4.4 Required Mitigation – Installation of a Detention Tank
Due to the projected increase in post-development peak flows, mitigation measures are required to ensure
compliance with Noosa Shire Council stormwater management requirements and to prevent potential downstream
impacts. The most suitable solution is the use of a detention tank; modelling will ensure the designed tank will
achieve the following outcomes:
• Attenuate peak discharge by temporarily storing excess runoff and releasing it at controlled, pre-
development rates
• Control flow velocities, thereby reducing the risk of downstream erosion and infrastructure overloading
and
• Improve water quality by facilitating the settlement of suspended solids and associated pollutants prior to
discharge.
The detention tank will be designed to ensure that post-development peak flows do not exceed pre-development
flow conditions for all relevant design storm events. Further hydrological modelling will be undertaken to
appropriately size the tank and confirm its effectiveness in mitigating increased flow volumes and velocities.
4.5 Stormwater Detention and Mitigation Strategy
The use of a detention tank is proposed to be utilised for stormwater detention and will be sized to retain all site-
generated flows. The tank is located in the southeastern portion of the development, as shown on the Civil Set of
Plans (Drawing No. P0478-26-001_Cooroy_Development_OPW), for Council’s consideration.
The detention tank has been designed to detain and control stormwater flows for all assessed events, up to and
including the 1% AEP, ensuring post-development peak discharges do not exceed pre-development levels in
accordance with QUDM. Attenuation is provided across all design storm events, with tank sizing and outlet controls
configured to achieve compliant discharge rates. Refer to Table 4-2 for tank design parameters.
The site naturally drains towards the east in accordance with the existing topography. The proposed development
is designed so that stormwater from the site, including roof areas and hardstand, will be captured by a detention
tank located in the southeastern portion of the site, redirecting overland flow away from adjacent properties.
This approach ensures controlled attenuation of the increased peak flows generated by the proposed
development’s additional impervious surfaces prior to discharge via a new 375mm RCP pipe into council’s existing
stormwater network within Myall Street. Existing site overland flow paths will continue to be conveyed towards
the east in accordance with predevelopment conditions.
Hydrological modelling adopts a consistent catchment framework for both pre- and post-development scenarios,
enabling direct comparison and demonstrating compliance with Council’s non-worsening drainage requirements.
Table 4-2: Detention Tank Parameters
Parameter Value
Tank Footprint 50.00 m2
Internal Tank Height 1.50 m
1% AEP Storage Volume 74.53 m³
1% AEP Water Depth 1.49 m
Lower Discharge Control 170 mm orifice at 116.84 m AHD
Secondary Discharge Control 245 mm orifice at 117.84 m AHD
Outlet Pipe Size 375mm dia RCP
Outlet Pipe Invert Level 116.84 m AHD
45 MAPLE STREET, COOROY
24 June 2026 P a g e | 14
Stormwater Management Plan
Client Reference: P0478-26-001
Prepared for Myall Rise PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - P0478-26-001_45_Maple_Street_Cooroy_SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.