Council archive · source document
20517 App K.pdf [As Published] · 132007.1259
© JWwP 3.3 Bulk Water Supply Impacts The demand from the proposed development exceeds the allocation for the subject site (68.47 ET) and thus, a bulk water analysis is required. Table 3.1 details the augmentations for the supply zone. Table 3.1 Additional Capacities Required for Proposed Development Proposed Additional Additional Additional Reservoir Pump Station Demand Demand (ET) (ET) Storage Flow (ML) (L/s) 92.08 23.61 0.039 ML 0.50 L/s Analysis has been performed on the bulk water transfer infrastructure supplying the development. This includes analysis of: e MD demand upon Laguna and Viewland Drive Reservoirs e MDMM demand upon the Tewantin Pump Stations The results on the Bulk Water analysis indicate that the network performs to a satisfactory standard for MD and MDMM flows. SCANLON PROPERTY GROUP JUNE 2007 ESSENCE OF PEREGIAN, NOOSA —- WATER SUPPLY ANALYSIS REVISION 1 z:\38-water\070245-001 essence of peregian ws\water analysis\report\essence of peregian_report_rev1.doc 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App K.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.