150730 HD OW-A (Landscaping)
Attached to the e-mail OPW15/0134 Application for Operational Works - 60 Hofmann Dr Noosaville.
LANDSCAPE SPECIFICATIONS
1.0 GENERAL NOTES
2.0 LANDSCAPE CONSTRUCTION
TOPSOILS
PROPOSED UNIT DEVELOPMENT
ABBREVIATIONS
TOPSOILS. LANDSCAPE CONTRACTOR TO COLLECT SOIL SAMPLES & HAVE THEM TESTED BY
A NATIONAL ASSOCIATION OF TESTING AUTHORITIES ACCREDITED LAB FOR HORTICULTURAL
LOT 4, SP222982, 60 HOFMANN DRIVE, NOOSAVILLE, QLD
SUITABILITY FOR TURF GRASS & GARDEN PURPOSES.
GARDEN AREAS TO HAVE 300mm OF TOPSOIL & TURF AREAS 150mm. IF THERE IS NOT
Landscape Operational Works Package
ENOUGH SITE TOPSOIL, IMPORT TOPSOIL TO MRTS-16 STANDARDS.
JULY 2015
LEVELS REMOVE PLANTS FROM CONTAINERS / BAGS / TUBES CAREFULLY & INSPECT ROOTBALL, MAINTENANCE REGIME - SCHEDULE
THE FOLLOWING LANDSCAPE OPERATIONAL WORKS PLAN PACKAGE CONSISTS OF THE REMOVE OLD MATTED & COILED ROOTS TO EXPOSE YOUNG ROOTS ENSURING THE PLANT IS
NOT ROOT BOUND, I.E. NO GIRDLED ROOTS. ALL STOCK TO BE FREE OF STRUCTURAL TASK FREQUENCY PERFORMANCE INDICATOR
FOLLOWING SCHEDULE OF DRAWINGS;
LD1 GENERAL NOTES INVERTS. IF A DISCREPANCY OCCURS NOTIFY SUPER. DEFECTS ABOVE & BELOW SOIL LINE (I.E. NO GIRDLED ROOTS). Weekly: November - February Maintain turf to present consistent &
DO NOT MIX SOIL FROM HOLE WITH MULCH. Fortnightly: March - April vigorous appearance, mow to 30mm
LD2 DETAILS
ROUGHLY SQUARE HOLE SIDES. Mowing Monthly: May - August high.
LD3 SCHEDULES, LEGEND
POSITIVE DRAINAGE & NO WATER HOLDING AREAS. FILL HOLE WITH WATER, ALLOW TO DRAIN BEFORE PLANTING. Weekly: November - February
LP1 LANDSCAPE PLAN
INSTALL FERTILISER TABLET(S), INSTALL PLANT, BACKFILL PLANT WITH AMELIORATED SITE Fortnightly: March - April Maintain turf neatly against any edge &
THE LANDSCAPE PLANS MUST BE READ IN CONJUNCTION WITH THE OPERATIONAL WORKS TOPSOIL OR MRTS-16 TOPSOIL IF THERE IS NOT ENOUGH SITE TOPSOIL. Trimming Monthly: May - August around any service or respective cover
LANDSCAPING DECISION NOTICE ONCE ISSUED & THE NSC CURRENT PLANNING SCHEME. WATER PLANT IN WELL & MAINTAIN SOIL MOISTURE LEVELS THROUGH E.P. No weeds or grass taller than
DRAINAGE Every 2 weeks October - March.
MULCH AROUND PLANT PER ABOVE FINISHING 20MM BELOW HARD SURFACES. plant within 500mm of plants.
Spraying / wick wiping Every 4 weeks April - September
PRELIMINARIES DO NOT COMPACT PLANT PIT.
SYSTEM. REFER ENGINEER'S DRAWINGS FOR DRAINS & HYDRAULIC SERVICES. 100mm minimum required depth &/or
(OTHER THAN THOSE INDICATED ON THESE PLANS) & BOUNDARIES. ALL SERVICES & TUBE STOCK PLANTING - BIO BASIN AREAS mulch adequate to suppress weed
GRAVEL TRENCH SURROUNDED BY SUPER APPROVED PERMEABLE BIDIM. REMOVE ALL WEEDS FROM PLANTING AREAS. LEVEL & TRIM PER ENGINEER'S PLANS. Re-mulching Once during MP & once per year growth & maintain soil moisture.
RELATED INFRASTRUCTURE INCLUDING STREET LIGHTING SHOWN ON THESE PLANS ARE
INDICATIVE ONLY. INSTALL PLANTS PER PLANT SCHEDULE DENSITIES, NOTES & DETAILS. Inspect planting at the start of
MULCH BIO-AREA FILTER MEDIA SAND WITH WEED FREE SUGARCANE MULCH 100mm DEEP & spring & assess damaged, dead
INSTALL PINNED OPEN WEAVE JUTE NETTING OVER. CUT NETTING LOCALLY TO PLANT. or unhealthy plants. Replant as To achieve minimum design planting
WITH THE LA TO ESTABLISH SCOPE OF WORKS, MANAGEMENT PROCEDURES & CLARIFY ANY GARDENS ETC. MAY IMPEDE DRAINAGE; REFER TO LA BEFORE CONTINUING WORKS. Re-planting required. densities and garden cover
ISSUES. OPEN WEAVE JUTE NETTING OVER MULCH. CUT NETTING LOCALLY TO PLANT. Every 2 or 3 days during EP, Plants exhibit healthy growth & no signs
weekly during MP, or as required of drought stress
NEW TURFED AREAS Watering to maintain adequate soil moisture
OF SITE SERVICES, REFER ENGINEER'S DRAWINGS GENERALLY. FENCING, GATES, & REFERENCE POSTS FILL DEPRESSIONS & PROVIDE EVEN FALLS PER PLANS.
SUPPLY & CONSTRUCT FENCING & REFERENCE POSTS PER PLANS, LEGEND & DETAILS. Fertilising - required
FINISHED TURF GRADES/CONTOURS SHALL BE SMOOTH & UNDULATING, FREE FROM
FENCING ALIGNMENT & SET OUT TO BE SURVEYED & PEGGED BY LICENSED PROJECT where & when plants
THESE PLANS. WHERE DISCREPANCIES OCCUR WITHIN LANDSCAPE DOCUMENTATION DELETERIOUS MATERIALS, DEBRIS, LARGE CLODS OF SOIL, STONES, & ORGANIC MATTER,
SURVEYOR. are not responding to
REFER TO LA PRIOR TO PROVISION OF TENDER PRICING &/OR CONSTRUCTION. POSITIVE FLOWING MINIMUM 2% SLOPES & NO WATER HOLDING AREAS. CO-ORDINATE
slow release fertiliser Plants appear healthy exhibit good rate
ON-SITE WITH SUPER & ENSURE LEVELS ARE APPROVED PRIOR TO LAYING TURF. WHERE
EDGING applied at planting Once during MP or as required of growth.
PEGGED BY A LICENSED SURVEYOR IN COORDINATION WITH PROJECT SURVEYOR. TURF MEETS HARD EDGES, ADJUST FINISH TOPSOIL LEVELS TO ALLOW STORMWATER TO
MAINTAIN EDGES PER PLAN & DETAILS. FLOW UNIMPEDED OVER LAID TURF TO LOW AREA RESPECTIVELY. As required where plants require
SUPPLY & LAY 'A' GRADE TURF PER PLANS & THE PLANTING SCHEDULE. support. Allow to stake 20% of
SEDIMENT & EROSION CONTROL
- ALLOW FOR SEEPAGE INTERCEPTION SUB-SURFACE DRAINAGE WHERE PATHS & WHERE TURF IS INSTALLED ON SLOPES >20% (1:5) - PIN TURF TO INDUSTRY STANDARDS. trees during EP. Allow to stake
LANDSCAPE WORKS IMPEDE DRAINAGE. (TO BE COORDINATED ON SITE) REMOVE PINS ONCE TURF IS WELL ESTABLISHED. Staking further 20% of trees during MP. Plants growing in an upright manner.
- ALLOW FOR 300mm x 300mm GRAVEL TRENCH WITH SOCKED AG-LINE UNDER PATH, WATER TURF IN WELL, APPLY WATER TO MAINTAIN SOIL MOISTURE UNTIL ESTABLISHED. Following storm event, heavy
Inspection for storm
DISCHARGE TO STORMWATER DRAINAGE LINES. INSTALL GEO-FABRIC ON BIO-RETENTION FILTER MEDIA PRIOR TO LAYING TURF. rainfall or high winds Any damage noted and rectified
damage
PLANTING BIO-BASIN MEDIA AREA - RETROFIT Pruning - to promote Monthly during EP, every 3 months Plants have desired natural form &
REFER TO 'TOPSOILS' SECTION FOR MORE INFORMATION. AFTER CONSTRUCTION IS COMPLETED, REMOVE TEMPORARY TURF, PINNED healthy plant growth MP & beyond display healthy growth
MANAGEMENT PLAN & LOCAL AUTHORITY REGULATIONS.
MULCH PLANTING AREAS AS PER FINISHES SCHEDULE. GEO-FABRIC & ACCUMULATED SEDIMENT & DISPOSE OFF-SITE APPROPRIATELY. EP - Provide a report to Super on Scheduled activities carried out.
DIRECTED ON SITE BY SUPER. SUPPLY & INSTALL ADDITIONAL FILTER MEDIA SOIL AS REQUIRED AFTER WORKS ABOVE. establishment progress at each Successful establishment. Scheduled
(SPECIFICALLY NUTSEDGE), PESTS INCLUDING FIRE ANTS & SOIL BORNE VIRUSES & SUPPLY & INSTALL TUBESTOCK PLANTS PER SCHEDULES HEREIN. progress payment claim. Maintenance activities carried out.
DISEASES. FURNISH LA WITH CERTIFICATIONS RESPECTIVELY FOR APPROVAL PRIOR TO MAINTAIN MEDIA TUBESTOCK AS PER NOTES & SCHEDULES HEREIN. Successful maintenance.
WITH MANUFACTURER'S SPECIFICATIONS. MP - Provide completed activities
INSTALLATIONS. Monitoring list to Super after every 3 months.
DEVICES ARE INSPECTED & MAINTAINED AS FOLLOWS; 3.0 MAINTENANCE
a.) DURING CONSTRUCTION: - DAILY DURING DRY WEATHER
TREE PLANTING
CONTRACTOR TO WATER PLANTINGS DURING CONSTRUCTION PERIOD. SOURCES:
- PRIOR TO PREDICTED STORM EVENTS CIVIL ENGINEERING - EMPIRE ENGINEERING
- TWICE DAILY DURING PROLONGED RAIN FROM PRACTICAL COMPLETION - A 12 WEEK ESTABLISHMENT / MAINTENANCE PERIOD EMPIRE ENGINEERING
b.) DURING ESTABLISHMENT PERIOD: - WEEKLY DURING DRY WEATHER WILL COMMENCE & WATERING DURING THIS PERIOD & ANY SUBSEQUENT PERIODS WILL ARCHITECTURE - OKSIO DESIGNS & REITSMA
'NATSPEC GUIDE SPECIFYING TREES: A GUIDE TO ASSESSMENT OF TREE QUALITY (2003)'.
- PRIOR TO PREDICTED STORM EVENTS
FURNISH LA WITH CERTIFICATION PRIOR TO INSTALLATION.
- TWICE WEEKLY DURING PROLONGED RAIN CERTIFICATIONS:
PRACTICAL COMPLETION DATE (I.E. BEGINNING OF 52 WEEK 'ON-MAINTENANCE').
BEFORE EXCAVATION.
GRADED TO ENSURE CONTROL OF RUNOFF. INSPECTION; NATSPEC, MRTS-16 TOPSOIL
ESTABLISHMENT PERIOD FINISH DATE (BALANCE OF 52 WEEK 'ON-MAINTENANCE PERIOD).
CONTRACTOR TO ENSURE COMPATIBILITY & CONSISTENCY IN CONTROL MEASURES.
SAMPLE APPROVALS:
100mm DEEP. DO NOT MULCH WITHIN 50mm OF TRUNK / PLANT STEM.
PREVENT EROSION.
- HOOP PINE MULCH
SITE WORKS & DRAINAGE
PITS DO NOT DRAIN. LANDSCAPE CONTRACTOR TO FURNISH RATE PER TREE.
.
PER DETAIL.
ALL TREES TO BE LOCATED;
- AT LEAST 2m FROM DRIVEWAY CROSSOVERS
- AT LEAST 600mm FROM CONCRETE PATHS
GARDENS ETC. MAY IMPEDE DRAINAGE, REFER TO SUPER BEFORE CONTINUING WORKS.
- MINIMUM OF 1000mm FROM UNDERGROUND SERVICES. LOCATION OF SERVICES TO
BE CONFIRMED ON SITE BY CONTRACTOR BEFORE EXCAVATION COMMENCES
- MINIMUM 2m FROM STORMWATER CATCH PITS
ISSUES ARE IDENTIFIED REFER SUPER.
- MINIMUM OF 6m FROM OVERHEAD STREET LIGHTING & POWER POLES
REFER TO 2.0 LANDSCAPE CONSTRUCTION - DRAINAGE FOR MORE INFORMATION.
- MINIMUM OF 900mm FROM BACK OF KERB (& IN BETWEEN KERB & FOOTPATH WHERE
APPLICABLE)
SLEEVING & CONDUITS
- MINIMUM OF 1500mm HORIZONTALLY & VERTICALLY FROM SEWER LINES
- BETWEEN BACK OF KERB & FOOTPATH WHERE APPLICABLE ALLOWING FOR SERVICES
THAT BISECT LANDSCAPE AREAS FOR LANDSCAPE DRAINAGE PURPOSES. EXTEND ENDS
300mm BEYOND PATHS, EACH SIDE & CAP.
GENERAL PLANTING
SUPPLY & PLACE PLANTS ACCORDING TO PLANTING SCHEDULE, SETOUT NOTES & DETAILS.
WHERE DISCREPANCIES OCCUR ADVISE SUPER PRIOR TO PLANTING.
ENSURE PLANTS ARE PLACED & PLANTED AT EQUAL CENTRES, STAGGERED, NOT IN ROWS
UNLESS INDICATED ON PLANS.
MASS & GROUP PLANTINGS TO BE SPACED EVENLY IN A TRIANGULAR PATTERN TO ACHIEVE
OPTIMUM COVER RELATED TO MATURE PLANT SIZE & FORM.
SHRUBS & SPREADING GROUNDCOVERS TO BE SET BACK A MINIMUM 600mm FROM ROADS,
KERBS, GARDEN EDGES & PATHS TO ALLOW FOR MATURE PLANT FORM. CONFIRM WITH LA
WHICH REQUIRE MORE DISTANCE.
ALL PLANTS MUST BE PLANTED USING ONE AGRIFORM 10g FERTILISER (N.P.K. 20 : 4.3 : 4.1)
TABLET AT A RATE OF 1/140mm, 2/200mm, 3/300, 4/45 litre & ABOVE POT SIZES, 5g TABLET FOR
TUBESTOCK. USE PHOSPHORUS FREE TABLETS FOR CALLISTEMONS.
SOAK PLANTS THOROUGHLY BEFORE REMOVING FROM CONTAINER.
S1507853
150731-A anembo consultants
KNOWLES GROUP PTY LTD LOT 4 SP222982 Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall 60 HOFMANN DRIVE anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale NOOSAVILLE, QUEENSLAND, 4566 Ph: 07 5437 0000 Fax: 07 5437 0088
can not be guaranteed when printing from PDF files. e-mail: [email protected] www.anembo.com