6.3) Additional aspects of development
Additional aspects of development are relevant to this development application and the details for these aspects
that would be required under Part 3 Section 1 of this form have been attached to this development application
Not required
6.4) Is the application for State facilitated development?
Yes - Has a notice of declaration been given by the Minister?
No
Section 2 – Further development details
7) Does the proposed development application involve any of the following?
Material change of use Yes – complete division 1 if assessable against a local planning instrument
Reconfiguring a lot Yes – complete division 2
Operational work Yes – complete division 3
Building work Yes – complete DA Form 2 – Building work details
Division 1 – Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
local planning instrument.
8.1) Describe the proposed material change of use
Provide a general description of the Provide the planning scheme definition Number of dwelling Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m2)
(if applicable)
8.2) Does the proposed use involve the use of existing buildings on the premises?
Yes
No
8.3) Does the proposed development relate to temporary accepted development under the Planning Regulation?
Yes – provide details below or include details in a schedule to this development application
No
Provide a general description of the temporary accepted development Specify the stated period dates
under the Planning Regulation
Division 2 – Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.
9.1) What is the total number of existing lots making up the premises?
9.2) What is the nature of the lot reconfiguration? (tick all applicable boxes)
Subdivision (complete 10) Dividing land into parts by agreement (complete 11)
Boundary realignment (complete 12) Creating or changing an easement giving access to a lot
from a constructed road (complete 13)
[OCR of page images]
6.3) Additional aspects of development
LJ Additional aspects of development are relevant to this development application and the details for these aspects
that would be required under Part 3 Section 1 of this form have been attached to this development application
CJ Not required
6.4) Is the application for State facilitated development?
CO Yes - Has a notice of declaration been given by the Minister?
[No
Section 2 — Further development details
7) Does the proposed development application involve any of the following?
Material change of use LJ Yes — complete division 1 if assessable against a local planning instrument
Reconfiguring a lot LI Yes — complete division 2
Operational work I Yes — complete division 3
Building work LJ Yes — complete DA Form 2 - Building work details
Division 1 — Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
local planning instrument.
8.1) Describe the proposed material change of use
Provide a general description of the Provide the planning scheme definition | Number of dwelling | Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m?)
(if applicable)
8.2) Does the proposed use involve the use of existing buildings on the premises?
(Yes
[] No
8.3) Does the proposed development relate to temporary accepted development under the Planning Regulation?
CJ Yes — provide details below or include details in a schedule to this development application
[J No
Provide a general description of the temporary accepted development Specify the stated period dates
under the Planning Regulation
Division 2 — Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.
9.1) What is the total number of existing lots making up the premises?
9.2) What is the nature of the lot reconfiguration? (tick all applicable boxes)
LJ Subdivision (complete 10) LJ Dividing land into parts by agreement (complete 11)
C1 Boundary realignment (complete 12) LJ Creating or changing an easement giving access to a lot
from a constructed road (complete 13)
Queensland
Government
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (DA Form 1 - 33 CURRAWONG STREET NOOSA HEADS Copy.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.