Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

02/1602 - Operational Works - Transport Type 5 - Domestic Marine - Jetty [As Published] · 142008.1602

of 17

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

Form 1 Development Application

PatE °°

/
¥

Building &/or operational works assessable 4 0 SEP 9008

against a planning scheme \* . ,
Ky euiil - lewantin

 

1. Nature of work that requires assessment against a planning scheme:

 

{] Building work - Complete Table A [Xx] Operational work - Complete Table B
Table B
(i) What is the nature of the operational work? (
7] Roadworks (1) Stormwater ( Water infrastructure (1) Sewerage infrastructute
(JJ Landscaping CO Earthworks ([] Drainage Works (J Signage
(C Clearing vegetation under the planning scheme KX] Other - Specify below

 

New private timber jetty

 

 

 

(ii) What type of approval is being sought? (OTE: /f you have indicated multiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)

[XJ Development Permit (] Preliminary approval (1 Both (Specity betow)

(iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision?
BX) No] Yes - Specify the number of lots being created

(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
@ lot) i

LXINo =] Yes - Complete Table B(a)

 

 

 

 

2. What is the dollar value of this operational work? (i. the total value including GST, materials and labour} |$ 14000

 

 

 

 
   

3. Confirm that the following mandatory information accompanies this application

 

Plans, andspecifications if applicable, showing the nature and location of the proposed works (inckuting the
extent of any cut and fil)

over the counter

 

 

 

 

OFFICE USE ONLY

 

 

Date Received Reference Numbers |

 

 

 

 

 

Advice for completing Part E

General advice
le Part A must also be completed for all IDAS development applications.
le ‘The applicant is responsible for answering all questions fuily and correctly, unless following a response there is a statement to go directly to another question.

 

 

 

 

 

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

02_1602 - Operational Works - Transport Type 5 - Domestic Marine - Jetty [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.