Council archive · source document
150MossmanCt-1 · OPW16/0101
Attached to the e-mail OPW16/0101- Operational Works Application.
TOP O
RL 1.95 AHD
\ | TING REVETMENT Wall
2000
SIDE ELEVATION aN ‘
ale 1:100
JETTY FRAMING SCHEDULE
<K SIZE/GRADE
PIX ov
TO REVETVENT
200dia H6 TREATED
T
MOSSMAN COUR
GW
SITE N
2250
GENERAL NOTES
I ALL TIMBER SHALL BE DURABILITY CLASS | OF APPROVED SPECIES WITH A MINIMUM STRESS GRADE
OF FIA UNLESS NOTED OTHERWISE.
Project GETTY PLANS
2 ALL CONSTRUCTION TO COMPLY WITH THE ENVIRONMENTAL PROTECTION AGENCY'S OPERATIONAL
POLICY — “BUILDING ANP ENGINEERING STANDARDS FOR TIDAL WORKS" UNLESS NOTED OTHERWISE.
eeation | ot (62 Mossman Ct
2 ALL BOLTS, ROPS ETC TO PE MARINE GRADE Sl6 STAINLESS STEEL, ALL OTHER STEEL WORK NOOSA HEADS
INCLUDING NUTS, BOLTS, WASHERS AND SCREWS NOT TO BE HDG OR STAINLESS STEEL
A TOPS O PILES TQ BE SEALED AND FULLY CAP FLASHED OR RINGED WITH AN ALUMINIUM OR,
et 69 o S5P N2|B59
STAINLESS STEEL BAND
Weyba "March
5. WRITTEN DIMENSIONS TAKE PRECEDENCE. DO NOT SCALE DIRECTLY FROM DRAWING. ANY
DISCREPANCIES, ERRORS, OMISSIONS OR QUESTIONS SHOUD BE DIRECTED TO THE BUILDER OR WORKING DRAWINGS
Site Plan and Jetty Layout
6 CONSTRUCTION MUST NOT VARY FROM THESE DRAWINGS WITHOUT THE WRITTEN APPROVAL FROM N
THE OWNER, RELEVANT AUTHORITIES AND THE DESIGNER ° MCA4C-O0|
7. THESE DRAWINGS HAVE BEEN PREPARED FOR PULDING APPROVAL ONLY. FURTHER CONSTRUCTION 2 bate - a
DETAILS, SHOP DRAWINGS OR OTHER INFORMATION REMAIN THE RESPONSIBILITY OF THEIR AUTHOR(S) FRAMING LAYOUT A2 pate APRIL 22/6
&. FIXING/CONSTRUCTION DETAILS PROVIDED ARE TO BE CHECKED AND CERTIFIED BY STRUCTURAL Scale 1: 100
ENGINEER AND WILL BECOME THE RESPONSIBILITY OF THE CERTIFIER.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
150MossmanCt-1.pdfRelated documentApplication case desk ↗
About this file
- File size
- 131 KB (small file)
- File type
No other editions are linked here.