Property Vegetation Management Plan



   Performance requirement                     Acceptable solution                                          Compliance Assessment

                                                                                                               dedication of the Noosa on Weyba Send land to the State; and

                                                                                                            > the Weyba Nature Refuge located on Council controlled land to the
                                                                                                               south of Hollett Road.
                                                                                                            The extent and context of the proposed remnant vegetation is such that it
                                                                                                            would not cause land degradation and would maintain ecological
                                                                                                            processes by retaining areas of remnant vegetation that are:
                                                                                                            a) of sufficient size and configured in a way to maintain ecosystem
                                                                                                                functioning; and
                                                                                                            b) of sufficient size and configured in a way to remain in the landscape
                                                                                                               in spite of any threatening processes; and
                                                                                                            c) located on the lot(s) that are the subject of the application to maintain
                                                                                                               connectivity to remnant vegetation on adjacent properties.
                                                                                                            As such the proposal satisfies PR P.4: Connectivity.

                                               P.4.3                                                        AS P.4.3 is not applicable as the proposed development is not a
                                                                                                            significant community project.
                                               Where clearing is for a significant community project,
                                               maintain the current extent of mapped remnant
                                               vegetation where the vegetation is—
                                                   a)   of sufficient size and configured in a way to
                                                        maintain ecosystem functioning; and

                                                   b)   of sufficient size and configured in a way to
                                                        remain in the landscape in spite of any
                                                        threatening processes; and
                                                   c)   located on the lot(s) that are the subject of the
                                                        application to maintain connectivity to mapped
                                                        remnant vegetation on adjacent properties.

   PR P.5: Soil erosion                        AS P.5                                                       Complies with PR P.5
   To regulate the clearing of vegetation in   P.5.1                                                        The proposed development would require mechanical clearance of
                                                                                                            remnant vegetation on land that is characterised by slopes of
   a way that does not cause land
                                               Mechanical clearing only occurs on—                          approximately 5% and as such would comply with AS P.5.1 and thereby
   degradation and maintains ecological                                                                     satisfy PR P.5.
   processes – the effect of clearing does         a)   very stable soils on a slope less than 30%; and


Northbrook Corporation Pty Ltd                                                      Version 3                                                                       11 October 2013
5101-19 PVMP v3.docx                                                          Commercial in Confidence                                                                     Page 15

Used in these records

About this file

File size
16.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 12- Amended Property Vegetation Management Plan MCU12_0208.pdf · 16.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.