Original source · versioned page text
RFI - P0478-26-001_45_Maple_Street_Cooroy_SWMP
Original PDF page 22, section 1. The text section number identifies this passage in the reader.
7 Conclusion The Stormwater Management Plan for the proposed multiple dwelling development 45 Maple Street, Cooroy has been prepared to demonstrate compliance with the stormwater management requirements of Noosa Shire Council, QUDM and relevant State Planning Policy provisions. The assessment incorporates detailed hydrological modelling, comparison against existing conditions, and the development of an effective stormwater management strategy that mitigates potential impacts arising from the proposed works. 7.1 Hydrological and Hydraulic Considerations Assessment of the existing site confirms that stormwater runoff generally flows towards the east in accordance with site topography. Pre-development peak flows were estimated using both the Rational Method and DRAINS modelling to establish a baseline for comparison. While the Rational Method provided a suitable verification check, the DRAINS model more accurately represents catchment behaviour, including rainfall losses, temporal variation, storage effects, and flow routing. Accordingly, DRAINS modelling has been adopted for the final design and assessment. 7.2 Stormwater Quantity Management The proposed development increases impervious area and runoff potential. To mitigate these impacts, a proposed OSD tank has been incorporated within the southern portion of the site. The detention system captures stormwater runoff and attenuates peak flows prior to discharge via the lawful point of discharge into Council’s existing stormwater network within Myall Street. Existing overland flow paths are maintained, and no increase in discharge to adjoining properties occurs. Hydrological modelling confirms that post-development peak discharge rates are equal to or less than pre- development flows for all assessed storm events up to and including the 1% AEP event, satisfying Council’s non- worsening drainage requirements. The detention system has been designed with appropriate storage and outlet controls to achieve compliant discharge rates, including: Storage volume: 75.00 m³ • Storage volume: 74.53 m³ for the 1% AEP event • Maximum water depth: 1.49 m • Lower outlet: 170 mm orifice • Secondary outlet: 245 mm orifice • Outlet pipe: 375 mm diameter These design elements ensure safe and effective management of stormwater flows generated by the development. 45 MAPLE STREET, COOROY 24 June 2026 P a g e | 19 Stormwater Management Plan Client Reference: P0478-26-001 Prepared for Myall Rise PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - P0478-26-001_45_Maple_Street_Cooroy_SWMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.