Stormwater Management Plan · MCU15/0122

Attached to the e-mail MCU15/0122 - Response to Information Request - Stormwater Mgmt Plan, Bioretention & Rainwater reuse Email 2 of 3.

of 55

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 9, section 1. The text section number identifies this passage in the reader.

                                                                                          15099 - SBSMP/3
                                                                                                   Page 9




5.5 Peak Flows
Refer to Table 5-3 for a summary of the predicted minor and major discharge rates for pre- and
post-development conditions and Appendix F for the Rational Method calculations.

                               Table 5-3 – Pre and Post-Development Peak Flows

                             Property State               Q10 (m3/s)        Q100 (m3/s)

                           Pre-development                  0.161                0.279
                           Post-development                 0.230                0.386


It is evident that there will be an increase between the pre-development and post-development
peak discharge flow rates. On-site detention will therefore be required to mitigate the
increased discharge flow rates to ensure pre-development flow rates can be achieved.


5.6 On-Site Detention Analysis
XP-RAFTS has been used to model the peak discharges from the site under both existing (pre-
development) and proposed (post-development) conditions, and to determine the sizing
requirements of the detention basin as outlined in Section 5.05.2 of the QUDM.

5.6.1 Pre-Development
Figure 5-1 shows the XP-Rafts model used to represent the pre-development site conditions and
Table 5.4 summarises the input parameters used in the model for the pre-development site
scenario.




                             Figure 5-1 –XP-RAFTS Pre-development Model




Site Based Stormwater Management Plan
Proposed Medical Development at Cnr Val Crescent & Goodchap Street, Noosaville

Used in these records

About this file

File size
7.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Plan.pdf · 7.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.