Skip to the record
Accept no imitations.

Council archive · source document

07/0387 - Op Works - Landscaping, Carparking & Access, Frontage [As Published] · 142007.387

of 62

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

DRAWING SIZE - A2

Increase pool wall
thickness to 200mm

where supporting
Hockwork walls.

4 ~ $12 horizontal bars,
continuous, equally spaced in edge
thickening.

S12 @ 250 vert &
horiz. u.n.o.

(placed centre}
(900 Mox. wall ht)

Existing timber retaining wall

—

POOL PLAN

This footing is
founded below
critical line ond is
stable.

Piers supporting strip

footings or past pad
footings founded into
selected material and below
critical line ore considered
stable.

This footi
without piers The builder /contractor

Is founded | shall confirm all relevant
above critical levels prior to
depth line and commencing works.

is unstable.

|=—tine of proposed
Poot Excavation or
| other trench.

R16x400(L) Dowels (Galv)

Hydrostatic pressuse relief valve to
current Australion Stondard. Sealed
and bonded to pool floor in
accordance with the maufacturers
specification.

$12 @ 100. centres. Fall.

Skimmer box in
accordance with
AS1926

Locate skimmer box
$0 flop faces
prevailing wind.

$12 @ 100mm centres
round skimmer box.

Approved joint
sealing tope over
Skkoflex capping.

Hydrotite waterstop Abelflex. between

strips both sides of .
and full length of Hyerotite strips.

250 Min

@ 600ctrs with one end Hydrocast 'EX’

greased and fitted with on
end cap.

CRITICAL DEPTH LINE

waterstop to wall ond
floor Min.

CONTROL JOINT DETAIL

4 — S}2 horizontot bars,
continuous, equally
Spaced in edge
thickening.

Water tine.

460 Min.

S12 @ 250 vert
& horiz. u.n.o.
(ploced centre}

Notural Sirota.

Additional $12 - 250 vert placed
between other verts, extend past
radius os shown.(ie. $12~125)

100mm thick compacted 10mm
to 20mm clean crushed rock
filter media.

Continue $12 @ 150 centres around

valve in beth directions ~

lap=500mm

500mm x 500mm pit filled with
10mm to 20mm crushed rock (no
fines) fitter material.

Wrap in geotextile membrane.

Where radius less than
500mm provide
Additional $12-200
Horizontals, Between
moin bars.

Sl2 @ 250 vert &
horiz. u.n.o,
(placed centre}

STAIR DETAIL

S12 @ 250 vert &
horiz. u.n.o.
(placed centre)

GENERAL NOTES :

~ Poot to be constructed in accordance with AS 2783 and
council sofety requirements.

~ Concrete Strength Fe = 32MPo ol 28 days (effective
cement content to be not less than 280kq per m3} for pools
within tkm of large expanses of solt woter such as the seo
(but pool not to be constructed in tidal splash zones of salt
woter). Where pools are constructed more thon km from
large expanses of salt water (such as the sea) the concrete
strength may be reduced to 25MPa,

- Admixtures to comply with AS1478

~ Concrete slump 86mm.

- Concrete to be sprayed in 0 continuous operation ond cured
for 7 days minimum. This involves keeping the walls ond floor
surface moist in an appraved manner (ie. fog spray)
Alternatively the surface can be sprayed with confilm or
equally approved additive.

~ Rod concrete in walls to remove alt air pockets {only
vibrate in tight corners).

~ Do not use curing compounds which affect the bonding of
applied coatings.

- Reinforcement - All steel to be grade 250 S bors.
Reinforcement ~ minimum cover 70mm +5/-Omm

— Reinforcement iops 500mm for S bars,

~ All reinforcement bars to be continuous around all comers
and curves and shalt be lapped U.N.O.

Minimum stripping and/ or backfilling time is 14 days.

~ The final pool shape and layout should be approved by the
engineer prior to commencement of works.

~ All fences and gates surrounding pool area shail be in
accordance with AS1926.

~ The poo! excavotion shall in no way undermine ony adjacent
structures or services (Refer to critical line diagram provided).
The pool contractor /budder is responsible for obtaining afl
felevont levels and positions of adjacent structures prior to
commencing work.

Issue:

CONSTRUCTION
CONSULTING ENGINEERS

structural - civil - geotechnical

ABN 40 098 481 899

18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544 Fax (07) 5447 2634

Title: POOL CONSTRUCTION DETAILS

Project Lot 161 Orealla Cres,
Sunrise Beach.

Date: May 2006. Drg No. 16115-PD

 

Used in these records

About this file

File size
5.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0387 - Op Works - Landscaping, Carparking & Access, Frontage [As Published].pdf · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.