Council archive · source document
001A333D.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
Ere] *
RESPONSE TO INFORMATION REQUEST Fach *
live load of ;
5.0kPa; ‘
(ii) a
concentrate
d live load of
4.5kN;
(c) if a relevant
planning
scheme
standard is
more stringent
than the
standard
mentioned — in
' paragraph (a)
@ or (b)the
relevant
planning
scheme ,
standard, to the
extent it is
more stringent
than the
standard
mentioned _ in
paragraph (a)
or (b).
$015.3 Prescribed tidal work | PS15.3. The design and|PS15.3 Refer to $012.10. *,
that is a boardwalk or construction of the "
an independent deck boardwalk or deck is
does not prevent or consistent with the
hinder remedial work following
© being undertaken on standards—
any bank of tidal water .
or for any existing (a) subject h to
retaining -wall, (b), a
revetment or seawall boardwalk or
or another existing independent
structure. deck either—
(i) can be a
; easily .
dismantled
and
reassemble
d; or
(ii) does not
restrict the
movement
of
machinery
ordinaril
. © ‘ - ode ‘ “ a a Pa e 37 f .
emanate ~*~. Response to Information Request 9 :
. LEGAL a re - .
* - . . Any .See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A333D.001.pdfRelated documentPublic source context ↗
08/1704 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.