Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Attachment 12- Amended Property Vegetation Management Plan MCU12/0208

of 55

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (16.7 MB): may take a few minutes to open.

Log in to see the plans as drawn
Noosa on Weyba
Property Vegetation Management Plan



   Performance requirement                       Acceptable solution                                          Compliance Assessment

   PR P.9: Conserving status                     AS P.9                                                       Complies with PR P.9.
   thresholds                                                                                                 The proposed development would not require nor create a potential
                                                 P.9.1
                                                                                                              future need for the clearance of any of the regional ecosystems listed in
   To regulate the clearing of vegetation in
                                                 Clearing in a regional ecosystem listed in Table 2, does     RVM Code Table 2 Regional ecosystems that are at risk of the remnant
   a way that conserves remnant
                                                 not occur unless the clearing is less than—                  extent falling below 30% of its pre-clearing extent, or having a remnant
   vegetation that are regional ecosystems
                                                                                                              extent of less than 10 000 hectares.
   and prevents the loss of biodiversity –       > 10 metres wide; or
   maintain the current extent of regional
   ecosystems listed in Table 2.                 > 2 hectares.

   PR P.10: Acid sulfate soils                   AS P.10.1                                                    Complies with PR P.10.
   To regulate the clearing of vegetation in     Clearing in land zone 1, land zone 2 or land zone 3 in       The proposed development would not require, nor create a potential
                                                                                                              future need for, the clearance of assessable vegetation within land zone
   a way that does not cause land                areas below 5 metres Australian Height Datum–
                                                                                                              1, land zone 2 or land zone 3.
   degradation and maintains ecological
                                                 a) is carried out in accordance with an acid sulfate soils   Nevertheless, as parts of the site include areas below 5 m AHD, a site-
   processes – clearing activities do not                                                                     specific acid sulfate soils environmental management plan will be
                                                    environmental management plan as outlined in the
   result in disturbance of acid sulfate soils                                                                developed and implemented in accordance with State Planning Policy
                                                    State Planning Policy 2/02: Planning and Managing
   or changes to the hydrology of the                                                                         2/02: Planning and Managing Development Involving Acid Sulfate Soils
                                                    Development Involving Acid Sulfate Soils; and
   location that will either–                                                                                 and the Queensland Acid Sulfate Soil Technical Manual should the
                                                 b) follows management principles in accordance with          requirement arise.
      a) aerate horizons containing iron
                                                    the Soil Management Guidelines in the Queensland
         sulfides; or
                                                    Acid Sulfate Soil Technical Manual.
      b) mobilise acid and/or metals.




Northbrook Corporation Pty Ltd                                                       Version 3                                                                     11 October 2013
5101-19 PVMP v3.docx                                                           Commercial in Confidence                                                                   Page 18

Used in these records

About this file

File size
16.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 12- Amended Property Vegetation Management Plan MCU12_0208.pdf · 16.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.