Skip to the record
Noosa’s premier civic archive.

Council archive · source document

001A333D.001

of 114

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

De
               Sunshine Coast Regional Council                                        Lv" neem      TURE          *

                      2. THE SITE                                                                                  ‘
                           2.1  General
          8    The Site is located at 30 Noosa Parade, Noosa

                     2.1.1  Shape and Size of the Site
          9    The site has a frontage to the Noosa River of approximately 19.971 metres and is approximately
               30.5 metres deep from the top of the river wall to the Noosa Parade frontage.
          10   _~—siThe site faces approximately north west across the Noosa River to the Noosa Spit Recreation
               Reserve.

                     2.1.2  Current improvements on the Site
©         11   Current improvements on the site include an almost complete new house that is quite large, very
               attractive, modern in character, and of two (2) storey construction.                     ;          n
          12   The house is designed in such a way that it is symmetrical to the river frontage. Although .the .   :
                house visually dominates the river frontage it does so in a manner that is very attractive and quite
                in keeping with the other visually dominant houses along this part of the river.
          13   A tiled terrace and swimming pool will occupy most of the space between the house and the
                river. Planting will occur in the remaining space
          14    A rock wall extends across and beyond the river frontage of the site. This rock wall consists of
                fragmented quarry rock. The purpose of the wall is to prevent erosion on the site by both wave
               “action and river flow. It also makes access to the water difficult at all times. Access to the water
             ™ gs well as to boats is a major consideration of the overall house development.

©

                                                                                                                  4

                                                                                                                   §

                                                                                                                   ‘

                                                                                                                  Any

               _ 25/02/2009               .                        :             .           Pageéof22         alt

Used in these records

About this file

File size
7.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001A333D.001.pdf · 7.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.