Attachment 12- Amended Property Vegetation Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Very large file (16.7 MB): may take a few minutes to open.
Noosa on Weyba
Property Vegetation Management Plan
Table 3-1 Compliance assessment of the proposed development with the MCU Policy
Performance Requirement Compliance Assessment
PR F1 - To regulate the clearing of vegetation in a way that Complies with PR F1
ensures the conservation of regional ecosystems, clearing as a The proposed development layout has been configured so as to minimise potential impacts to
result of the MCU only occurs where the applicant has ecological values of the site. In particular, development is proposed within the already-cleared
demonstrated that the development has first avoided and portions of the site, and the proposed layout provides for the retention of corridors of wildlife
minimised the impacts of the development. habitat that will facilitate the movement of native wildlife species within and through the site.
Over 72% of the Noosa on Weyba site would be specifically preserved and managed to
conserve and re-establish regional ecosystems.
PR F2 - Clearing as a result of the MCU assessed under this Complies with PR F2
Table may occur only where the MCU can demonstrate that the As detailed in Section 2.1 and 2.2 herein, the Noosa on Weyba proposal will provide substantial
level of conservation and biodiversity outcomes ensured by the conservation and biodiversity benefits. Substantial rehabilitation works are proposed within the
development significantly exceeds the extent and value of the site and the level of conservation and biodiversity outcomes ensured by the development
area proposed to be cleared. This can only be achieved by significantly exceeds the extent and value of the proposed clearing area. Specifically, the
meeting the requirements of the Policy for Vegetation clearance of assessable vegetation is limited to the selective clearance of woody vegetation
Management Offsets. within a mapped area of RE 12.5.3 that is ~0.12 ha in extent, while ~6.29 ha of the site will be
rehabilitated establish a vegetation community with the composition and structure of RE 12.5.3.
Approximately half of the 0.1 ha of proposed clearance of mapped areas of RE12.5.3 is also
proposed to establish and internal road connection linking Precinct 3 and Precinct 4. The
alternative road connection would involve the upgrading of Hollett Road which would require the
clearance of approximately 1.5 ha of remnant vegetation comprised of RE12.3.13, RE12.3.5,
RE12.5.3 and RE12.5.9.
The proposed offset measures will be undertaken in accordance with the Policy for Vegetation
Management Offsets. Specifically, the offset will be:
> land-based and within an area that is not mapped as remnant vegetation;
> the same RE type as that proposed for clearance;
> of ecological equivalence;
> legally secured (as per the BDOA Agreement); and
> implemented in accordance with an Offset Area Management Plan.
PR F3 - Clearing as a result of the MCU assessed under this Complies with PR F3
Table may occur only where the MCU meets: Compliance with Performance Requirements 2 to 10 of the RVM Code, Part P is achieved by
a) Performance Requirements 2 to 10 of the relevant the proposed development, as demonstrated in Table 3-2 below.
code, Part Xb for an extractive purpose; or
b) Performance Requirements 2 to 10 of the relevant
code, Part P for all other purposes.
Northbrook Corporation Pty Ltd Version 3 11 October 2013
5101-19 PVMP v3.docx Commercial in Confidence Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 12- Amended Property Vegetation Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 16.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.