Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Stormwater Management Plan · MCU15/0122

Attached to the e-mail MCU15/0122 - Response to Information Request - Stormwater Mgmt Plan, Bioretention & Rainwater reuse Email 2 of 3.

of 55

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

                                                                                 15099 - SBSMP/3
                                                                                          Page 3




1 INTRODUCTION
This Site Based Stormwater Management Plan (SBSMP) has been prepared for the proposed
Proposed Medical Development at the Cnr Val Crescent & Goodchap Street, Noosaville.

This SBSMP has been prepared to investigate the effects the development will have on
stormwater quantity and quality.

The objective of this SBSMP is to ensure that there is no adverse impact by the development on
the environmental value of the receiving waters during the construction and operational phases
of the development. This SBSMP will also provide recommendations to ensure that the post-
development peak outflow conditions are not greater than the pre-development peak outflow
conditions.

In order to achieve this objective, this SBSMP:

    1. Describes the environmental setting of the development site and precinct;
    2. Describes the nature of the proposed development as it relates to stormwater quality;
    3. Calculates the peak flows for both pre and post-development conditions;
    4. Calculates the detention volume required to achieve the pre-development outflow in
       the post-development state, and;
    5. Identifies potential sources of contaminants and describes the management techniques
       designed to be employed on the site to achieve the water quality objectives.


The proposed development has been assessed against the following guidelines and planning
documents:

    1. State Planning Policy 2014 (SPP 2014);
    2. Urban Stormwater Quality Planning Guidelines 2010;
    3. The Queensland Urban Drainage Manual (QUDM);
    4. The Noosa Council Planning Scheme




Site Based Stormwater Management Plan
Proposed Medical Development at Cnr Val Crescent & Goodchap Street, Noosaville

Used in these records

About this file

File size
7.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Plan.pdf · 7.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.