Appendix B- Landscape Concept Design · MCU23/0078
Very large file (25.4 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
4.4 Landscape Care
Maintenance issues are considered an integral part of the
landscape design. It is critical that a long-term maintenance regime
is implemented and re-evaluated over time. It is imperative the
landscape thrives after installation with minimal maintenance and
on-going cost to owners.
The following are some of the initiatives adopted to help ensure the
long-term viability of the landscape:
− Choosing plant species which are suitable to the location and
differing microclimates on site, with long life expectancy and
minimal pruning, watering and fertilising requirements.
− Designing all ground level planters to be accessible from
pathways and paved areas and any balcony planters, where
not accessible from the adjacent balcony, to be accessed using
rooftop abseiling or safety lines provided.
− Requiring plant suppliers have an industry accreditation and
third-party assessed QA system.
− Certifying that all trees comply with the NATSPEC Guide
– Specifying Trees: A Guide to Assessment of Tree Quality
(2003) to avoid any long-term structural issues.
− Using a quality, tested and certified, soil blend that complies
with Soils for Landscape Development guidelines and
AS4419, constructed with a duel-horizon to minimise slumping,
maximise plant survival rates, and minimise maintenance.
− Installing of a fully-automatic, multi-station, reticulated irrigation
system to all landscape and recreation areas, including podium
planters.
− Using a minimum of 75mm of organic mulch to reduce weed
growth and water loss in garden areas.
− Providing hose cocks in all outdoor areas (communal and
private) to enable additional plant watering and surface
washdown when necessary.
− Submitting a Planting Maintenance Program by the Landscape
Contractor at the completion of construction.
− Incorporating a minimum 12 week establishment and
maintenance period by the Landscape Contractor and a 52
week defects period for advanced tree stock.
− Ensuring a training program is carried out by the Landscape
Contractor at handover to ensure that maintenance staff can
operate the irrigation system and maintain the landscape.
wildstudio.com.au Noosa Civic Village Mixed Use Development I 22101 LC-01 [B] I 22-05-2023 I Page 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix B- Landscape Concept Design.pdfRelated documentApplication case desk ↗
About this file
- File size
- 25.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.