Council archive · source document
REC11/0154 Development Application part 1 of 2 IDAS Form 1 and 7
R ao1a aa.......... I SCRC CORRESPONDENCE
II'fl'If'IIN III'H'^IIM
RF^^ . `
THIS IS THE NEXT PART OF A
23 I)EC 2011 FI
MULTIPLE PART RECORD I)y
wan
Part ' Of
Application number: /4!f (!5-6-1 '/ 0
vi6)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 10 pages
Page 2
Page 3
Integrated Development Assessment System form
Application Details - IDAS form 1
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete this form (Application details - IDAS form 1)
• complete any other forms relevant to your application
provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)
Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.
Name/s (individual or company name in full) Trustees of the Christian Brothers Qld
For companies, contact name C/ Martoo Consulting
Postal address Po Box 1684 Noosa Heads Q 4567
Contact phone number 5455 5425
Mobile number (non-mandatory)
Fax number (non-mandatory)
e-mail address (non-mandatory)
1. What is the nature of development proposed? (tick all applicable boxes)
material change of use of premises
q building work
0 operational work
® reconfiguring a lot
Department of Infrastructure and Planning QPlan Queensland
Government
Page 4
q I
2. What type of approval is being sought?
development permit
preliminary approval
q both - provide details below
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
® No
Yes - complete table A and then go to question 5
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
Lot on plan
Street Address
description
Local government area
Unit Street Street name and official Post Plan type (e.g. Logan,Cairns)
Lot No
No.
No. No. suburb/locality name code and plan no.
Girraween Court Sunshine
1 2 4567 3 RP887636 Sunshine Coast
Beach
Street address / lot on plan
Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
q water e.g. jetty, pontoon)
Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)
Coordinates (note: place each set of
coordinates in a separate row) Zone Local government
Datum
reference area (If applicable)
Fasting Northing Latitude Longitude
GDA94
D WGS84
q other
5. Total area of the premises on which the development is proposed (indicate hectares or m2
1.12 hectares
6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)
1 vacant
7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)
Subdivision to create one additional lot (long term lease - 20 years plus 10 years)
Applir ;!ion Ceti s - IDAS form 1
Version 1.0 18 December 2009
Page 5
Iqq
8. Is owner's consent required for this application? (refer to notes at the end of this form for more information'
SIGN
HERE
No
® Yes - complete either table D, table E or table F as applicable
Table D (note: do not complete this table if lodging the application on-line using Smart eDA)
Name of owner/s of the land Sunshine Coast Council
I/We, the above-mentioned owner/s of the land, consent to the making of this application.
Signature of owner/s of the land
Date 1 4 ^IL II
Table E
Name of owner/s of the land
q The owner's written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land
By making this application, I, the applicant, declare that the owner has given written consent to the making of
the application.
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)
® No q Yes - complete table G
10. Identify if any of the following apply to the premises (tick applicable box/es)
q adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
q on strategic port land under the Transport Infrastructure Act 1994 - complete table I
q in a tidal water area - complete table J
11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)
M No Yes - ensure the type, location and dimension of each easement is included in the plans submitted
opln_..i?icm '),tai/s - IDAS foram 1
Version 1.0 18 December 2009
Page 6
qqq
12. Does the proposal include new building work or operational work on the premises? (including any
services)
No q Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted
13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
end of this form for more information)
® No - Go to question 15 q Yes
15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?
® No
q Yes - provide details below
16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)
Method of lodgement to
Description of attachment or title of attachment
assessment manager
Martoo Consulting Letter and proposal plans over the counter
North Coast Environmental Services - Ecological Assessment report
over the counter
June 2011 - CD
Form 7 over the counter
17. Applicant's declaration
® By making this application, I declare that all information in this application is true and correct (note: it is
unlawful to provide false or misleading information).
iplication Details - IDAS form 1
Version 1.0 18 December 2009
Page 7
Notes for completing this form
Question 8:
• Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.
• Owner's consent is not required for a mobile and temporary ERA.
Question 9:
• Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.
Question 13:
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
long service leave levy is payable.
• The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14:
• The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
• Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
wwwgleave.gld.gov.au. For further information contact QLeave on 1800 803 481 or www.gleave.gId.gov au.
Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.
OFFICE!US DNI. me
nt Counter
Date re eived Referende numbers
DEC 2n»
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
Council. I have been engaged as the private certifier for the
To:
building work referred to in this application.
Date of BSA Certification Building
Name
engagement license number classification/s
Appl,, ;,^^, Details - IDAS form I
Version 1.0 18 December 2009
Page 8
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
QLeave Project Amount form sighted by Name of officer who
Description of the work Date paid
Number paid ($) assessment sighted the form
manager
The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.
appl^;r^!ron Details - IDAS form 1
Version 1.0 18 December 7n09
Page 9
Reconfiguring a lot - IDAS form 7
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for reconfiguring a lot.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete Applicant details - IDAS form I
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic port land under the Transport Infrastructure Act 1994.
1. What is the total number of existing lots making up the premises? one
2. What is the nature of the lot reconfiguration? (tick applicable box/es)
® subdivision - complete questions 3-6 and 11
boundary realignment - complete questions 8, 9 and 11
creating an easement giving access to a lot from a constructed road - complete questions 10 and 11
dividing land into parts by agreement -please provide details below and complete questions 7 and 11
3. Within the subdivision, what is the number of additional lots being created and their intended final use?
Intended final use of new lots Residential Commercial Industrial Other (Specify)community services ecW
Number of additional of lots
one
created
4. What type of approval is being sought for the subdivision?
E preliminary approval
® development permit
q both
5. Are there any current approvals associated with this subdivision application? (e.g. material change of use)
® No Yes - provide details below
Department of Infrastructure and Planning QPlan Queensland
Government
Page 10
6. Does the proposal involve multiple stages?
Z No - complete Table A q Yes - complete Table B
Table A
What is the total length of any new road to be constructed? I Nil
What is the total area of land to be contributed for community purposes? I Nil
Does the proposal involve the construction of a canal or other artificial waterway?
® No Yes
Does the proposal involve operational work for the building of a retaining wall?
® No F Yes
7. Lease/agreement details - how many parts are being created and what is their intended final use?
Intended final use of new parts Residential Commercial Industrial Other (Specify) community services
Number of additional parts created one additional lot
11. Confirm that the following mandatory information accompanies this application
Confirmation of Method of
Mandatory supporting information
lodgement lodgement
I
site plans drawn to scale (1:100, 1:200 or 1:500 are the recommended scales)
which show the following:
• the location and site area of the land to which the application relates
(relevant land)
• the north point
• the boundaries of the relevant land
• any road frontages of the relevant land, including the name of the road
• the contours and natural ground levels of the relevant land
• the location of any existing buildings or structures on the relevant land
• the allotment layout showing existing lots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves,
building envelopes and existing or proposed open space (note:
over the counter
numbering is required for all lots) ® confirmed
• any drainage features over the relevant land, including any
watercourse, creek, dam, waterhole or spring and any land subject to
a Q100 flood event
• any existing or proposed easements on the relevant land and their
function
• all existing and proposed roads and access points on the relevant land
• any existing or proposed car parking areas on the relevant land
• the location of any proposed retaining walls on the relevant land and
their height
the location of any stormwater detention on the relevant land
• the location and dimension of any land dedicated for community
purposes
• the final intended use of any new lots
a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents relevant ® confirmed over the counter
to the application
Recoc!, ; ;nng a lo' - IDAS form 7
Version 1.0 18 December 2009
Page 11
Notes for completing this form:
• This form can also be used for reconfiguring a lot against the land use plan for Cairns airport land or Mackay
airport land. Whenever a planning scheme is mentioned, take it to mean land use plan for the airport land
Privacy - please refer to your local council for further details on the use of information recorded in this form.
OFF ICE USE- ON LY -
r . J,- 1-1 -1
- . -ol in ter
Date Received Referehce Numbers
DEC g A
The Sustainabl e Pla n ni ctO 12009 is admini$tered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.
Tewantin
Reconn:rIring a lot - IDAS form 7
Version 1.0 18 December 2009
Used in these records
REC11/0154 Development Application part 1 of 2 IDAS Form 1 and 7Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.