Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2021-08-16 General Committee Meeting Agenda

of 92

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                 16 AUGUST 2021


           Currency Period
     8.    This development approval lapses if the use has not happened by 20 August 2027,
           unless an application to extend the currency period is approved by Council.
           Land Amalgamation
     9.    Lot 1 on SP228052 and Lot 30 on SP170751 must be amalgamated.
           Traffic
     10.   The drop off/pick up/ carpark configuration, accessed from the Goodchap
           Street/Eumundi Noosa Road roundabout entry, as detailed in the approved plans must
           be upgraded in accordance with an Operational Works approval.
     11.   An internal one-way vehicular link from the new staff car park to the Goodchap
           Street/Eumundi Noosa Road roundabout exit as detailed in the approved plans must be
           provided in accordance with an Operational Works approval.
     12.   The applicant will comply with the requirements of any deed of agreement entered into
           with Council with respect to:
           a.    The upgrade of the drop off/pick up/ carpark configuration accessed from the
                 Goodchap Street/Eumundi Noosa Road roundabout entry; and
           b.    The provision of an internal one-way vehicular link from the new staff car park to
                 the Goodchap Street/Eumundi Noosa Road roundabout exit.
     ENGINEERING
           Stormwater Drainage
     13.   The site must be provided with a stormwater drainage system connecting to the existing
           school drainage system and the lawful point of discharge.
     14.   Any damage caused to existing services and assets as a result of the development works
           must be repaired at no cost to the asset owner at the following times:
           a.    where the damage would cause a hazard to pedestrian or vehicle safety,
                 immediately; or
           b.    where otherwise, upon completion of the works associated with the development.
           Any repair work which proposes to alter the alignment or level of existing services and
           assets must first be referred to the relevant service authority for approval.
B.   Enter into a Deed of Agreement with the applicant that provides for the carrying out of upgrade
     works to the drop off/pick up/ carpark configuration accessed from the Goodchap
     Street/Eumundi Noosa Road roundabout entry and an internal vehicular link.
C.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.



REPORT
1.   PROPOSAL
The application seeks approval for a Material Change of Use - Educational establishment.
The applicant submits the following:
     The proposal involves relocation of an existing demountable and a new additional
     demountable. An additional 290m2 of GFA is proposed. The demountable buildings are



                                                                                      Page 7 of 92
Log in to download the original file

2021-08-16 General Committee Meeting Agenda(PDF, 8MB).pdf · 8.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.