Original source · versioned page text
Other Change Decision Notice - Council Meeting Decision MCU15 0069.01
Officer: Patrick Murphy Direct Telephone: 07 5329 6436 Our Reference: MCU15/0069.01 Your Reference: 0261 21 July 2021 AM McDonald C/- Pivotal Perspective Pty Ltd 4/59 Mary St NOOSAVILLE QLD 4566 [email protected] Dear Sir/Madam, Decision Notice – Other Change Planning Act 2016 I refer to your application and advise that on 15 July 2021, Council decided to approve the application, subject to conditions. Details of the decision are as follows: APPLICATION details Application No: MCU15/0069.01 Street address: Sails On Duke 1/39 Duke St Sunshine Beach Qld 4567 Real property description: Lot 1 SP 268333, Lot 1 SP 297616 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details The following type of approval was issued on 21 September 2015. Development Permit for Material Change of Use - Multiple Housing Type 2 – Duplex In relation to representations, Council on 14 October 2015 decided to approve a change to Condition 14. In relation to the request to make an Other Change to the existing approval, Council on 15 July 2021, decided to approve the requested changes. The changes are detailed below. A. Approve the application in accordance with additional conditions. currency period of approval The relevant period for the Material Change of Use for Multiple Housing Type 2 - Duplex development approval is 4 years starting the day that this development approval takes effect. The currency period for the Material Change of Use for Short Term Accommodation development approval is stated in the conditions below. assessment manager conditions PLANNING When Conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date SD.101 S5 Site / Cover Sheet drawn by Kidd + Co Designers 31/08/15 SD.201 S5 Ground Floor Plan drawn by Kidd + Co Designers 31/08/15 SD.202 S5 First Floor Plan drawn by Kidd + Co Designers 31/08/15 SD.203 S5 Second Floor Plan drawn by Kidd + Co Designers 31/08/15 SD.204 S5 Roof Plan drawn by Kidd + Co Designers 31/08/15 SD.501 S5 Elevations drawn by Kidd + Co Designers 31/08/15 SD.502 S5 Elevations drawn by Kidd + Co Designers 31/08/15 SD.503 S5 Elevations drawn by Kidd + Co Designers 31/08/15 Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed within this Decision Notice. Building Height The maximum height of the development must not exceed 12 metres above the finished ground level and the natural ground surface. Certification must be submitted to Council from a Licensed Surveyor which certifies that the building does not exceed the maximum height requirement of this Decision Notice. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the pre-start meeting. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with condition. Building Appearance All air conditioning units or other mechanical equipment must be fully enclosed or screened such that they are not visible from the street frontages or adjoining properties. All deck and balcony areas above ground floor must not be enclosed by permanent fixtures such as shutters, louvers, glass paneling or the like, except where required to satisfy any privacy condition of this Decision Notice. The stair/lift southern façade shall be articulated to provide further interest to this elevation. This could include the use of vertical and horizontal timber battening, vegetation crawlers and/or mix of materials. An amended southern elevation plan with these changes shall be submitted and approved by Council prior to the issuing of Development Permit for Operational Works. Fencing and Walls Any street fencing must be set back an average of 1 metre from the front property boundary. Any fencing on the front boundary must either: not exceed a maximum height of 1.2m be of open construction The area of land between the fence and the front property boundary must be densely landscaped to screen any fencing from the street. Clothes Drying Areas Each dwelling unit must be provided with access to an outdoor clothes line which is screened from public view. Community Management Statement Any proposed Community Management Statement required for the development pursuant to the Body Corporate and Community Management Act 1997 must be submitted to Council for endorsement at the same time as submission of the Building Format Plan (or similar) to Council for compliance assessment. Landscaping Works The development site must be landscaped. The works must be undertaken in accordance with an Operational Works approval and The Noosa Plan for that specific area and must include in particular: The retention of the existing pandanus along the northern property boundary and the existing mature native trees along the southern boundary within the frontage of the site. Suitable landscaping within the frontage of the site and the road reserve, exclusive of the access driveway, generally uncompromised by infrastructure items, including a minimum of 8 x 45L coastal street tree varieties. Suitable native screening vegetation to be provided around the property boundaries, including minimum 800mm wide landscaping beds along all property boundaries, with the exception of that part of along the south-eastern side boundary adjoining the fire escape stairs, garage 1 and visitor parking, necessary to provide a pathway for fire escape purposes. All landscape works must be established and maintained in accordance with the approved design for the life of the development, and in a manner that ensures healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached. All landscape works must be maintained generally in accordance with the approved design for the life of the development. Waste Where the development involves the removal, relocation or demolition of a building, a Waste Management Plan (construction and demolition) shall be submitted and approved by Council prior to issue of a development permit for operational works. Waste Management Plans (construction and demolition) are required to be submitted in accordance with Planning Scheme Policy 11, Waste Management Plans see table below. Waste storage areas are to provide for adequate separation of all reusable, recyclable and waste materials. These shall be located so that they are convenient and safe to use. (Refer to Noosa Council Waste Management Code). The Plan shall contain the following information: The site area for the storage and separation of waste is to be shown on the plan drawings accompanying the application. A waste management table as indicated below is to be completed showing how waste material is to be segregated - recycled – reused or disposed. MATERIALS ON-SITE DESTINATION Re-use and Recycling Disposal Expected waste materials Estimated volume(m³) On-site *specify proposed re-use or on-site recycling methods Off-site *specify contractor and recycling outlet *specify contractor and landfill site or other disposal site Excavation material Green waste Bricks Concrete Timber-please specify Plasterboard Metals - please specify Asbestos Other - please specify Note * If a demolition contractor is undertaking works, then the Waste Management table is to be completed by the demolition contractor. The developer must provide waste storage and disposal facilities in accordance with Planning Scheme Policy “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, including an external imperviously paved area correctly sized for all refuse and recycling containers and suitably screened from public places and neighbouring properties. Noise Nuisance Noise emission from mechanical equipment shall comply with the following requirements: Air-conditioning and Refrigeration 7am to 10pm: Maximum background + 5dB(A) 10pm to 7am: Maximum background + 3dB(A) Pumps 7am to 7pm: Maximum background + 5dB(A) 7pm to 10pm: Maximum background + 3dB(A) 10pm to 7am: No audible noise. Submission of written certification from a suitably qualified person confirming that the noise levels from all mechanical equipment comply when measured at either the residential boundary or outside the most exposed part of an affected building, whichever is the closest to the equipment. The assessment and certification is required immediately after installation of the equipment and prior to any occupation of the building, and in a format approved by Council. All equipment should be operating at the same time to test the overall noise level created. Advice: It is highly recommended that the person you engage to certify the installation is involved at the plan development stage so they can recommend where this equipment is best located. They can also advise about noise enclosures and can make other suggestions to avoid noise problems. It is a lot more costly to try and deal with noise problems after everything is built. Noise from residential building works shall comply with the following – Limited to between 7:00am to 6:30pm Monday to Saturday. All reasonable measures are taken to minimise noise emissions. Not permitted on Sunday or public holidays. ENGINEERING External Works - Pedestrian Facilities A 1.5m wide concrete footpath must be provided within the road verge for the entire length of the frontage of the site. The path must generally match with existing grassed verge without causing a trip hazard and join smoothly with any existing adjoining path. The works must be undertaken in accordance with an Operational Works approval and must be in compliance with IPWEAQ standard drawing SEQ R-065 Concrete Pathway Construction Details. Where necessary the concrete footpath should to be extended beyond the frontage of the site to the reasonable satisfaction of Council. This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-trunk infrastructure. Site Access and Driveway A sealed access driveway must be provided from the front street to all parking and manoeuvring areas of the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular: A minimum driveway width of 3.0m. A driveway crossover in accordance with IPWEAQ standard drawing SEQ R- 050 and to grades prevent vehicles from scraping and/or bottoming whilst also allowing for compliant grades for footpath and pedestrians movements along the footpath and grassed verge without any step or trip hazard. The driveway cross and longitudinal gradients in compliance with relevant sections and requirements of AS 2890.1:2004. For pedestrian safety between vehicles exiting the site and pedestrians on the footpath, the driveway and any associated fencing or vegetation near the driveway shall comply with the minimum sight line requirements as defined in AS 2890.1, section 3.2.4. Car Parking Car parking must be provided within the site generally as shown on the approved plans. The works must be undertaken in accordance with an Operational Works approval and must include in particular: The car parking must be in compliance with the provisions of AS/NZS 2890.1-2004 for user class 1A with allowance for vehicles to enter and leave the site in a forward gear and with a minimum head clearance (headroom) at any point of 2.2m. All car parking areas and access driveways must be maintained exclusively for vehicle parking and manoeuvring and kept in a tidy and safe condition at all times. Reinstatement Works Where required, any redundant driveway must be removed, and the kerb, channel and verge area reinstated and landscaped to match the existing kerb and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and turf, and must be maintained by the developer until established. The driveway layback must be saw-cut and removed to allow for a smooth and neat finish with the adjoining kerb. Any badly damaged kerb and channel along the frontage of the site or adjacent sections of kerb line must be repaired or replaced to the reasonable satisfaction of Council. Stormwater Drainage The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken in accordance with an Operational Works approval in compliance with the relevant sections of Queensland Urban Drainage Manual and supported by a detailed stormwater drainage design prepared and certified by a suitably qualified and experienced Registered Professional Civil Engineer. The works must include in particular: Extension of the development site stormwater system to accommodate surface stormwater runoff from any adjoining property that naturally drains through the site or may potentially be affected by the development, including the registration of drainage easements; and The use of gravity stormwater drainage. The development of the site must not worsen existing drainage conditions on other properties by diverting stormwater runoffs or causing additional stormwater ponding on any other property. Stormwater overland runoffs from the site must be kept to its predevelopment flow rates for all storms up and including 1 in 100 years storm event. Easements Easement of appropriate width must be created over all stormwater pipelines on the site that convey stormwater flows from adjacent properties. Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property. All easements must be created in accordance with the requirements of planning scheme and granted at no cost to the Grantee. All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee. Earthworks and Retaining Walls All earthworks must be carried out in compliance with an Operational Works Development permit approval. All earthworks and associated batters/retaining walls must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. All earthworks must be undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments, Council’s codes and relevant government regulations and guidelines. Certification must be provided by an RPEQ and submitted to Council prior to the issue of the Certificate of Classification for the building. The development works must not adversely impact on the stability of the subject site or other properties and shall not affect the structural integrity of any of the existing fences or structures that border the site. Fences that are affected shall be replaced prior to the Building Certifier issuing the Certificate of Classification. Electricity and Telecommunication Services Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications. ADDITONAL MATERIAL CHANGE OF USE CONDITIONS ADDED 15 JULY 2021 PLANNING When Conditions must be Complied With Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date SD.101 S5 Site/Cover Sheet, prepared by Kidd + Co 31.08.2015 SD.201 S5 Ground Floor Plan, prepared by Kidd + Co as annotated by Council 31.08.2015 SD.202 S5 First Floor Plan, prepared by Kidd + Co as annotated by Council 31.08.2015 SD.501 S5 Elevations, prepared by Kidd + Co as annotated by Council 31.08.2015 SD.502 S5 Elevations, prepared by Kidd + Co as annotated by Council 31.08.2015 SD.503 S5 Elevations, prepared by Kidd + Co as annotated by Council 31.08.2015 Currency This development approval lapses if the use has not happened by 15 July 2027, unless an application to extend the currency period is approved by Council. Nature and Extent of Approved Use The total number of bedrooms on the site must not exceed 3. No more than 6 guests may occupy the premises at any time. All outdoor areas, including balconies, decks, pool and the like, must not be used after 9pm each night. The premises must not be used as a party house, with no events, functions or parties (e.g. bucks parties, hen’s parties, raves, or wedding receptions for example) permitted on site. Amenity The operation of the approved use must not detrimentally affect the residential amenity (including but not limited to noise, overlooking, light spill or odour) enjoyed by surrounding residents or cause a nuisance, including a noise nuisance. Car Parking Existing car parking on site, as detailed on the approved plans, must be maintained and kept available for users of the short term accommodation. All car parking areas and access driveways must be maintained exclusively for vehicle parking and manoeuvring and kept in a tidy and safe condition at all times. Waste Management Waste storage and disposal facilities must be provided in accordance with Planning Scheme Policy 9, Waste Management, including an external imperviously paved area correctly sized for all refuse and recycling containers and suitably screened from public places and neighbouring properties. Waste containers must: a. At all times be regularly cleaned and maintained in a clean, tidy, sanitary and hygienic condition. b. Be placed on the kerb side frontage of the premises, for the collection of general waste from the container; and c. Not be placed on the kerb side frontage for longer than 24 hours before or after the scheduled collection day for the collection of waste in the container. Contact Person Prior to the commencement of the use written confirmation must be provided to Council confirming: a. the name and telephone number of the contact person (which may include the name and contact details of an individual, letting agency, property manager, security firm or the like) for the purposes of the operation of the short stay letting at the premises; and b. that the contact person is available 24 hours a day, 7 days a week; and c. that the contact person resides within 20 minutes travel time (by vehicle) of the premises; and d. that the contact person is to be responsible for the supervision and management of the premises, including addressing complaints about the use of the premises for short stay letting and visitor queries. A sign must prominently and permanently display in letters and numbers not less than 50mm in height, a current up to date written notice detailing the contact person’s phone number, and a statement that the contact person is responsible for the supervision and maintenance of the premises. The sign must not exceed 0.2m2, be displayed at the front of the premises and be visible to members of the public at all times. Code of Conduct A code of conduct must be developed and provided to all users and occupants of the short term accommodation, including any website or social media used to promote the use of the premises for short term accommodation. The code of conduct must advise all users of the premises: a. That the use of the premises must not: i. detrimentally affect the residential amenity (including but not limited to noise, overlooking, light spill or odour) enjoyed by residents in the vicinity of the premises; or ii. cause a nuisance (including a noise nuisance); iii. display unacceptable behavior including: loud aggressive behaviour; yelling, screaming, arguing; or excessively loud cheering, clapping and singing. iv. create a level of noise above the acceptable levels described by Queensland Government legislation for environmental protection (noise). b. That a user of the premises must not sleep or camp on the premises in a tent, caravan, campervan or similar facility. c. That each vehicle used by a user of the premises must: i. be stored in a manner that does not cause a nuisance or inconvenience to adjoining premises; and ii. be parked within the parking facilities at the premises where provided. d. That each user of the premises must store general waste (including the separation of recyclable waste) produced as a result of the ordinary use or occupation of the premises in a waste container. e. That each user of the premises must ensure that the premises, including the grounds of the premises, are kept in a safe and tidy condition. f. That pets occupying the premises must be managed and not cause a nuisance (including a noise nuisance). g. The nature and extent of the approved use as detailed in conditions numbers 4 to 7 of this development approval. The Code of Conduct must be displayed in a prominent location at the premises so that it can be viewed by guests. Complaints Management The contact person must maintain a record of all complaints received, identifying how each complaint has been resolved or addressed within a reasonable time. The contact person must respond to all complaints within 30 minutes of notification of a complaint. The contact person, must keep and maintain a register of the use of the premises for short stay letting or home hosted accommodation, and record in the register, each of the following: on each occasion on which the premises are used, or occupied, for short stay letting or home hosted accommodation on a commercial basis: i. the number of adults who are users of the premises; and ii. the number of minors, an individual who is under 18, who are users of the premises. the dates when each person’s use, or occupation, of the premises for short stay letting or home hosted accommodation began and ended. The contact person, must make available, for inspection by Council, within 5 business days of receipt of a written request given at any time, each of: the written record of complaints referred to in condition 18; and the register referred to in condition 20 reasons for approval 1. The proposed short term accommodation is consistent with previous approvals granted in Noosaville and Sunshine Beach 2. The proposed short term accommodation is identified as a consistent use in the high density residential zone by the Noosa Plan 2020. referral agencies Not applicable advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act. Development Compliance Inspection Prior to the commencement of the use, please contact Council's Development Audit & Response Unit to arrange a Development Compliance Inspection. Infrastructure Charges This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in accordance with Council’s “Charges Resolution” made pursuant to the Sustainable Planning Act 2009 and in conjunction with the State Planning Regulatory Provision (adopted charges). Building and Construction Industry (Portable Long Service Leave) Levy The QLeave levy must be paid prior to the issue of a development permit where it is applicable. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855. Co-ordination of Operational Works Assessment Additional application fees apply to Operational Work applications where the different aspects of the works are lodged separately. Significant savings in application fees will result if all works are lodged in a single application. Qualified Person For the purpose of preparing a Geotechnical Report, and for certifying geotechnical stability for the development, a qualified person is considered to be a person who: is a Registered Professional Engineer of Queensland (RPEQ); and has a degree in civil engineering or engineering geology; and has a minimum of 5 years experience in the field of geotechnical engineering or engineering geology. Preparation of a Preliminary Construction Management Plan A preliminary Construction Management Plan must be submitted with the Operational Works application and must address the following: Traffic Management during all aspects of the construct phase including: A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction. Maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased Proposed fencing to the site during the construction phase of the development. Adequate parking arrangements for construction workers. Maintenance and protection of water quality and existing drainage lines through the construction site through the implementation of appropriate erosion and sediment control measures. Works programme identifying key components of the works and their respective durations. Establishment of a communication protocol with the general public, adjoining owners, emergency services and local businesses as required to advise of construction times, impacts on traffic and services and other relevant issues. Additional Advisory Notes added 15 July 2021 It is the responsibility of the owner and the identified contact person to operate the short term accommodation in compliance with the development approval conditions at all times. Should the development approval conditions not be met Council may issue an Infringement and/or take action under the Planning Act 2016 to enforce compliance. Council is currently in the process of creating a new Local Law to assist in managing short term accommodation in the Shire. In this regard, an approval may be require property notes Not applicable. variation approval details Not applicable. further development permits required Type of Development Permit Required Development Permit for Operational Works Development Permit for Building Works submissions Application – MCU15/0069.01 There were 3 properly made submissions about the application. In accordance with the Planning Act 2016, the name, address and electronic address of the principal submitter for each properly made submission is provided and attached. rights of appeal You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. other details If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully, Patrick Murphy Coordinator Planning Enc: List of Submitters Appeal Rights Approved Plans/Documents Unitywater DECISION NOTICE HISTORY Original Decision Notice – 21 September 2015. Negotiated Decision Notice – 14 October 2015, with an amendment to conditions 14. Decision Notice – Other Change – MCU15/0069.01 – 15 July 2021, with additional conditions List of Submitters PLANNING ACT 2016 & PLANNING REGULATION 2017 Name Email Address Bob Rollington [email protected] 3/37 Duke St Sunshine Beach 4567 Ross Phillips & Diane Boeyen [email protected] 2/39 Duke St Sunshine Beach 4567 Edward Payne [email protected] 45 Duke St Sunshine Beach 4567 Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer2.xml] Page 4 of 15 [word/footer3.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 15 [word/footer4.xml] Page 7 of 7 [word/footer5.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 3 [Attachment: image2.png (image text)] ee) NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.