Original source · versioned page text
Final Plans -Materiality & Visualisation Package
The original of this document is very large (12.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn EW-W 01
EAST WING - EAST FACADE - BANKSIA AVE
EAST WING VIEWED FROM SERENITY CLOSE
EW-E 01
RM / CONC MRS
GL2 + SHUTTER GL2 + SHUTTER
SCR2 GL3
RM / CONC
SCR1 KEY PLAN - VIEWS
SCR2
SERENITY CLOSE
RL 31750 - _LEVEL 03 UPPER
RL 28750 - _LEVEL 03
RL 25000 - _LEVEL 02
RL 21750 - _LEVEL 01
RM / CONC
STN1
ELEVATION - EAST WING - EAST FACING - BANKSIA AVE
VEHICLE ENTRY GATE HOUSE
(PUBLIC ENTRY) RL 18000 - _GROUND FLOOR
EXISTING SIGNIFICANT MATURE
STREET TREES HIDDEN FROM
VIEW FOR CLARITY
1 PART - EAST - EAST
001.10 1 : 200
CONC 2 CONC CONC 2 CONC
BAL CONC SCR1 GL2 + SHUTTER BAL1 GL2 + SHUTTER BAL1
GL1 GL2 + SHUTTER BAL1 GL1 BAL CONC GL1
CONC GL1 CONC SCR1 CONC
SCR1 CONC
BANKSIA AVENUE
RL 31750 - _LEVEL 03 UPPER
RL 28750 - _LEVEL 03
SCR2
RL 25000 - _LEVEL 02
RL 21750 - _LEVEL 01
RL 18000 - _GROUND FLOOR
VEHICLE ACCESS
MENITIES VEHICLE ACCESS TO BASEMENTS (GATEHOUSE
OPEN LANDSCAPED
BEYOND)
COURTYARD
RL 14750 - _LOWER GROUND
CONC-PC2 CONC-PC2 CONC-PC2
EXISTING SIGNIFICANT
MATURE TREES HIDDEN
RL 11750 - _BASEMENT
FROM VIEW FOR CLARITY
4 PART - EAST - SOUTH
001.10 1 : 200
EW-E01 - EAST WING - WEST FACADE - MAIN ENTRY EW-W01 - EAST WING - NORTH/ WEST CORNER
BANKSIA AVENUE FRONTAGE
Y PLAN:
1 REV DESCRIPTION BY DATE PROJECT: TITLE:
A FURTHER ADVICE RESPONSE 30.08.24
3 - 7| SERENITY CLOSE NOOSA HEADS ELEVATION - EAST WING - EAST & WEST
THE CALILE HOTEL - NOOSA | CALILE MALOUF INVESTMENTS | FURTHER ADVICE REPONSE 30.08.2024 2100014 | RICHARDS & SPENCE
PROJECT DIRECTOR: STATUS:
2
APR PRELIMINARY ONLY 05
CLIENT: PROJECT NUMBER: DRAWING NUMBER: REVISION:
CALILE MALOUF INVESTMENTS 2100004 AR-021.12 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.