Skip to the record
The only place to find full transcripts.

Council archive · source document

07/0387 - Op Works - Landscaping, Carparking & Access, Frontage [As Published] · 142007.387

of 62

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997
State-controlled road matters (cont)

IDAS Assessment Checklist, Version 18.0, 10 November 2006
(1 (ii) development on land not contiguous to a State-controlled road and -

(J (a) material change of use -
* assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
(J (b) reconfiguring a Jot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
CJ (ce) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above}~
* assessable against the local government's planning scheme; and
¢ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.

Hip noné of the above

 

Clearing vegetation.

 

 

 

3. The application involves: (tick applicable box/es)
4 For more information refer to Guide 12. . oO (i) material change ofuse—-
Unless you answered ‘none of the above" to Q3, the . +
application requires assessment by the Depaitment (a) assessable against the planning scheme;
jofNatural Resources Mines and Water (NRMW). <a .
“Ean agency other than NRMW is the assessment (b) on a fot containing .
manager for the application, NRMW isa * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
yeanourence agency for he application ja rotation to © if there is no property map of assessable vegetation for the lot - remnant vegetation;
Ifyou ticked 03(i) or (i), your application requires {c) where the existing use of the land is a rural or environmental use; and
referral to NRMW for assessment regardless of (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
; whether vegetation clearing is proposed or not: . . . .
3 . . ne ((ii)_ reconfiguring a lot -
(a) on aot containing a category 1, 2 or 3 area shown on a property map of
' assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
{b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and :
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
(iii), operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
{b) not associated with a material change of use assessable against the planning
. scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
" Form 1
min) none of the above.
ee
Strategic port land 4. The application involves:
For more information refer to Guide Wi, (1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
tf you ticked {i) - the retevant Port Authority is the Act Part | of F 1
assessment manager for the application. Ct) - complete Part | of Form
I you ticked (i) Queensland Transport is a CO) (ii) a material change of use that is inconsistent with the land use plan approved under the
Concurrence agancy for the application. TI Act for the strategic port land - complete Part | of Form 1
iy none of the above .
Acid sulfate soils 5. The application involves development on land situated in an identified’ local government area

For more information refer to Guide 10,

Untess you answered "none of the above" to Q5, ihe
application requires assessment by Department of
Natural Resources Mings and Water (NRMW).

if an agency other than NRMW is the assessment
manager for the application, NRMW is an advice
agency for the application in relation to this matter.

 

and where the surface of the land is: (tick applicable box)

(1 {i)_ below 20m AHDE and the development will involve the excavation of 1000m3 or more of
soil or sediment at or below 5m AHD, or

(J (ii) at or below 5m AHD and the development will involve filling the site with 1000m3 or more
of material

{iii) none of the above

 

 

5. The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cairns, Calliope, Catoundra, Cardwel, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Tosres, Townsville, Whitsunday.

6 Australian Height Datum (AHO).

Page2

Used in these records

About this file

File size
5.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0387 - Op Works - Landscaping, Carparking & Access, Frontage [As Published].pdf · 5.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.