26 November 2015

Our Reference: 15193
Council Reference: MCU15/0095

The Chief Executive Officer
Noosa Council
Via email: [email protected]

Attention: Denis Wallace


Dear Denis,

RE:      RESPONSE TO INFORMATION REQUEST
         DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE – SERVICE STATION AND
         RECONFIGURATION OF A LOT (1 LOT INTO 2 LOTS)
         115 EUMUNDI NOOSA ROAD, NOOSAVILLE, QLD 4566
                                                              th
Further to council’s information request (RFI) dated 9 November 2015, please find below our formal response to all
the information requested as per section 278 of the Sustainable Planning Act, 2009 (the Act).

In support of this request, please find the following attachments to this response:
     -  Amended DA Drawings
     -  Stormwater Calculations Table (Item 8)

We have adopted council’s numbering and have provided commentary on each matter.

Further Information Requested                                  Development Response
Issue – Airborne Hazards
The service station is proposed adjacent to a school and it may be prudent to provide screening vegetation to reduce
airborne hazards, such as benzene. Screening plantings of a tall species such as Eleocarpus Eumundi along the
proposed internal boundary or existing south-eastern property boundary should be considered and a slightly modified
layout may be required to provide suitable garden bed widths.

Information Required
1. Provide comment and/or amended proposal plans on                1.   Benzene as an active constituent of Motor Spirit is
    the development’s ability to provide tall screening                 1% v/v as legislated in Australia. This is a minor
    plantings to reduce airborne hazards to the                         fraction of total chemical compounds in Motor
    neighbouring school. The most suitable location                     Spirit. With the advent of modern VR1 systems and
    appears to be along the proposed internal boundary                  fibreglass underground tanks the vapour fraction
    between the lots, though the garden bed there is                    escaping to the environment has reduced to
    proposed at only 600mmm wide and could be                           extremely low levels that poses no detrimental
    increased by relocating the internal boundary slightly              health impacts to those living in close proximity to
    to the east (say by 900mm).                                         Petrol Stations.

                                                                   2.   The refuelling canopy is some 46m to the boundary
                                                                        with the school that backs onto the sports hall and
                                                                        swimming. There are no classrooms within at least
                                                                        100-150m of the petrol station. This separation
                                                                        distance alone is more than sufficient to neutralise
                                                                        / dilute any minor trace benzene particulates to
                                                                        such a degree and to be undetectable.



                           Head Office                             New South Wales                     Victoria
                           17 Dover Street, Albion Qld 4010        Suite 315, 33 Lexington Drive       Suite 13, 150 Albert Road
                           PO Box 301, Albion Qld 4010             Bella Vista NSW 2153                South Melbourne Vic 3205

                           Reception : +61 7 3854 2900             Australia Wide: 1300 794 300        Website: www.tfa.com.au
Log in to download the original file

2015-11-26_Response to Further Information- Council.pdf · 523 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 4 pages

Page 2

TfA Project Group Pty Ltd                                                                                                             Noosaville


         Further Information Requested                                 Development Response
         Issue – Existing Vegetation
         The Noosa Plan seeks to retain existing vegetation on sites where practicable. Comments in Section 6.2 of the
         submitted planning report are noted but only address the Walter Hay Drive frontage, which is not consistent with pre-
         lodgement advice. A preliminary landscape design is required to demonstrate the full extent of proposed vegetation
         retention.

         Information Required                                               The revised DA Drawings now show the existing trees,
         2. Provide a preliminary landscaping design showing the            proposed to be retained and removed. Refer Drawing
             location of existing trees on the site and road reserve.       D06.
             The plan must identifying trees to be retained and
             removed, having regard to the location of the                  The trees being removed behind the building on the
             proposed building work, earthworks, pedestrian link,           Walter Hay Street frontage will include additional
             services, etc.                                                 planting to compensate their removal.

         Issue - Access
         A preliminary access driveway design is required, as this area has a number of design considerations, which may
         include HV electricity cabling.

         Information Required
         3. Provide a preliminary design for the proposed access            a)   The revised DA Drawings now show all the relevant
             driveway that include the following:                                dimensions. Refer drawing D02.
             a) All relevant dimensions including lanes and
                  median widths.                                            TfA Project Group Civil Engineer Response below:

              b) A compliant longitudinal section/profile for both          b) i. - iv) Cross- sections are now in the amended
                 lanes of the driveway that:                                   drawings attached. Refer drawing D015.
                 i.        Extends from the existing street median
                           in Eumundi Noosa Road to the end of the
                           access handle (or the end of the
                           proposed internal driveway median).
                 ii.       Demonstrates adequate ground
                           clearance (no bottoming down) for an
                           Articulated Vehicle and a Heavy Rigid
                           Vehicle along the vehicles traveling paths.
                 iii.      Indicate the finished and existing ground
                           levels to give indication of the depth of
                           the earthwork associated with the access
                           driveway particularly across the road
                           footpath verge.
                 iv.       Shows in section any underground
                           service that could be impacted on by the
                           changes in surface levels, particularly the
                           existing in-ground electricity cable
                           running along the front boundary.

         Issue - Earthwork
         Earthworks associated with the development are not detailed.

         Information Required                                               TfA Project Group Civil Engineer Response below:
         4. Provide preliminary design plan/s showing the extent
             of required earthworks on the site including:
                                                                            a)   Refer to Drawing D10 in the amended drawings
              a)    Surface finish levels for the earthworks and floor           which show the proposed final floor elevations of
                    level for proposed buildings.                                the building and the final site grading.

                                                                            b) As shown in the original Site Grading and
              b) Retaining walls and batters (all new retaining walls          Stormwater Drainage Plan, the proposed retaining



                                                                   Page 2 of 5                                                       26/11/2015

Page 3

TfA Project Group Pty Ltd                                                                                                             Noosaville


         Further Information Requested                                      Development Response
                  and batters must be located within the boundaries            wall is within the proposed boundaries of the site
                  of the site).                                                and proposed lot 1.

              c)    Relevant cross sections as necessary to illustrate      c)   Refer to the cross sections attached in the
                    the extent of earthworks and retaining walls                 amended drawings.
                    and/or batters.

         Issue - Footpath
         Existing footpath adjustment/reconstruction.
         Information Required                                               TfA Project Group Civil Engineer Response below:
         5. Provide engineering plans showing the required
              adjustment to the existing concrete footpath near the         To maintain connectivity with Eumundi- Noosa Road, no
              proposed access driveway to achieve compliant grades          changes to the existing crossovers grades are proposed.
              for a public pathway.
                                                                            The proposed alteration only involves widening at the
                                                                            existing entry point to allow access for a 19m AV fuel
                                                                            delivery vehicle.

                                                                            Further to the above, all detailed design will be
                                                                            undertaken at the operational works stage. This is
                                                                            typically the most feasible stage within which to
                                                                            conduct detailed design as the bulk of changes /
                                                                            iterations (both council and applicant driven) are
                                                                            undertaken during DA stage.

         Issue – Existing Stormwater Infrastructure
         An existing stormwater inlet pit situated at the proposed access to the development site.

         Information Required                                               The stormwater inlet pit has been relocated to the
         6. Provide preliminarily design plan to relocate/replace           west. This has also been updated in the stormwater
             the existing stormwater inlet pit away from the                management plan as necessary.
             proposed access driveway.

         Issue - Traffic
         There are concerns with the potential for queuing in the road and traffic conflict in the shared access area (easement
         area), particularly in association with the future industry/retail development on the balance lot.

         Information Required
         7. Provide the following:
             a) Justification to allocate four parking spaces (Nos          a)   Drawing No 15193 D14 Revision A is indicative only.
                 14 to 17 on Drawing No 15193 D14 Revision A) at                 Any future application over proposed lot 2 will be
                 the entry to the site. This is considered to create a           subject to its own development application and
                 potential for traffic conflict and queuing problems.            conditions.
                 It considered that this area more suited to a
                 passive use, such as landscaping or for future
                 stormwater bio-retention basin or water quality
                 devices.
             b) A traffic management procedure to demonstrate               b) It is considered that traffic management procedure
                 refueling will not impact on traffic movements in             is not necessary. As per the Traffic Report prepared
                 Eumundi Noosa Road or the internal traffic within             by QTraffic originally submitted, the site access
                 the site. Also, advise if time restrictions will be           arrangements are consistent with the existing
                 implemented on refuelling operation schedules to              arrangements, and are considered to be
                 address this issue.                                           appropriate given the nature of the use and the
                                                                               existing road environment.
                                                                               Section 4 of the report states that the level of
                                                                               traffic generation for the proposed development is
                                                                               low, and once distributed onto the surrounding



                                                                   Page 3 of 5                                                       26/11/2015

Page 4

TfA Project Group Pty Ltd                                                                                                               Noosaville


         Further Information Requested                                     Development Response
                                                                              road network, would be within the range of typical
                                                                              fluctuations in traffic volumes.

                                                                                The expected sales and trade expectations for the
                                                                                site would have one with possibly two deliveries
                                                                                occurring in a 7 Day period. It is the policy to
                                                                                undertake these deliveries outside of peak periods
                                                                                to minimise any impact on traffic within the site.
                                                                                A 3 dispenser site with 6 filling positions has the
                                                                                capacity to process 83 vehicles per hour without
                                                                                the need for a single car to queue. Traffic
                                                                                generation rates anticipated for this development
                                                                                are projected to be significantly lower than the
                                                                                capacity of the site to process vehicles for the
                                                                                foreseeable future.
                                                                                One or two tanker refuelling deliveries every 7 days
                                                                                would have no impact on queuing.

              c)    Assessment of the need for a no-queuing area to        c)   It is considered that queuing in the easement area
                    avoid obstructions to traffic flows within the              will be unlikely as a result of the proposed service
                    access easement area and to allow for the future            station development given the ample queuing
                    development of the balance lot.                             space on site, as per Drawing No 15193- D13.
                                                                                However, as mentioned in 7a above, any future
                                                                                development application over the balance lot will
                                                                                also presumably be required to demonstrate no
                                                                                queuing into the easement area.

         Issue – Stormwater
         Clear compliance with Specific Outcomes O1, O3, O6, and O9 of the Water Sensitive Design Code has not been
         demonstrated. It is also unclear whether there are appropriate level differences for the proposed detention tank and
         grass lined swale to function, given existing site levels.

         TfA Project Group Civil Engineer Response to Specific Outcomes O1, O3, O6 and O9 below:

         O1
         Prior to the discharge of run-off to the legal point on Eumundi Noosa Road, stormwater will be captured and treated
         through a combination of gully pits fitted with Spel Stormsacks (gross pollutant traps), underground pipes and a
         detention system.

         O3
         The proposed development does not consider the reuse of stormwater.

         O6
         The Spel units proposed (Spel Stormsacks and Spel Puraceptor) captures gross pollutants and hydrocarbons at water
         quality standards of Brisbane City Council. The total area of the site being developed is less than 2,500 m2 therefore
         the development is not required to achieve the TN, TP and TSS pollutant reductions outlined in the Queensland State
         Planning Policy (SPP) July 2014.

         O9
         The proposed development includes gully pits fitted with Spel Stormsacks (Gross pollutant traps) that captures 99.99%
         of gross pollutants (sediment, litter, oil and grease) up to the bypass flowrate.

         Information Required                                              TfA Project Group Civil Engineer Response below:
         8. Provide a preliminary stormwater drainage design               The proposed development does not incorporate the
             demonstrating the proposed open swale drain and               use of swales, however the proposed detention tank
             detention tank will be able to function at the proposed       comprises an underground unit designed to suit the
             location in respect of invert levels at the legal point of    invert levels of the legal point of discharge.



                                                                  Page 4 of 5                                                          26/11/2015

Page 5

TfA Project Group Pty Ltd                                                                                                        Noosaville


         Further Information Requested                                   Development Response
             discharge and without interference with other
             underground infrastructure required for operation of        A detailed calculations table showing the surface and
             the use.                                                    invert levels of the proposed stormwater system has
                                                                         been provided (see attached). This table demonstrates
                                                                         that the pipe network, including the detention tank, can
                                                                         be connected to the Council’s stormwater drainage
                                                                         infrastructure.

                                                                         Refer to the Stormwater calculations sheet attached.

         9.   Demonstrate with the preliminary stormwater                TfA Project Group Civil Engineer Response below:
              drainage design how runoff from hardstand areas will
              be captured and reused on site, where possible, and        The development does not consider reusing treated
              polished through natural treatment strategies prior to     stormwater on site. The preliminary stormwater
              discharge from site.                                       drainage design captures and conveys run-off from
                                                                         hardstand areas via gully pits (fitted with Storm Sacks)
                                                                         and underground pipes connected to a detention tank
                                                                         prior to discharge from the site. Any hydrocarbon spill
                                                                         from under the canopy is also captured via gully pits
                                                                         and underground pipes directed to a Spel Puraceptor
                                                                         for hydrocarbon removal. The site’s treated stormwater
                                                                         then will discharge to the legal point of discharge.

         Issue – Gross Pollutant Trap Maintenance
         Some gross pollutant traps generate and leach water pollutants if not appropriately maintained and can cause non-
         compliance with Specific Outcome O6 of the Water Sensitive Design Code.

         Information Required                                            TfA Project Group Civil Engineer Response below:
         10. Provide confirmation from the applicant that the
             expected maintenance costs and labour associated            The gross pollutant traps will be maintained and
             with maintenance of gross pollutant traps, as               serviced by the owners of the development as per the
             compared to natural water sensitive design features,        manufacturer specifications.
             are understood and accepted.
                                                                         The developer understands and accepts the
                                                                         maintenance responsibilities and requirements of the
                                                                         stormwater treatment system (Spel units) proposed.


         In accordance with section 278 of the Act, this response comprises our formal response to the council’s information
         request.

         If you require any further details, please contact me on (07) 3854 2909 or mobile 0437 005 231.

         Yours faithfully,




         Hayley Edmunds
         Town Planner
         BUrbDev (URP), MPIA




                                                                Page 5 of 5                                                     26/11/2015

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.