Annex 8 - Safety in Design Report V1
Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).
Figure 3: The four restoration sites selected for Phase 1
Project Timeframe
The Phase 1 works are anticipated to be implemented between 2021 and 2024
Phase 2
Phase 2 works include:
• Augmentation of the pilot phase restoration sites, with additional restoration substrate deployed as
required.
• Identification of new restoration sites in Restoration Zones 1 to 5
• Deployment of restoration substrates into newly identified sites.
These will be subject to future permits. Timing and funding is currently uncertain.
6