150730 HD OW-A (Landscaping)

Attached to the e-mail OPW15/0134 Application for Operational Works - 60 Hofmann Dr Noosaville.

of 4

Page text shows just the words. Original shows the document exactly as it was published.

          LANDSCAPE SPECIFICATIONS

          1.0 GENERAL NOTES
                                                                                            2.0 LANDSCAPE CONSTRUCTION

                                                                                            TOPSOILS
                                                                                                                                                                                                                                        PROPOSED UNIT DEVELOPMENT
          ABBREVIATIONS
                                                                                             TOPSOILS. LANDSCAPE CONTRACTOR TO COLLECT SOIL SAMPLES & HAVE THEM TESTED BY
                                                                                             A NATIONAL ASSOCIATION OF TESTING AUTHORITIES ACCREDITED LAB FOR HORTICULTURAL
                                                                                                                                                                                                                                                        LOT 4, SP222982, 60 HOFMANN DRIVE, NOOSAVILLE, QLD
                                                                                             SUITABILITY FOR TURF GRASS & GARDEN PURPOSES.

                                                                                             GARDEN AREAS TO HAVE 300mm OF TOPSOIL & TURF AREAS 150mm. IF THERE IS NOT
                                                                                                                                                                                                                                                                             Landscape Operational Works Package
                                                                                             ENOUGH SITE TOPSOIL, IMPORT TOPSOIL TO MRTS-16 STANDARDS.
                                                                                                                                                                                                                                                                                                                                                                 JULY 2015

                                                                                            LEVELS                                                                                       REMOVE PLANTS FROM CONTAINERS / BAGS / TUBES CAREFULLY & INSPECT ROOTBALL,          MAINTENANCE REGIME - SCHEDULE
          THE FOLLOWING LANDSCAPE OPERATIONAL WORKS PLAN PACKAGE CONSISTS OF THE                                                                                                         REMOVE OLD MATTED & COILED ROOTS TO EXPOSE YOUNG ROOTS ENSURING THE PLANT IS
                                                                                                                                                                                         NOT ROOT BOUND, I.E. NO GIRDLED ROOTS. ALL STOCK TO BE FREE OF STRUCTURAL           TASK                      FREQUENCY                             PERFORMANCE INDICATOR
          FOLLOWING SCHEDULE OF DRAWINGS;
                LD1   GENERAL NOTES                                                          INVERTS. IF A DISCREPANCY OCCURS NOTIFY SUPER.                                              DEFECTS ABOVE & BELOW SOIL LINE (I.E. NO GIRDLED ROOTS).                                                      Weekly: November - February           Maintain turf to present consistent &
                                                                                                                                                                                         DO NOT MIX SOIL FROM HOLE WITH MULCH.                                                                         Fortnightly: March - April            vigorous appearance, mow to 30mm
                LD2   DETAILS
                                                                                                                                                                                         ROUGHLY SQUARE HOLE SIDES.                                                          Mowing                    Monthly: May - August                 high.
                LD3   SCHEDULES, LEGEND
                                                                                             POSITIVE DRAINAGE & NO WATER HOLDING AREAS.                                                 FILL HOLE WITH WATER, ALLOW TO DRAIN BEFORE PLANTING.                                                         Weekly: November - February
                LP1   LANDSCAPE PLAN
                                                                                                                                                                                         INSTALL FERTILISER TABLET(S), INSTALL PLANT, BACKFILL PLANT WITH AMELIORATED SITE                             Fortnightly: March - April            Maintain turf neatly against any edge &
          THE LANDSCAPE PLANS MUST BE READ IN CONJUNCTION WITH THE OPERATIONAL WORKS                                                                                                     TOPSOIL OR MRTS-16 TOPSOIL IF THERE IS NOT ENOUGH SITE TOPSOIL.                     Trimming                  Monthly: May - August                 around any service or respective cover
          LANDSCAPING DECISION NOTICE ONCE ISSUED & THE NSC CURRENT PLANNING SCHEME.                                                                                                     WATER PLANT IN WELL & MAINTAIN SOIL MOISTURE LEVELS THROUGH E.P.                                                                                    No weeds or grass taller than
                                                                                            DRAINAGE                                                                                                                                                                                                Every 2 weeks October - March.
                                                                                                                                                                                         MULCH AROUND PLANT PER ABOVE FINISHING 20MM BELOW HARD SURFACES.                                                                                    plant within 500mm of plants.
                                                                                                                                                                                                                                                                             Spraying / wick wiping Every 4 weeks April - September
          PRELIMINARIES                                                                                                                                                                  DO NOT COMPACT PLANT PIT.
                                                                                             SYSTEM. REFER ENGINEER'S DRAWINGS FOR DRAINS & HYDRAULIC SERVICES.                                                                                                                                                                              100mm minimum required depth &/or
             (OTHER THAN THOSE INDICATED ON THESE PLANS) & BOUNDARIES. ALL SERVICES &                                                                                                   TUBE STOCK PLANTING - BIO BASIN AREAS                                                                                                                mulch adequate to suppress weed
                                                                                             GRAVEL TRENCH SURROUNDED BY SUPER APPROVED PERMEABLE BIDIM.                                 REMOVE ALL WEEDS FROM PLANTING AREAS. LEVEL & TRIM PER ENGINEER'S PLANS.            Re-mulching                Once during MP & once per year       growth & maintain soil moisture.
             RELATED INFRASTRUCTURE INCLUDING STREET LIGHTING SHOWN ON THESE PLANS ARE
             INDICATIVE ONLY.                                                                                                                                                            INSTALL PLANTS PER PLANT SCHEDULE DENSITIES, NOTES & DETAILS.                                                 Inspect planting at the start of
                                                                                                                                                                                         MULCH BIO-AREA FILTER MEDIA SAND WITH WEED FREE SUGARCANE MULCH 100mm DEEP &                                  spring & assess damaged, dead
                                                                                                                                                                                         INSTALL PINNED OPEN WEAVE JUTE NETTING OVER. CUT NETTING LOCALLY TO PLANT.                                    or unhealthy plants. Replant as       To achieve minimum design planting
             WITH THE LA TO ESTABLISH SCOPE OF WORKS, MANAGEMENT PROCEDURES & CLARIFY ANY    GARDENS ETC. MAY IMPEDE DRAINAGE; REFER TO LA BEFORE CONTINUING WORKS.                                                                                                          Re-planting               required.                             densities and garden cover
             ISSUES.                                                                                                                                                                     OPEN WEAVE JUTE NETTING OVER MULCH. CUT NETTING LOCALLY TO PLANT.                                             Every 2 or 3 days during EP,       Plants exhibit healthy growth & no signs
                                                                                                                                                                                                                                                                                                       weekly during MP, or as required of drought stress
                                                                                                                                                                                        NEW TURFED AREAS                                                                     Watering                  to maintain adequate soil moisture
             OF SITE SERVICES, REFER ENGINEER'S DRAWINGS GENERALLY.                         FENCING, GATES, & REFERENCE POSTS                                                            FILL DEPRESSIONS & PROVIDE EVEN FALLS PER PLANS.
                                                                                             SUPPLY & CONSTRUCT FENCING & REFERENCE POSTS PER PLANS, LEGEND & DETAILS.                                                                                                       Fertilising - required
                                                                                                                                                                                         FINISHED TURF GRADES/CONTOURS SHALL BE SMOOTH & UNDULATING, FREE FROM
                                                                                             FENCING ALIGNMENT & SET OUT TO BE SURVEYED & PEGGED BY LICENSED PROJECT                                                                                                         where & when plants
             THESE PLANS. WHERE DISCREPANCIES OCCUR WITHIN LANDSCAPE DOCUMENTATION                                                                                                       DELETERIOUS MATERIALS, DEBRIS, LARGE CLODS OF SOIL, STONES, & ORGANIC MATTER,
                                                                                             SURVEYOR.                                                                                                                                                                       are not responding to
             REFER TO LA PRIOR TO PROVISION OF TENDER PRICING &/OR CONSTRUCTION.                                                                                                         POSITIVE FLOWING MINIMUM 2% SLOPES & NO WATER HOLDING AREAS. CO-ORDINATE
                                                                                                                                                                                                                                                                             slow release fertiliser                                         Plants appear healthy exhibit good rate
                                                                                                                                                                                         ON-SITE WITH SUPER & ENSURE LEVELS ARE APPROVED PRIOR TO LAYING TURF. WHERE
                                                                                            EDGING                                                                                                                                                                           applied at planting        Once during MP or as required        of growth.
             PEGGED BY A LICENSED SURVEYOR IN COORDINATION WITH PROJECT SURVEYOR.                                                                                                        TURF MEETS HARD EDGES, ADJUST FINISH TOPSOIL LEVELS TO ALLOW STORMWATER TO
                                                                                                       MAINTAIN EDGES PER PLAN & DETAILS.                                                FLOW UNIMPEDED OVER LAID TURF TO LOW AREA RESPECTIVELY.                                                       As required where plants require
                                                                                                                                                                                         SUPPLY & LAY 'A' GRADE TURF PER PLANS & THE PLANTING SCHEDULE.                                                support. Allow to stake 20% of
          SEDIMENT & EROSION CONTROL
                                                                                                  - ALLOW FOR SEEPAGE INTERCEPTION SUB-SURFACE DRAINAGE WHERE PATHS &                    WHERE TURF IS INSTALLED ON SLOPES >20% (1:5) - PIN TURF TO INDUSTRY STANDARDS.                                trees during EP. Allow to stake
                                                                                                    LANDSCAPE WORKS IMPEDE DRAINAGE. (TO BE COORDINATED ON SITE)                         REMOVE PINS ONCE TURF IS WELL ESTABLISHED.                                          Staking                   further 20% of trees during MP.       Plants growing in an upright manner.
                                                                                                  - ALLOW FOR 300mm x 300mm GRAVEL TRENCH WITH SOCKED AG-LINE UNDER PATH,                WATER TURF IN WELL, APPLY WATER TO MAINTAIN SOIL MOISTURE UNTIL ESTABLISHED.                                  Following storm event, heavy
                                                                                                                                                                                                                                                                             Inspection for storm
                                                                                                    DISCHARGE TO STORMWATER DRAINAGE LINES.                                              INSTALL GEO-FABRIC ON BIO-RETENTION FILTER MEDIA PRIOR TO LAYING TURF.                                        rainfall or high winds                Any damage noted and rectified
                                                                                                                                                                                                                                                                             damage
                                                                                            PLANTING                                                                                    BIO-BASIN MEDIA AREA - RETROFIT                                                      Pruning - to promote      Monthly during EP, every 3 months Plants have desired natural form &
                                                                                             REFER TO 'TOPSOILS' SECTION FOR MORE INFORMATION.                                           AFTER CONSTRUCTION IS COMPLETED, REMOVE TEMPORARY TURF, PINNED                      healthy plant growth      MP & beyond                       display healthy growth
             MANAGEMENT PLAN & LOCAL AUTHORITY REGULATIONS.
                                                                                             MULCH PLANTING AREAS AS PER FINISHES SCHEDULE.                                               GEO-FABRIC & ACCUMULATED SEDIMENT & DISPOSE OFF-SITE APPROPRIATELY.                                          EP - Provide a report to Super on     Scheduled activities carried out.
             DIRECTED ON SITE BY SUPER.                                                                                                                                                  SUPPLY & INSTALL ADDITIONAL FILTER MEDIA SOIL AS REQUIRED AFTER WORKS ABOVE.                                  establishment progress at each        Successful establishment. Scheduled
                                                                                             (SPECIFICALLY NUTSEDGE), PESTS INCLUDING FIRE ANTS & SOIL BORNE VIRUSES &                   SUPPLY & INSTALL TUBESTOCK PLANTS PER SCHEDULES HEREIN.                                                       progress payment claim.               Maintenance activities carried out.
                                                                                             DISEASES. FURNISH LA WITH CERTIFICATIONS RESPECTIVELY FOR APPROVAL PRIOR TO                  MAINTAIN MEDIA TUBESTOCK AS PER NOTES & SCHEDULES HEREIN.                                                                                          Successful maintenance.
            WITH MANUFACTURER'S SPECIFICATIONS.                                                                                                                                                                                                                                                        MP - Provide completed activities
                                                                                             INSTALLATIONS.                                                                                                                                                                  Monitoring                list to Super after every 3 months.
             DEVICES ARE INSPECTED & MAINTAINED AS FOLLOWS;                                                                                                                             3.0 MAINTENANCE
                  a.) DURING CONSTRUCTION:         - DAILY DURING DRY WEATHER
                                                                                            TREE PLANTING
                                                                                                                                                                                                        CONTRACTOR TO WATER PLANTINGS DURING CONSTRUCTION PERIOD.            SOURCES:
                                                    - PRIOR TO PREDICTED STORM EVENTS                                                                                                                                                                                        CIVIL ENGINEERING - EMPIRE ENGINEERING
                                                    - TWICE DAILY DURING PROLONGED RAIN                                                                                                  FROM PRACTICAL COMPLETION - A 12 WEEK ESTABLISHMENT / MAINTENANCE PERIOD                        EMPIRE ENGINEERING
                  b.) DURING ESTABLISHMENT PERIOD: - WEEKLY DURING DRY WEATHER                                                                                                           WILL COMMENCE & WATERING DURING THIS PERIOD & ANY SUBSEQUENT PERIODS WILL           ARCHITECTURE - OKSIO DESIGNS & REITSMA
                                                                                             'NATSPEC GUIDE SPECIFYING TREES: A GUIDE TO ASSESSMENT OF TREE QUALITY (2003)'.
                                                    - PRIOR TO PREDICTED STORM EVENTS
                                                                                             FURNISH LA WITH CERTIFICATION PRIOR TO INSTALLATION.
                                                    - TWICE WEEKLY DURING PROLONGED RAIN                                                                                                                                                                                     CERTIFICATIONS:
                                                                                                                                                                                         PRACTICAL COMPLETION DATE (I.E. BEGINNING OF 52 WEEK 'ON-MAINTENANCE').
                                                                                             BEFORE EXCAVATION.
             GRADED TO ENSURE CONTROL OF RUNOFF.                                                                                                                                                                                                                              INSPECTION; NATSPEC, MRTS-16 TOPSOIL
                                                                                                                                                                                         ESTABLISHMENT PERIOD FINISH DATE (BALANCE OF 52 WEEK 'ON-MAINTENANCE PERIOD).
             CONTRACTOR TO ENSURE COMPATIBILITY & CONSISTENCY IN CONTROL MEASURES.
                                                                                                                                                                                                                                                                             SAMPLE APPROVALS:
                                                                                             100mm DEEP. DO NOT MULCH WITHIN 50mm OF TRUNK / PLANT STEM.
             PREVENT EROSION.
                                                                                                                                                                                                                                                                                       - HOOP PINE MULCH
          SITE WORKS & DRAINAGE
                                                                                             PITS DO NOT DRAIN. LANDSCAPE CONTRACTOR TO FURNISH RATE PER TREE.
                                                                                                                                          .
                                                                                                             PER DETAIL.
                                                                                             ALL TREES TO BE LOCATED;
                                                                                                   - AT LEAST 2m FROM DRIVEWAY CROSSOVERS
                                                                                                   - AT LEAST 600mm FROM CONCRETE PATHS
             GARDENS ETC. MAY IMPEDE DRAINAGE, REFER TO SUPER BEFORE CONTINUING WORKS.
                                                                                                   - MINIMUM OF 1000mm FROM UNDERGROUND SERVICES. LOCATION OF SERVICES TO
                                                                                                     BE CONFIRMED ON SITE BY CONTRACTOR BEFORE EXCAVATION COMMENCES
                                                                                                   - MINIMUM 2m FROM STORMWATER CATCH PITS
             ISSUES ARE IDENTIFIED REFER SUPER.
                                                                                                   - MINIMUM OF 6m FROM OVERHEAD STREET LIGHTING & POWER POLES
             REFER TO 2.0 LANDSCAPE CONSTRUCTION - DRAINAGE FOR MORE INFORMATION.
                                                                                                   - MINIMUM OF 900mm FROM BACK OF KERB (& IN BETWEEN KERB & FOOTPATH WHERE
                                                                                                    APPLICABLE)
          SLEEVING & CONDUITS
                                                                                                   - MINIMUM OF 1500mm HORIZONTALLY & VERTICALLY FROM SEWER LINES
                                                                                                   - BETWEEN BACK OF KERB & FOOTPATH WHERE APPLICABLE ALLOWING FOR SERVICES
             THAT BISECT LANDSCAPE AREAS FOR LANDSCAPE DRAINAGE PURPOSES. EXTEND ENDS
             300mm BEYOND PATHS, EACH SIDE & CAP.
                                                                                            GENERAL PLANTING

                                                                                             SUPPLY & PLACE PLANTS ACCORDING TO PLANTING SCHEDULE, SETOUT NOTES & DETAILS.
                                                                                             WHERE DISCREPANCIES OCCUR ADVISE SUPER PRIOR TO PLANTING.
                                                                                             ENSURE PLANTS ARE PLACED & PLANTED AT EQUAL CENTRES, STAGGERED, NOT IN ROWS
                                                                                             UNLESS INDICATED ON PLANS.
                                                                                             MASS & GROUP PLANTINGS TO BE SPACED EVENLY IN A TRIANGULAR PATTERN TO ACHIEVE
                                                                                             OPTIMUM COVER RELATED TO MATURE PLANT SIZE & FORM.
                                                                                             SHRUBS & SPREADING GROUNDCOVERS TO BE SET BACK A MINIMUM 600mm FROM ROADS,
                                                                                             KERBS, GARDEN EDGES & PATHS TO ALLOW FOR MATURE PLANT FORM. CONFIRM WITH LA
                                                                                             WHICH REQUIRE MORE DISTANCE.
                                                                                             ALL PLANTS MUST BE PLANTED USING ONE AGRIFORM 10g FERTILISER (N.P.K. 20 : 4.3 : 4.1)
                                                                                             TABLET AT A RATE OF 1/140mm, 2/200mm, 3/300, 4/45 litre & ABOVE POT SIZES, 5g TABLET FOR
                                                                                             TUBESTOCK. USE PHOSPHORUS FREE TABLETS FOR CALLISTEMONS.
                                                                                             SOAK PLANTS THOROUGHLY BEFORE REMOVING FROM CONTAINER.



                                                                                                                                                                                                                                                                                                S1507853
                                                                                                                                                                                                                                                                                                150731-A                                anembo consultants
KNOWLES GROUP PTY LTD                                             LOT 4 SP222982                                                                                                                                                                                                                                                        Landscape Architects
                                                                                                                                                                                                                                                                                                                                        Environmental
                                                                                                                                                                                                                                                                                                                                                                             Project Management


This document is the copyright of anembo consultants & shall      60 HOFMANN DRIVE                                                                                                                                                                                                                                                      anembo consultants pty.ltd.
                                                                                                                                                                                                                                                                                                                                        Sunshine Coast:   PO Box 24
                                                                                                                                                                                                                                                                                                                                                                          A.B.N. 75 089 473 156
                                                                                                                                                                                                                                                                                                                                                                      Moffat Beach   QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale          NOOSAVILLE, QUEENSLAND, 4566                                                                                                                                                                                                                                          Ph: 07 5437 0000                      Fax: 07 5437 0088
can not be guaranteed when printing from PDF files.                                                                                                                                                                                                                                                                                     e-mail: [email protected]               www.anembo.com
Log in to download the original file

150730 HD OW-A (Landscaping).pdf · 1.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.