |            es              c                 i          oO:
  238   Pes   pigSuse      2S a    Q                                                 MS |x           af    3           o     o           =  |e      3°)!
  257   SNL   SoGgeofe     oa GO    &              %   z                             ai     =     U: Ss    =           =     o          18 9         mall
ees eu8sEe    ge 8Sery     a) af    g                  2                             Re      oO      282               Bo    o           “162      ia       <b}
geagerss      BEagzee      Fs      eg               Sle                              e\lel|       W    Fi.  3          £&                   age    |*        dD)
Zes2s5ee      C8 cL28=S    2 G     =                 Zig  lc  a.                  2 | 5 |g             szs a           c     3           aja!
SEG ase0#2    wPSG5fE      a  8    =                  SS  5    52                 5  3  8   a          55s     _       =     3           =[=   |:            oC
SEVZ5S2e      se Pagge     gas     zg               mola  |    |&s               Ele Bide              Eso  '  a       §     a         a7|z                 ou.
Osera ths     F£sseas§     $F       &               m=  |, |s  86                eile 4    |%          52   Wn               =         5
  32    @     3       HO   BER      S               >  2  2.288                  # | iz a  |i]         z2      Co      4                        ed
SSELBSER      Eves oes g     ~—- —~2                e  j2sS85                     :  = 8 |             5:   Oo               G           a)  oa) =
gfRAIEIG          a2=s22   ge    8 0        “4         BErEceges                 Eh ee                 22  =           ee    a           a),51  6
$5285 $25 agie        S65 nuff   84         =          Balls £13 9                alge  el   oc        85   se         ano   Ww        2 2/6
Seescess      stpagosc2ts        88    .    .          85518 315 3               fete [710             as =            VA    oy        sshs|    8
HSSpeese      Ses S2eSean        FO FE                                            gaze 33] | oe        2205            5a    yw            =—K1 5
§SesEseese hogy sszass           =     Be 3   8      Zsasssees                   Besse ge              £2      2       a     of              al.=
2SesSeeonesiesecf2n22—           §   &¢ 2   Te       §i4 tial ait                Sse 82 FO                  8           5    a6        29 log  len 2
SSGGHtSH0C SEIGEGessg            2 5 2      2G       ets e eset                  Cogs lealy               a~Awn          8:08          27  |22|O/5 1
Oo.  .  .      .   o*      SS£&  o52¢6 4 @                                                \4              2           2    2           é   2   £   é

     §              g3       é         Elggg3
     =   a          as        &        ai2333
     5   at         Be                 g\eeac
     3   ee         Z8       3         See              <
     = ig           Be       2)   3     |} __           £
         |            ze      EIsS     Zln\— nin       g
      2  ls       i          els 2     6           €   3
      zg 2                   ries                  Ss)  liz
      = |=          >         ys =                 & | 8                                                         Ey
      me ie         =         P/e% | 3             =    5
       =            £        Ela~e                 o2on                                                  ——       as
      Zz oO         <<        Elio                 @sen-                                                  ——F    1 _¥
     Pe it         is}       2/   ¢                S2ko                                                   —-      =
 pm  £e.|g                        2                O55f                                                  Pest      A
 iS, St5\§                   g    %             a   see                                                  Fe        am
 aa  Eel              .       2|  €             3    Se                                                  == -      or
 8     ES\2           $      £      £       =   Ss  »aR                                                  SF        =
 2    23        S   of            alle      §        eee                                                 =
 @     32       oe) 2c            3         g5       Bay                                        =        =)
 2     aig      ©   se            oj) 2     6       FrSs
       gig          Bo              Qe      2°       gee                                       rr          b
 5    Sola      2   & $=     =       a=     aa  2   222                                        =|    assy
 gi             2     658 |   (8)   (es)    gulls                                              cA
                      Bq                   te          8                                      z       fas
 285.                        5            gee         “                                       a
 gee a|         ey           8) ale4)     f2aleé i;                                                   I
       ce          fSes         c@        e290     €  <2                                        PI    =
       aSias      ie  se        Ss        239      =  8%                                         y    C
       Eyes       cai        E\2:         seca     §    Ze                                      =|     =
         ale            :    F/ez         a5       o  98                                        i
     gge ge           30      215 5       Zonk        BS                                                =—
      Bele            iad       a 8       68s         BB                                       ip      =
     erie           geek | 2/85           re                                                           pet
     “sigs            SE        a           ££     *
       gr lar       © 53°    ia:  3       See                                                          =
       felfe        Weoes!|  |B]  &       ate      Ge                                            iit
      SES             Sees!   |S          gas       ae                                           ea     at
       FEE            Feat)  [S|  €       833
        ie oe     |   meee        3       ose      ay                                            co     —
     2s 9           2S       s         a| sasife | s                                             ~~     I
     Es fa          Ee            SE      Zee       alae                                        B
                                                                                                 un      r
             Glocclaealey lala                                                                    a      oat
   3\3 3     Bageae     |g3     Be \99/g))   (Bagg   g      222222 5
     a3        gee ge |e 8        § 8 8\8      esis  (8          |    5    2
   Bla 2     Bigaigd gz         #e   22/8     Siz ziz |Z    a2a2224 48                            Lal
   alse      Blazaala laa]      Bis lea      Blsala |3|     Pee EE RS                            | im
   Br         Beas es            i°  ee       5                          i
   é         &                  8            Bloale 2                 _&
   2                                              3s        .         ge
 ii        2          2       3                3E2          g         a
 Ss        =         ot       £3.    Jew   z   £s\5         g 4       = 5
           s          &                          at           5       x  5
 &                   eo le |  (ae          =|  lexis     ele 5         13                                  =
           5         5  |S        2        8)  ese       Sie 22 28       &                                  =
 i         8          e       Ee           S|  (88/5     Bette 8 §                                             ;
 2         4         ja |S    =   3            563       Sle i zga®?                                i—     ie                1}
           B         a  |26                2)  88           $5 82825                                wy        J
 3                   &  sf)   |S  -         my) leek        SeEES F                                  a              ;         —
 3                   ?    gic] fa is       me |e 3/2        eeses #@&                                       =y                ar
 ii         “|S      fgee)    |e  &        Plsig se         #4332 8                                 at                          |
 1           2       Bal g    2   8        — RE           mig  G9 BES    P                          i                          -
             Bg       jek         S        2\Bes                 3g:                                t      io)                 Y
   §       S\5    Fel2slSs| |§ Se |, gs      Bie 318        SR PBBE                                                            aa)
   =          8 .s sess]     18 Se   [eels] |S/8/= Sis   5       BReE8                                       eS                =
   3       Big   sabes        Bf:    gels    Bes         B2iiit 8                                                               =.
   i.            g&sozls 2      ela jos        gele         Se = =                                               -              ze
 23] |     lel   seeesel] |e as      ezeiai    iit | |elee 33g é                                      ||
   3       i     Bs clBalg    Baie   28a       Bec       csc       ee                                 to
 a°|   .       gia tzé            5 gca        fie   cl  |z                                          ra       —
       2        eS  ea |8         & le <3)     Esie 8                                                 WH      ems
       E       ie8 Feels 5        B ale        egle                   8
     aa        £85 slegaa         Fae          Fea   is)    ly? F     s    &                                  Be
     és        sof sls 3|5 8      veg §|8      3\e   |3     $2222        68                                    faa]
               &    =     =          &          > sl lS       é¢ &       m 5
     t&      | 68 8 ale |s 6    _ 8282s        22548        eR GES 95                                   7       _—"
   als 8      Bs ge gie aio      Ds           aisgie is     ~ - EEE      Se                            5        a    é
   Fee] |    |FRSESR a) | Fe         BER]    (Bese & |      |p 8 2b 2 25                              A
                                                                                                        ua      aE
                    abt                  H             alk ls            |                                       ——}
                                          :
               c   as!  Ss               33
               a    a   a             alge             ale ik         slgiz| |g als                       J      4
               2    8   &  §                           3 3  6
   §           2    ob  5 &            5|23          ot |e |e       ge elge   € Ele                      wi
   3           =    3%  323%             bg          2g |g  |g      2 8/8/8) |B BIE                        J
   g             _  8B  SeeR             ee              |e le      5 algig  a a|5                      i |
   2.2                                   5             22 |2        Ogee     fee                         bl
    iS                                    =              3  3
   “le                                   sas           a |s if        sles    a ale
                        E                B38           22 8           gS = |B SB
     5           bo     BS                es           s |a |e        s|E\E   EEE                           z
    jo           Pe     ff             &               g lg 8         ele |e  EEE.
     i         Se   £   ete            e\B             Szlasl as      B18 18 iB BiB S
     iz        SEE      ESE            =|8 93          ba/5 2/5 3     sles   leslie
    re         SS a     $s             Beas            Soe            3\8/3)  8 13
   ze          “zg Bp   gee            =o           25 sileFni        gis\s| |e 3|8
   Sis           8  ¢&  seg               Ze           g2ls2\5           I
   58            Bf, 222;             #4| 32        ee oee3lé2        2}     |2z|2
   gio           Sead   Beso          ff|,35        ee  wal] ae       $/8|8   & 8)8
   £3            8282   #338        a\""|823                        pelolo)  joalo
   gle           a                  =    Bx       glee   |§ |E      & sels    EEE
                    te      4                      glBge |2 [2      © zle/2   E Ele
   el                zi               gal §       eee lee           fees     [esis
     ee             oe     v2         Erle G2          aziz 2         elle   rele
 a |       la]      Uk   oO              od BT                        at
 &S        2}  >    oh     3           2             Ee |e |p         slg)  |e gle
 *          ’  ©    oe     oe          Bla           £6 |6 |6     '   gle\s  ele
 D>        >|  5    as     as            5           y                         5
 BB        2)  5    cs     83          os       2                 2   22\2|  j22i2ss
 2 <8      mS       235 = 3%      a |                ge |e ls     =
           S|  °    &5_& &3       SB | 2             a iA ®       g
 g         g        zege reg]     |g                              e2                                         — |
 2         2        gpd #98       :    z        3    Ee |e le       5                                        pI
 2         2        sade   32          28       sj?) | ia                                                   my
     3           _  Seas Sea           ag          2] = \@ 8        elale|    pele
     3                                 =          eB) Fe ie         § s8\8)  gale ele
    iB        Ey                     5                              SEF      Fre as
    ta                              3                _              = xy      5%
     E        56                       =             zg ig g          RE      REEL
     ;       HS 8       8 8                          ze i             alsa)  sala giz
     §                                 2             x8 [2 lg       eg B/E Be cle cle cle c
   gle                                 3,              2 F          £ 2/8 2/9 alg ale =|s 8
   Fils          Ee     €  F           7:                   i       @ sisisik Silesia cies
     3           =  E   EE             =               2 le |B        Z\z iz
      E          gz     i              Ele                  Z             howler helelels
     ee          gE #   & #            sig             8  5 63        Riele
    ee            =      ee            Sig               z               Slt =
     me          Ee     gs          i                as 2 |&        we SiS\8E EE EVE ElEE
     es        eG       EG                           est i          Blea s aie bls Sip a
     Es        picts    Ssi5           x             222%             sizisi8 ais gia 48s
     NS        Eig
5	1	1	1	160	3	472	3110	66	33	14	Hig
5	1	1	1	160	4	681	3102	29	43	54	ald
5	1	1	1	160	5	876	3110	31	19	40	ae
5	1	1	1	160	6	1143	3108	15	13	1	i
4	1	1	1	161	0	209	3117	767	44	-1	
5	1	1	1	161	1	209	3130	11	13	22	E
5	1	1	1	161	2	223	3117	8	44	42	3
5	1	1	1	161	3	378	3120	59	32	0	S3ek
5	1	1	1	161	4	471	3120	60	32	33	Ses)
5	1	1	1	161	5	682	3135	34	20	53	AA
5	1	1	1	161	6	896	3130	11	16	31	a
5	1	1	1	161	7	932	3130	9	16	31	ib
5	1	1	1	161	8	966	3130	10	13	30	EF
4	1	1	1	162	0	209	3140	1011	35	-1	
5	1	1	1	162	1	209	3144	9	31	22	3
5	1	1	1	162	2	379	3150	27	21	24	Bb
5	1	1	1	162	3	418	3150	25	21	24	Bo
5	1	1	1	162	4	474	3150	26	21	81	Bo
5	1	1	1	162	5	512	3150	24	21	54	Fo
5	1	1	1	162	6	671	3140	41	32	68	alg
5	1	1	1	162	7	966	3149	10	12	89	=
5	1	1	1	162	8	1105	3155	31	8	5	ela!
5	1	1	1	162	9	1151	3140	27	32	29	|-
5	1	1	1	162	10	1181	3140	39	32	29	ale
4	1	1	1	163	0	209	3164	1011	34	-1	
5	1	1	1	163	1	209	3172	31	14	46	Ss
5	1	1	1	163	2	379	3169	67	22	43	2323
5	1	1	1	163	3	474	3169	66	22	64	2223
5	1	1	1	163	4	690	3164	22	34	26	ie
5	1	1	1	163	5	1082	3171	11	26	38	#
5	1	1	1	163	6	1107	3169	29	28	48	5/5)
5	1	1	1	163	7	1170	3169	8	19	51	6
5	1	1	1	163	8	1190	3169	30	19	17	S/6
4	1	1	1	164	0	209	3179	1115	49	-1	
5	1	1	1	164	1	209	3184	31	32	48	23
5	1	1	1	164	2	378	3189	69	27	0	ESS
5	1	1	1	164	3	471	3189	69	27	38	S228
5	1	1	1	164	4	668	3179	42	49	68	ale
5	1	1	1	164	5	876	3186	29	20	58	as
5	1	1	1	164	6	1079	3187	183	38	0	sie\eeele
5	1	1	1	164	7	1226	3180	41	49	0	sly
5	1	1	1	164	8	1271	3180	25	49	86	|
5	1	1	1	164	9	1315	3197	9	28	79	¢
4	1	1	1	165	0	378	3214	884	22	-1	
5	1	1	1	165	1	378	3231	11	5	80	5
5	1	1	1	165	2	1107	3207	71	36	2	glgiels
5	1	1	1	165	3	1190	3207	30	36	33	gle
5	1	1	1	165	4	1232	3214	30	14	28	38
4	1	1	1	166	0	186	3225	1138	32	-1	
5	1	1	1	166	1	186	3232	34	22	15	a3
5	1	1	1	166	2	355	3229	71	24	69	58
5	1	1	1	166	3	471	3229	12	22	75	3
5	1	1	1	166	4	509	3229	12	23	80	3
5	1	1	1	166	5	684	3235	13	16	47	2
5	1	1	1	166	6	879	3235	28	16	68	RS
5	1	1	1	166	7	1107	3225	217	32	19	giglels
5	1	1	1	166	8	1180	3219	42	42	57	slg
5	1	1	1	166	9	1222	3219	42	42	38	bla
5	1	1	1	166	10	1264	3219	42	42	26	aly
5	1	1	1	166	11	1306	3219	21	42	26	=
4	1	1	1	167	0	183	3244	1141	34	-1	
5	1	1	1	167	1	183	3244	57	33	44	Flea
5	1	1	1	167	2	351	3252	38	16	74	FS
5	1	1	1	167	3	415	3252	11	16	42	3
5	1	1	1	167	4	471	3251	49	17	56	35
5	1	1	1	167	5	677	3245	17	33	22	Bi
5	1	1	1	167	6	876	3249	31	13	42	Ee
5	1	1	1	167	7	1104	3247	54	33	0	S|a|5
5	1	1	1	167	8	1167	3258	11	12	9	a
5	1	1	1	167	9	1185	3247	35	33	6	35\a
5	1	1	1	167	10	1229	3247	33	33	0	o|o
5	1	1	1	167	11	1271	3247	33	33	27	4/8
5	1	1	1	167	12	1312	3251	12	20	0	&

Section 21

Page 21 of 92

Notes & Disclaimers
           7     f                       GYMNASIUM “=                         Fe         2    *         a    ome   Z i Me e 2)       ‘gj .                              yt  i     .     :          >,       . WallCelingiRoof frames built to Ausco
          y      f       ‘.,                                  Re                              ”         7      wn         ge                                           =    37 uf                            Backbone framing design standards.
                \           .                                   %                                &,       v2      Pa"           as        ao                a3        a                                     + Building chassis designed to Ausco
                   ‘           .                                                                                        ae                 wet           f      ot                                          Standard Chassis drawings.
                      ..                                              pa           :          Fi                  Meg co     tan       oe         “yn                              Lt     ae                2-AlWoik mise be dare tr eosetadree wih
                         oF                                       x                 |                oe           OE YA                                  See                                                 Sore ieee
                           .                                                      e                    XI                               me   “       ;   ae or                  ww                    ,          fard(s) and tl ional Construction
                >          a                                         \p 225,     j         =        1a QS  %        =                    Fa         or Ley ap7       SS:    on . tin   a                     Code.
                 F            a                                         e        ,        f          es a       xn          aha od   oeqstnias Aerize i    oe      |     Kat rie            ov    ~~        + Furniture, plumbing, & electrical
               -   »            ~S                                                                 ic       nce       ye   TPR             PR     eee                aes AR: ‘i. i)              <a          representations are indicative. Appearance
                                  >.                                                       x                      SS ed          a    s    Ge                rae       ce   ithe    Sakae         o. —       may vary depending on supplier.
                                    ~                                      :            ‘N      ie            iS   BN      See                EE. i         een                      ate     =        3     + Loose items to be packed for transport.
             :                        Fi                                    .                   }              NS    NAA              te be ips       ms    AK             *      a                         . Ste star, famp ar buidog starting a
                                                                                            i                -      ale
5	1	1	1	15	4	2017	469	2	3	0	y
5	1	1	1	15	5	2091	460	9	15	70	A
5	1	1	1	15	6	2162	468	41	3	25	hot
5	1	1	1	15	7	2273	459	12	20	21	ki
5	1	1	1	15	8	2483	461	63	11	18	meee
5	1	1	1	15	9	2898	455	41	30	53	licati
5	1	1	1	15	10	3001	475	3	3	57	.
5	1	1	1	15	11	3025	463	27	19	77	Size,
5	1	1	1	15	12	3053	455	35	31	91	fall
5	1	1	1	15	13	3089	467	9	11	93	and
5	1	1	1	15	14	3115	455	74	31	76	location
5	1	1	1	15	15	3188	455	23	31	95	to
4	1	1	1	16	0	356	458	2887	74	-1	
5	1	1	1	16	1	356	481	70	19	25	PR
5	1	1	1	16	2	1032	468	42	42	25	ae
5	1	1	1	16	3	1233	480	18	27	33	Ny
5	1	1	1	16	4	1353	465	35	42	29	“2
5	1	1	1	16	5	1415	466	24	48	23	as
5	1	1	1	16	6	1615	481	48	26	26	OM
5	1	1	1	16	7	1780	461	66	56	10	andl
5	1	1	1	16	8	1913	477	47	29	42	cay
5	1	1	1	16	9	1998	467	23	43	30	ff
5	1	1	1	16	10	2031	458	184	74	47	Le
5	1	1	1	16	11	2252	465	52	47	17	ed
5	1	1	1	16	12	2431	496	2	2	0	;
5	1	1	1	16	13	2514	462	48	55	69	a
5	1	1	1	16	14	2835	491	14	14	71	a
5	1	1	1	16	15	2882	459	125	51	0	ceaaamione,
5	1	1	1	16	16	3014	485	229	20	95	Constructed
5	1	1	1	16	17	3116	471	21	40	96	to
5	1	1	1	16	18	3143	485	61	20	96	comply
5	1	1	1	16	19	3206	471	35	40	95	with
4	1	1	1	17	0	365	486	2752	65	-1	
5	1	1	1	17	1	365	493	61	43	29	Sn
5	1	1	1	17	2	455	507	28	23	27	SS
5	1	1	1	17	3	924	502	11	9	19	a
5	1	1	1	17	4	982	530	23	11	28	WE
5	1	1	1	17	5	1099	506	57	30	30	ay
5	1	1	1	17	6	1182	520	23	12	50	gt
5	1	1	1	17	7	1331	509	71	30	29	ar)
5	1	1	1	17	8	1545	505	161	32	15	eS
5	1	1	1	17	9	1918	518	76	25	20	bes
5	1	1	1	17	10	2009	509	21	29	10	We
5	1	1	1	17	11	2078	486	73	65	50	sha
5	1	1	1	17	12	2177	492	29	45	22	le
5	1	1	1	17	13	2264	507	38	31	20	ok
5	1	1	1	17	14	2417	511	17	25	4	i
5	1	1	1	17	15	2499	508	20	39	49	us
5	1	1	1	17	16	2526	505	23	38	59	AL
5	1	1	1	17	17	2559	510	7	5	50	MIN
5	1	1	1	17	18	2874	503	89	44	11	eee
5	1	1	1	17	19	3114	533	3	3	0	;
4	1	1	1	18	0	489	523	2679	33	-1	
5	1	1	1	18	1	489	535	17	13	0	—~
5	1	1	1	18	2	966	535	18	15	20	+185
5	1	1	1	18	3	1025	544	12	3	48	_
5	1	1	1	18	4	1115	542	3	2	34	a
5	1	1	1	18	5	1180	532	23	12	20	ra
5	1	1	1	18	6	1332	523	16	32	25	oe
5	1	1	1	18	7	1564	544	50	8	21	sappy
5	1	1	1	18	8	1623	527	17	32	36	ar
5	1	1	1	18	9	1663	541	44	12	0	RORROT
5	1	1	1	18	10	1731	549	5	5	14	cee
5	1	1	1	18	11	2002	530	9	33	43	Bb
5	1	1	1	18	12	2151	530	61	25	16	DS
5	1	1	1	18	13	2187	524	57	35	29	ae
5	1	1	1	18	14	2243	534	55	17	2	OT
5	1	1	1	18	15	2428	548	3	6	0	s
5	1	1	1	18	16	2492	541	28	14	41	ING
5	1	1	1	18	17	2639	546	12	10	12	hes
5	1	1	1	18	18	2678	535	50	15	20	eer
5	1	1	1	18	19	2867	530	185	16	96	Manufactured
5	1	1	1	18	20	2980	523	27	32	96	to
5	1	1	1	18	21	3007	523	48	32	96	Wind
5	1	1	1	18	22	3058	523	59	32	95	Speed:
5	1	1	1	18	23	3124	523	44	32	75	8190
4	1	1	1	19	0	268	531	2788	58	-1	
5	1	1	1	19	1	268	545	6	11	32	1
5	1	1	1	19	2	363	532	27	52	10	we
5	1	1	1	19	3	431	556	3	2	6	:
5	1	1	1	19	4	517	553	14	12	54	~
5	1	1	1	19	5	852	554	10	9	0	S
5	1	1	1	19	6	954	554	22	11	39	sa}
5	1	1	1	19	7	987	548	79	18	0	sales,
5	1	1	1	19	8	1129	560	4	3	92	4
5	1	1	1	19	9	1198	539	16	35	42	Wi,
5	1	1	1	19	10	1370	556	98	10	0	_qnarine
5	1	1	1	19	11	1475	539	82	46	0	uncgpraent
5	1	1	1	19	12	1567	552	24	15	0	EN
5	1	1	1	19	13	1591	539	54	46	0	EST
5	1	1	1	19	14	1721	546	35	18	38	ae
5	1	1	1	19	15	1801	532	36	35	31	ee
5	1	1	1	19	16	1949	554	19	11	35	at
5	1	1	1	19	17	2075	531	64	58	25	sp
5	1	1	1	19	18	2135	539	25	20	30	a
5	1	1	1	19	19	2250	541	48	35	56	LY)
5	1	1	1	19	20	2427	550	108	20	24	RELOCATED
5	1	1	1	19	21	2691	551	34	14	0	-
5	1	1	1	19	22	2867	552	115	15	92	Manufactured
5	1	1	1	19	23	2988	555	17	12	91	in:
5	1	1	1	19	24	3014	552	42	15	60	MOB
4	1	1	1	20	0	290	555	2979	76	-1	
5	1	1	1	20	1	290	583	11	10	24	Psa
5	1	1	1	20	2	444	571	38	22	42	SNS
5	1	1	1	20	3	542	572	30	20	22	Sa
5	1	1	1	20	4	737	579	35	35	63	\
5	1	1	1	20	5	841	564	29	33	42	an
5	1	1	1	20	6	918	568	62	10	0	ee
5	1	1	1	20	7	984	562	216	34	11	Rll
5	1	1	1	20	8	1264	555	96	44	46	ye
5	1	1	1	20	9	1511	563	51	31	23	a
5	1	1	1	20	10	1706	586	7	8	0	’
5	1	1	1	20	11	1803	565	15	27	48	a
5	1	1	1	20	12	1926	569	39	28	8	ae
5	1	1	1	20	13	2005	555	162	55	31	LT
5	1	1	1	20	14	2248	567	26	39	24	ae
5	1	1	1	20	15	2459	586	2	2	18	a
5	1	1	1	20	16	2481	562	35	69	13	Cs
5	1	1	1	20	17	2517	560	44	47	8	zh
5	1	1	1	20	18	2679	573	17	12	7	a
5	1	1	1	20	19	2867	574	72	15	89	Intended
5	1	1	1	20	20	2946	574	75	15	96	Location:
5	1	1	1	20	21	3028	574	90	18	94	Noosaville,
5	1	1	1	20	22	3125	574	41	15	91	QLD
4	1	1	1	21	0	312	578	2957	89	-1	
5	1	1	1	21	1	312	602	36	28	2	>
5	1	1	1	21	2	402	603	32	27	0	~S
5	1	1	1	21	3	491	600	37	29	22	SS
5	1	1	1	21	4	806	601	54	28	11	eee
5	1	1	1	21	5	1062	618	16	11	48	Br
5	1	1	1	21	6	1108	597	28	43	15	sy
5	1	1	1	21	7	1173	607	38	36	21	+
5	1	1	1	21	8	1221	615	6	4	54	=
5	1	1	1	21	9	1268	597	87	37	8	Se
5	1	1	1	21	10	1415	591	113	49	16	“XS
5	1	1	1	21	11	1567	600	62	31	13	ae
5	1	1	1	21	12	1639	598	3	3	0	:
5	1	1	1	21	13	1661	598	14	40	0	e-
5	1	1	1	21	14	1716	611	57	26	23	a
5	1	1	1	21	15	1862	578	429	89	33	Pl
5	1	1	1	21	16	2330	622	29	18	23	re
5	1	1	1	21	17	2408	603	42	37	0	i
5	1	1	1	21	18	2505	602	58	39	39	We
5	1	1	1	21	19	2606	604	40	9	41	af
5	1	1	1	21	20	2856	606	66	34	40	Client
5	1	1	1	21	21	2921	606	86	34	96	Approval
5	1	1	1	21	22	3268	606	1	34	84	|
4	1	1	1	22	0	369	627	2840	59	-1	
5	1	1	1	22	1	369	637	20	26	33	~~
5	1	1	1	22	2	467	639	24	28	46	DS
5	1	1	1	22	3	561	649	4	2	0	-
5	1	1	1	22	4	788	664	4	3	0	.
5	1	1	1	22	5	933	639	39	34	33	og
5	1	1	1	22	6	990	637	32	30	41	aN
5	1	1	1	22	7	1080	638	37	32	30	ee
5	1	1	1	22	8	1134	636	3	5	36	:
5	1	1	1	22	9	1166	646	26	21	33	a
5	1	1	1	22	10	1220	635	12	16	17	e
5	1	1	1	22	11	1302	638	11	11	0	1
5	1	1	1	22	12	1320	638	45	22	1	iaie
5	1	1	1	22	13	1383	649	8	11	49	0
5	1	1	1	22	14	1396	649	32	11	45	Goer
5	1	1	1	22	15	1451	646	45	23	18	nial
5	1	1	1	22	16	1559	646	32	37	21	a
5	1	1	1	22	17	1617	643	26	31	19	co
5	1	1	1	22	18	1681	635	19	23	15	?
5	1	1	1	22	19	1792	641	32	26	5	oS
5	1	1	1	22	20	1836	643	63	43	14	Son
5	1	1	1	22	21	1901	627	34	47	28	“a
5	1	1	1	22	22	1987	657	2	2	0	;
5	1	1	1	22	23	2052	656	53	14	27	een
5	1	1	1	22	24	2220	642	7	40	0	t
5	1	1	1	22	25	2306	635	27	39	30	fp
5	1	1	1	22	26	2332	639	68	30	42	Mee
5	1	1	1	22	27	2410	643	30	25	7	—'
5	1	1	1	22	28	2635	640	11	19	13	‘
5	1	1	1	22	29	2866	658	38	11	13	client
5	1	1	1	22	30	2928	642	55	33	82	Good
5	1	1	1	22	31	2987	642	71	33	95	Shepard
5	1	1	1	22	32	3057	642	80	33	96	Lutheran
5	1	1	1	22	33	3139	642	70	33	90	College
4	1	1	1	23	0	303	664	2233	20	-1	
5	1	1	1	23	1	303	664	9	6	0	~
5	1	1	1	23	2	374	664	37	13	39	=~
5	1	1	1	23	3	497	670	8	5	52	=
5	1	1	1	23	4	863	676	3	2	43	.
5	1	1	1	23	5	1157	666	16	7	33	ae
5	1	1	1	23	6	1461	666	31	14	13	Non
5	1	1	1	23	7	1657	669	37	11	50	>.
5	1	1	1	23	8	1848	676	20	6	0	RE
5	1	1	1	23	9	1932	667	13	6	35	a
5	1	1	1	23	10	1978	667	97	15	40	Sees
5	1	1	1	23	11	2131	680	4	4	43	>
5	1	1	1	23	12	2226	683	3	1	23	3
5	1	1	1	23	13	2292	675	2	3	0	o
5	1	1	1	23	14	2316	667	135	15	24	See
5	1	1	1	23	15	2498	672	14	12	13	7
5	1	1	1	23	16	2519	667	12	13	60	he
4	1	1	1	24	0	317	675	2641	39	-1	
5	1	1	1	24	1	317	675	35	29	33	=
5	1	1	1	24	2	370	681	3	2	0	;
5	1	1	1	24	3	409	677	45	29	44	OA
5	1	1	1	24	4	485	689	5	7	30	fa
5	1	1	1	24	5	509	688	24	14	32	ho
5	1	1	1	24	6	698	679	28	21	51	»
5	1	1	1	24	7	875	681	16	30	34	Ss
5	1	1	1	24	8	946	685	29	17	44	2m
5	1	1	1	24	9	1013	677	22	27	62	3
5	1	1	1	24	10	1168	677	86	24	27	ae.
5	1	1	1	24	11	1444	701	16	7	86	&
5	1	1	1	24	12	1470	678	9	7	43	5
5	1	1	1	24	13	1499	681	44	24	17	bP
5	1	1	1	24	14	1676	681	17	29	86	>
5	1	1	1	24	15	1715	687	21	16	0	——
5	1	1	1	24	16	1798	687	53	21	7	ra.
5	1	1	1	24	17	1873	681	73	24	27	noe
5	1	1	1	24	18	1977	681	50	26	31	ae
5	1	1	1	24	19	2050	678	77	32	8	Sa
5	1	1	1	24	20	2157	702	30	7	32	—
5	1	1	1	24	21	2244	682	48	22	2	ie
5	1	1	1	24	22	2307	676	18	29	0	e
5	1	1	1	24	23	2367	687	12	19	0	|
5	1	1	1	24	24	2468	676	38	34	27	oe
5	1	1	1	24	25	2866	684	64	30	96	Approved
5	1	1	1	24	26	2929	684	29	30	95	by:
4	1	1	1	25	0	276	677	2993	83	-1	
5	1	1	1	25	1	276	710	29	23	23	SS
5	1	1	1	25	2	342	700	167	43	0	SSORL.
5	1	1	1	25	3	721	696	46	55	22	~‘,
5	1	1	1	25	4	829	697	76	44	30	as
5	1	1	1	25	5	940	720	41	18	11	ie
5	1	1	1	25	6	1046	716	123	42	11	a
5	1	1	1	25	7	1304	699	92	29	27	ee
5	1	1	1	25	8	1542	677	58	63	18	ee
5	1	1	1	25	9	1689	706	71	7	6	i
5	1	1	1	25	10	1817	706	26	28	34	a
5	1	1	1	25	11	1829	706	48	34	33	a
5	1	1	1	25	12	2135	711	37	27	48	ee
5	1	1	1	25	13	2183	692	98	68	16	ae
5	1	1	1	25	14	2302	685	84	70	21	BN
5	1	1	1	25	15	2453	711	26	25	31	ca
5	1	1	1	25	16	2523	695	33	50	0	\y
5	1	1	1	25	17	2854	712	77	43	87	Company
4	1	1	1	26	0	229	730	3040	57	-1	
5	1	1	1	26	1	229	735	307	34	22	SONAL
5	1	1	1	26	2	610	757	4	1	26	ON
5	1	1	1	26	3	696	732	163	55	51	OS
5	1	1	1	26	4	869	726	12	65	28	_
5	1	1	1	26	5	1395	750	4	4	33	ee
5	1	1	1	26	6	1454	736	161	38	36	ESS
5	1	1	1	26	7	1966	737	373	41	33	eee
5	1	1	1	26	8	2452	741	129	34	33	SS
5	1	1	1	26	9	2867	764	56	13	27	whith
5	1	1	1	26	10	3268	745	1	26	79	|
4	1	1	1	27	0	285	745	2284	79	-1	
5	1	1	1	27	1	285	772	88	17	29	Ne
5	1	1	1	27	2	728	762	163	49	22	ay
5	1	1	1	27	3	900	745	218	79	34	«XN
5	1	1	1	27	4	1141	761	257	46	39	ee
5	1	1	1	27	5	1475	772	56	30	47	US
5	1	1	1	27	6	1557	771	338	37	38	Dei
5	1	1	1	27	7	1868	741	88	87	33	ee
5	1	1	1	27	8	1964	768	113	50	17	Ce
5	1	1	1	27	9	2430	772	88	44	34	a8
5	1	1	1	27	10	2867	800	65	16	44	<a
4	1	1	1	28	0	228	783	2708	80	-1	
5	1	1	1	28	1	228	810	11	33	0	s
5	1	1	1	28	2	331	811	9	21	20	es
5	1	1	1	28	3	478	810	4	4	0	,
5	1	1	1	28	4	553	822	2	2	30	;
5	1	1	1	28	5	688	817	8	8	10	2
5	1	1	1	28	6	738	785	89	53	31	eer
5	1	1	1	28	7	858	809	14	24	47	A
5	1	1	1	28	8	879	804	16	20	27	~
5	1	1	1	28	9	947	807	33	32	12	a
5	1	1	1	28	10	988	783	106	80	14	ag
5	1	1	1	28	11	1163	813	2	2	0	!
5	1	1	1	28	12	1336	832	11	16	59	7
5	1	1	1	28	13	1387	814	26	24	15	a
5	1	1	1	28	14	1600	802	82	23	8	eae
5	1	1	1	28	15	1814	805	36	47	13	ie
5	1	1	1	28	16	1865	811	43	27	19	ta
5	1	1	1	28	17	1967	803	36	13	35	bons
5	1	1	1	28	18	2090	807	48	43	45	ey
5	1	1	1	28	19	2146	808	15	37	54	A
5	1	1	1	28	20	2194	806	20	33	32	i
5	1	1	1	28	21	2283	795	17	48	40	re
5	1	1	1	28	22	2424	802	65	46	0	Rs
5	1	1	1	28	23	2511	807	15	11	24	—
5	1	1	1	28	24	2628	814	5	6	25	$a
5	1	1	1	28	25	2934	810	2	2	25	:
4	1	1	1	29	0	345	821	2924	39	-1	
5	1	1	1	29	1	345	838	24	11	51	SS
5	1	1	1	29	2	514	839	6	5	57	y
5	1	1	1	29	3	689	838	33	13	34	port
5	1	1	1	29	4	841	836	28	18	34	As
5	1	1	1	29	5	960	835	22	9	15	ng
5	1	1	1	29	6	990	834	62	19	23	HEE
5	1	1	1	29	7	1168	853	3	1	0	:
5	1	1	1	29	8	1310	836	43	16	42	an
5	1	1	1	29	9	1547	821	17	39	0	“,
5	1	1	1	29	10	1792	837	67	17	41	ES
5	1	1	1	29	11	1880	838	79	19	33	ee
5	1	1	1	29	12	2093	844	54	15	20	Cf
5	1	1	1	29	13	2165	837	37	23	22	ONS
5	1	1	1	29	14	2225	825	51	39	0	Reger
5	1	1	1	29	15	2420	835	50	25	33	ae
5	1	1	1	29	16	2674	840	17	6	88	~
5	1	1	1	29	17	2854	850	415	3	0	————
5	1	1	1	29	18	3259	829	14	39	60	|
4	1	1	1	30	0	377	866	2867	75	-1	
5	1	1	1	30	1	377	907	7	8	29	:
5	1	1	1	30	2	595	862	20	75	23	te
5	1	1	1	30	3	808	889	180	28	38	a
5	1	1	1	30	4	1079	894	75	23	30	A
5	1	1	1	30	5	1203	884	355	36	39	Nt
5	1	1	1	30	6	1714	892	94	40	37	Ta
5	1	1	1	30	7	1931	901	19	20	0	*
5	1	1	1	30	8	2067	905	4	4	24	Zhe
5	1	1	1	30	9	2121	884	178	42	30	spe).
5	1	1	1	30	10	2326	896	3	8	50	ben
5	1	1	1	30	11	2371	891	61	50	57	&
5	1	1	1	30	12	2433	875	69	57	25	uy:
5	1	1	1	30	13	2852	888	26	52	87	[
5	1	1	1	30	14	2869	899	80	24	91	Sheet
5	1	1	1	30	15	2938	888	27	52	68	|
5	1	1	1	30	16	3037	902	74	15	22	__Content
5	1	1	1	30	17	3208	902	36	15	95	Rev
4	1	1	1	31	0	265	935	2962	35	-1	
5	1	1	1	31	1	265	951	4	5	35	.
5	1	1	1	31	2	459	941	70	19	51	oy
5	1	1	1	31	3	590	936	77	24	48	wy
5	1	1	1	31	4	876	935	174	27	37	eS
5	1	1	1	31	5	1201	949	10	8	57	«
5	1	1	1	31	6	1415	943	111	19	0	~—e
5	1	1	1	31	7	1648	961	2	2	0	:
5	1	1	1	31	8	1759	960	21	4	33	a
5	1	1	1	31	9	1930	936	28	37	14	ee
5	1	1	1	31	10	1962	940	109	14	24	ye
5	1	1	1	31	11	2222	939	78	31	44	A
5	1	1	1	31	12	2328	941	32	18	28	ee
5	1	1	1	31	13	2466	955	13	7	40	th.
5	1	1	1	31	14	2888	949	39	12	14	001
5	1	1	1	31	15	2941	937	33	36	45	|Site
5	1	1	1	31	16	2980	937	33	36	74	Plan
5	1	1	1	31	17	3224	949	3	13	40	1
4	1	1	1	32	0	267	967	2983	47	-1	
5	1	1	1	32	1	267	979	7	19	9	-
5	1	1	1	32	2	363	988	21	14	17	ae
5	1	1	1	32	3	472	982	23	17	29	>
5	1	1	1	32	4	567	980	15	18	51	yf
5	1	1	1	32	5	664	977	9	10	9	YD
5	1	1	1	32	6	694	982	42	24	29	3h
5	1	1	1	32	7	861	974	15	37	2	ee
5	1	1	1	32	8	873	978	144	27	17	beat
5	1	1	1	32	9	1044	983	86	13	11	otter.
5	1	1	1	32	10	1255	984	19	14	17	8
5	1	1	1	32	11	1329	988	45	15	33	Fn
5	1	1	1	32	12	1386	975	42	37	31	Pas
5	1	1	1	32	13	1491	977	107	16	41	Se
5	1	1	1	32	14	1657	988	28	20	40	rs
5	1	1	1	32	15	1748	967	94	47	34	SS
5	1	1	1	32	16	1860	977	49	33	52	ae
5	1	1	1	32	17	2048	990	2	2	40	“
5	1	1	1	32	18	2156	982	112	29	19	oer.
5	1	1	1	32	19	2283	984	50	24	27	eB
5	1	1	1	32	20	2360	993	43	14	13	OK
5	1	1	1	32	21	2636	993	2	2	38	P
5	1	1	1	32	22	2888	988	39	16	58	A401
5	1	1	1	32	23	2940	977	89	34	38	|RoofPin
5	1	1	1	32	24	3068	977	114	34	5	SSCS
4	1	1	1	33	0	275	994	2405	41	-1	
5	1	1	1	33	1	275	994	43	38	11	=
5	1	1	1	33	2	498	1002	21	15	86	>
5	1	1	1	33	3	623	1001	4	5	0	:
5	1	1	1	33	4	837	1016	19	4	7	yo
5	1	1	1	33	5	1159	1011	60	14	16	i
5	1	1	1	33	6	1278	1005	77	20	27	OIG,
5	1	1	1	33	7	1535	1008	68	17	38	att
5	1	1	1	33	8	1659	1005	44	24	28	ie
5	1	1	1	33	9	1744	1004	101	27	30	Oa
5	1	1	1	33	10	2024	1021	4	3	0	:
5	1	1	1	33	11	2126	1008	54	24	29	Bo
5	1	1	1	33	12	2205	1011	37	21	35	a
5	1	1	1	33	13	2357	1017	7	10	27	ke
5	1	1	1	33	14	2496	1024	4	3	36	4
5	1	1	1	33	15	2638	1016	42	13	21	oe
4	1	1	1	34	0	235	1015	3016	53	-1	
5	1	1	1	34	1	235	1043	6	6	38	;
5	1	1	1	34	2	319	1024	75	31	28	SN
5	1	1	1	34	3	519	1019	22	17	45	my
5	1	1	1	34	4	628	1019	70	38	32	Les
5	1	1	1	34	5	814	1043	88	8	24	i
5	1	1	1	34	6	907	1034	77	16	38	a
5	1	1	1	34	7	1218	1021	155	32	28	eee
5	1	1	1	34	8	1459	1033	95	21	2	eee
5	1	1	1	34	9	1573	1028	129	25	12	ree
5	1	1	1	34	10	1729	1026	118	42	26	ete
5	1	1	1	34	11	2034	1026	91	29	30	es
5	1	1	1	34	12	2204	1027	202	24	26	Ee:
5	1	1	1	34	13	2454	1029	34	25	40	ae
5	1	1	1	34	14	2640	1025	28	36	15	ees
5	1	1	1	34	15	2839	1038	2	2	1	[300
5	1	1	1	34	16	2945	1020	59	44	1	|ereuna
5	1	1	1	34	17	3003	1020	45	44	0	Ficor
5	1	1	1	34	18	3047	1020	45	44	46	ee
4	1	1	1	35	0	390	1036	2456	53	-1	
5	1	1	1	35	1	390	1038	46	51	16	SS
5	1	1	1	35	2	548	1054	8	5	33	~
5	1	1	1	35	3	599	1065	7	8	40	7
5	1	1	1	35	4	665	1061	25	17	0	¢f4
5	1	1	1	35	5	793	1052	32	25	6	se
5	1	1	1	35	6	864	1050	48	29	18	OR
5	1	1	1	35	7	954	1036	32	43	0	S
5	1	1	1	35	8	1040	1053	10	18	0	“,
5	1	1	1	35	9	1497	1053	107	28	0	RELOCATION
5	1	1	1	35	10	1629	1049	34	34	0	OR
5	1	1	1	35	11	1682	1050	131	32	28	L302
5	1	1	1	35	12	1827	1054	53	27	8	Sar)
5	1	1	1	35	13	2041	1054	62	28	42	Pe
5	1	1	1	35	14	2203	1054	65	26	41	NS
5	1	1	1	35	15	2420	1059	24	20	38	ae
5	1	1	1	35	16	2603	1057	54	28	39	Pin
5	1	1	1	35	17	2797	1073	3	5	18	or
4	1	1	1	36	0	406	1072	2439	47	-1	
5	1	1	1	36	1	406	1079	21	20	2	\
5	1	1	1	36	2	558	1074	13	10	0	~
5	1	1	1	36	3	590	1075	19	25	47	/
5	1	1	1	36	4	831	1074	72	32	24	ON
5	1	1	1	36	5	961	1072	104	32	23	OE
5	1	1	1	36	6	1143	1083	9	15	13	CCL,
5	1	1	1	36	7	1358	1084	52	23	40	le
5	1	1	1	36	8	1446	1080	124	26	22	rs
5	1	1	1	36	9	1579	1080	89	29	19	oe
5	1	1	1	36	10	1692	1079	72	28	5	ae
5	1	1	1	36	11	1779	1079	37	21	6	eine
5	1	1	1	36	12	1852	1081	12	27	4	Ze
5	1	1	1	36	13	2022	1078	121	19	24	a
5	1	1	1	36	14	2372	1080	42	29	56	a
5	1	1	1	36	15	2627	1087	48	19	8	yee
5	1	1	1	36	16	2757	1076	88	43	31	Sr
4	1	1	1	37	0	396	1079	2434	66	-1	
5	1	1	1	37	1	396	1089	51	44	18	SS
5	1	1	1	37	2	459	1106	44	36	55	SS
5	1	1	1	37	3	626	1098	11	42	0	“a
5	1	1	1	37	4	706	1106	16	25	17	fae
5	1	1	1	37	5	845	1095	22	25	0	f
5	1	1	1	37	6	898	1118	53	17	13	ey
5	1	1	1	37	7	1078	1110	15	18	36	a
5	1	1	1	37	8	1162	1111	57	26	0	SSocoar
5	1	1	1	37	9	1267	1109	4	4	0	Oh
5	1	1	1	37	10	1282	1110	67	28	4	xum,
5	1	1	1	37	11	1453	1125	29	10	41	eee
5	1	1	1	37	12	1567	1111	111	30	30	Se
5	1	1	1	37	13	1702	1100	68	40	30	ok
5	1	1	1	37	14	1792	1103	35	33	5	az
5	1	1	1	37	15	1847	1106	17	27	0	SS
5	1	1	1	37	16	1958	1130	9	8	0	-
5	1	1	1	37	17	2067	1135	6	3	42	2
5	1	1	1	37	18	2347	1114	17	12	23	ae
5	1	1	1	37	19	2588	1079	47	66	0	ist
5	1	1	1	37	20	2645	1111	9	14	0	‘
5	1	1	1	37	21	2776	1122	1	13	4	a
4	1	1	1	38	0	464	1120	2352	68	-1	
5	1	1	1	38	1	464	1135	110	27	31	Oe
5	1	1	1	38	2	600	1137	65	26	45	2.
5	1	1	1	38	3	682	1130	13	47	23	Le
5	1	1	1	38	4	755	1149	19	12	0	-
5	1	1	1	38	5	833	1136	3	3	20	y
5	1	1	1	38	6	886	1135	66	34	25	a
5	1	1	1	38	7	1020	1124	68	40	11	LZ
5	1	1	1	38	8	1206	1134	69	18	14	ye
5	1	1	1	38	9	1355	1142	9	6	0	-
5	1	1	1	38	10	1492	1131	96	53	11	inti:
5	1	1	1	38	11	1687	1146	6	5	12	Zp
5	1	1	1	38	12	1722	1120	90	46	28	CN
5	1	1	1	38	13	1839	1129	79	59	0	ONC
5	1	1	1	38	14	1993	1145	14	26	34	>.
5	1	1	1	38	15	2079	1163	2	2	0	y
5	1	1	1	38	16	2604	1140	44	26	12	Pas
5	1	1	1	38	17	2692	1127	15	55	0	oe
5	1	1	1	38	18	2777	1137	39	29	31	LAS
4	1	1	1	39	0	516	1145	2322	62	-1	
5	1	1	1	39	1	516	1151	83	45	69	SS
5	1	1	1	39	2	660	1164	23	26	20	Oh
5	1	1	1	39	3	708	1145	145	43	29	Phe
5	1	1	1	39	4	946	1163	72	36	12	BPE
5	1	1	1	39	5	1220	1160	38	31	9	ont
5	1	1	1	39	6	1575	1164	148	24	60	AGES
5	1	1	1	39	7	1732	1167	70	27	8	I
5	1	1	1	39	8	1915	1163	52	30	18	oO
5	1	1	1	39	9	2008	1146	77	61	33	bile
5	1	1	1	39	10	2321	1162	25	11	59	~
5	1	1	1	39	11	2638	1171	68	12	5	a
4	1	1	1	40	0	453	1179	2352	63	-1	
5	1	1	1	40	1	453	1179	245	39	39	TONS
5	1	1	1	40	2	769	1195	25	18	41	OW
5	1	1	1	40	3	836	1181	134	37	39	See
5	1	1	1	40	4	984	1182	70	60	28	a
5	1	1	1	40	5	1329	1200	6	4	26	ee:
5	1	1	1	40	6	1514	1210	9	5	0	.
5	1	1	1	40	7	1611	1185	141	34	40	Kip
5	1	1	1	40	8	1848	1186	119	43	42	a
5	1	1	1	40	9	2636	1196	6	14	0	:
5	1	1	1	40	10	2727	1191	32	11	26	hae
4	1	1	1	41	0	258	1199	2545	64	-1	
5	1	1	1	41	1	230	1217	38	31	35	hs
5	1	1	1	41	2	469	1217	129	37	30	et)
5	1	1	1	41	3	630	1199	335	64	10	Gs?
5	1	1	1	41	4	1055	1194	55	73	15	ee
5	1	1	1	41	5	1164	1218	329	32	1	Se
5	1	1	1	41	6	1512	1218	339	35	20	fees.
5	1	1	1	41	7	1927	1217	97	33	19	OS
4	1	1	1	42	0	383	1233	2467	60	-1	
5	1	1	1	42	1	488	1245	115	35	11	San
5	1	1	1	42	2	613	1244	173	49	38	RO
5	1	1	1	42	3	830	1266	16	10	10	ety
5	1	1	1	42	4	908	1256	76	29	24	hat
5	1	1	1	42	5	1004	1233	34	41	96	4
5	1	1	1	42	6	1272	1249	118	28	19	SO
5	1	1	1	42	7	1459	1248	202	36	54	KI
5	1	1	1	42	8	1875	1264	34	16	36	eee
5	1	1	1	42	9	2831	1245	19	19	54	=
4	1	1	1	43	0	384	1264	2885	48	-1	
5	1	1	1	43	1	384	1294	5	5	19	:
5	1	1	1	43	2	470	1279	19	16	84	\
5	1	1	1	43	3	514	1275	24	6	13	i
5	1	1	1	43	4	593	1274	116	25	33	ees
5	1	1	1	43	5	771	1271	61	28	0	ex.
5	1	1	1	43	6	893	1276	46	36	12	Jf
5	1	1	1	43	7	968	1268	14	42	42	abe
5	1	1	1	43	8	1275	1293	4	2	60	>
5	1	1	1	43	9	1316	1279	19	16	28	*
5	1	1	1	43	10	1452	1286	30	23	26	FO
5	1	1	1	43	11	1532	1278	185	27	0	ONFIIZ
5	1	1	1	43	12	1694	1272	35	41	55	A
5	1	1	1	43	13	1742	1265	71	36	48	MM
5	1	1	1	43	14	1847	1264	65	48	1	NN
5	1	1	1	43	15	1962	1278	7	25	70	NS
5	1	1	1	43	16	2506	1266	74	36	26	a
5	1	1	1	43	17	2871	1293	4	9	74	1
5	1	1	1	43	18	2889	1274	63	38	0	feeicon
5	1	1	1	43	19	2955	1291	52	12	21	ais
5	1	1	1	43	20	3009	1274	20	38	0	win
5	1	1	1	43	21	3162	1293	57	13	32	(aa
5	1	1	1	43	22	3242	1290	27	12	35	a]
4	1	1	1	44	0	232	1285	3037	60	-1	
5	1	1	1	44	1	232	1287	26	50	32	Ee
5	1	1	1	44	2	396	1311	4	3	49	:
5	1	1	1	44	3	788	1297	3	4	36	PRR
5	1	1	1	44	4	885	1292	57	31	31	MOL
5	1	1	1	44	5	1105	1299	27	10	23	TE
5	1	1	1	44	6	1297	1310	3	12	3	;
5	1	1	1	44	7	1420	1306	31	22	23	SF
5	1	1	1	44	8	1518	1295	217	30	42	NYE
5	1	1	1	44	9	1764	1293	31	22	41	EX
5	1	1	1	44	10	1870	1302	105	24	31	eS
5	1	1	1	44	11	2447	1294	18	51	0	p
5	1	1	1	44	12	2869	1310	7	10	23	i
5	1	1	1	44	13	3242	1304	27	16	43	a
4	1	1	1	45	0	307	1341	2962	46	-1	
5	1	1	1	45	1	307	1343	127	33	29	i
5	1	1	1	45	2	456	1349	86	27	24	OS
5	1	1	1	45	3	892	1347	30	24	4	Ba?
5	1	1	1	45	4	987	1364	31	12	36	ee
5	1	1	1	45	5	1051	1360	45	19	44	fens
5	1	1	1	45	6	1109	1343	97	26	14	STORM
5	1	1	1	45	7	1413	1352	30	28	0	q
5	1	1	1	45	8	1583	1351	118	16	0	Nie
5	1	1	1	45	9	1704	1352	80	9	43	og
5	1	1	1	45	10	1876	1351	145	36	26	toe
5	1	1	1	45	11	2402	1341	24	29	41	&
5	1	1	1	45	12	2660	1355	21	6	38	=
5	1	1	1	45	13	2901	1365	23	13	0	—
5	1	1	1	45	14	2998	1353	166	26	8	Se
4	1	1	1	46	0	436	1365	2833	34	-1	
5	1	1	1	46	1	436	1367	14	31	0	Ss
5	1	1	1	46	2	493	1378	15	6	20	=
5	1	1	1	46	3	561	1375	14	11	0	~
5	1	1	1	46	4	758	1381	9	3	5	ir
5	1	1	1	46	5	918	1365	32	33	89	SS
5	1	1	1	46	6	1001	1376	98	15	30	Sf.
5	1	1	1	46	7	1457	1380	38	11	0	uenee
5	1	1	1	46	8	1496	1373	53	26	0	Carport
5	1	1	1	46	9	1585	1378	123	15	22	Ne
5	1	1	1	46	10	1756	1365	35	34	0	dt
5	1	1	1	46	11	1911	1377	91	16	0	Neer
5	1	1	1	46	12	2393	1366	19	33	7	Ly
5	1	1	1	46	13	2871	1382	4	9	4	1b
5	1	1	1	46	14	2886	1373	44	26	0	|oateg
5	1	1	1	46	15	2931	1373	8	26	37	of
5	1	1	1	46	16	2942	1373	39	26	0	RAdnge
5	1	1	1	46	17	2981	1373	23	26	44	andl
5	1	1	1	46	18	3005	1373	31	26	1	zyn.ts.
5	1	1	1	46	19	3040	1373	41	26	0	Relorstee
5	1	1	1	46	20	3085	1373	25	26	0	fcr
5	1	1	1	46	21	3172	1382	47	9	0	iMoxes—tacauy
5	1	1	1	46	22	3224	1373	10	26	52	|
5	1	1	1	46	23	3242	1382	10	9	50	ae
4	1	1	1	47	0	450	1375	2819	40	-1	
5	1	1	1	47	1	450	1388	5	5	32	~
5	1	1	1	47	2	508	1396	5	3	30	7
5	1	1	1	47	3	585	1397	3	2	24	.
5	1	1	1	47	4	721	1377	46	23	23	Ot
5	1	1	1	47	5	947	1386	17	17	27	oe
5	1	1	1	47	6	1100	1390	39	12	39	a
5	1	1	1	47	7	1420	1375	68	40	19	mes
5	1	1	1	47	8	1498	1392	24	5	0	Papert
5	1	1	1	47	9	1593	1392	19	7	21	tN
5	1	1	1	47	10	1643	1382	72	24	11	cin
5	1	1	1	47	11	1758	1386	38	10	39	tt.
5	1	1	1	47	12	1893	1389	63	14	21	ea
5	1	1	1	47	13	1945	1376	21	40	29	ae
5	1	1	1	47	14	2380	1392	6	10	10	P
5	1	1	1	47	15	2869	1400	67	10	0	+_feets
5	1	1	1	47	16	3171	1395	98	15	27	ee
4	1	1	1	48	0	235	1396	3034	33	-1	
5	1	1	1	48	1	235	1415	20	7	56	=
5	1	1	1	48	2	574	1401	78	16	9	a,
5	1	1	1	48	3	787	1401	49	23	34	Sy,
5	1	1	1	48	4	942	1403	44	19	34	SOIR
5	1	1	1	48	5	1142	1401	44	11	25	oon
5	1	1	1	48	6	1205	1415	47	9	15	en
5	1	1	1	48	7	1406	1417	5	4	51	Deck
5	1	1	1	48	8	1576	1397	54	29	3	SON
5	1	1	1	48	9	1740	1396	34	17	0	aiaal
5	1	1	1	48	10	1898	1404	8	18	9	Ve
5	1	1	1	48	11	1940	1400	85	25	43	ee
5	1	1	1	48	12	2386	1395	23	43	27	de
5	1	1	1	48	13	2865	1422	16	7	0

                             as    ee     SEAS    :         Fi.               35            Deck."     y          f     ‘       [Ne    EN    Ensring Autaicy          ,                                                                 a]
     3                   :   aa             so      os         =  Sy       Classfoo            A    Mi        oo ane ae des       4     =                Z          . fio                                        FOR APPROVAL
        —<           ’               Re    re          ee           Mg RN  8 5                      oe. Ay, We                  find          or                     ;                                                                    |
      ie Pe                          Oe              2  SSS                              non      apt.    QE Bit] as                   ED                           |                                           AX Ausco
 \                 nr                  ee          pon   ne          ma              fl                    LIOR       hee               ;     Shas
    ©            :       ait               SC OR                         RS                         5 PO            TIE        Ea 3                       ey                                   MATH            ae                  ve
             TP   eee         rs            a    ‘     SI    4 OS        on    Pee?                Lar <         SS ae                          a                                                             ‘COPRIGET USSD MOL LA FTFLTD, THEDSCL MENT M8407 EL
     ed        te           ee                Soe    P|    wo                2. Breakout Room 1     wet           Pie.       bum    fer as:                                                                    TEPRTMCED SBMAGEESCCRTHRTSCHMEED WTTCLT ATER
    ‘i       :        “ss                    ’         5     we   GS         aes          °      ;      af         eS        es       le          i                                            STAFF                         -
    -          Beret                                RR, MAD                    SES        ‘._.  /Bteakoiit Réom 3__ Arai      oe    7%  SSB    oR                                                          .
                 es     ae                    OR                  OR            RR                              a EES           Meee aoe                               ~~                    —              Site Plan (MQB)
    Le... >          .      -          y    _~      “eS    Th,       BOS        Ce        pe             ge                      ‘eet,       a]                            r~               —_—
 =                    Ton         is           BO      NS         pa SO.               Se                    bcm.           AY  ge       see,                                               :      —
           =         “a      cee     %     ¥           Se        a Ons                  Ne      1)    i}     Room         eR                 fi                                              <
                      —                                     So           ORO               RA ot                                                                         a
        Se                 4            =        _              SCY for                           ts x   Cue            Diiieet             Sein                    b ts hoe                               a
        i              :               ;     =                    oe       a    eo.          ee,                ;       ee FP            pay eating                       :     .                    ~
  ,       rr)                                   S            ,         oe      SE!                 SS             See    a    Fo so.         ‘                          tao                            _
   id       ~      aS           . 7                  ae           ae            OS                 Se                      or)        i                              ia                                     30.85x12m Learning Centre-    |
        F   fs           «=   F                       >              7   5	1	1	1	68	8	1210	1840	7	2	38	=
5	1	1	1	68	9	1219	1842	26	2	26	TO
5	1	1	1	68	10	1300	1838	7	7	32	a
5	1	1	1	68	11	1451	1833	13	7	32	Se
5	1	1	1	68	12	1571	1832	3	4	0	rk
5	1	1	1	68	13	1605	1839	2	2	0	an
5	1	1	1	68	14	2002	1834	8	4	13	iy
5	1	1	1	68	15	2038	1844	12	4	7	he
5	1	1	1	68	16	2437	1842	14	8	49	Ay
5	1	1	1	68	17	2505	1841	3	3	0	-
4	1	1	1	69	0	233	1815	2755	97	-1	
5	1	1	1	69	1	233	1835	21	18	69	fe
5	1	1	1	69	2	278	1864	6	8	36	4
5	1	1	1	69	3	348	1849	4	4	35	wns
5	1	1	1	69	4	414	1868	6	4	13	8
5	1	1	1	69	5	474	1816	137	65	16	as,
5	1	1	1	69	6	667	1855	13	8	0	-
5	1	1	1	69	7	864	1854	31	18	14	——
5	1	1	1	69	8	1054	1857	2	3	31	see
5	1	1	1	69	9	1077	1840	76	32	0	eu
5	1	1	1	69	10	1209	1843	30	30	0	—
5	1	1	1	69	11	1246	1833	93	61	34	ean
5	1	1	1	69	12	1405	1854	8	7	7	$
5	1	1	1	69	13	1511	1854	2	2	31	5
5	1	1	1	69	14	1527	1815	101	97	35	Sa
5	1	1	1	69	15	1678	1864	2	5	26	;
5	1	1	1	69	16	1834	1840	24	41	34	i
5	1	1	1	69	17	1938	1869	7	6	0	F
5	1	1	1	69	18	1969	1836	56	43	54	ant
5	1	1	1	69	19	2055	1847	10	7	36	*
5	1	1	1	69	20	2375	1832	38	35	26	a
5	1	1	1	69	21	2473	1851	11	31	34	3
5	1	1	1	69	22	2478	1843	41	54	6	P|
5	1	1	1	69	23	2578	1849	28	37	0	e
5	1	1	1	69	24	2721	1860	67	25	43	on
5	1	1	1	69	25	2871	1848	31	20	92	SG
5	1	1	1	69	26	2929	1848	59	20	86	(B190
4	1	1	1	70	0	271	1864	2614	58	-1	
5	1	1	1	70	1	271	1869	6	18	0
             (wie
5	1	1	1	70	3	566	1877	43	19	15	i
5	1	1	1	70	4	621	1869	9	31	27	oa
5	1	1	1	70	5	811	1872	97	17	27	ae
5	1	1	1	70	6	1081	1882	2	2	0	:
5	1	1	1	70	7	1197	1889	2	2	19	‘
5	1	1	1	70	8	1225	1871	44	28	0	..-
5	1	1	1	70	9	1289	1875	39	20	34	a
5	1	1	1	70	10	1352	1872	34	27	26	>.
5	1	1	1	70	11	1471	1871	11	34	59	bes
5	1	1	1	70	12	1533	1881	14	13	0	FON
5	1	1	1	70	13	1569	1876	51	22	13	ete
5	1	1	1	70	14	1656	1895	3	2	0	O>.
5	1	1	1	70	15	1803	1885	12	16	28	ft
5	1	1	1	70	16	1834	1874	4	4	0	.
5	1	1	1	70	17	1975	1872	18	7	25	it
5	1	1	1	70	18	2393	1864	20	58	0	,
5	1	1	1	70	19	2454	1877	22	20	0	>
5	1	1	1	70	20	2641	1883	35	6	45	_
5	1	1	1	70	21	2767	1877	6	23	20	|
5	1	1	1	70	22	2798	1875	46	27	8	a*
5	1	1	1	70	23	2860	1880	25	9	35	Tent
4	1	1	1	71	0	312	1871	2851	62	-1	
5	1	1	1	71	1	312	1904	23	21	0	NS
5	1	1	1	71	2	383	1877	53	39	0	we
5	1	1	1	71	3	467	1922	6	6	53	r
5	1	1	1	71	4	580	1893	11	9	7	a
5	1	1	1	71	5	655	1890	22	43	0	eS
5	1	1	1	71	6	787	1892	27	35	10	4
5	1	1	1	71	7	893	1897	75	32	49	—
5	1	1	1	71	8	1042	1912	7	5	0	D
5	1	1	1	71	9	1327	1923	9	8	40	OS
5	1	1	1	71	10	1453	1890	63	39	29	oe
5	1	1	1	71	11	1574	1884	54	46	18	RD
5	1	1	1	71	12	1724	1902	98	23	28	me
5	1	1	1	71	13	2436	1895	5	11	25	pat
5	1	1	1	71	14	2548	1871	33	59	47	7
5	1	1	1	71	15	2776	1900	33	33	52	x.
5	1	1	1	71	16	2871	1899	64	23	77	Good
5	1	1	1	71	17	2945	1899	100	28	95	Shepard
5	1	1	1	71	18	3056	1899	107	23	95	Lutheran
4	1	1	1	72	0	301	1905	2659	80	-1	
5	1	1	1	72	1	301	1932	20	35	35	oN
5	1	1	1	72	2	358	1905	186	66	17	ie
5	1	1	1	72	3	824	1930	191	55	41	a
5	1	1	1	72	4	1330	1932	17	33	35	SED
5	1	1	1	72	5	1632	1930	60	29	21	ns
5	1	1	1	72	6	2025	1933	75	31	86	HPE
5	1	1	1	72	7	2112	1934	12	30	86	/
5	1	1	1	72	8	2137	1933	113	31	96	HOME
5	1	1	1	72	9	2657	1922	182	62	49	ZX
5	1	1	1	72	10	2871	1936	89	28	22	colteee
4	1	1	1	73	0	295	1965	2533	28	-1	
5	1	1	1	73	1	295	1965	26	11	10	PS
5	1	1	1	73	2	353	1968	63	15	25	Oe
5	1	1	1	73	3	636	1979	3	3	0	,
5	1	1	1	73	4	712	1965	11	5	0	-
5	1	1	1	73	5	825	1967	25	23	27	ic
5	1	1	1	73	6	915	1967	63	23	33	ae
5	1	1	1	73	7	1054	1975	3	2	0	p
5	1	1	1	73	8	1262	1974	10	8	44	>
5	1	1	1	73	9	1335	1969	38	19	0	iF
5	1	1	1	73	10	1676	1984	2	2	21	‘
5	1	1	1	73	11	2708	1971	1	3	74	j
5	1	1	1	73	12	2817	1969	11	24	17	pi
4	1	1	1	74	0	296	1957	2545	80	-1	
5	1	1	1	74	1	296	1975	109	60	50	Peta
5	1	1	1	74	2	418	1957	68	62	10	So
5	1	1	1	74	3	584	1979	83	58	2	St
5	1	1	1	74	4	757	2003	18	10	26	eae
5	1	1	1	74	5	834	1986	229	33	45	Se
5	1	1	1	74	6	1447	1988	186	25	29	eee
5	1	1	1	74	7	1853	2004	10	9	20	.
5	1	1	1	74	8	2024	1975	50	31	85	EC
5	1	1	1	74	9	2086	1977	13	29	85	/
5	1	1	1	74	10	2112	1977	164	31	96	ENGLISH
5	1	1	1	74	11	2723	1981	118	44	36	Veale
4	1	1	1	75	0	316	2002	2953	59	-1	
5	1	1	1	75	1	316	2016	128	43	15	ae
5	1	1	1	75	2	594	2015	17	33	42	ae
5	1	1	1	75	3	838	2002	41	40	0	a
5	1	1	1	75	4	895	2051	6	4	31	.
5	1	1	1	75	5	1031	2002	75	54	21	ra
5	1	1	1	75	6	1188	2041	19	10	18	5
5	1	1	1	75	7	1417	2030	24	14	4	ie
5	1	1	1	75	8	1619	2026	173	31	25	Bi,
5	1	1	1	75	9	2022	2019	121	31	37	STAFF
5	1	1	1	75	10	2723	2028	116	33	0	NORTH
5	1	1	1	75	11	2860	2044	43	12	27	es
5	1	1	1	75	12	2943	2044	51	11	5	jrwron
5	1	1	1	75	13	3025	2045	23	10	39	se
5	1	1	1	75	14	3088	2014	27	51	40	|
5	1	1	1	75	15	3123	2053	15	7	16	a
4	1	1	1	76	0	343	2033	2918	77	-1	
5	1	1	1	76	1	343	2053	97	36	0	wide
5	1	1	1	76	2	527	2033	75	71	29	as
5	1	1	1	76	3	942	2046	30	35	57	>
5	1	1	1	76	4	1047	2058	2	2	46	:
5	1	1	1	76	5	1063	2047	112	58	0	Tee
5	1	1	1	76	6	1248	2081	5	2	62	;
5	1	1	1	76	7	1453	2057	193	15	0	Ocean
5	1	1	1	76	8	1927	2035	286	75	43	a
5	1	1	1	76	9	2406	2056	11	31	38	f
5	1	1	1	76	10	2889	2063	16	16	39	ic
5	1	1	1	76	11	2928	2050	14	41	44	|
5	1	1	1	76	12	2942	2050	41	41	71	Mar
5	1	1	1	76	13	2993	2063	20	16	92	18
5	1	1	1	76	14	3033	2063	59	16	44	1250
5	1	1	1	76	15	3100	2039	2	55	45	|
5	1	1	1	76	16	3113	2035	69	63	28	GE
5	1	1	1	76	17	3211	2055	50	32	79	AD
4	1	1	1	77	0	287	2084	2982	40	-1	
5	1	1	1	77	1	287	2088	42	18	16	et
5	1	1	1	77	2	537	2092	3	3	11	BR
5	1	1	1	77	3	741	2103	15	15	28	%
5	1	1	1	77	4	822	2108	2	2	29	;
5	1	1	1	77	5	928	2086	103	28	0	~~.
5	1	1	1	77	6	1113	2084	125	37	35	ee
5	1	1	1	77	7	1318	2114	2	2	0	;
5	1	1	1	77	8	1467	2090	32	32	13	SR,
5	1	1	1	77	9	1607	2087	33	13	55	xm
5	1	1	1	77	10	1734	2090	23	24	0	b
5	1	1	1	77	11	1995	2093	66	26	18	pc
5	1	1	1	77	12	2406	2091	1	3	43	.
5	1	1	1	77	13	2690	2096	62	28	49	>
5	1	1	1	77	14	2782	2113	12	9	36	ae
5	1	1	1	77	15	2860	2099	51	12	0	cmceoty
5	1	1	1	77	16	2943	2099	49	11	1	|oestse
5	1	1	1	77	17	3005	2088	20	39	75	|
5	1	1	1	77	18	3035	2088	113	39	34	DIMENSIONS
5	1	1	1	77	19	3153	2104	33	15	22	ARE
5	1	1	1	77	20	3194	2104	16	15	22	IN
5	1	1	1	77	21	3218	2104	34	15	52	MM
4	1	1	1	78	0	339	2092	2930	92	-1	
5	1	1	1	78	1	363	2115	42	49	17	ali
5	1	1	1	78	2	562	2099	37	74	22	gs
5	1	1	1	78	3	639	2102	101	82	18	re
5	1	1	1	78	4	804	2152	13	6	70	£
5	1	1	1	78	5	871	2107	108	49	29	MES
5	1	1	1	78	6	1008	2127	147	30	22	Ps
5	1	1	1	78	7	1176	2092	133	78	33	eo.
5	1	1	1	78	8	1327	2138	3	5	0	.
5	1	1	1	78	9	1456	2120	137	39	8	So
5	1	1	1	78	10	1684	2132	70	27	36	ari
5	1	1	1	78	11	1968	2117	125	44	13	awe
5	1	1	1	78	12	2344	2133	84	26	25	———
5	1	1	1	78	13	2536	2147	11	28	10	,
5	1	1	1	78	14	2567	2111	98	31	25	Se
5	1	1	1	78	15	2692	2132	57	26	9	ma
5	1	1	1	78	16	2860	2118	55	48	38	ae
5	1	1	1	78	17	2946	2118	67	16	51	MARIS
5	1	1	1	78	18	3066	2131	41	34	61	DO
5	1	1	1	78	19	3107	2115	41	54	60	NOT
5	1	1	1	78	20	3147	2115	59	54	60	SCALE
5	1	1	1	78	21	3268	2100	1	42	92	|
4	1	1	1	79	0	236	2137	3033	99	-1	
5	1	1	1	79	1	236	2160	4	5	80	2
5	1	1	1	79	2	360	2160	33	56	40	4.
5	1	1	1	79	3	423	2173	44	25	7	Site
5	1	1	1	79	4	621	2163	14	7	0	pian
5	1	1	1	79	5	656	2162	13	47	0	‘\
5	1	1	1	79	6	676	2157	39	51	61	Js
5	1	1	1	79	7	783	2157	27	68	10	7
5	1	1	1	79	8	986	2160	19	33	29	a
5	1	1	1	79	9	1034	2167	68	31	22	a,
5	1	1	1	79	10	1192	2168	28	5	15	eT
5	1	1	1	79	11	1231	2137	198	86	17	Se
5	1	1	1	79	12	1453	2164	56	30	0	—
5	1	1	1	79	13	1529	2164	39	40	64	Qe
5	1	1	1	79	14	1638	2157	75	79	20	ue)
5	1	1	1	79	15	1727	2163	50	59	0	¥

                                                                                                                                        “= ce ee oC                                   Eon                i  0240100047    [               |
   gE         7a                  PON            :          a         : “AS        <>                 ee. aeack oe            ae         ee reetnontete -—t                      n                        come              sea       me
     Seat     |     oe          &          age         —              4                                ~        o        =        s          ree eee                ee                           a        1                               |
be a    = y         + 2S ri         x2 \      ee            a       5 ~ WSS                     5	1	1	1	82	16	1580	2241	48	21	41	Tee
5	1	1	1	82	17	1767	2226	18	36	32	aT
5	1	1	1	82	18	1895	2250	35	8	31	we
5	1	1	1	82	19	2044	2228	40	33	0	3
5	1	1	1	82	20	2162	2260	15	3	18	ee
5	1	1	1	82	21	2276	2240	28	4	44	tee
5	1	1	1	82	22	2625	2259	6	6	67	x
5	1	1	1	82	23	2877	2242	12	6	43	~
5	1	1	1	82	24	3098	2228	94	28	92	A-001
5	1	1	1	82	25	3229	2230	7	26	90	|
4	1	1	1	83	0	2981	2288	289	44	-1	
5	1	1	1	83	1	2981	2288	105	44	96	Page
5	1	1	1	83	2	3102	2288	42	34	96	21
5	1	1	1	83	3	3166	2288	42	35	96	of
5	1	1	1	83	4	3222	2288	48	35	96	92

Section 22

Page 22 of 92

ee                       2)                   3)               (4)                  (5)                  fe)                  @)                    “8 )                 (9)                  40)
                                                               ML                 Kor                   s)                   &                    5)        080        \8                   iT                   Re                   i                    10)
                                                                                                       13650                                               3450                                                 13750                                        |
                                                                                                                                                                                                                   |                                         *
                                                              116       3224       176           4sB7              100                      8497                        16                 6674                  176                  6724                  116
                                                                i                    4                              A                                                    y                                         1                                         i
                                 DR          _©          _              04           A Sone                wo2          wo2           Wot Ie                                 Boxe               °%     wai    BBB      B    Ios  xB       073   Cpr     8   A  —2           3    &      Te
                               Meee           =                     a                    “                   ~~           ay        ay.        a                           ie            a | ay               *       a            -       a            a          =
                                                                                                                               |        Breakout ha         1                                 |                                         |
                                              8                                                                                \         |    39.64    m?                           |         |                  »                      |
                                              g           wot                     ala                                                            61m                                                            2
                                                                                   op
                                                                                                                                                                                                                              o                   a
                                                      WLI      ir                              2
                                                           02    2         WLo3            Breakout Room 3                       FLO?                                                                    WLO3,          WLOS
                                                                                                 47.00 m?                      !                    |                                         |                                                                             S            P
                                              g                                   -i«                                          WLO1                                                                                                                                       f=]            5
                                              ay                                   on                                                                                                                                                                                                    om
                                                                                                                                                                   ne               | Classtoom     2                            Clasgroom 1               >                &            a
                                    eS                              Staff Room                                                                                                           62.90    m?                                63.B7     m?            a                       i
                                    8                                30.38     m?                             =                                                                                 -                »                     ine                                          8)   g
                                    ai                                  Jem             FLO1                                                                   WLo2                        Fuot                 <q                    Fuo4                                          a|   =
                                                                                                                          Breakout Room 2          |                                |         ]                                                                                          3
                                              8            wor  HS                                                              23.25 m?             wor    Deck                                                                                                                         B
                                              $                  .                                                                                 |      15.82 m*                                                                                                                       p
                                                                                     4
                                                                                      7                                 FLOt |
                               B \         of                                                        ade                    caluy             we                        4     wos Above        Wiwo4 Aboys                 itvo4 stigve | 4%    wo4 Above
                                              a                                           pe                  aaa                   ——s            |$—___.——__]              peers                       ce I                                 ees
                               Nea         z°                  La                      =     WOT              -Do2  ‘|| pooz '        wor                                        wo               wo2        p02 | bpo2       wi02               81    5B    |
                                           g—                    5                                 weos, —                                                                                webs                         =               Wks                   ;
                                              &                                                                                I                    |     Deck           |                    |                    |                    |                                   8
                                              =                                                                 Say                                                                                                   3
                                              8                                                      _—                                                  65.31 m?                   |                                           _                                           &
                                ro                                        A                         i                                                                                                                              i
                               (Cc           ——                        Yay                    fj                              +                                          +        1          +e                                        it                      ee
                               Sn                               Plas   wor       |”   Los      fF                                                    io                          Ethe         ise                             LE —frss
                                                                |            WLo2               ae                             |                    |                    |                                         |            aaa
                                                                                                                                                                                              |                               a                              )

                                                                       3400                 3400                 3450                 3400                 3450                 3400                 3450                 3450                  3450         |
                                                                |                 p—_                   dg            __.                                                                   hk                                                    a ____                                           (faeces ed, nar cn                “aaa | a
                                                                      Module 1             Module 2             Module 3             Module 4             Module 5             Module &             Module 7             Module 8              Mod] Drawings-Architectural | —_t_{wststthaun                                         soneie |
                                                                                                                                                                                                                                                                                                   5                                         =
                                                                                                                                                                                                                                                    Sheet             Content            Rev       +  feeiatedtaingtacatend aaM aad  Aces |
                                                                                                                                                                                                                                                     A000    Schedules - Builcing Shell    \          sien
                                                                          1.    |Ground Floor                                                                                                                                                        4001 |Site Pen                                1  frostieget tangs mt zy.re Relates Pcs itenes aay | ae
                                                                                                                                                                                                                                                   | A100 [GroundFlow Plan              ||         Speen                             a       Te
                                                                                 4-100                                                                                                                                                               ae                                    +]      =                                         Bs
                                                                                                                                                                                                                                                     A200    Elevations                    1              FOR APPROVAL
                                               Manufacturing_Doors                             ;                                                                         Manufacturing - Floor                                                     es                                                    4QAuUSCcO
                                        Size                               Finish                                         Tag                        Type                           Frame Crs. _ Pan Material                Insulation               eneral   Notes & Disclaimers                       mS TASS     5  PTLTD, THIEDSCLIAE AT MAN HOT
                              ]                                       Frame | Frame                                        FLO? Particleboard, 22mm, F11 flocring grade, LC150 joists 400       0.35mm Galv Steel Pan [R15 Glass Wod                + Wall/Ceiling/Roof frames built to Ausco          PRIMER oa DoE              ao
 Tag | Qty.| Style/Type | Leaf1|Leef2] H | KR)   |W(R)| Head | Glazing Type     Finis  [Leaf Finish   Accessories          FLO2 Decking, NMothrood 23mm                           “4a0          E                   7                                 Backbone framing design standards.                              OT
ny                                  eee |                           Aominiom  |Biucktane (Osean) [eben                                                                                                                                                Standard Chassis drawings                    Ground Floor Plan
           ‘Swing Dear  e200                           2040  [Clear = Aluminium Clear Timber SC [Half Glazed, lever escape set                                                                                                                      + Building chassis designed to Ausco
                              |                                      aa      Anadi   vd (Deer    (Satin Chr } hol  cor
                                                                    ss                                                                                                                                                                              -Avckmatiesee receccgwh
                                                                                                                                                                       =                           ee     Frame                                       Standard(s) and the National Canstruction    (    Q     )
                                                                                                                                                                                                                                                      the relevant AustraliawNew Zealand
                                                                                                                                                                     Si                           Finish
                                               Manufact              oe                                                    Tag    Qty.    Styie/Type      H_|HiRi     W_   |WiR} Head | Glazing   Type     Finish           Accessories              Code.                       :
                                                         ring                                                              wor    15 | NalfSlideriindsw | 1075 | 1900 1800 | 1e10 | 2275 | Gey   Aluminium  Crest  Foregass Wesh Aluminium Fiyscreen + Furniture, plumbing, & electrical        Me
     Name           Area | Perim.       Floor Covering                 Skirting                     Cornice                                                                                               Anodised |(Black}                           representations are indicative. Appearance  —Pwie:t                  7
Breakout Room 1   Nol Placed|Not Placed|Carpel Tiles __—_—_—_‘[Alurniniumm skit 100mm (Clear Anodisedl | 8mm Set plaster comice REE) |   SRR | aces            tee | tone   See   (eee | BE      AR       Ee       eee ere ee reer                    may vary depencing on supplier.              30.85x12m Learning Centre-
Breakout Room 2   Not Placed|Not Placed| Carpet Tiles       ‘Aluminium skirt 100mm (Clear Anodised) [55mm Set plaster comice Wa    8   |WindowwiSide Lowes | 482 | 467 1800 | 1810 | 612 | Gey   Aluminum | Clear  _|Fibregase Mesh Aluminum Fiysereen + Loose items to be packed for transport    SG (B190)
                                                                                                                                                                                                          ‘Anadioed |(Blacky                        * Site, stairs, ramp and building skirting =
Breakout Room 1    29.61 m* | 25.32m |                                                                                                                                                                                                                indicative only. Size, fall and location to suit “""
Breakout Room 2-23.25 me | 19.30m                                                                                                                                                        walls                                                        site conditions Constructed ta comply with © Good Shepard Lutheran
Breakout Room 2    47.00 m= [28.82 m | Carpet Ties          [Alumniniom skirt 100mm (Clear Anodisedi |SSmm Set plester comice                                             Manufacturing                -                         5                    AS1428.1.
(Classroom 4       63.37 m? | 32:30 m [Carpet Tiles         [Aluminium skirt 100mm (Clear Anodisedh |SSmm Set plaster comice                                  Frame                                                                                  Manufactured to Wind Speed: B190              College
Classroom 2        €2.90m? | 3220m | Carpet Tiles           Aluminium skirt 100mm (Clear Anodisedh [55mm Set plaster comice Tag             Frame              crs.              Cladding                       Lining              Insulation       Manufactured in: MQB
Deck               15.82 m? | 16.14 m_|Modwood              NA,                            INA,                            WLO1 Engineered steel frame, 75mm, 00       =                                Plasterboard, 10mm, TSF   r                  Intended Location: Noosaville, QLD
                                                                                                                                “Lipped C" section                                                      (Blenc}
staf! Room         30.38m?_| 25.30.                                                                               YP v02 Engines stec! frame, 75mm,           400      ‘Scyon Matrix Panel (Deep Ocean & Plasterboard, 10mm. TSF  R2.0 glasswool    Client Approval                               trumty | Ov we   | sere       ¥
                                                                                                                                “Lipped C" section                     Papertark. refer elvations, express joint |(Blanc}       batts    oa a                                                                AR        ;       Bo         A2
                                                                                                                                                                       painted black)                                                               Client’ Good Shepard Lutheran Callege            (C  | MAR   18)  1-100)    ‘prt
                                                                                                                           WLO3 Engineered steel frame, 75mm, 400      3.6mm Raugh Ply                  Plasterboard, 10mm. TSF   R2.0 glasswool                                                   coe       cates
                                                                                                                           5	1	1	1	80	2	1376	2105	71	19	0	Liped C"section .         oe                 |(Blanc). one side only — bats                Approved ty                                  oveab | MAR 1g|     DIMENSIONS AREINMM
                                                                                                                           WLO3 Engineered steel frame, 75mm, 400      Seyon Matrix Panel (Deep Ocean & Plasterboard, 10mm, TSF   R2.0 glasswool     7                                                                    DO NOT SCALE          i
                                                                                                                                “Lipped C" section                    Paperbark refer elvations, express joint |(Blanc)          batts              Company                                       Project ho.           Ore ho.                 '
                                                                                                                                                                       painted black}                  |                                             Sale tdlacinan                                 0240100047          | ‘s                    ‘
                                                                                                                                                                                                                                                     res                                          erg                       a            w(t
                                                                                                                                                                                                                                                    Signaty                                                                                     :
                                                                                                                                                                                                                                                                                                    -                        A-100         |    :

Section 23

Page 23 of 92

a                  we                 ra                  oN                 ane               fas                fax                  ow               eas                 ASS
                  (1)                (2)                (3;                .4)                5}                 (6;                (7)                (8;                (9)                (10:
                                                                                                       30850
                    |                  |                                     |                  |                  |

                    |                  |                                     |                  |                  |
                                                                                                        ee                               ss... 8s...                                  SS
@                       TUN            ETE     CO           TL            LT              CYL               LI           ri      UN                          TIE                     LI)                           oom
                    |                                                        |                                               |                                     |
                    |                                                        |                                               |
                    |                                                        |                                                                                     |
         8          |                                                        |                                               |        |                                                                           a
   Q
                    |                                                        I                                           RFI                                                                                      g
                    |                                                        |                                                                                     |
(B>        .        UI         |                   |                        ul                                            MEET   A   Ll                         Hl                          |                               (BY
Ne                          willl              |                               |                                             anni                             mink                                                          ee)
         x                                                                                                                                                                                 x
 “sn                |                                                                                                                                                                                                        is
(C+4—~                  im                                                                                                                                                                                                  (Cc)
Si                                                     4                       iat                                                                                       4                                                  sey
                    |                  |                                     |                  |                  |                                                    =
                                                         |
                           3400               3400               3450                3400               3450               3400               3450               3450               3450                                          pases eesetaesete   6           ntensaipe ransom
                   a                                                                                                oe                 eg                                                                                           1 oescc aa aades co, arcu     aie    |e
                          Module 1           Module 2           Module 3           Module 4           Module 5           Module 6           Module 7           Module 8           Module &                                          Hes Sa ieoe                          Le
                                                                                                                                                                                                                                    i                                    =
                                                                                                                                                                                                                                      sare
                  (1)                2}                 (3;                4)                 5)                 (6;                (7)                (8;                9)                 (10:                                     eal ect                   1      |
                     LX.             T™é                xo                 ee                 fo                 fon                os                 rar                 a                  Se                                       ate       ems     Aragon   “We
                   _                  “a                 er                 =                  =                  =                  i                  =                  sail               =                                    3                                     By
                        | 1. |Ground Floor Roof                                                                                                                                                                                   ___FORAPPROVAL
                 ay         | 4-100                                                                                                                                                                                                      4\.AuUSCcO
                                                                                                                                                                                                                                                            MODULAR
                                                                                                                                                                                          General Notes & Discinimers                   COPPRIE AUS MOLL LS. PT LTB. THE DSCLASENT Mite 40" BL
                                                                                                                                                                                          + WalliCeiling/Roof frames built to Ausco       SESE SRRAWE'SCGRTHRTS EGED MOLT WITTER
                                                                                                                                                                                           Backbone framing design standards      7.“
                                                                                                                                                                                          + Building chassis designed to Ausco
                                                                                                                                                                                           Standard Chassis drawings                Roof Plan (MQB)
                                                                                                                                                                                          + All work must be done in accordance with
                                                                                                                                                                                           the relevant Australia/New Zealand
                                                                                                                                                                                           Standard(s) and the National Construction
                                                                                                                                                                                           Code,
                                                                                                                                                                                          * Furniture, plumbing. & electrical
                                                                                                                                                                                           representations are indicative. Appearance — Pret             7m
                                                                                                                                                                                          may vary depending on supplier.           30.85x12m Learning Centre-
                                                                                                                                                                                          + Loose items to be pecked for transport. SG    (B190
                                                                                                                                                                                          * Site, stairs, ramp and building skirting SG (BI90)00
                                                                                                                                                                                           indicative only. Size, fall and location to suit"
                                                                                                                                                                                           site conditions. Constructed ta comply with Good Shepard Lutheran
                                                                                                                                                                                           AS1428.1.
                                                                                                                                                                                          Manufactured to Wind Speed: B190        College
                                                                                                                                                                                          Manufactured in: MQB
                                                                                                                                                                                          Intended Location: Noosaville, QLD
                                                                                                     ——            —                                                                      Client Approval                          Temnty — | teawnse | sce
                                                                                             Frame]             si                             [sheet | —_Content [Rev]                   ies:   Good SteperdLuteranGalege            HC | MARA)    1100]    “SY       AD
                                                                                                      Cladding       Lining    | ule
5	1	1	1	59	5	1966	2074	20	57	63	|
5	1	1	1	59	6	2020	2097	40	11	0	a
5	1	1	1	59	7	2413	2105	66	16	81	Approved
5	1	1	1	59	8	2485	2106	14	15	96	by
5	1	1	1	59	9	2818	2094	50	11	0	tweety
5	1	1	1	59	10	2901	2094	48	9	0	|Get
5	1	1	1	59	11	2964	2088	18	36	50	|
5	1	1	1	59	12	2992	2098	112	15	84	DIMENSIONS
5	1	1	1	59	13	3110	2098	32	15	95	ARE
5	1	1	1	59	14	3150	2098	16	15	88	IN
5	1	1	1	59	15	3174	2098	34	15	88	MM
4	1	1	1	60	0	2020	2112	1028	27	-1	
5	1	1	1	60	1	2020	2117	39	12	0	A001
5	1	1	1	60	2	2086	2117	24	13	34	|Site
5	1	1	1	60	3	2117	2117	28	12	94	Plan
5	1	1	1	60	4	2835	2112	38	15	88	AAD
5	1	1	1	60	5	2880	2108	19	28	88	|
5	1	1	1	60	6	2903	2112	40	15	93	MAR
5	1	1	1	60	7	2951	2112	19	15	93	18
5	1	1	1	60	8	3036	2125	12	14	55	Di
4	1	1	1	61	0	1358	2125	1804	30	-1	
5	1	1	1	61	1	1358	2131	113	15	82	Engineeredsteel
5	1	1	1	61	2	1495	2131	32	12	66	1100
5	1	1	1	61	3	1577	2131	50	12	15	[Custom
5	1	1	1	61	4	1626	2121	31	33	87	Orb
5	1	1	1	61	5	1663	2121	38	33	93	(Deep
5	1	1	1	61	6	1852	2131	30	12	22	Ri.0
5	1	1	1	61	7	1888	2131	38	12	72	Glass
5	1	1	1	61	8	1930	2131	33	12	87	Wod
5	1	1	1	61	9	2020	2139	40	12	47	ica
5	1	1	1	61	10	2086	2139	49	12	23	laa
5	1	1	1	61	11	2413	2141	66	14	0	Saae
5	1	1	1	61	12	3049	2125	13	15	52	1
5	1	1	1	61	13	3069	2125	37	15	93	NOT
5	1	1	1	61	14	3111	2125	51	15	96	SCALE
4	1	1	1	62	0	1357	2136	1025	41	-1	
5	1	1	1	62	1	1357	2148	122	23	33	a.”
5	1	1	1	62	2	1577	2148	48	15	5	P=
5	1	1	1	62	3	1852	2148	22	12	49	oad
5	1	1	1	62	4	2002	2136	380	41	14	see
5	1	1	1	62	5	2818	2148	46	11	0	~Sao100087
5	1	1	1	62	6	3023	2148	41	10	55	|
                                                                                              Tame                                                                  Z                                                                        m4

                                                                               rer ee                                                             200   [Elevations                       Date (dd-mm-yyyyi                         0240100047 | -
                                                                                                                                                  4200  _|Ground Floor RCP                Signature                                Derghn.                vee        | tee
                                                                                                                                             [4500 |Section &Detats            Pt]                                                  jn                     A-101        I

Section 24

Page 24 of 92

et             as             Res            AN            pan             fs            Pes,           fe             aay            Re                                                                       General Notes & Disclaimers
                                 (1)             2;             3h             4:             6}             6;           17             (8:            9)             10;                                                                      + Wall/Ceiling/Roof frames buill to Ausco
                                  :     3400           3400           4B             8400           4B             OD            3450      ~~    3450           3450                                                                              Backbone framing design standards.
                                  _,_ =          |,                                        ee                        Te          Ee                          re                                                                                 * Building chassis designed to Ausco.
                                                                                                                                                                                                                                                  Standard Chassis drawings.
                                   |              |                                                                                                                                                                                             + All work must be done in accordance with
                                                         |                                                                                                                                                                                        Standard(s) and the National Construction
                                                                                                                                                                                                                                                  the relevant Australian/New Zealand
                                        SS                  a           =             =        ———<—                    =      SSS                                               Ceiling Pitch Point wr                                          Sate,                   ‘
                                      Ee]                                                       oe                         peed | owt |                       ew                             :                                                  re em teeta ald
        —                          eee | ee | a                                                              a            |              i             al               |                     ar05                                                files ple       er sy ee
                                   Te                           ool)                                Ol                        oe)                                                     le                                                        Sere
                                               a         -   be    eae                —— -                 |        —        mw    ST nd                om   as   —                            Tak                                                may vary depending on supplier.
                                                7             :    ba     a      uh                      |     =         |          Hl | Lect a                       |                       2405                                              + Site, stairs, ramp and building skirting
                                                                                                                                                                                                                                                  indicative only. Size, fall and location to suit
                         g                           i                 | |   |         mi                                             |     |                        i            Q   Ground Floor   Ww   .                                       site conditions. Constructed to comply with
        a eer                           =                                                     ———                                                                                =               ee     g                                         AS1428.1.
                                   ——_———                                                                                                                                    oo       ey            ee, eee ee                                  Manufactured to Wind Speed: B190
                                       soot        woe    Ty.           }            Bee ee sites ale           -_-—----—                         “ye           ey            S            ~ Datum    Ww                                        Manufactured in: MOB
                                      zi   ;                  ne es                                                                                                                                                                                         Sane      r
                    ae                 ---—-                            |                                                                                                                     -600                                              Intended Location: Noosaville, QLD
                                                                                                                                                                                                                                                Client Approval
                                                                                  .                                                                                                                                                              client. Good Shepard Lutheran Coll
                                                                        2.   Project South                                                                                                                                                      Client,  Good Shepai   eran College
                                                                       A200 1: 120                                                                                                                                                              eee
                                                                                                                                                                                                                                                Compeny
                                { A ,                                      Bi         Cc:                                                       é Cc      f B :                                     { A)                                        Date {dd-rom-yyyy}:
                                  -                  9800                   =“ 2400                                                              =   aagg                      pone                   a                                         Signature
                                 2%. MD_                                              Ft                                                         yi        OF                                        {
         a            .                                                                                                                                                                                             oe           .                      Drawings - Architectural
Ww    Ceiling Pitch Point                                                                                                                                                                                        Ceiling Pitch Point_ Wy         Sheet           Content         Rev
      2705          .                                                  eo                                                                                         i         7    =                                 #          2705                4-000  |Schedules - Building Shell 1
               ia                      TT                                 me                                                                                                       Ee                             /            3                  A001 |Site Plan                 \
SW    Deck Colling   °— — ——           ae  aa                                   en                                                                 eae Ot                                   Po                         Des Colnl
      7408                        |                          |-                                                                                   Ir                                                                          240s                is     [oom                     !
                                   i              l  5)    Ti         in    = 1                                                                        iT            T      TO        T    il   T    5
                                                       ,                                                                                                                                                                                          8-200  _|Elevations             \
YW    _Ground Floor               |                                                     hs                                                   it    |   |                                                              Ground Floor wr              &-500_|Section & Details       \
       >.                    zx    —~—==e                                               i                                       OE                                                              sf} )6)~SCti<‘<‘ié—SO
w     Datum,                                                                                 P                                            jaa                                                                         ae    Datum    wr
      600                                                                                                                                                                                                                      -600
                                            5.   Project West                                                                                              3.   Project East
                                           A-200 1:120                                                                                                    A-200 1:120
                                  weit          ee             nr             ets           ast             ei             yen              S.            —_            iy                                                                       | |wescdiarp, soca ccch. sis 8 wrcawe Ear
                                “10°            £93           iB}             i7}           (6}            (5)            o<)            (3)            ee             (1)                                                                       eee                        ae
                                  ar)            |     3450     |    3450      D    3400     }     3450      |    3400     }     3450      |    3400     1      3400    }                                                                        1 |adycrsd Wu deg nce ade Ui rors | BCaC:8
                                  /                                                                                                                                                                                                                =
                                                                                                                                                                         |                                                                       bo sesare fe teegeardisya tlc: Hihetiowes Assit
                                                                                                                          Existing Admin Building                                                                                               Ox                          ae
 Ww    Ceiling Pitch Point                                                                                                                                                                                                                             FOR APPROVAL
                                                                                                                                                                         |
       2705».
 vices                             ee                                              eT                         Ta aD                                 TTT                                                                                               nee
                                                   ed                                                              a a                    a              fl
       2405                                     ae           =                   =          LN                                     ye     =            a              —                                                                             (COPYRIGHT.AUS00 MODUS PTYLTD, THISOCCUMERT MAY YOT SE
                                                                                                                                                                                                                                                     WoPMOLUGLE CRG ISLCN UA EW ILGLE'® THOU 6 LA
  ww   GroundFloor       9                                       eile                             es                         ee                                                + o                                                              Te               id
       0           eee             ==                       SSS                                                   7    ——=——=_                             =.               -—_   -—-—--—--                                                      Elevations (MQB)
 w     Datum    »      “1261            l         F                                                             Li                          =
                            Pr              mn                                                                                                              i                    ase
                                                                                                                                               See ge
       -600                                                                           EG        Se        eg UN al            fie pees ps a                                      —s
                                                                                                                                                            —— Ground Level as per suveryors drawing          ee                                                                    ee
                                                                                                                                                                                                           oar                                  30.85x12m
5	1	1	1	65	3	3000	1799	75	22	96	Learning
5	1	1	1	65	4	3116	1800	13	21	96	Cent
4	1	1	1	66	0	723	1805	2485	59	-1	
5	1	1	1	66	1	723	1812	24	23	57	4.
5	1	1	1	66	2	781	1810	96	31	82	Project
5	1	1	1	66	3	889	1810	73	25	96	North
5	1	1	1	66	4	2446	1806	44	23	89	w
5	1	1	1	66	5	2853	1817	35	42	18	a
5	1	1	1	66	6	2900	1805	39	59	48	ret
5	1	1	1	66	7	2942	1805	47	58	40	a
5	1	1	1	66	8	3013	1805	94	20	93	earning
5	1	1	1	66	9	3132	1805	76	16	92	Centre-
4	1	1	1	67	0	2237	1843	560	15	-1	
5	1	1	1	67	1	2237	1845	53	13	92	GL-FFL
5	1	1	1	67	2	2304	1846	36	12	94	+2078
5	1	1	1	67	3	2460	1843	11	14	96	4
5	1	1	1	67	4	2696	1845	53	13	77	GL-FFL
5	1	1	1	67	5	2755	1846	42	12	76	+1261
4	1	1	1	68	0	711	1848	2155	30	-1	
5	1	1	1	68	1	711	1858	53	16	84	A200
5	1	1	1	68	2	780	1859	20	15	34	1:
5	1	1	1	68	3	803	1842	36	43	34	120
5	1	1	1	68	4	2296	1848	7	8	0
                                                                                                                                                                                                                                                Nee
                                                                                                                                                                                        Kile:                                          —         Good Shepard Lutheran
                                                                                                                                                                                        Ao                                         3&2           College
                                                                                                                                                                                          “     5                                          .

                                                                                                                                                                                        GL-FFL +1755,  B            i?      EB    GL-FFL +773
                                                                                                                                                                                                         mes        i                          Teawn Ry Trews Tate a     BA
                                                                                                                                                                                                        pe         os                              ic   |maris,   AS   | ot]      AD
                                                                                                                                                                            oe      ach aa             ;       y-phA-200                                       indicate:
                                                                                                                                                                            :xisting Admin Building .  ?      ie  ij                           Checked Rs Deve ee
                                                                                                                                                                                                   Sh         }  ?                               aD | MAR1g     DIMENSIONS AREIN MIM
                                                                                                                                                                                                     ~~      fag                                                     DO NOT SCALI      i
                                                                                                                                                                                                    i   Pea f                                   Pint 40.           ‘owe                i
                                                                                                                                                                                                     sdf                                         0240100047 | -                        :
                                                                                                                                                                                                            end                                 Crawirn 4a.           Set        tave  i
                                                                                                                                                                                                                                                 s                    A-200        |   |
                                                                                                                                                                                                                                                             Page 24 of 92

Section 25

ATTACHMENT 2




  Page 25 of 92

26 $0 GZ abed

                                                                                                                                         ”   wo     *     DB   “99S? 01D @TTrAescoy py TpUNENZ STI NOTLYIO] :NOILYIOT
            “                                                                                                                            Pio                              NV 1d YALSVIA
                                                                                                                                                          N                    eSeTT oO} wezey3N] preydays poog
            hea ae                                                                                                                                                           YSOON 3931103 com
           iq  it         wement nace eo nacatev SOME ure oe sause ua focenica hen iapamaes tal covenaom a “
           is  fis                                                                            a                  a
           ag    2                                                                        a - fig                    7    \
           eH           ee fre                                  tr |                  wid                                 i=
               ep       [oe | eee | oe]                           oe                    i                                     Ay
               tie          |           ema      |    vanes]       oe              ig          4                                i
               a                                                                                                             ,
                        low | Om | | |                                             :         ,                :                   oe
             -                 @Ppoo Bupyeg ze9 pue skem enlg ‘uel BSOON OUL      wa                                                 2 <
              )                                                                 -.           ”                                         S
             .                = —                                                    &                             SA                Wem
             =                                        emnrgn ee preme te)          ,     ,                                a            i                 .
             2           oes                              —                       Aer                                                                         .
             a                               wed =D             Peproig ROL          ;                                                     =       “    ;
            Ps                             wurde                 ‘bow meweL                b         .          om   P      MEO             ce                 arr,
             ae         Ju | samamrencssoomen |            | anesorne |                   v4       5            hey                        Nee                      ss
           wos]         fax]           wer nnee |           |      ae                 TF    nn          Re           Pe              PR        Ty, 8 a
                                                                                                o       jf      ‘        .           :                   —                ;

                            sjooups 38 aunjonyseyuy odsues ayes 40) BulUUe|d                         ae               a         id   re             Ss      oe   %        a /
                                                                                     ye                               ,  c                            +.     é    |         by  H
                                               Bupjied 429 Buyspey sjooyss          4 es              a
5	1	1	1	26	8	1919	1379	78	98	30	14
5	1	1	1	26	9	2075	1399	175	27	15	zs
5	1	1	1	26	10	2314	1407	33	30	40	Aw,
5	1	1	1	26	11	2498	1376	90	64	16	Cf
5	1	1	1	26	12	2609	1396	61	64	44	=
5	1	1	1	26	13	2691	1412	63	48	48	os
5	1	1	1	26	14	2798	1408	113	31	69	=
4	1	1	1	27	0	693	1460	2222	75	-1	
5	1	1	1	27	1	693	1475	74	34	41	S30vdS
5	1	1	1	27	2	769	1475	75	34	0	SNDIHVd
5	1	1	1	27	3	843	1475	41	34	34	HWS
5	1	1	1	27	4	895	1491	6	3	59	-
5	1	1	1	27	5	907	1487	28	15	32	bz
5	1	1	1	27	6	987	1463	63	63	34	©
5	1	1	1	27	7	1410	1492	54	24	27	a
5	1	1	1	27	8	1520	1470	65	65	9	sa
5	1	1	1	27	9	2096	1470	59	58	25	Ce
5	1	1	1	27	10	2154	1470	30	58	17	no
5	1	1	1	27	11	2219	1488	4	4	2	i
5	1	1	1	27	12	2370	1460	20	62	44	3
5	1	1	1	27	13	2451	1468	26	52	7	“y
5	1	1	1	27	14	2536	1513	8	9	31	‘
5	1	1	1	27	15	2593	1490	23	38	0	i}
5	1	1	1	27	16	2748	1467	14	55	35	me
5	1	1	1	27	17	2832	1470	46	42	0	od
5	1	1	1	27	18	2901	1493	14	15	0	:
4	1	1	1	28	0	949	1494	1999	97	-1	
5	1	1	1	28	1	949	1505	101	86	39	“es
5	1	1	1	28	2	1422	1496	99	74	0	eo
5	1	1	1	28	3	1871	1564	183	2	24	ae
5	1	1	1	28	4	2053	1549	238	10	49	Ce
5	1	1	1	28	5	2318	1509	269	56	31	oe
5	1	1	1	28	6	2589	1529	64	55	29	a
5	1	1	1	28	7	2838	1533	38	32	29	gee
4	1	1	1	29	0	1395	1564	1541	21	-1	
5	1	1	1	29	1	1395	1566	4	6	0	.
5	1	1	1	29	2	2267	1572	15	6	47	wy
5	1	1	1	29	3	2356	1564	44	10	23	ee
5	1	1	1	29	4	2562	1564	69	15	56	a
5	1	1	1	29	5	2787	1575	2	2	0	,
5	1	1	1	29	6	2891	1571	7	10	14	~_—
4	1	1	1	30	0	397	1557	2547	71	-1	
5	1	1	1	30	1	397	1563	22	42	25	5
5	1	1	1	30	2	701	1572	74	35	22	S3OvdS
5	1	1	1	30	3	777	1572	76	35	21	ONDIHVd
5	1	1	1	30	4	852	1572	36	35	29	HYD
5	1	1	1	30	5	903	1590	6	3	83	-
5	1	1	1	30	6	915	1586	17	13	60	Si
5	1	1	1	30	7	994	1557	37	71	51	eS
5	1	1	1	30	8	1346	1580	37	31	48	aN
5	1	1	1	30	9	1393	1575	8	7	28	a
5	1	1	1	30	10	1503	1576	3	2	0	,
5	1	1	1	30	11	1590	1585	15	9	1	es
5	1	1	1	30	12	1664	1562	47	43	24	re
5	1	1	1	30	13	1730	1572	29	32	63	»
5	1	1	1	30	14	1842	1595	42	14	22	_
5	1	1	1	30	15	2064	1585	3	1	20	:
5	1	1	1	30	16	2080	1582	33	31	0	w]
5	1	1	1	30	17	2139	1570	48	51	37	<a
5	1	1	1	30	18	2214	1584	26	16	12	a
5	1	1	1	30	19	2364	1580	2	2	17	i
5	1	1	1	30	20	2565	1574	61	44	42	nd
5	1	1	1	30	21	2709	1580	30	35	40	les
5	1	1	1	30	22	2798	1569	27	53	0	.
5	1	1	1	30	23	2889	1572	38	42	4	oy
5	1	1	1	30	24	2942	1592	2	2	0	;
4	1	1	1	31	0	1573	1584	1366	71	-1	
5	1	1	1	31	1	1573	1614	3	1	31	PO
5	1	1	1	31	2	1790	1584	371	71	49	rae.
5	1	1	1	31	3	2461	1632	20	16	28	ey,
5	1	1	1	31	4	2571	1607	114	44	16	©
5	1	1	1	31	5	2765	1611	174	39	16	7s
4	1	1	1	32	0	397	1634	2536	49	-1	
5	1	1	1	32	1	397	1639	22	29	46	2
5	1	1	1	32	2	1325	1635	49	48	0	c%
5	1	1	1	32	3	1988	1655	6	8	90	7
5	1	1	1	32	4	2045	1634	34	44	45	bg
5	1	1	1	32	5	2232	1646	20	7	35	a
5	1	1	1	32	6	2286	1644	5	6	0	¢
5	1	1	1	32	7	2383	1649	17	20	31	[a
5	1	1	1	32	8	2509	1653	117	28	23	em
5	1	1	1	32	9	2822	1636	43	32	24	ea
4	1	1	1	33	0	397	1656	2453	75	-1	
5	1	1	1	33	1	397	1669	22	13	49	5
5	1	1	1	33	2	965	1656	81	42	20	onzon1
5	1	1	1	33	3	1261	1667	76	31	48	DS
5	1	1	1	33	4	1767	1696	4	3	20	es:
5	1	1	1	33	5	1874	1673	57	20	41	Se
5	1	1	1	33	6	2139	1669	57	31	32	74
5	1	1	1	33	7	2323	1670	185	36	18	FN
5	1	1	1	33	8	2581	1669	21	15	33	i
5	1	1	1	33	9	2668	1673	79	48	60	Ms
5	1	1	1	33	10	2775	1670	42	61	28	rs
5	1	1	1	33	11	2842	1677	8	10	0	y
4	1	1	1	34	0	397	1674	2432	97	-1	
5	1	1	1	34	1	397	1704	22	27	73	2
5	1	1	1	34	2	820	1688	223	47	6	3uNLONYLSVUSNI
5	1	1	1	34	3	1251	1674	111	92	28	<3
5	1	1	1	34	4	1765	1702	13	23	20	J
5	1	1	1	34	5	1837	1674	35	84	30	|
5	1	1	1	34	6	2138	1716	46	15	2	SHE
5	1	1	1	34	7	2372	1704	1	32	42	8
5	1	1	1	34	8	2409	1697	43	48	43	|
5	1	1	1	34	9	2482	1707	70	54	34	eu
5	1	1	1	34	10	2593	1724	71	19	61	CD
5	1	1	1	34	11	2728	1733	2	3	34	fay
5	1	1	1	34	12	2798	1682	31	89	0	°
4	1	1	1	35	0	397	1726	2451	61	-1	
5	1	1	1	35	1	397	1734	22	44	0	*
5	1	1	1	35	2	879	1726	162	46	8	LYOdSNVUL
5	1	1	1	35	3	1254	1728	15	58	20	NS
5	1	1	1	35	4	1767	1754	1	3	0	’
5	1	1	1	35	5	1848	1744	59	25	43	ae
5	1	1	1	35	6	1985	1766	19	10	28	=
5	1	1	1	35	7	2231	1765	10	14	1	:
5	1	1	1	35	8	2333	1742	10	11	0	‘
5	1	1	1	35	9	2465	1764	34	23	18	=
5	1	1	1	35	10	2545	1745	66	37	33	TL
5	1	1	1	35	11	2641	1732	82	50	48	PG
5	1	1	1	35	12	2845	1778	3	4	81	‘
4	1	1	1	36	0	397	1757	2448	71	-1	
5	1	1	1	36	1	397	1783	22	26	28	z
5	1	1	1	36	2	1246	1810	3	3	0	Py
5	1	1	1	36	3	1338	1794	61	21	24	hat
5	1	1	1	36	4	1670	1810	4	2	8	:
5	1	1	1	36	5	1747	1796	10	17	28	|
5	1	1	1	36	6	1837	1774	66	54	32	‘>
5	1	1	1	36	7	1977	1801	10	12	0	Py
5	1	1	1	36	8	2057	1792	50	23	26	a
5	1	1	1	36	9	2213	1815	4	4	23	—__,
5	1	1	1	36	10	2317	1797	21	18	56	a
5	1	1	1	36	11	2433	1806	6	11	33	-
5	1	1	1	36	12	2452	1786	37	10	47	Sd
5	1	1	1	36	13	2502	1779	46	40	50	A
5	1	1	1	36	14	2657	1757	29	57	17	.
5	1	1	1	36	15	2779	1789	23	30	47	>
5	1	1	1	36	16	2830	1780	15	17	31	»
4	1	1	1	37	0	398	1800	2238	32	-1	
5	1	1	1	37	1	398	1811	21	13	28	z
5	1	1	1	37	2	1247	1813	28	8	66	Ge
5	1	1	1	37	3	1343	1800	50	28	10	oe
5	1	1	1	37	4	1621	1824	4	3	42	P
5	1	1	1	37	5	1741	1817	6	8	0	P
5	1	1	1	37	6	1832	1818	63	13	62	ig,
5	1	1	1	37	7	2307	1820	7	6	12	?
5	1	1	1	37	8	2439	1801	59	28	31	Me
5	1	1	1	37	9	2518	1827	6	5	15	ie
5	1	1	1	37	10	2635	1823	1	5	33	;
4	1	1	1	38	0	397	1814	2307	57	-1	
5	1	1	1	38	1	397	1828	22	13	0	o
5	1	1	1	38	2	1206	1830	19	24	24	®
5	1	1	1	38	3	1340	1826	81	26	30	eee)
5	1	1	1	38	4	1493	1832	48	17	4	fs
5	1	1	1	38	5	1684	1814	59	38	31	ea
5	1	1	1	38	6	1944	1847	8	9	0	:
5	1	1	1	38	7	2461	1833	55	27	18	re
5	1	1	1	38	8	2623	1838	9	17	27	ii
4	1	1	1	39	0	397	1839	2137	57	-1	
5	1	1	1	39	1	397	1842	22	30	26	=
5	1	1	1	39	2	1158	1862	4	3	31	we
5	1	1	1	39	3	1278	1839	286	57	3	ePLET
5	1	1	1	39	4	1598	1810	47	92	3	Ft
5	1	1	1	39	5	1899	1857	87	14	0	a
5	1	1	1	39	6	2041	1868	31	9	19	a
5	1	1	1	39	7	2379	1847	155	33	30	b=
4	1	1	1	40	0	1215	1860	1428	73	-1	
5	1	1	1	40	1	1215	1872	60	26	47	Pak.
5	1	1	1	40	2	1361	1873	49	60	59	a+
5	1	1	1	40	3	1433	1883	21	15	43	af
5	1	1	1	40	4	1469	1879	106	38	6	yds
5	1	1	1	40	5	1592	1876	50	28	17	|
5	1	1	1	40	6	1662	1869	19	43	50	7
5	1	1	1	40	7	1780	1860	13	47	26	Ss
5	1	1	1	40	8	1967	1875	24	33	0	S
5	1	1	1	40	9	2080	1879	32	20	21	aS
5	1	1	1	40	10	2236	1891	4	15	0	’
5	1	1	1	40	11	2437	1878	13	29	31	f
5	1	1	1	40	12	2470	1905	3	5	0	':
5	1	1	1	40	13	2594	1870	49	58	55	isp
4	1	1	1	41	0	1208	1877	1284	71	-1	
5	1	1	1	41	1	1208	1877	424	71	22	POEL
5	1	1	1	41	2	1949	1902	121	41	34	LF
5	1	1	1	41	3	2168	1899	20	24	17	i)
5	1	1	1	41	4	2233	1827	146	147	11	tae
5	1	1	1	41	5	2410	1931	82	11	44	(|
4	1	1	1	42	0	1225	1922	1236	87	-1	
5	1	1	1	42	1	1225	1943	67	11	19	St
5	1	1	1	42	2	1345	1938	30	24	26	Set
5	1	1	1	42	3	1495	1948	18	15	42	“5
5	1	1	1	42	4	1712	1936	28	28	40	ae
5	1	1	1	42	5	1761	1924	129	58	20	ee)
5	1	1	1	42	6	1977	1940	29	69	21	|
5	1	1	1	42	7	2179	1965	3	2	68	J
5	1	1	1	42	8	2205	1922	130	86	34	IANS
5	1	1	1	42	9	2400	1940	61	26	25	Bo
4	1	1	1	43	0	1472	1962	1120	27	-1	
5	1	1	1	43	1	1472	1962	38	18	12	2.
5	1	1	1	43	2	1544	1964	3	4	34	ik
5	1	1	1	43	3	1691	1963	91	19	41	aS
5	1	1	1	43	4	2173	1967	51	13	46	aoe
5	1	1	1	43	5	2322	1967	117	20	45	i:
5	1	1	1	43	6	2588	1983	4	6	31	j
4	1	1	1	44	0	1382	1956	1210	95	-1	
5	1	1	1	44	1	1506	1981	138	36	43	ae
5	1	1	1	44	2	1678	1977	86	53	41	=.
5	1	1	1	44	3	1797	1994	25	5	31	=
5	1	1	1	44	4	1857	1961	42	59	25	4
5	1	1	1	44	5	1922	2007	12	15	0	~
5	1	1	1	44	6	1988	1956	76	95	28	Lb
5	1	1	1	44	7	2304	1986	51	34	14	eg
5	1	1	1	44	8	2505	2019	21	7	45	—
4	1	1	1	45	0	397	2014	2111	60	-1	
5	1	1	1	45	1	397	2021	22	28	78	2
5	1	1	1	45	2	1571	2022	30	6	8	CO,
5	1	1	1	45	3	1715	2046	3	6	9	/
5	1	1	1	45	4	1760	2014	28	27	33	ar
5	1	1	1	45	5	1845	2041	3	1	50	-
5	1	1	1	45	6	1887	2022	5	2	0	5
5	1	1	1	45	7	1902	2027	21	13	27	a
5	1	1	1	45	8	2000	2046	4	4	3	os
5	1	1	1	45	9	2171	2044	39	27	0	é
5	1	1	1	45	10	2296	2029	18	34	61	k
5	1	1	1	45	11	2321	2026	6	29	0	F
5	1	1	1	45	12	2339	2034	38	40	5	eX
5	1	1	1	45	13	2400	2041	2	2	12	¥
5	1	1	1	45	14	2500	2043	8	10	31	pe
4	1	1	1	46	0	397	2039	2095	57	-1	
5	1	1	1	46	1	397	2056	22	22	36	&
5	1	1	1	46	2	1804	2058	2	3	0	:
5	1	1	1	46	3	1871	2058	18	37	26	ie
5	1	1	1	46	4	1923	2039	105	56	0	Ds
5	1	1	1	46	5	2132	2054	27	41	27	le
5	1	1	1	46	6	2272	2060	20	37	0	me
5	1	1	1	46	7	2341	2052	13	29	0	\
5	1	1	1	46	8	2383	2056	23	44	44	eC
4	1	1	1	47	0	397	2083	2016	46	-1	
5	1	1	1	47	1	397	2083	22	11	91	=
5	1	1	1	47	2	1982	2099	42	19	77	w
5	1	1	1	47	3	2048	2091	148	38	49	ins
5	1	1	1	47	4	2234	2089	32	33	30	a
5	1	1	1	47	5	2371	2095	42	33	21	Ian
4	1	1	1	48	0	397	2164	22	22	-1	
5	1	1	1	48	1	397	2164	22	22	63	Ba
4	1	1	1	49	0	238	2202	354	35	-1	
5	1	1	1	49	1	238	2203	23	34	36	é
5	1	1	1	49	2	275	2202	317	35	72	LNAWHOVLLV

Section 26

Page 26 of 92

ba
                                             a A           eile EP                                                                                                             9
                                       aif    aE             ae                —_—    &                                                                                        se
                                             _-   - a                    =              *        eo                                                                            w”
                                Se      > a                                       LAP oe                     ee
                           7             ye if                     :     2           ee      cy ter                    ‘  ¢                                                    2
                               eer      74                          F           a             Se    ad       ee     oer                                                        5
                                    ZR            SS.                           Hes                            de                                                              :
                >          fe   Tf              Ss  J                   4            ie 4                             Ae              TRANSPORT                                .
               e         mY     i    .     > *> 98       s*       ?         #        J                           .  >                  INFRASTRUCTURE                          S
                cS                ee          <Y           5            '          mS                          i Re                   vai                                      S
               Ya                 aS           pee                   1                                \ 4                              =
             »  rae “he   :        *            ;                s     zi                            a     ©                          6      283 - CAR PARKING SPACES
                 till   bh      yy                                          |            Sf    *%  ~ y
                        ep    S       las                    *                                  wW    a               Schools Proposed Car Parking
                  pe   y   Fee We   wy}                                                oS              Va             Planning for Safe Transport Infrastructure at Schools
                 e             oN               .                  v4                SCR                           bad          (OE (a I                      Koos
                   a       eS  ay   ~                                                    P         Sf                            N
                       '      oe             Nz            ail,               FO                      Re            P=         |ncneene pee
                     ,     3           S                                             ED ae Rts es
                                :                               ee                                             hl                     Oh                                     Cd:
                              ty                                         =  fs   y 4    ; nd      7    fn   ,         Total Req.           CorParks
                                  sae  n    cS      1           jf           e..     ae            P  Fe oy           Total Prowded        Car Paks             248         pid
                                       Ses                       FN                 —       oe     a                  Receeane”                                              =
                                                   =                       oo             ier         ce              The Noosa Pian, Drive Ways and Car Parking Code        a
                                                                             ee           ;   * ‘    A    E          gL        [xtamsaoaes [SEN               |           i
                                                            MS                          a                            pwr      [ome             ee            |            i
                                                             ‘ ‘   =    ;                 ae   o.  ng                                                                     378
                                                                 ;                                  ae                a
                                                                      Va                      ws                        oe                   ee                           ii   fs
                                                                          NS                 e                         —— si                                              OE
                                                                                     tie   “a                          TT METber have been generated by using the ratic of the crrert ata rarioer Tierney rect bette coe ae the incmamein #35 Ht
                                                                                     8                                prep sdrt ge rn yuo hs    ot     i                  Se:
   an COLLEGE NOOSA
Good Shepherd Lutheran College        N                                                                                                                                   ——
MASTER PLAN                         Ofhro4                                                                                                                                   Gi
LOCATION: LOCATION 115 Eueundi Rd__Woosaville OLD 4566. as -
                                                                                                                                                                Page 26 of 92

Section 27

GENERAL COMMITTEE MEETING AGENDA                                                 16 AUGUST 2021


8    OPERATIONAL PLAN PROGRESS REPORT – 4TH QUARTER 2020-21

Author            Chief Executive Officer, Brett de Chastel
                  CEO’s Office

Index             ECM/ Subject/ Corporate Planning

Attachments       1.   Operational Plan Progress
                  2.   Key Performance Indicators
                  3.   Amended Operational Plan 2021/22
                       (Attachment provided separately to this report)


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Chief Executive Officer to the General Committee Meeting dated
16 August 2021 regarding the 2020-21 and 2021-22 Operational Plans and:
A.   Note the progress with the implementation of the 2020-21 Operational Plan to 30 June 2021
     provided as Attachment 1 to the report;
B.   Note Council’s Key Performance Indicators provided as Attachment 2 to the report; and
C.   Adopt the amended Operational Plan 2021/22 provided as Attachment 3 to the report.


REPORT
The purpose of this report is to provide Council with an overview of progress in implementing the
annual Operational Plan, provide details of Council’s quarterly Key Performance Indicators (KPIs)
and present an updated 2021/22 Operational Plan which corrects some errors identified in the
version adopted by Council at the Special Meeting on 30 June 2021.

To provide context about how our organisational reporting to Council works, the following graphic is
provided:




                                                                                     Page 27 of 92

Section 28

GENERAL COMMITTEE MEETING AGENDA                                                            16 AUGUST 2021


1.    2020-21 OPERATIONAL PLAN UPDATE

Only the major initiatives are included in the Operational Plan with day to day “business as usual”
activities included in Branch Plans.

The Branch Plans are being used by Managers to manage day to day activities. They are an
effective tool for ensuring that all of the “business as usual” activities are undertaken and that any
minor projects are followed through. They are reported to Council by Directors on a quarterly basis
and those reports are on this round of Council meetings.

Details of each Operational Plan project is set out in Attachment 1 with an assessment of whether
the issue in completed, on track or behind schedule. Comments are also provided for the information
of Councillors about the status of each issue. It is important to note that this is “as at 30 June” i.e.
the end of the fourth quarter and in some instances, the multi-year actions have been advanced
further since that time.

There are 35 initiatives in the 2020/21 Operational Plan. The current status of those projects is:

 Status               Quarter 1              Quarter 2            Quarter 3            Quarter 4
                      (July – Sept 2020)     (Oct – Dec 2020)     (Jan – Mar 2021)     (Mar – June 2021)
 Not started          4                      3                    0                    0
 Behind Schedule      7                      6                    8                    9
 On Track             23                     25                   26                   9
 Completed            1                      1                    1                    17

Note - some of these initiatives are multi-year projects and have been identified as “on track” where
the initiative will be completed in the next financial year.
The table below highlights some specific Operational Plan issues that may be of interest to Council
with a particular emphasis on some projects that are behind schedule.

 Initiatives                               Comment
 Complete asset management plans           The pathways and boardwalks AMP has been completed and
 for pathways and boardwalks and for       adopted by Council. The remaining AMP for parks and playgrounds
 parks and playgrounds.                    has been delayed due to staff changes. It is expected to be
                                           completed in December 2021.
 Establish a place making team and         Internal governance arrangements were put in place in November
 commence a pilot project                  2020 but more work needs to be done for organisational readiness
                                           to make this a success. A workshop is planned with Councillors to
                                           progress further in the coming weeks.
 Design and construction of stage 3 of     Construction is now progressing well after the initial delays caused
 the Rufous Street project including the   by the previous contractor going into liquidation.
 construction of the new Peregian
 Beach Community House
 Finalising the design of the Peregian     Plans have now been drawn up and the Fire Tech funding of
 Digital Hub extension                     approximately $800k will support additional high-tech fitout. This
                                           project was delayed due to the delays in the Peregian Beach
                                           community house project (see above)
 Undertake an evaluation of Council’s      This has been delayed due to other priorities (including the latest
 response to the Covid19 pandemic          lockdown). The intent is to undertake a review of what went well,
 including its impact on Council           what can be learnt from our Covid response etc.


                                                                                              Page 28 of 92

Section 29

GENERAL COMMITTEE MEETING AGENDA                                                            16 AUGUST 2021


    Initiatives                             Comment
    Continue to partner with The Nature     Engineering and bathymetric analysis has been completed and the
    Conservancy to implement the Oyster     State assessment and referral agency has identified no significant
    Reef Restoration Project in the Noosa   obstacles to approvals. Staff will report to Council once we receive
    River                                   the TNC annual report and KPIs on this project.
    Deliver economic stimulus projects      Most of these projects have been completed but there are a couple
    funded by the Commonwealth and          that will carry over to the first few months of 2021/22. Arrangements
    State government Covid19 grants         are being put in place with the relevant government agencies to
                                            ensure that time and cost extensions are approved.
    Review of Council’s Corporate Plan      With the planned retirement of the CEO, the development of a new
                                            corporate plan will be undertaken in early 2022 once the new CEO is
                                            on board.


2.       KEY PERFORMANCE INDICATORS

As Council would be aware, KPIs were first developed for our organisation at the beginning of
2014/15. 16 of those KPIs are reported to Council on a quarterly basis. The KPIs are included in
Attachment 2.

As advised previously, the Executive Team has undertaken a review of these KPIs and will transition
those KPIs which are at a Departmental Level into the relevant quarterly department update reports
to Council from the first quarter of the 2021/22 year.

The key issues arising from an assessment of the KPIs are as follows:

Our People
        Given that this is the end of financial year KPI report, there are a couple of “annual type” KPIs
         worth noting. The first of these is staff turnover. Staff turnover in 2020/2021 is the lowest it has
         been in the last 7 years ie 6.6%. For the information of Council, our historical staff turnover
         has been as per the table below:
          Year                       Staff turnover rate
                                     (percentage)
          2014/15                    11.06%
          2015/16                    13.06%
          2016/17                    8.9%
          2017/18                    8.2%
          2018/19                    10.9%
          2019/20                    9.6%
          2020/21                    6.6%

        In relation to Workplace Health and Safety, our Lost Time Injury Duration results have been
         quite variable over the last 12 months. There have been a number of longer term issues which
         have impacted on the statistics.
        Personal leave shows that personal leave had been reducing compared to previous years but
         there has been a significant increase in the number of long-term illnesses. This was
         particularly the case in relation to personal leave greater than 5 days reflecting some long-term
         illnesses of some staff.



                                                                                                Page 29 of 92

Section 30

GENERAL COMMITTEE MEETING AGENDA                                                  16 AUGUST 2021


    Accrued annual leave has continued to increase as staff are constrained in options to travel
     for leave and many staff have also been too busy to take leave (reflecting high workloads).
     This peaked in May 2021 as many staff worked on try to finalise projects before the end of the
     financial year and Council budgets. Staff burnout remains a risk due to high workloads and
     staff are encouraged to take leave to refresh and recharge.

Our Customers
   The number of customer requests has continued to increase and is at an all-time high. This
     has presented some challenges with meeting customer requests within the target dates and
     our management team is currently refocusing on this issue. One of our Infrastructure Services
     Managers is leading a project looking at how we can better manage customer requests across
     the organisation. This includes looking at new monitoring provisions which allows for escalation
     of requests if not addressed within certain timeframes.
    While the number of customer requests is increasing, the response time for our front line staff
     in answering telephone calls and dealing with matters in the first instance is still quite good.
    For building, plumbing and development applications, we are seeing record application
     numbers. This is not a Noosa phenomenon with other local governments reporting similar
     record application numbers. Further, all councils are competing for limited resources with town
     planners and building surveyors in particular being in short supply in south-east Queensland.
     This is no doubt as a result of the various government stimulus programs to encourage building
     development across the country and also reflecting the high demand for new housing as a
     result of the influx of interstate migrants. For the development assessment area, they are also
     dealing with the additional superseded planning scheme applications which could be made up
     to 31 July 2021. Now that no further superseded planning scheme applications can be made,
     the branch will be able to work through to clear the backlog over time. Other councils are
     facing similar issues but we have the added burden of the superseded planning scheme
     applications at this point in time.


Our Finances
   Our financial KPIs measure solvency, investment performance and outstanding rates. All of
     these KPIs continue to be on track and in particular, there is no significant change in trend for
     rate arrears. Our ratepayers are paying their rates at the same level as pre-pandemic times.
    Council receives a financial performance report at the end of each month which provides a
     more detailed analysis of Council’s financial position. Council receives a detailed report on
     Capital Works progress every quarter.

Our Systems and Processes
    The use of online services continues to increase year on year. The proportion of payments
     continues to be high as cash payments are being limited due to the COVID-19 pandemic.




                                                                                       Page 30 of 92

Section 31

GENERAL COMMITTEE MEETING AGENDA                                                 16 AUGUST 2021


3.     AMENDMENT TO 2021/22 OPERATIONAL PLAN
Council adopted the 2021/22 Operational Plan as part of the suite of budget documents at a Special
Meeting on 30 June 2021. Following that meeting, three errors were identified as well as some
formatting and other minor changes required to finesse the document. The three errors that require
correction are:
1.     Page 13 - A change to the Outcome for the Operational Initiative “Implement the Noosa
       Bushland Reserve Strategic Management Plan and Fire Management Plan” to replace the
       current text with: “Clear prioritisation of resources towards bushland management and active
       involvement of the community in the restoration of degraded bushland areas” and assign
       Environmental Services as the Responsible Area.
2.     Page 14 – Replace the Operational Initiative “Noosa Heads Main Beach SEMP” with
       “Implement Noosa River SEMP”.
3.     Page 20 - A change to the Outcome for the Operational Initiative “Continue to implement the
       WFP strategy across operational areas” to replace the current text with “Current and future
       workforce needs are identified to ensure Council has the resources needed to meet service
       delivery outcomes”.
The amended Operational Plan is provided at Attachment 3.

4.     CLOSED SESSION ITEMS
At the request of Councillors, this part of the report identifies whether or not there have been any
matters dealt with in confidential session within Council or Committee meetings which have
subsequently been made public. There were none in this quarter. The community can keep up-to-
date with this information by checking Council's website – https://www.noosa.qld.gov.au/decision-
making

Previous Council Consideration

Quarterly reports are provided to Council outlining our progress with the Operational Plan.

Finance
The projects within the Operational Plan are reviewed and funded as part of Council’s annual budget
process.

Risks & Opportunities
A failure to achieve the outcomes set out in the Operational Plan would be problematic. In some
cases, projects may take longer than anticipated to achieve the best outcome.

Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

The details of each of the Operational Plan activities have been provided by relevant Departments.




                                                                                     Page 31 of 92

Section 32

GENERAL COMMITTEE MEETING AGENDA                                                       16 AUGUST 2021


Departments/Sections Consulted:

 X   Chief Executive Officer   X   Community Services                      X   Corporate Services
     Executive Support             Director                                    Director
                                   Community Development                       Financial Services
                                   Community Facilities                        Fleet
                                   Libraries & Galleries                       ICT
                                   Local Laws                                  Procurement
                                   Waste & Environmental Health                Property
                                                                               Revenue Services

 X   Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
 X   Director                      Director                                    Director
     Community Engagement          Building & Plumbing Services                Asset Management
     Customer Service              Development Assessment                      Buildings and Facilities
     Governance                    Economic Development                        Civil Operations
     People and Culture            Environmental Services                      Disaster Management
                                   Strategic Land Use Planning                 Infrastructure Planning,
                                                                               Design and Delivery




                                                                                            Page 32 of 92

Section 33

GENERAL COMMITTEE MEETING AGENDA   16 AUGUST 2021


                                   ATTACHMENT 1




                                     Page 33 of 92

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                          16 AUGUST 2021

                                                                                                                                                                                          ATTACHMENT 1
      OPERATIONAL PLAN 2020-21 PROGRESS REPORT

       THE NOOSA ENVIRONMENT
       No. Project                                                   Responsibility                         Detect                                                                           AT Ered
       1   Continue   the   implementation   of  Council's  Fire     Director Environment & Sustainable     Council is currently implementing on-ground actions related to our existing   Completed     @
           Management Plans                                          Development                            fire management plans. A new Bushland Reserve Fire Management Plan
                                                                                                            was endorsed by Council in June 2021. Site-specific multi-agency plans for
                                                                                                            some of our highest risk sites are also being developed, to further
                                                                                                            complement and strengthen our existing actions. Advertising for the new
                                                                                                            position of Fire Management Officer will be undertaken in July 2021.
       2   Implement the Noosa Environment Strategy                  Environmental Services Manager         With an adopted Environment Strategy, appropriate monitoring mechanisms      Completed      oO
                                                                                                            are now being put in place for implementation and actions are progressing.
                                                                                                            The first annual report on the progress of the Implementation Plan of the
                                                                                                            Environment Strategy was reported to Council in August 2020.

       3.  Adopt   the  Noosa    River  Management    Plan   and     Environmental Services Manager         Feedback from both previous Draft River Plan consultation periods has been      On track    oO
           commence implementation                                                                          collated and was reported to Council in January 2021. The Noosa River
                                                                                                            Stakeholder  Advisory  Committee    has  been   formed  with  14   local
                                                                                                            representatives following an open EOI process, and met for the first time in
                                                                                                            April. This stakeholder group will support the finalisation and implementation
                                                                                                            of the Plan, as well as the resolution of other long-standing issues
                                                                                                            associated with the Noosa River.
       4   Continue to implement and undertake a review of Zero      Director Environment & Sustainable     The Climate Change Response Plan was open for public comment 19 March           On track    oO
           Emissions Noosa (ZEN) Strategy and Action Plan            Development                            to 30 April 2021. The CCRP is currently being finalised for the August 2021
                                                                                                            Council meetings.

       5   Finalise the strategic review of landfill emission reduction Waste and Environmental  Health     Eleven additional methane extraction wells were installed in March 2021.        On track   @
          opportunities                                              Manager                                Methane capture has increase significantly over the 4th quarter. Extensive
                                                                                                            capping works to prevent fugitive emissions to be completed as part of
                                                                                                            capital works over the next 18 months. LFG contractor (LMS) currently
                                                                                                            exploring options to utilise methane for power generation on site.
       6   Continue to partner with The Nature Conservancy to        Director Environment & Sustainable     The Project Manager has had extensive one-on-one meetings with key Behind Schedule         (@))
           implement the Oyster Reef Restoration Project in the      Development                            stakeholders. Engineering and bathymetry works have been completed and
           Noosa River                                                                                      a pre-lodgement meeting with SARA (State Assessment and Referral
                                                                                                            Agency) was held in early June, which identified no significant obstacles to
                                                                                                            appovals. TNC are currently working to provide the required follow-up
                                                                                                            information following this meeting, prior to final submission of permit
                                                                                                            applications.
       7   Continue the implementation of the Yurol and Ringtail     Chief Executive Officer                The Transition Committee met on 7 July 2021. The project is continuing well  Completed      oO
           Forestry Project                                                                                 with timber plantation harvesting continuing and plans for revegetation being
                                                                                                            finalized.

                                                                                                                                                                                               Page 33 of 92

Section 34

GENERAL COMMITTEE MEETING AGENDA   16 AUGUST 2021




                                     Page 34 of 92

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                           16 AUGUST 2021

 OPERATIONAL PLAN 2020-21 PROGRESS REPORT

 THE NOOSA COMMUNITY
 No. Project                                                  Responsibility                       Ure                                                                             AD Ftd
 1   Support the community in the ongoing recovery efforts   Director Community Services           Support from across organisation continuing for businesses, residents and    Completed   ©
     from COVID-19                                                                                 community organisations. Successful festive season particuarly the
                                                                                                   Christmas Convoy. Ongoing work through Community Grants program and
                                                                                                   vanous Council teams particularly Community Development, Economic
                                                                                                   Development and Environmental Health.
 2   Support the community in the ongoing recovery efforts   Director Community Services           Appointment of temp. Community Development Officer - Recovery, has been    Completed     @
     from the bushfires                                                                            made. Work plan developed and a number of initiatives completed inc First
                                                                                                   Year Anniversary events at Peregian, Cooroibah and North Shore. Cat C and
                                                                                                   D projects well underway.
 3.  Continue with the design and construction of Stage 3 of Director Community Services           Tender for new Community House and Greenspace closed. Evaluation of    Behind Schedule   ¢))
     the Rufous Street project including the construction of                                       tender responses complete. Tender report adoped by Council. Construction
     the new Peregian Beach Community House                                                        commenced and on track. Design of refurb for old Community House
                                                                                                   underway.
 4 — Review options for mobile/outreach library services     Libraries & Galleries Manager         Replacement plan endorsed by Council in February. Tender awarded for new     Completed   ©
                                                                                                   vehicle in July. [TQ for kiosks released in July.

 5   Progress implementation of Master Plans for the Noosa   Community Development Manager         Noosa District - Preliminary plans for link road complete; detailed design   Completed   ©
     District Sports Complex and the Cooroy Sports Complex                                         commenced; concept plans for wellbeing hub developed; lighting installed at
                                                                                                   Cricket, Rugby League and Touch Football; second field relocated for Rugby
                                                                                                   League. Cooroy - extemal funding sought for lighting; consultation with clubs
                                                                                                   on amenities/clubhouse redevelopment.
 6   Implement a new Heritage Portal                         Heritage Coordinator                  New Heritage Portal site now live.                                           Completed   @

 7   Develop a new Waste Management Strategy                 Waste and Environmental Health        Contract to develop strategy awarded to Mike Ritchie and Associates.           Ontrack   @
                                                             Manager                               Scoping of staging of strategy production has been agreed and relevant
                                                                                                   Council data provided. Work on the draft strategy currently underway.
                                                                                                   Kerbside component of the Strategy is nearing completion following two
                                                                                                   Councillor workshops. Final development of strategy will be driven by the

                                                                                                                                                                               Page 34 of 92

Section 35

GENERAL COMMITTEE MEETING AGENDA   16 AUGUST 2021




                                     Page 35 of 92

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                            16 AUGUST 2021

OPERATIONAL PLAN 2020-21 PROGRESS REPORT
 THE NOOSA ECONOMY
 No. Project                                                  Responsibility                        Deter                                                                            AS Ets
 1   Support business recovery efforts post COVID-19          Economic Development Manager          Most Business Precincts in the Noosa Shire report a strong recovery. The     Completed    ©
                                                                                                    accommodation sector is particularly strong, and the evidence points to high
                                                                                                    demand for remote workers relocating from metro areas.
 2   Undertake a review of the Local Economic Plan and        Economic Development Manager          Following workshop sessions with Councillors and Business Roundtable           Ontrack    @
     develop a new five year Plan                                                                   members an Economic Strategy 2021 Discussion Paper is under
                                                                                                    development.
 3.  Continue to progress Council’s Industry Development      Economic Development Manager          Noosa Council is continuing to facilitate the Noosa Education and Training  Completed     @
     Program across our priority sectors focussing on digital,                                      Alliance, with this group now an incorporated group. The Peregian Digital
     education and training, and rural enterprise                                                   Hub is operating at capacity. FireTech Living Lab program will continue to be
                                                                                                    rolled out over next 18 months.

4    Finalise the design of the Peregian Digital Hub extension Economic Development Manager         The Digital Hub expansion plans have been drawn-up and the FireTech     Behind Schedule   0
     (refit of Community House) as part of the Stage 3 Rufous                                       datalab funding of approximately $800k will support additional high-tech fitout
     Street project                                                                                 of the old community house.

 5   Deliver  economic    stimulus  projects  funded   by     Director Infrastructure Services      The majority of projects are on track for completion within the guidelines of  Ontrack    @
     Commonwealth and State Government COVID-19 grants                                              the grant funding and negotiations with State Govemment have commenced
                                                                                                    on those projects that may require time and cost extensions. Quotes have
                                                                                                    been awarded for remaining projects to be completed in 4th Quarter.

                                                                                                                                                                                 Page 35 of 92

Section 36

GENERAL COMMITTEE MEETING AGENDA   16 AUGUST 2021




                                     Page 36 of 92

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                            16 AUGUST 2021

 OPERATIONAL PLAN 2020-21 PROGRESS REPORT
 LONG TERM PLANNING FOR NOOSA SHIRE
 No. Project                                                  Responsibility                         Uren                                                                            Ry Est
  1   Finalise the Climate Change Adaptation Plan and initiate Director Environment & Sustainable   Draft Coastal Hazards Adaptation Plan public consultation is complete.         On track  @
      implementation of actions                               Development                           Review of submissions and further targetted consultation via a newly formed
                                                                                                    CHAP Roundtable underway. Whole of Shire Climate Change Response
                                                                                                    Plan has completed consultation and will be reported to Council in August.

 2    Continue to implement the Noosa Transport Strategy      Director Infrastructure Services      Go Noosa program continuing as business as usual for peak holidays,         Completed    o
      priority actions as determined by Council                                                     electric bus negotiation with TransLink continuing, in principle agreement
                                                                                                    from TransLink for Free Weekend Buses all year and for Kin Kin Flexi Link
                                                                                                    cabs. Car park supply and management and Noosa Heads bus stop analysis
                                                                                                    in progress. Investigating Noosa National Park bus for peak holidays and
                                                                                                    funding review of new transport initiatives.
 3.   Finalise the adoption of the new Noosa Planning         Director Environment & Sustainable    Noosa Plan 2020 commenced 31 July and has already had one                   Completed    @
     Scheme                                                   Development                           administrative amendment. Wide range of supporting material is available
                                                                                                    on line. Special interest presentations have occurred. Further draft
                                                                                                    amendments are in progress.
 4    Establish a Placemaking Team and commence pilot         Director Environment & Sustainable    Commenced internal governance structure in Nov 2020 and continuing with = Behind Schedule 0
     project                                                  Development                           with organisational readiness program and developing, evaluation and
                                                                                                    monitoring criteria.
 5    Finalise the development of the Walking and Cycling     Director Infrastructure Services      The Noosa Cycling and Walking Strategy and Implementation Plan adopted       Completed   ©
     Strategy                                                                                       by Council in July 2021.
 6    Complete Asset Management Plans for pathways and        Director Infrastructure Services      The Pathways and Boardwalk Asset Management Plan has been adopted by    Behind Schedule   eo
      boardwalks and for parks and playgrounds                                                      Council. The Parks and Playgrounds Asset Management Plan is delayed due
                                                                                                    to staffing constraints within the Asset Management Branch. Expected
                                                                                                    completion December 2021.
 7    Implement recommendations arising from the Noosa Spit   Director Infrastructure Services      Submission for permits and approvals completed. Additional information         Ontrack   @
      Shoreline Erosion Management Plan (SEMP)                                                      requested by the State that will involve further investigation. Detailed
                                                                                                    specification and drawings have been completed. Tender to be advertised in
                                                                                                    line with approval conditions when received. Expected to commence project
                                                                                                    in winter 2022.
 8    Review the Noosa Council Corporate Plan                 Chief Executive Officer               Councillors determined to delay the review of the Corporate Plan until the Behind Schedule 0
                                                                                                    commencement of the new CEO in early 2022.

                                                                                                                                                                                 Page 36 of 92

Section 37

GENERAL COMMITTEE MEETING AGENDA   16 AUGUST 2021




                                     Page 37 of 92

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                              16 AUGUST 2021

 OPERATIONAL PLAN 2020-21 PROGRESS REPORT
 EXCELLENCE AS A COUNCIL
 No. Project                                                  Responsibility                         Deter                                                                            ASE tre)
 1.  Continue to develop a Workforce Planning Strategy        Director Executive Services            Conintued focus is on succession planning for key positions and the     Behind Schedule   ())
                                                                                                     inclusion of workforce planning within Branch Plans ahead of revised
                                                                                                     broader strategy to be developed in 2021/22.
 2   Continue the transition to Technology One CiAnywhere     Director Corporate Services            E-recruitment project completed. Early adopter project for fees and charges  Completed    ©
     for Council's enterprise management system                                                      completed and incorporated in budget system. Corporate performance
                                                                                                     management system implementation planning underway. Review of CIA
                                                                                                     request management system implementation in progress to identify
                                                                                                     improvement opportunities. Procure to Pay stage 2 project underway.

 3.  Review Council's Community Engagement Strategy           Director Executive Services            Given the change in timing for the development of the new Corporate Plan, Behind Schedule ¢))
                                                                                                     action will be taken to commence the review of the strategy in 2021/22. A
                                                                                                     project plan is to be developed and a workshop with Council is planned for
                                                                                                     August/September 21.
 4   Undertake an evaluation of Council's response to the     Chief Executive Officer                This will commence shortly and look at what went well in our Covid response Behind Schedule o
     COVID-19 pandemic including its impact on Council                                               and lessons learnt that can be incorporated into future responses.

 5   Undertake the biennial Community Satisfaction Survey     Director Executive Services            The Survey was undertaken in April this year. The final report is expected in Completed   @
                                                                                                     July and the results will be formally reported to a future meeting of Council.

 6   Continue to develop our staff through leadership/        People & Culture Manager               Training needs identified for the commencement of the development of         Completed    ©
     supervisor development programs and the employee                                                2021/22 programs. Leadership Group session held in Q4 as a continuation
     training program                                                                                of those held earlier in 2020/21.

 7   Review Business Continuity Plans based on COVID-19       Relevant Directors                     Council's Pandemic Management Sub-Plan reviewed and updated based on            Ontrack   @
     experience                                                                                      learnings over previous 12 months. ICT Business Continuity Plan updated
                                                                                                     and reviewed.
 8   Monitor and continue to improve workplace health and     Director Executive Services            Continuing to implement the deliverables from the Workplace Health &        Completed     @
     safety performance                                                                              Safety Management System Plan (April 2020-March 2021)

                                                                                                                                                                                   Page 37 of 92

Section 38

GENERAL COMMITTEE MEETING AGENDA   16 AUGUST 2021


                                   ATTACHMENT 2




                                     Page 38 of 92

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                    16 AUGUST 2021

                 ORGANISATIONAL PERFORMANCE REPORTING                                                                                                               ATTACHMENT 2
                 OUR PEOPLE
               Measure                                                                    Measure
                                                                                           Council % of LGW
                                                                                           Safety of the workplace
                 30                                                                         3%
                25               “=
                                ae
                                2 @
                               *   *
                  15           :    s                       |    ae       ee
                                    .
                     oF 3.                        Poe
                  “Tm |            PS                                                       ‘tt              ht ha                 hae                  eS
                                       ABR             eeee
                  (Paes
                  o      a                                                                  0%
                      July Aug Sept Oct   Nov  Dec  Jan  Feb  Mar  Apr  May June                 20145    2015/16  2016/17  2017/18  2018/19  2019/20  2020/21
                Comment
                Duration is defined as the average days lost per lost time injury. The formula is No. of
               work days lost / No. of lost time injuries.
                Measure                                                                    Measure
                Personal leave total days x month                                          Accrued Annual Leave weeks (median

                 500        rs                                                             6
                           7%
                 400      of                                                     .         5
                  oh      OER,                                                                                                                                 .
                  oo      AEE                          EOE                                 pee | og
                          See                                INES                                 tities
                  100               i    1    2    |             \     ~   i     .         2                                 1     a
                       CORRES                                                              Oa
                       July Aug Sept Oct Nov Dec Jan      Feb Mar Apr May June                BERR
                           .                                                               0
                         Sick leave <Sdays Carers leave <Sdays Personal leave >5 days          July Aug   Sept  Oct  Nov  Dec   Jan  Feb   Mar  Apr  May June

                                                                                                                                                                        Page 38 of 92
                                                             2018/19 data is shown by dotted purple line. 2019/20 data is shown by black line

Section 39

GENERAL COMMITTEE MEETING AGENDA   16 AUGUST 2021




                                     Page 39 of 92

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                      16 AUGUST 2021

 Measure
  Staff turnover rate as percentage of establishment level
 Purpose
   0 track staff tumover over time and identify trends

   6%

   4%
                                              at?%,
               =a         ee         eee            “fey,
   2%

   0%
             Sept              Dec              Mar              June
 Comment
 2020/21 - 6.6%; 2019/20 - 9.6%; 2018/19 - 10.9%; 2017/18 - 8.2%; 2016/17 - 8.9%;
 2015/16 - 13.06%; 2014/15 - 11.06%.
  Data recorded on a quarterly basis.

                                                     2018/19 data is shown by dotted purple line. 2019/20 data is shown by black line

                                                                                                                                                                                          Page 39 of 92

Section 40

GENERAL COMMITTEE MEETING AGENDA   16 AUGUST 2021




                                     Page 40 of 92

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                              16 AUGUST 2021

                      OUR CUSTOMERS
                     Measure
                      Number of requests received x month                                           % of requests completed within target date x month
                      Level of customer demand & whether service levels appropriat                  Indicator of whether service levels are satisfacto
                        2500                                                                         100%
                        2250
                        me a A                                                                        cox
                        1750  a            A                                                       See                                   call          rl
                        oo?            ee eee ee                          ee                         60%                                                 —
                        oo ff oe                    ee              oe
                         ae                     eet                            ees                    om
                         co.      fe          ne ee        oe     ee ee
                         20 HII
                          e                                         =               a                 20%
                              July Aug Sept Oct   Nov   Dec  Jan  Feb March Apr May June
                            @ All others         @ Local Laws        u@ Parks                          0%
                              Waste Management   #™ Works Operations @ Environmental Health                 July  Aug  Sept  Oct  Nov  Dec   Jan  Feb March Apr   May June
                      Comment
                      Categories show the 'Work Groups' that on average receive the highest number of
                      requests each month.
                     Measure
                      Average seconds of “wait” time in phone queue                                 Number of planning applications decided within statutory timeframe
                      Service timeliness / capacity to respond                                      Service timeliness
                      60                                     .                                                                                 lm Not decided
                                                            a                                       30                                          wa Decided
                                                          we,                                                                                  —— April applications
                             Rte                         “           oe%e,                                                                     ——May applications
                                *                       *                 7
                      40         os                 pr         —       5	1	1	1	30	6	1619	1621	9	2	65	-
4	1	1	1	31	0	873	1620	1677	182	-1	
5	1	1	1	31	1	873	1620	37	169	21	;
5	1	1	1	31	2	956	1620	36	169	0	,
5	1	1	1	31	3	1201	1645	36	144	0	:
5	1	1	1	31	4	1283	1624	37	165	21	;
5	1	1	1	31	5	1358	1620	42	169	26	N
5	1	1	1	31	6	1545	1649	48	31	58	1
5	1	1	1	31	7	1777	1646	31	21	28	:
5	1	1	1	31	8	2364	1654	186	148	34	NO
4	1	1	1	32	0	578	1675	2158	218	-1	
5	1	1	1	32	1	578	1746	44	58	37	20
5	1	1	1	32	2	791	1688	35	101	0	-
5	1	1	1	32	3	1037	1691	38	98	47	i
5	1	1	1	32	4	1119	1675	37	114	87	[
5	1	1	1	32	5	1446	1731	37	58	50	a
5	1	1	1	32	6	1527	1726	36	63	49	a
5	1	1	1	32	7	1779	1781	26	21	36	to
5	1	1	1	32	8	1952	1768	185	99	47	SJ
5	1	1	1	32	9	2236	1753	61	39	6	a
5	1	1	1	32	10	2381	1721	355	172	6	Pe
4	1	1	1	33	0	607	1938	2059	39	-1	
5	1	1	1	33	1	607	1946	15	21	51	0
5	1	1	1	33	2	1887	1938	52	39	53	Mey
5	1	1	1	33	3	2195	1943	22	20	61	%
5	1	1	1	33	4	2340	1943	23	20	59	%
5	1	1	1	33	5	2490	1938	30	39	54	by
5	1	1	1	33	6	2630	1942	36	22	54	Rp
4	1	1	1	34	0	663	1938	2241	71	-1	
5	1	1	1	34	1	663	1978	50	26	93	July
5	1	1	1	34	2	744	1978	49	26	93	Aug
5	1	1	1	34	3	823	1978	57	25	94	Sept
5	1	1	1	34	4	912	1978	43	21	94	Oct
5	1	1	1	34	5	991	1978	48	21	95	Nov
5	1	1	1	34	6	1073	1978	48	21	95	Dec
5	1	1	1	34	7	1156	1978	43	21	94	Jan
5	1	1	1	34	8	1237	1978	46	21	84	Feb
5	1	1	1	34	9	1304	1978	75	21	96	March
5	1	1	1	34	10	1402	1978	44	25	91	Apr
5	1	1	1	34	11	1480	1978	52	26	91	May
5	1	1	1	34	12	1557	1978	60	21	96	June
5	1	1	1	34	13	2049	1938	107	70	10	“ne
5	1	1	1	34	14	2213	1948	50	60	18	tote

                                                                                                                                          “ot,                       wet,
                                                                                                    Comment
                                                                                                    June total applications - 87. Not decided in timeframe - 9.
                                                                                                   May total applications - 64. Not decided in timeframe - 8.
                                                                                                   April total applications - 67. Not decided in timeframe - 11.

                                                                     2018/19 data is shown by dotted purple line. 2019/20 data is shown by black line                              Page 40 of 92

Section 41

GENERAL COMMITTEE MEETING AGENDA   16 AUGUST 2021




                                     Page 41 of 92

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                16 AUGUST 2021

          Measure                                                                           Measure
           % of building information requests completed within statutory time frame
           Service timeliness                                                                Level of activity & service
                                                                                              20
            100%                                                “Wecanest?™

             60%                                                                              10
             40%
                                                                                               5
             20%                                                                  ,
             0%                                                                                0
                   July Aug Sept Oct     Nov  Dec   Jan  Feb March Apr May June                    July  Aug  Sept   Oct  Nov   Dec   Jan   Feb March Apr     May June
                                                                                             Comment
                                                                                             Legislation introduced on 1 July 2019 has reduced the statutory time from 20 days to 10
                                                                                             days

                                                            2018/19 data is shown by dotted purple line. 2019/20 data is shown by black line

                                                                                                                                                                    Page 41 of 92

Section 42

GENERAL COMMITTEE MEETING AGENDA   16 AUGUST 2021




                                     Page 42 of 92

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                           16 AUGUST 2021

                     OUR FINANCES
                    Measure                                                                        Measure
                     Investment return 0.25% above benchmark (UBS Bank Bill index)                 Rate arrears ratio <5%
                    Purpose                                                                        Purpose
                     Performance of invested ratepayer funds                                       Measures the efficiency of Council's collection of rates and charges
                      1.0%                                                                          15%
                                                                                      *
                                                                                     *
                                                                                     *
                     0.8%                                                           3
                             *,                    +     °               ooo,     :                 10%          ~~
                     0.6%      +                          fo          vs         “       -                                                           °
                                .                            +       ’                                                   >
                     0.4%         se                           a,                        :                                                                a      “Gar «
                                 .                            e     *                                                                                           .
                               gs              OS                                                    *                             >
                     Saninin                                                             |               Ln
                     0.0%                                                                            0%
                            July Aug Sept Oct    Nov  Dec  Jan   Feb  Mar  Apr  May June                  July  Aug  Sept  Oct  Nov   Dec   Jan  Feb   Mar  Apr   May June

                     Measure
                     Working capital ratio > 2 (times)
                     Purpose
                     Measures Council's ongoing solvency
                      8         «
                                a?
                               &  “ee,                                    serene
                      6      <        “tune                            o* —       4%
                                                                                    *
                                                  —/              i                  i
                      .           7     7         7     :         7     i;   7     l
                      2                                                                  -

                          July Aug  Sept  Oct  Nov   Dec  Jan   Feb  Mar  Apr   May June

                                                                    2018/19 data is shown by dotted purple line. 2019/20 data is shown by black line                            Page 42 of 92

Section 43

GENERAL COMMITTEE MEETING AGENDA   16 AUGUST 2021




                                     Page 43 of 92

GENERAL COMMITTEE MEETING AGENDA                                                                                                 16 AUGUST 2021

         OUR SYSTEMS & PROCESSES

        Measure                        eee                               Measure                    eee
        Identify growth of online services                                Identify growth of online services
         50%                                                               100%
          * |          ae                                                   =A
                                                                           90%      —]    i   -  —    = a8) .*      = re ete = deae a ~
         oo         ee                   ea          ee                     ™       Oooo ooo
          non                                                               moa
                                                                            =       THEE
          10% ; =       ———      ad  rd       ~   |   +    a                30%
              Wi                                i    i   lh               ox     LPT
          0%                                                                oe         LIL       LL       LLL
               July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June          oy Lo              a       a        a    a
                   WE requests @ Email (incl. requests via mobile applications)  July Aug Sept Oct Nov Dec Jan   Feb Mar Apr May June
                                                                          Comment
                                                                          This KP! includes all payments made to Council via electronic means (including BPAY, direct
                                                                          debit, via Council's website, at Australia Post outlets etc)

                                                2018/19 data is shown by dotted purple line. 2019/20 data is shown by black line

                                                                                                                                    Page 43 of 92

Section 44

GENERAL COMMITTEE MEETING AGENDA                                                   16 AUGUST 2021



9      BUDGET REVIEW 1 (BR1) FOR THE 2021/22 FINANCIAL YEAR


Author             Manager Financial Services, Trent Grauf
                   Corporate Services Department

Index              ECM/ Subject/ 7.29 – 2021-2022 Budget

Attachments        1.   Proposed Operating Budget Submissions
                   2.   Proposed Capital Budget Submissions
                   3.   Revised Capital Program
                   4.   Revised Statement of Income and Expenditure
                   5.   Revised Budget Financial Statements



EXECUTIVE SUMMARY
The Local Government Act 2009 and Local Government Regulation 2012 require Council to
undertake regular reviews of the adopted budget to ensure it remains reflective of planned activities
to be funded through the financial year. This first budget review for the 2021/22 financial year (BR1)
incorporates:
      Any capital or operating projects that were incomplete with unspent budgets at the close of the
       2020/21 financial year and are eligible for carryover into the current budget year.
      Any new or emergent actions arising from Council resolution, Executive Team or Capital Works
       Executive action since the adoption of the original budget in June 2021.

In summary the budget review is proposing to decrease Council’s operating position by $1.0 million;
reducing from a $309k surplus down to a $692k deficit. Capital grant revenue has increased by $4.4
million and the revised capital expenditure program has increased by $6.8 million to $53.7 million.


Item                                       Original Budget       Adjustments Proposed Budget
                                                    ($’000)           ($’000)    (BR1) ($’000)
Operating Revenue                                 $106,634               $614           $107,248
Operating Expenditure                             $106,325             $1,616           $107,941
Operating Result                                      $309            ($1,002)             ($692)
Capital Grants and Contributions Revenue           $20,562             $4,421            $24,984
Capital Works Expenditure                          $46,897             $6,797            $53,694



RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee Meeting
dated 16 August 2021 and approve the proposed changes to the budget for the 2021/22 financial
year as outlined in the Revised Budget Financial Statements attached to the report.




                                                                                       Page 44 of 92

Section 45

GENERAL COMMITTEE MEETING AGENDA                                                     16 AUGUST 2021


REPORT
Section 170(3) of the Local Government Regulation 2012 allows Council, by resolution, to amend
the budget at any time before the end of the financial year.

The key criteria for budget reviews include:
1.   Council must aim for compliance with its Financial Sustainability Policy.
2.   Any eligible capital or operating project must be underway with a commitment to deliver and
     complete the project.
3.   Capital submissions will be reviewed and authorised by the Executive Team before inclusion
     as a budget review submission, where the group will consider justification for the request,
     deliverability as well as organisational and community priorities before endorsing any capital
     works.
4.   All operating and capital submissions for additional spend, reallocation of savings or additional
     revenue will be confirmed by the Executive Team based on business risk assessment.

The revised statement of comprehensive income, included as Attachment 4, identifies the financial
statement line items that have been affected by the proposed budget adjustments. The budget
financial statements, included in Attachment 5, also identify the impact of the proposed budget
adjustments to Council’s financial sustainability indicators.

1.     Operating Budget Adjustments
The proposed operational budget adjustments will result in a $1.0 million decrease to Council’s
operating position. The following table summarises the operational carryovers by type of funding,
with a detailed list contained in Attachment 1. It is noted that the majority of budget submissions are
grant or levy related programs and projects, where funds had already been received in prior years
and there is no long-term cash flow implication for Council (i.e. the expenditure is not recurring or
will be built into the base budget).

The financial statements in Attachments 4 and 5 also outline the revised budget position.

 Type                                       Submissions              Expense             Revenue
                                                                       ($’000)             ($’000)
 Grant Funded                                    17                      1,421               (364)
 Levy Funded                                      1                       161                    -
 General Revenue Funded                           1                         33                   -
 Additional Revenue                               1                          -               (250)
 Total                                            8                      1,616               (614)


2.     Proposed Carryovers - Capital Expenditure Projects
To inform the determination of capital carryovers, the following table summarises the 2020/21 full
year financial result for the capital works program. It identifies a total unspent 2020/21 budget of $6.7
million, which is set as the target ceiling of funding available for carryover. This ensures that cash
reserves are not eroded in accordance with the Financial Sustainability Policy.

Item                                 Amount
                                      ($’000)
Current Budget 2020/21 (BR3)         $31,243
Total Expenditure 2020/21             $24,517
Total Unspent                          $6,725

                                                                                         Page 45 of 92

Section 46

GENERAL COMMITTEE MEETING AGENDA                                                      16 AUGUST 2021


A total of 50 existing projects have been proposed for carryover from the 2020/21 year with a total
value of $5.9 million. In addition, a total of 11 emergent works and variations with a project budget
of $0.9 million are proposed for inclusion in the revised budget. These works have been funded
through grants and subsidies as well as general reserves. The total proposed capital works
adjustment is $6.8 million.

The following table summarises the proposed revised 2021/22 capital budget by program, with the
full list contained in Attachment 2.

 Item                                                                      Amount
                                                                            ($’000)
 Original Budget                                                           $46,897
 Carryovers                                                                 $5,868
 Emergent Works and Variations                                                $930
 Proposed Revised Capital Expenditure Budget                               $53,694

The following table summarises the proposed revised 2021/22 capital budget by program, with the
full list contained in Attachment 2.

Program                                           2021/22    Carryovers       Emergent        Proposed
                                                  Original                       Items        BR1 Total
                                                  Budget                                        Budget
Capital Works
   Bridges                                          7,461           134                 -         7,595
   Coastal Canals and Waterways                     1,675           155                20         1,850
   Cemeteries                                         180              -                -           180
   Community Facilities                             4,209         1,915                 -         6,124
   Corporate Buildings                                 15              5                -            20
   Environmental Assets, Tracks and Trails          1,441           259                 -         1,700
   Gravel Road Network                                410              -                -           410
   Holiday Parks                                        0           (30)               70            40
   Libraries and Galleries                            475           347                 -           822
   Parks and Playgrounds                            4,932         (227)                 -         4,704
   Pathways and Boardwalks                          2,771           648               155         3,574
   Public Transport Infrastructure                    275             77                -           352
   Sealed Road Network                             14,090           386                 -        14,476
   Sports Grounds and Facilities                       50              -                -            50
   Stormwater Drainage                                987           767               148         1,903
   Transport and Infrastructure Management            675             42              501         1,218
   Waste Management                                 2,360           200                 -         2,560
Other Works
   Fleet - Plant Replacement                        1,685         1,042                36         2,763
   Asset Management                                   750            26                 -           776
   ZEN                                                400            50                 -           450
   Information Technology                             600            69                 -           669
   Planning                                           160             -                 -           160
   Loan Redemption                                  1,297             -                 -         1,297
   Grand Total                                     46,897         5,867               930        53,694




                                                                                            Page 46 of 92

Section 47

GENERAL COMMITTEE MEETING AGENDA                                                      16 AUGUST 2021


Previous Council Consideration

The 2021/22 original budget was adopted by Council resolution on 30 June 2021 (Ref. Special
Meeting Minutes, 30 June 2021, Item 3, Page 3).

Finance
The financial sustainability ratios for asset sustainability and net financial liabilities are forecast to
meet the benchmark targets under the revised BR1 budget for 2021/22; however the operating
surplus ratio will fall below the target range.

Ratio                          Target       Original Budget        BR1
Operating Surplus             0 – 10%            0.3%             (0.6%)
Net Financial Liabilities      < 60%             (8.1%)           (4.9%)
Asset Sustainability           > 90%            107.8%            121.9%




Risks & Opportunities

Council’s risk register includes a number of risks that could impact on ongoing financial sustainability.
Effective budget management and reporting is an important risk mitigation tool.

Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

Financial Services have been in contact with all Council branches. Directors of each department
have reviewed endorsed all submissions received. The Executive Team has also reviewed and
endorsed all submissions received.




                                                                                          Page 47 of 92

Section 48

GENERAL COMMITTEE MEETING AGENDA                                                          16 AUGUST 2021


Departments/Sections Consulted:

 X   Chief Executive Officer      X   Community Services                      X   Corporate Services
     Executive Support                Director                                X   Director
                                      Community Development                   X   Financial Services
                                      Community Facilities                        Fleet
                                      Libraries & Galleries                       ICT
                                      Local Laws                                  Procurement
                                      Waste & Environmental Health                Property
                                                                                  Revenue Services

 X   Executive Services           X   Environment & Sustainable Development   X   Infrastructure Services
     Director                         Director                                    Director
     Community Engagement             Building & Plumbing Services                Asset Management
     Customer Service                 Development Assessment                      Buildings and Facilities
     Governance                       Economic Development                        Civil Operations
     People and Culture               Environmental Services                      Disaster Management
                                      Strategic Land Use Planning                 Infrastructure Planning,
                                                                                  Design and Delivery




                                                                                               Page 48 of 92

Section 49

GENERAL COMMITTEE MEETING AGENDA   16 AUGUST 2021




                                     Page 49 of 92

GENERAL COMMITTEE MEETING AGENDA                                                            16 AUGUST 2021

  2021/22 Budget Review 1 - Operating Submissions                                         ATTACHMENT 1
 item             tC“ tws~—~“‘Detai#s— = CC—“‘CNC#*drExpensse:*([Revenue |                              TOTAL
 IGrantFunded |                                                        ——C—‘“‘—‘iT
 Art Gallery and Butter     Floating Land 2021. Planning work commenced in 2020/21   70,361              70,361
  Factory                   funded via grants received in advance.
  Library Services          Be Connected Grant for Building Digital Skills program.
                            Funds received in 2020/21 but not fully expended.
                            Engaging Science 2020 grant program. Funds received in
                            2020/21 but not fully expended.
                            Indigenous Welcome Book grant. Funds received in                              6,236
                            2020/21 but not fully expended.
                            Best Start / First Five Forever grant. Funds received in 22,170              22,170
                            2020/21 but not fully expended.
  Community Development   ‘| ActiveKIT Program. New grant approved for 2021-22               -100,000 Ff
                            COTA Queensland Seniors Connect grant. Funds
                            received in 2020/21 but not fully expended.
  RADF (Various Areas)      RADF 2020-21 program funds received but not fully
                            expended (Library Makerspace, Gallery Masterclass, Grow
                            Your Arts, etc.
 Tourism and Economic       FireTech Intemational Conference grant. Funds received  50,000               50,000
 Development                in 2020/21 but not fully expended.
                            FireTech Connect Conference 2020 (QLD Gov't). Funds                           4.238
                            received in 2020/21 but not fully expended.
 Transport and Traffic      Community Road Safety Grant. Funds received in                                9,361
 Planning                   2020/21 but not fully expended.
  Environmental Services    Conservation Projects on Council Land funded as part of 200,000) -100,000   100,000
                            the $4 million Community Stimulus Program
                            Final grant payment for Conservation Projects on Council          -10,753    -10,753
                            Land undertaken in 2020/21 funded as part of the $1.8
                            million Works for Queensland program
  Bushfire Recovery (Various |Cat D 2019 Bushfire Exceptional Assistance Funding - 634,086              634,086
Areas)                      carryover of unspent 2 year project funds
                            Cat C 2019 Bushfire Community Recovery Funding -        117,593             117,593
                            carryover of unspent 2 year project funds
                            Queensland Bushfires Cat C Grant - further funding for   76,000)  -76,000
                            Aged Care Sector
                            Local Economic Recovery Grant (LER). Program             84.823]  -77,478     7,345
                            underway
  Grant Funded Total                                                               424,714] -364,234] 1,057,484)
llevyFunded |
 Tourism and Economic Levy | Balance of unspent historical LEP levy program restricted 161,000          161,000
                            cash applied into Economic Promotion and Industry
                            Assistance programs
  Levy Funded Total         pot                                                    184,000] |           161,000
 [AdditionalRevenue |                                               —C—s—“—*‘“CSs‘“‘“‘iYSSC‘(;
  Financial Services        Eligibility and backlog of claims under Fuel Tax Credit          -250,000}  -250,000
                            system reviewed with catchup claim identified from the last
                            4 financial years, plus forecast revenue for 2021/22
 AdditionalRevenueTotal |                             CC—“‘(‘CONOOOOO                   CI -250,000] -250,000)
  General Rate Funded       Pf
  Beaches and Canals        Noosa River and Canal Dredging program - additional
                            background work from 2020/21 required for permit
                            extension
  GeneralRateFundedTotal]    — C—“‘(‘SSOOOOOCOC(’NTCOCT 33,050] ——s|33,050)

                                                                                                 Page 49 of 92

Section 50

Page 50 of 92

Tewantin Doonella BridgeRenewal                                     980,000,     26,593}                            1,976,593 | Multi-year project. Design underway, with construction scheduled for 2021-22 to 2022-23
   Cooran Tablelands Road Bridge Renewal —=S=S=S*=*~“*~*~*~*~*~*sS~*~*S*S«~SSSTB| «NTS OTA|S*|~S*S*~*S*~YCS*S*« 88,650 Mlt-year project. Tender & grant funding negotiations underway
   ‘Kin Kin Wanpunga Lane Bridge Renewal     SSSSS~SS~«wiSBHBZD|_—~=«DHSHS|SS*|S*S*~*™SCSCS*«S*S 80,877 Multi-year project Tender & grant funding negotiations underway.
    Cooroy Belli Creek RoadBridgeRenewal                                900,000     20,165)            |                879,835) Mult-year project. Design underway, with construction scheduled for 2021-2200
    Noosa Heads Garth ProwdBridgeRenewal                               000,000       4314) | __ 1,004,314 | Multi-year project. Design underway, with construction scheduled for 2021-22 to 2022-23
    Black Mountain Lawnville Road Bridge Renewal                      1,470,874      16,914) | __ 1,453,960 Multi-year project. Design underway, with construction scheduled for 2021-22000
    Cooroy Gumtree Drive PedestrianBridge Construction           130,000,800
    Total Bridges                                                      7,460,772     134,457          0            0     7,595,229
   NoosaHeadsDogBeachSEMP                                             1,090,000,      1.547)           | S| _«A,441,547 Mult-yearproject Works scheduledfor 2021-220
    Noosa WatersRevetmentWall                                           80000        78.768} |                         __ 128,768 Construction currently underway for revetment wall works. Expected completion Qt.
    Replace Dune Fencing atFirstCutting-Catb20190                                   800          |                     __25,000 Construction commencing August for dune fencing work. Expected completion Q1.
    Renewal of revetment wall at O-Boats Gympie Tce, Noosaville         175,000           | | ____ 175,000 Project is design ready, with scope revised to also T-Boatsemergent works.
    Noosa Heads Main Beach Sand Recycling System PipeworkRenewal        100,000,                                         100,000)
    Noosa Main Beach Removable Sand Break Seating Structure      7500000
    Noosa Main Beach Shower & Rock Wall Seating Improvements            185,000                                           885,000
   Noosa Heads Main Beach AccessbityMat                         |                     |__|                    20.000,    2.000 810K    cing contrxton om Sandy Boon towards beach mat. Scope and timing tobe confirmed.
    Total Coastal Canals and Waterways                                 1,675,000     155,315          0       20,000     1,850,315
    Cooroy Cemetery Plant &EquipmentShed                               180,000                                            80,000)
    Total Cemeteries                                                     180,000          0           0            0      180,000
    Rufous St- Stage 3 Community House, Car Park & Landscape          2,100,000   1,346.91)                             (3,446,491 | Multyear project. Construction works underway,
   Rufous St=Stage 3 Digital Hub Expansion =                SS~S*~“‘~*~*~étS*~“‘dR‘SSG’~S~*~*~*~*~*~*~™S~S*~*~*~*~*~YSCS*S*SC«S SG Multyear project Construction works underway.
   Rufous St-Stage 3Project Management _—=SSSS~=~<“—~*~—~sSSC*‘“‘CN!#(#Y!”SOWC#OONG7|~~~~OW*~*~=«S~SS~SS~*«Y~S~~«29,767|Muliyear project Construction works underway
    NAC ReplacementofLightPoleFitings                                            8D}             |                 |___59,500) Replacement works delayed to 2021-220
    Pomona School of Arts Hall- Amenities Upgrade-W4Q                               183,590)     -70,000/ SS ____ 113,590 W40 funded project under construction, with grant time extension approved.
    Tewantin Sports Complex-NavyCadets-W4Q0                                         134,391)     70,000,           |__204,391 | W240 funded project under construction, with grant time extension approved.
    NAC Switchboard Replacement                                                    185,000 |                         ___135,000|Reptacment works delayed to 2021-220
    Living Fire Tech Lab-DisasterRecCatD                               963,000,     -28,092)                            1,934,908 | Multiyear project. Planning underunderway. Construction scheduled for 2021-22, 0
   Peregian Beach Rufous St Public At-Catb20i9.~=~=~*~*~*~<“‘*”S*SC*OYS*« BBA] SS*S*S*~*~S:*S*~<“*‘“‘*SCS*«G, BG Fre Recovery Grant Project (CatD).Notyetcommenced —SSS~S
    Sunshine Beach NAC Dosing ControlierRenewals                 170008000
    ‘Sunshine Beach NAC PoolCleanerRenewal                                98,000                                          28,000
    Tewantin ReGen Wellbeing and Community Hub Feasability Study |      100.000,                                           000
    Total Community Facilities                                        4,209,000    1,915,446          0            0     6,124,446
Corporate Buildings

                                                                                                                                                                                           Page 50 of 92

Section 51

Page 51 of 92

Noosa Depot Roof Replacment                                                              5000                                     5,000 Carryover of final invoice costs for depot works completed in 2020/21
 Tewantin Emergency Generator                                      5000800
 Total Corporate Buildings                                                  15,000        5,000            0             0        20,000

Trails Master Plan and Implementation Plan                                              55S                                 ____ 68,553) Multiyear project. Planning underunderway. Construction scheduled for 2021-22.
 Trail 5 Upgrade                                                          1,440,725     193440,       ~~ | ~~~, _              4,634,165) Multiyear project. Planning underunderway. Construction scheduled for 2021-22.
 Total Environmental Assets, Bushland, Tracks and Trails                  1,440,725     258,993            0             0     1,699,718

 Shire Gravel Resheeting Annual Program                                    41000000                                              410,000)
 Total Gravel Road Network                                                 410,000            0            0             0       410,000

 Boreen Point Campground Upgrade Works - U&R                                    at       -30171, 70000                            39,829 U&R grant funded project under construction, with grant time extension approved.
 Total Holiday Parks                                                             0     (30,171)       70,000             0        39,829

 Whole of Shire Mobile Library Service Solution                                         346916                                   696,916 Vehicle on order, with procurement underway for kiosks
New Regional Art Gallery Pre-Feasibility Study                            125,000)                                              925000
 Total Libraries & Galleries                                               475,000     346,916             0             0       821,916
 Noosa Hinterland Priority Playground                                                   421248,       = | ~—————s«|_—s«        4,160,752) Multiyear project. Construction works underway. Scheduled for completion December.
 Sunshine Beach Skate Park New Shade Structure - U&R                        ee)         130137,    0                             130,137 |U&R funded project about to commence construction, with grant time extension approved.
Lake Cooroibah Foreshore - CatD2019                                                     500008                                  50,000 Fire Recovery Grant Project (Cat D). Not yet commenced.
 Replace Shade Shelters at Noosa Banks - CatD 2019                                       18,821)           |                     13,821 | Fire Recovery Grant Project (Cat D). Not yet commenced.
 Sunshine Beach Metal Skate Ramp Renewal                           380,000,500
 Total Parks & Playgrounds                                               4,932,000      -227,290           0             0     4,704,710
 Noosa Heads Noosa Parade Road Corridor Upgrade - Design                «2,000,000     -152833,—                               1,847,167 | Multiyear project. Planning underunderway. Construction scheduled for 2021-22 to 2022-23.
 Cooroy Maple Street Raised Pedestrian Crossing - LGGSP                    316,000      567407,       = =          ss            883,407 Multiyear project. Construction works underway. Scheduled for completion Q2.
 Tewantin, Hilton Terrace CNLGGP & Ivory Palms                          ee)              69909        20,000, += =~—~—~—_         89,909 Commencement of works delayed, with $20k variation identified.
 Noosaville Sea Eagle Drive & Shire Drive Pathway Upgrades                  ee)         176418,                                  176,418 | Works underway, with reseal work to be finalised in Q1 2021-22 to finish project.
 Peregian Beach Boardwalk - U&R                                              en)         32371,                                   32,371 U&R funded project under construction, with grant time extension approved.
Noosa Heads First Point-Picture Point Lighting Renewal                     80,0000)                                              80,000
 Sunshine Beach Belmore Terrace Pathway Renewal                             100,000)                                            100,000
 Castaways Beach Flagship Ct Missing Pathway Link Expansion                   000)                                                   00
Cooroy Maple St Pathway Overtander Av to Bruce Hwy                         190.0000                                              190,000)
Cooroy Tewantin Rd Missing Pathway Link                                    80,500)                                               80,500
 Noosaville Bluebell Ct Missing Pathway Link                               13,000)                                               13,00
Pomona Stan Topper Park Pathway Link                                        92,000)                                               92,000
 Tewantin Tinaroo Place Missing Pathway Link                                12,000)                                               92000

                                                                                                                                                                                                       Page 51 of 92

Section 52

Page 52 of 92

Project Description                                                        2021-22     Carryover      Variation   Emergent         2021-22 Comments
                                                                              Original                                   Works         Revised
                                                                                Budget                                             Budget BR1

    Tewantin Poinciana Avenue Pathway                                            45,000       -45,000                                         0 Duplicate project proposed for removal. Forecast for 2022/23 ($150k budget)
    Park Rd Boardwalk Renewal - Temporary Path Removal                                                                    135,000       135,000 | Council resolution in April 2021 to remove the temporary footpath and remediate site
    Total Pathways & Boardwalks                                                2,770,500     648,272         20,000       135,000      3,573,772
Public Transport Infrastructure
    Shire Bus Shelter Disabled Compliant Program Annual - PTIAP                                                                                 Delays with completing all scheduled bus shelter replacements for 2020-21; to be undertaken in
                                                                                275,000        77,391                                   352,391 | 2021-22.
    Total Public Transport Infrastructure                                       275,000        77,391             0             0       352,391
Sealed Roads Network
    Shire Reseal & Rehabilitation Renewal Program Annual                       5,290,000      273,112                                  5,563,112 LRCI grant funded reseal works currently underway
    Tewantin Bypass Stage 1                                                    8,800,000      113,379                                  8,913,379
    Total Sealed Roads Network                                                14,090,000      386,491             0             0     14,476,491
Sports Ground and Facilities
    Cooroy Sports Complex Master Plan Implementation                             50,000                                                  50,000
    Total Sports Ground and Facilities                                           50,000             0             0             0        50,000
Stormwater Drainage
    Gympie Terrace Stormwater                                                   560,000        33,689                                   593,689
    Shire Bioretention Basin Renewals Program Annual                              75,000                                                 75,000
    Noosaville, Project Ave Stormwater Drainage Easement Upgrade                 152,324       63,982                                   216,306
    Sunrise Beach Sobraon Street Slope Stabilisation - W4Q &LRCI                      0      669.677                                    669.677
    Dath Henderson Culvert Repairs                                                                                        148,248       148,248 Emergent renewal works to culverts on Dath Henderson Road
    Noosaville Foreshore Park Stormwater Renewals                               200,000                                                 200,000
    Total Stormwater Drainage                                                   987,324       767,349             0       148,248      1,902,921
Transport and Infrastructure Management
    Whole of Shire Forward Planning & Design Program                            400,000                                                 400,000
    Tewantin, Hilton Tce & Emest St Intersection Upgrade                              0                      30,854                      30,854 Late Unitywater invoice received for mains relocation on on Hilton Terrace
    Transport Strategy, Walking & Cycling Strategy &CNLG Grant                        0        42.054                                    42.054
    Noosa Heads Bus Station Options Analysis and Concept Design                       0                                   200,000       200,000 | TMR contribution for planning works (50/50 TMR & council contribution)
    Tewantin Doonella St & Memorial Ave Intersection Upgrade                    275,000                                                 275,000
                                                                                                                                                Successful grant funding for planning works (50/50 grant & council contribution) to occur over 2021-
    Noosa Drive New Pathway Reef Hotel to Noosa Parade Planning & Design                                                  270,000       270,000 22 and 2022-23
    Total Transport and Infrastructure Management                               675,000        42,054        30,854       470,000      1,217,908
Waste Management
    500974 - Noosa Heads The
5	1	1	1	36	6	522	1942	97	22	96	Woods Bin Storage Enclosure 0      41,076                                    41,076 Completion of works delayed to 2021-22
    500976 - Masterplan Landfill SW Controls & Design                                 0        63,356                                    63,356 Multiyear project. Construction to commence 2021-22.
    510042 - Noosaville Eumundi Road Landfill Outbound Weighbridge              500,000        53,885                                   553,885 Multiyear project. Construction to commence 2021-22.
    510043 - Noosaville Eumundi Road Landfill Liner, Cell capping design       1,610,000       22,462                                  1,632,462) Multiyear project. Construction to commence 2021-22.
    510044 - Noosaville Eumundi Road Landfill Expansion of Resource Recov       250,000        18,727                                   268,727 Multiyear project. Construction to commence 2021-22.
    Total Waste Management                                                     2,360,000      199,506             0             0      2,559,506

                                                                                                                                                                                                               Page 52 of 92

Section 53

Page 53 of 92

Other Capital                                                           CES FRU Y    1,187,047          :         1th        6,115,238
   Shire Bridge Annual Level 3 Inspections Annual                         150,000                                              150,000
   Zero Emssens Noosa fojet npsmeniaton                                                                                               Otc
                                                                                                                                       et to be invoiced
   Shire CCTV Drainage Condition Assessment Program Annual               200,000                                              200,000
   Shire Road Infrastructure Asset Data Mgt & Condition Annual           200,000                                              200,000
  Asset Management Systems Implementation                                200,000                                              200,000
  Noosa Junction Streetscape                                                          87,                                     26,047 Levy funded planning and design work underway for Noosa Junction
   Total Asset Management                                               1,150,000       76,047            0            0     ‘1,226,047
  Plant and Fleet Replacement Progrz                                                  4042000 = |                   | 2727.900| Carryover for plant and fieet due to delays in delivery
   VHF Vehicle Installation - Cat D 2019                                                                         36,191}       36,191 | Reallocation of available Bushfire Recovery Grant to fund VHF
   Total Fleet - Plant Replacement                                       1,685,000    1,042,000           0      36,191      2,763,192
   Implementation of C1 Anywhere Functionality for TechnologyOne         600,000) —    69.0000 S| SS 669,000 Implentation of automated invoicing and Governance system review delayed from 2021-22
   Total Information Technology                                           600,000       69,000            0            0       669,000
   QTC Capital Debt Redemption                                           4,297,000, 0,297,000
   Total Other                                                          1,297,000            0            0            0     ‘1,297,000
   Shire Project Place Spaced Approach - Placemaking Pilot Program       160,000                                               60,000
   Total Planning Scheme Expansion                                         160,000           0            0            0       160,000

   Grand Total                                                         46,897,321    5,866,777      120,854     809,439    53,694,391

                                                                                                                                                                                                 Page 53 of 92

Section 54

Page 54 of 92

Noosa Shire Council
 2021/22 Capital Budget Review 1 - Capital Program                                                                                                                          ATTACHMENT 3
 Renewal Projects
 Program                                ogi lel a)                                                                             er ee a Te                Loans _evy Reserves General Rates        Total
 Or ore ACen

__ Coastal Canals and Waterways        | Noosa Heads Main Beach Sand Recycling System PipeworkRenewal                   |                                            100,000             |      100,000 |
__ Coastal Canals and Waterways       | Noosaville Noosa Waters Lock & Weir Annual Renewal Progam                                CO                                  5,00] 0,000|
__Coastal Canals and Waterways        | Noosaville Gympie Terrace Revetment Wall Renewal                                                                                          175-000)      175,000
___Coastal Canals and Waterways       ss [Noosa Waters Revetment Walle 8B)                                                                                                                       78,768)
___Coastal Canals and Waterways _——————s«| Replace Dune Fencing at FirstCutting-CatD2019————(i 5,000)                                                                                            25,000
  Community Facilities =——SSs«| Sunshine Beach NAC - Dosing Controller Renewals                                                                                                    17,000}       17, 000 |
___Community Facilities -——SSs« Sunshine Beach NAC - Pool CleanerRenewal                                              CO                                                           29,000)      2, 000|
___Community Facilities           SS INAC ReplacementofLightPole Fittings,                                                                                                         9500)        59,500
___Community Facilities               =| Tewaantin Sports Complex - Navy Cadets-W4Q 00                                                                                            204,391)      204,391 |
___Community Facilities            SSS (NAC Switchboard Replacement:                                                                                                              185,000)      135,000 |
___GravelRoadNetwork =               —C*Shife Gravel Resheeting Program                                                                                                           410,000)      410,000 |
__Libraries & Galleries      ——C—CSCC*d Site Mil Library Service Solution,                                CC                                                                       96916}       896,916)
  Parks & Playgrounds            SSC Sunshine Beach Metal SkateRamp Renewal                                                                                                       350,000)      350,000
  Parks & Playgrounds            SSCs Replace Shade Shelters at NoosaBanks-CatD2019 0                                                                                             1,821]         18,821
__Pathways &Boardwalks                «| Sunshine Beach Belmore Terrace PathwayRenewal                                                                                            100,000)      100, 000 |
__Pathways & Boardwalks           SSCS NS Heads First Point - Picture PointLightingRenewal                       —(—si‘“‘L                                                         80,000)       60,000
__Pathways & Boardwalks ——CSCSC#di Peefegian Beach Boardwalk-U&Ro                                                                                                                  8237          82,871
__Pathways & Boardwalks —=——SSS—s«| Park Rd Boardwalk Renewal-TemporaryPathRemoval                                  Ci‘                                                           135,000)      135,000
___Public Transport Infrastructure    (| Shire Bus Shelter Disabled Compliant Program: Year8—                        CY       48                                                   78,841)      327,391
___Sealed Roads Network              «Shire Reseal Program                                                                    85478                                              8,708,376)   5,563,112 |
__Stormwater Drainage                = Noosaville Gympie Terrace Stormwater Renewals                                                                                              593,689}      593,689)
___Stormwater Drainage       Cd Shite Bico-Retention Basin Renewals Program                                          CC                                                               000)       75,000
__Stormwater Drainage —SSCSCSC_—=C NOSville Noosaville Foreshore Park Stormwater Renewals                                                                                         200,000)      200,000
__ Stormwater Drainage        SSCS ath Henderson Culvert Works                                        ———“‘“‘       WC                                                            148248)       148,248 |
___Streetscapes and Road Corridors _—_—_—s|Noosa Heads Noosa Parade Corridor Upgrade                                                                                              782,167)    1,847,167!
__ Transport and Infrastructure Management __| Shire Forward Planning & Design Program ConstructionReadyDesigns       CO]                                                         400,000)      400, 000|
 Capital Works Tot 6550000, 11,865,271)                                                                                                                                                      19,421,604
 Other Capital
   Asset Management                     Shire CCTV Drainage Program                                                                                                               200,000        200,000
   Asset Management                     Shire Road Infrastructure Asset Data Management & Condition Program                         0                                             200,000        200,000
  Asset Management                      Shire Bridge Annual Level 3 Bridge & Structure Inspections                                                                                 150,000       150,000
   Fleet - Plant Replacement            Council Fleet and Plant Replacement Program                                                                                              2,727,000     2,727,000
   Fleet - Plant Replacement            VHF Vehicle Installation - Cat D 2019                                                                                                      36,191         36,191
 ea     ow pital Total                 ,                                                                               |!           7             ,                         ,    3,313,191 ,   3,313,191
 Grand Total                                                                                                                 5,949,672                                150,000    ihe rie Coy2 22,734,795

                                                                                                                                                                                 Page 54 of 92

The text continues on section 55.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.