02/1602 - Operational Works - Transport Type 5 - Domestic Marine - Jetty [As Published] · 142008.1602

of 17

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 
 
 

 

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May! 2008

|s any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
EX] No -Gotoat3 ((] Yes

42

 
    
 
  

FTE CRAMER niatke desu,

 

 

 

isa any of the proposed operational work for the cleering of native fe vegetation fo which the Vegetation Management Act 1999
applies?

[EX] No -Gotoa44 0 Yes

 

44 is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water: and other than undgr
the Water Act 2000, section 20(2), (3) or (5), or from a dam constructed on a watercourse or lake?

® No -Gotoa4.s [_] Yes - Answer (a) and (b) below

 

via wood BAP LEE tee Li alot LR tah

 

45 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking pr
interfering with artesian water (other than using a water truck to pump watery?

XK] No Goo 046 a] Yes - (Complete Form 1, Part K;} This application requires assessment by the Department of Natural Resources and Water

(NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agen
IPA, schedule & port) title @ toa Mey i Roeutiatyws, sctyrduis tobe &
Wil Raters cede EN eie Nhe Cotle: Seid Hl Cite Uy Cater

shen EP Reqabstene schedule 1 prety, abile datas 4
OP EERE RG Mot aie totts Wann

     

SHR POMOC bat UKE

 

ti

46 |s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for tal king!
overland flow water (other than using a water truck to pump water)?

[X] No -Gotoas7 ~—[[] Yes - Answer (a) and (b) below |

      

47 's any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
KX] No - Gotoases A Yes

i
BA,

 

48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water}?

EX] No - Gotoa49 [7] Yes - Answer both (a) and (b) below

   

49 Is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 No O Yes
(ii) To increase the storage capacity of a referable dam by more than 10% & No O Yes

If yes to either or both (i) or (ii) above - (Complete Form 1, Pan K.) This application requires assessment by the Department of Natural Resources and
Water (NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency,

ede ORR Tui? dats 2 dase 1

    

4.10 's any of the proposed operational work tidal work, other than excluded work defined under the IPA? i
BX] No -Gotoa11 [] Yes - Answer (a) and (b) below |

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

02_1602 - Operational Works - Transport Type 5 - Domestic Marine - Jetty [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗