¥Pmm \c company APPENDIX K Network Analysis Prepared by JWP 743 Ann Street, PO Box 1559, Fortitude Valley QLD 4006 Phone 07 3237 8899 Facsimile 07 3237 8833 Page 40 | 20517_PlReport_FINAL_FW MC.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 17 pages
Page 2
SUCCESS sous Partnership SUCCESS tron People JWP SCANLON PROPERTY GROUP Essence of Peregian, Noosa Water Supply Analysis JUNE 2007
Page 3
@ JWP Scanton Property Group Essence of Peregian, Noosa Water Supply Analysis June 2007 John Wilson and Partners Pty Ltd A.B.N. 85 011 022 503 Level 9 Centenary Square, 100 Wickham Street Brisbane 4000 Telephone: (07) 3244 9600 Facsimile: (07) 3244 9699 Email: [email protected] Document Control Revision Author Reviewer Approved for Issue Name Signature Date 0 S. Bedi A. Morris N.Cartwright 25/05/07 1 S. Bedi A. Morris N.Cartwright 20/06/07 © John Wilson and Partners Pty Ltd 2007 This document shall remain the property of John Wilson and Partners Pty Ltd. Unauthorised use of this document in any form is prohibited. SCANLON PROPERTY GROUP JUNE 2007 ESSENCE OF PEREGIAN, NOOSA —- WATER SUPPLY ANALYSIS REVISION 1 2:\38-water\070245-001 essence of peregian ws\water analysis\report\essence of peregian_report_revi.doc
Page 4
JwPp CONTENTS B 1 INtrOdUCtiOn sisscieisnicccsnisnnnascnanessscnawennanensennonmsneas cadrensnenewtnnsenreceusseressareasasbenavcaas 2 Proposed Development . 2.1 Scope of Analysis.. 2.2 Development Demand 3 Water Supply.. 3.1 Design Criteria 3.2 Existing Water Supply System.. 3.3. Bulk Water Supply Impacts 4 Network Analysis and Results 4.1 Design Cases .. 4.2 Existing System Analysi: 4.3 Ultimate System Analysis 4.4 Effects on Existing Customers . 4.5 Internal Water Reticulation Sizing. 5 Summary ® Voaoouu uv aww WNN WN 6 Qualification .. Appendices Appendix A Existing System — Network Results Appendix B Ultimate System — Network Results SCANLON PROPERTY GROUP JUNE 2007 ESSENCE OF PEREGIAN, NOOSA — WATER SUPPLY ANALYSIS REVISION 1 2:\38-water\070245-001 essence of peregian ws\water analysis\report\essence of peregian_report_rev1.doc
Page 5
Scanlon Property Group @ ° JwP Essence of Peregian, Noosa Water Supply Analysis 1 Introduction A Caravan Park redevelopment adjacent to David Low Way, Peregian is proposed and will consist of 103 Residential Units and 1956m‘? of Retail and Office Floor Space. This report analyses the Noosa Shire water supply reticulation network in Noosa Water Supply Zone (WSZ) to ensure that the system provides Maximum Hour (MH) demand and Fire-Fighting flow within the development in compliance with the Noosa Shire (NS) desired Level of Service (LOS) and does not disadvantage existing customers within the zone. To ensure LOS are maintained across all planning horizons, the proposed development has been analysed for the Existing (2005) and Headworks (Ultimate) Noosa Shire water supply system. This report: e Summarises the analyses carried out; e Sizes the internal reticulation of the proposed development; e Assesses MH demand and desired fire-fighting flow within the development; e Assesses the performance of the Existing (2005) and Headworks (Ultimate) Noosa Shire water supply systems in the Coastal WSZ in relation to servicing the additional demand from the proposed development. SCANLON PROPERTY GROUP JUNE 2007 ESSENCE OF PEREGIAN, NOOSA — WATER SUPPLY ANALYSIS REVISION 1 z:\38-water\070245-001 essence of peregian ws\water analysis\report\essence of peregian_report_rev1.doc 1
Page 6
JwpP 2 Proposed Development 2.1 Scope of Analysis The following analysis has been performed utilising an HJOMap model developed as part of the Noosa Council District Metered Areas Pressure Management Study (JWP, 2006). It should be noted that this report concerns the water demand from the proposed development at David Low Way, Peregian in isolation. The Noosa Ultimate Water Supply Existing (2005) and Ultimate models used in this assessment do not contain demands from recently proposed and approved developments outside of the proposed Essence of Peregian development. These models do however contain areas of future growth potential and augmentations to the water supply network as detailed in the Noosa Ultimate Water Supply. This assessment has assessed technical matters only. The servicing of the land by the water supply systems will ultimately require Council approval. Likewise any system augmentations suggested will again require the approval of Council and should not be regarded as being representative of Council's position. 2.2 Development Demand The subject land is approximately 2.56 hectares in area and will consist of Visitor Accommodation Units, Accommodation Shacks, Caretaker’s Residence, Retail and Office Floor Space. The development will become part of the Peregian Water Supply Zone. A representation of the demand for Existing and Ultimate planning horizons from the proposed development is detailed in Table 2.1. Noosa Shire adopts an Equivalent Tenement (ET) as the basis for water supply infrastructure planning. Based on the land use information provided by the Developer, the appropriate occupancy rates for the proposed development are detailed in Table 2.1. Table 2.1 Proposed Development EP Water Demand No. ws p . Area Unit Demand Demand Unit Type of Dwellings Units (ha) (ET) (ET) ee 66 - - 0.84 ET/unit 55.44 Accommodation . Shack 34 - a 0.9 ET/unit 30.90 Caretaker’s . Residence = 1 - 1 ET/dwelling 1 Retail Floor Space - - 0.0978 24.24 ET/ha 2.37 Ornice - ; 0.0978 24.24 ET/ha 2.37 Floor Space Total 92.08 The parcel of land is located within NSC Headworks boundaries and has been allocated a demand of 68.47 ET for Ultimate planning and as such the proposed demand exceeds the allocated demand. SCANLON PROPERTY GROUP JUNE 2007 ESSENCE OF PEREGIAN, NOOSA — WATER SUPPLY ANALYSIS REVISION 1 z:\38-water\070245-001 essence of peregian ws\water analysis\report\essence of peregian_report_rev1.doc 2
Page 7
Jwp 3 Water Supply 3.1 Design Criteria The reticulation network has been assessed based on design criteria, which are in general consistent with the Water Resources Commission Guidelines for Planning and Design of Urban Water Supply Schemes (DNR, 1997). Analyses have been performed to assess the capacity of the Existing and Headworks water networks in delivering the desired Noosa Shire (Levels of Service) LOS to the point of connection of the proposed development. The Noosa Shire design criteria adopted for this investigation are: - 1. Existing and Headworks Average Day (AD) water demands of 1100 L/ET/day of Noosa Heads Region Coastal Water Supply Zone. 2. Maximum Hour (MH):AD peaking factor of 3.6 for residential properties and 2.7 for commercial properties in the Coastal WSZ areas; 3. Under MH demand, residual heads at all nodes within the proposed subdivisions and surrounding areas are to be equal to or greater than 22m or 16m in small, isolated, highly elevated land parcels. 4. The reticulation should be capable of providing fire flow of 15 L/s for residential areas concurrent with MH flow with the residual pressure in the system not falling below 12 m.; 5. Fire Flow services for commercial properties are not to fall below 12m residual pressure; 6. Reservoirs are not to empty during three consecutive Maximum Days (MD); and 7. Pump Stations are to supply MDMM demand in 20 hours/day operation. 3.2 Existing Water Supply System The proposed development is located in the Peregian WSZ. The Peregian Reservoir (TWL RL 65.0m) is located adjacent to David Low Way, Noosa. The Viewland Drive Pumping Station, located at the Viewland Drive reservoir site, provides 20hr Mean Day Maximum Month (MDMM) flow to the Laguna Reservoir. The development will be serviced from the Peregian WSZ via an existing 150mm diameter main within David Low Way. SCANLON PROPERTY GROUP JUNE 2007 ESSENCE OF PEREGIAN, NOOSA — WATER SUPPLY ANALYSIS REVISION 1 z:\38-water\070245-001 essence of peregian ws\water analysis\report\essence of peregian_report_revi doc 3
Page 8
© JWwP 3.3 Bulk Water Supply Impacts The demand from the proposed development exceeds the allocation for the subject site (68.47 ET) and thus, a bulk water analysis is required. Table 3.1 details the augmentations for the supply zone. Table 3.1 Additional Capacities Required for Proposed Development Proposed Additional Additional Additional Reservoir Pump Station Demand Demand (ET) (ET) Storage Flow (ML) (L/s) 92.08 23.61 0.039 ML 0.50 L/s Analysis has been performed on the bulk water transfer infrastructure supplying the development. This includes analysis of: e MD demand upon Laguna and Viewland Drive Reservoirs e MDMM demand upon the Tewantin Pump Stations The results on the Bulk Water analysis indicate that the network performs to a satisfactory standard for MD and MDMM flows. SCANLON PROPERTY GROUP JUNE 2007 ESSENCE OF PEREGIAN, NOOSA —- WATER SUPPLY ANALYSIS REVISION 1 z:\38-water\070245-001 essence of peregian ws\water analysis\report\essence of peregian_report_rev1.doc 4
Page 9
JwP 4 Network Analysis and Results 4.1 Design Cases The demand from the proposed residential development was added to the H2OMap network models of the Existing (2005) and Headworks (Ultimate) Noosa Shire water supply systems. The following analyses have been performed: 1. A dynamic analysis under MH conditions for the Existing (2005) system, with the demand from the proposed development. 2. A static analysis under Fire Flow conditions (30L/s) for the Existing system, with the demand from the proposed development. 3. A dynamic analysis under MH for the Headworks system, with the demand from the proposed development. 4. Astatic analysis under Fire Flow conditions (30L/s) for the Headworks system, with the demand from the proposed development. 4.2 Existing System Analysis The results for the proposed development from the Noosa Shire water supply network during MH demand and under Fire Fighting conditions for the Existing system are given in Tables 4.1 and 4.2 respectively. The proposed internal reticulation and node identities are shown in Figure 1 and Appendix A provides the results for the development demand nodes. Table 4.1 Results under Maximum Hour Conditions at the Critical Node within the Existing System Node Pressure Acceptance Identifier HGL (m) (m) Criteria Result EPL 64.47 54.47 > 22m Satisfactory Table 4.2 Results under Fire Flow Conditions at the Critical Node within the Existing System : Residual Node Fire Flow Acceptance Identifier (L/s) Btescute Criteria Bene (m) EP1 30 42.39 > 12m Satisfactory The above analysis demonstrates that the Existing Noosa Shire water supply system is capable of supplying the development in accordance with the design criteria. SCANLON PROPERTY GROUP JUNE 2007 ESSENCE OF PEREGIAN, NOOSA — WATER SUPPLY ANALYSIS REVISION 1 z:\38-water\070245-001 essence of peregian ws\water analysis\report\essence of peregian_report_revi.doc 5
Page 10
@ JWwP 4.3 Ultimate System Analysis The results for the proposed development from the Noosa Shire water supply network during MH demand and under Fire Fighting conditions for the Ultimate are given in Table 4.3 and Table 4.4 respectively. The proposed internal reticulation and node identities are shown in Figure 1 and Appendix B provides the results for the development demand nodes. Table 4.3 Results under Maximum Hour Conditions at the Point of Connection within the Ultimate System Node HGL Pressure Acceptance Result Identifier (RL m) (m) Criteria EP1 64.44 54.44 > 22m Satisfactory Table 4.4 Results under Fire Flow Conditions at the Point of Connection within the Ultimate System ‘, Residual Node Fire Flow Acceptance Identifier (L/s) ea. Ls Criteria Result EPL 30 39.66 > 12m Satisfactory The above analysis demonstrates that the Headworks (Ultimate) Noosa Shire water supply system is capable of supplying the development in accordance with the design criteria. 4.4 Effects on Existing Customers The proposed development does not significantly impact on the capacity of surrounding areas and does not contravene the principle of “no disadvantage” to existing customers. 4.5 Internal Water Reticulation Sizing Due to the group title venture of the proposed development no internal reticulation no internal reticulation is required to be assessed as part of this analysis. SCANLON PROPERTY GROUP JUNE 2007 ESSENCE OF PEREGIAN, NOOSA — WATER SUPPLY ANALYSIS REVISION 1 z:\38-water\070245-001 essence of peregian ws\water analysis\report\essence of peregian_report_revi.doc 6
Page 11
@ JWP 5§ Summary A development at Essence of Peregian, Noosa is proposed and a water supply analysis has been performed. The proposed development and will be serviced by the Peregian WSZ. The results from the water supply analysis are summarised below: 1. The Peregian WSZ reservoir and Tewantin pump station have adequate capacity to service the proposed subdivision within the Noosa WSZ for Existing and Ultimate conditions. 2. Sufficient capacity exists within the Noosa Shire water supply system to provide Noosa Shire LOS to the proposed development for Existing and Ultimate conditions. 3. The proposed development does not significantly impact on the capacity of the Peregian WSZ and does not contravene the principle of “no disadvantage” to existing customers. SCANLON PROPERTY GROUP JUNE 2007 ESSENCE OF PEREGIAN, NOOSA - WATER SUPPLY ANALYSIS REVISION 1 z:\38-water\070245-001 essence of peregian ws\water analysis\report\essence of peregian_report_rev1.doc 7
Page 12
@ Jwp 6 Qualification sits In preparing the report and estimate of costs JWP has exercised the degree of skill and care and diligence normally exercised by members of the engineering profession and has acted in accordance with accepted practices of engineering design principles. 2 JwP has used all reasonable endeavours to inform itself of the parameters and requirements of the project and has taken all reasonable steps to ensure that the report and costs estimate is as accurate and comprehensive as possible given the information upon which it is based. 3. It is not intended that this report and costs estimate represent a final assessment of the feasibility of the project. 4. JWP reserves the right to review and amend all calculations, cost estimates and/or opinions included or referred to in the report if: (a) additional sources of information not presently available (for whatever reason) are provided or become known to JWP; or (b) JWP considers it prudent to revise the estimate in light of any information which becomes known to it after the date of submission. 5. This report and cost estimate is for the use of the party to whom it is addressed and for no other persons. No responsibility is accepted to any third party for the whole or part of the contents of this report and cost estimate. 6. If any claim or demand is made by any person against JWP on the basis of detriment sustained or alleged to have been sustained as a result of reliance upon the report and cost estimate or information therein, JWP will rely upon this provision as a defence to any such claim or demand. SCANLON PROPERTY GROUP JUNE 2007 ESSENCE OF PEREGIAN, NOOSA - WATER SUPPLY ANALYSIS REVISION 1 z:\38-water\070245-001 essence of peregian ws\water analysis\report\essence of peregian_report_revi.doc 8
Page 13
JWwP Figures SCANLON PROPERTY GROUP JUNE 2007 ESSENCE OF PEREGIAN, NOOSA — WATER SUPPLY ANALYSIS REVISION 1 2:\38-water\070245-001 essence of peregian ws\water analysis\report\essence of peregian_report_revi.doc
Page 14
eE9GrHze “XeY ooserrze “Ud 900 GIO Aaijen apnatiog ‘SBS XOG Od £05 720 TTO SB. Nav “PIT “Aag Su@u}eg pue UOSiIM UYOr dMf qulod uonseuu0D pasodoig Ajddng aaqen TE 3YuNndIs VSOON NVISSuad A0 | SON3SS4 BjLIS 0} JON \ La3uLS SNOdNU Asepunog quewdojanaq pasodouig aNa9a1
Page 15
JwP APPENDIX A Existing System — Network Results SCANLON PROPERTY GROUP JUNE 2007 ESSENCE OF PEREGIAN, NOOSA — WATER SUPPLY ANALYSIS REVISION 1 z:\38-water\070245-001 essence of peregian ws\water analysis\report\essence of peregian_report_rev1.doc
Page 16
JwPp Table Ai - Proposed Development Network Results Identifier Maximum Hour Fire Flow Node Elevation Demand Grade Pressure Fireflow Residual Demand Pressure ID (m) (L/s) (m) (m) (L/s) (m) 4475 10 0.31 64.47 54.47 15 46.55 4485 10.13 0.22 64.47 54.34 15 44.28 4487 11.44 0.01 64.47 53.04 15 45.7 4489 9.41 0.03 64.47 55.06 30 43,91 4491 18 0.18 64.47 46.47 30 30.37 4493 13 0.1 64.47 51.47 15 44.12 4495 12.42 0 64.47 52.06 x : 4497 10.42 0.1 64.47 54.05 15 41.59 EPi 10 1 64.47 54.47 30 42.39 SCANLON PROPERTY GROUP JUNE 2007 ESSENCE OF PEREGIAN, NOOSA - WATER SUPPLY ANALYSIS REVISION 1 2:\38-water\070245-001 essence of peregian ws\water analysis\report\essence of peregian_report_rev1.doc
Page 17
Jwp APPENDIX B Ultimate System — Network Results SCANLON PROPERTY GROUP JUNE 2007 ESSENCE OF PEREGIAN, NOOSA — WATER SUPPLY ANALYSIS REVISION 1 2:\38-water\070245-001 essence of peregian ws\water analysis\report\essence of peregian_report_rev1.doc
Page 18
JWwP Table B1 - Proposed Development Ultimate Network Results Identifier Maximum Hour Fire Flow Node Elevation Demand Grade Pressure Fireflow Residual Demand Pressure ID (m) (L/s) (m) (m) (L/s) (m) 4475 10 0.29 64.44 54.44 15 44.44 4485 10.13 0.67 64.43 54.3 15 41.36 4487 11.44 0.02 64.45 53.01 15 43.57 4489 9.41 0.03 64.44 55.03 30 41.42 4491 18 0.26 64.44 46.44 30 27.98 4493 13 0.17 64.45 51.44 15 41.99 4495 12.42 0 64.45 52.03 S = 4497 10.42 0.15 64.43 54.01 15 38.61 EP1i 10 1 64.44 54.44 30 39.66 SCANLON PROPERTY GROUP JUNE 2007 ESSENCE OF PEREGIAN, NOOSA — WATER SUPPLY ANALYSIS REVISION 1 z:\38-water\070245-001 essence of peregian ws\water analysis\report\essence of peregian_report_rev1.doc
Used in these records
20517 App K.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.