Original source · versioned page text
4 - Bushfire Response
(4) Planning Act 2016 Chapter 2 Planning [s 9] (c) _aplanning scheme policy. To the extent of any inconsistency— (a) a State planning policy applies instead of a regional plan or local planning instrument; and (b) a regional plan applies instead of a local planning instrument; and (c) aplanning scheme applies instead of a planning scheme policy; and (d) aTLPI applies instead of a planning scheme or planning scheme policy. Note— A TLPI may also suspend, or otherwise affect, the operation of a planning scheme or planning scheme policy—see section 23(3). 6) (6) A local planning instrument must not include a provision about building work, to the extent the building work is regulated under the building assessment provisions, unless allowed under the Building Act. To the extent a local planning instrument does not comply with subsection (5), the local planning instrument is of no effect. 9 When planning instruments and designations have effect (1) (2) @) This section explains when certain instruments made under this chapter start to have effect. The effective day is the day when the following instruments start to have effect— (a) aplanning instrument or designation; (b) an amendment or repeal of a planning instrument or designation. If this chapter requires public notice of the instrument to be published, the effective day is— (a) _ the day on which the notice is published in the gazette; or Current as at 10 June 2022 Page 23 Authorised by the Parliamentary Counsel ELDON BOTTCHER ARCHITECT PTY LTD © 5/10/22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original