Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

02/1602 - Operational Works - Transport Type 5 - Domestic Marine - Jetty [As Published] · 142008.1602

of 17

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 Mary 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal)

1 Noosa Waters Canal

Table E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994

 

 

 

Xm’ [hectares (Tick applicable unit)

 

 

     

4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service sta

[J

5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc.)?

tion, school, sugar cane farming etc.)

 

& No O Yes - Ensure the type, location and dimensions of each easement are included in plans, submitted with the application

  
 
        

6. Brief description of the proposal (e.g. 6 unit apartment building, 30 lot residential subdivision, a bore, aquaculture)

 

New timber jetty private

 

 

 

 

7. Does the poposal include new buildings or operational work (including any services) on the premises?

LI No — BX) Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application

   
 

    

  

8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the applicatio
involves State land (leased and freehold), declared Fish Habitat areas, taking quarty material, taking or interfering with water under the Water Act 2000, etc.)

&) No - Goto Q9 O Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section.

 

  
 
 

Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark ahd
not within @ canal as defined under the Coastal Protection and Management Act 1995; or work on rail cortidor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or an an attachment to this form If applicable.

 
 
 

Table H

 
 
 

 

 

     

David Snowden
PO Box 299 Noosaville 4566

  

7 The Promontory, Noosaville. QLD 4566

  

21/08/2008 |

 

Cheryl Snowden

2 PO Box 299 Noosaville 4566 7 The Promontory, Noosaville. QLD 4566 Ce, ML. 21/08/2008 ;

* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, 5127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website

 

 

 

 

 

 

 

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

02_1602 - Operational Works - Transport Type 5 - Domestic Marine - Jetty [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.