Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

20517 App K.pdf [As Published] · 132007.1259

of 18

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

©

JWwP

 

3.3 Bulk Water Supply Impacts

The demand from the proposed development exceeds the allocation for the subject site (68.47 ET)
and thus, a bulk water analysis is required. Table 3.1 details the augmentations for the supply
zone.

 

 

Table 3.1 Additional Capacities Required for Proposed Development
Proposed Additional Additional Additional
Reservoir Pump Station
Demand Demand
(ET) (ET) Storage Flow
(ML) (L/s)
92.08 23.61 0.039 ML 0.50 L/s

 

Analysis has been performed on the bulk water transfer infrastructure supplying the development.
This includes analysis of:

e MD demand upon Laguna and Viewland Drive Reservoirs

e MDMM demand upon the Tewantin Pump Stations

The results on the Bulk Water analysis indicate that the network performs to a satisfactory standard
for MD and MDMM flows.

 

SCANLON PROPERTY GROUP JUNE 2007
ESSENCE OF PEREGIAN, NOOSA —- WATER SUPPLY ANALYSIS REVISION 1
z:\38-water\070245-001 essence of peregian ws\water analysis\report\essence of peregian_report_rev1.doc 4

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20517 App K.pdf [As Published].pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.