Skip to the record
The gold standard in government transparency.

Council archive · source document

07/1255 - Approved Plans [As Published] · 152007.1255

of 13

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
NOOSA COUNCIL IDAS Development Application Decision Notice 4of9

Vegetation Protection & Weed Removal

12.

13.

14,

15.

16,

17.

Existing trees on site and within the road reserve are to be retained, except where required to be removed
due to a building approval or the conduct of an approved use. Driveways and buildings sites should be
designed to avoid the removal of native vegetation.

The applicant shall reinstate and landscape the acoustic buffer mound along the north and the east
boundaries of the site with dense vegetation generally in accordance with plan No. 9802R/A dated § April
1998 by Callaghan & Toth Consulting Engineers and which was part of Approval 12611DA (Date of
Decision 28/09/1998). All parts of the mound shall be constructed within the boundaries of the lots. A
Development Permit for Operational Works for earthworks and the landscaping of the mound is required.

The landscaped acoustic buffer mound is to be protected by Covenant. The Covenant area shall cover
the whole sound attenuation / visual buffer area.

Footpath improvements such as topsoiling, grassing, and tree planting are required to the Armitage Court

. frontages of the site (including the south boundary line of Lot 2) in accordance with Planning Scheme

Policy PSP03 Landscaping Plants & Guidelines. Grass shall be couch, free of weeds,

All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and Stock Route
Management) Act 2002 and including all Camphor Laurel trees on the property are to be controlled on the
site prior to Council endorsement of the Plan of Survey. In this context “controlled” shal! mean, for class 1
and 2 pests, completely eradicated. For class 3 pests it shall mean removal of the plants where they
threaten environmentally significant areas of the site such as riparian zones and areas of natural
vegetation.

Where class 3 plants are removed as a result of this condition and there is not sufficient natural
regeneration of native species, the areas shall be replanted with endemic native Species so that a
sustainable natural ecosystem is restored. .

Council's Conservation Management Supervisor will not inspect the site until 30 days after the weed
treatment and replanting is complete.

If there is any cleared vegetation it shall be suitably processed by one of the following methods and
removed from the site:-

17.1. Processing through a wood chipper or shredder, The resulting mulch is to be stockpiled loose in
heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres
between edges of heaps.

17.2. Disposal for firewood.
17.3. Disposal for landscaping purposes.

17.4. Transport to alternative site for breaking down materials provided that all necessary permits -have
been obtained to allow the alternate site to be used for this purpose.

The disposal method for clearing works is to be submitted in conjunction with an application for a
Development Permit for Operational Work. The Applicant is advised that: other methods may be
considered provided full details of the method are submitted,

The Applicant is also advised that burning off is an unacceptable method of disposal.

Roof Water & Stormwater Drainage

18.

19.

20.

Any works associated with this development shall not adversely affect the existing drainage conditions on
the adjoining properties by diverting and/or discharging additional stormwater runoff, blocking the natural
overland runoff from these properties or cause additional stormwater ponding.

The roof and paved area runoffs from Lot 1 shall be collected and discharged into Council's drainage
system without adversely impacting on Lot 2 or any adjoining property. Should any inter-allotment
drainage from Lot 1 encroach onto Lot 2, creation of a private drainage easement 1.5m wide shall be
required.

All site stormwater drainage shall be by means of a gravity system.

NSC e:\decume~1VhNocals~1\temp\d 1957decnotice 178497.doc

Used in these records

About this file

File size
751 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1255 - Approved Plans [As Published].pdf · 751 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.