Council archive · source document
Attachment 12- Amended Property Vegetation Management Plan MCU12/0208
Plans and drawings: the text below has words only, no drawings.
Very large file (16.7 MB): may take a few minutes to open.
Noosa on Weyba
Property Vegetation Management Plan
Performance requirement Acceptable solution Compliance Assessment
PR P.9: Conserving status AS P.9 Complies with PR P.9.
thresholds The proposed development would not require nor create a potential
P.9.1
future need for the clearance of any of the regional ecosystems listed in
To regulate the clearing of vegetation in
Clearing in a regional ecosystem listed in Table 2, does RVM Code Table 2 Regional ecosystems that are at risk of the remnant
a way that conserves remnant
not occur unless the clearing is less than— extent falling below 30% of its pre-clearing extent, or having a remnant
vegetation that are regional ecosystems
extent of less than 10 000 hectares.
and prevents the loss of biodiversity – > 10 metres wide; or
maintain the current extent of regional
ecosystems listed in Table 2. > 2 hectares.
PR P.10: Acid sulfate soils AS P.10.1 Complies with PR P.10.
To regulate the clearing of vegetation in Clearing in land zone 1, land zone 2 or land zone 3 in The proposed development would not require, nor create a potential
future need for, the clearance of assessable vegetation within land zone
a way that does not cause land areas below 5 metres Australian Height Datum–
1, land zone 2 or land zone 3.
degradation and maintains ecological
a) is carried out in accordance with an acid sulfate soils Nevertheless, as parts of the site include areas below 5 m AHD, a site-
processes – clearing activities do not specific acid sulfate soils environmental management plan will be
environmental management plan as outlined in the
result in disturbance of acid sulfate soils developed and implemented in accordance with State Planning Policy
State Planning Policy 2/02: Planning and Managing
or changes to the hydrology of the 2/02: Planning and Managing Development Involving Acid Sulfate Soils
Development Involving Acid Sulfate Soils; and
location that will either– and the Queensland Acid Sulfate Soil Technical Manual should the
b) follows management principles in accordance with requirement arise.
a) aerate horizons containing iron
the Soil Management Guidelines in the Queensland
sulfides; or
Acid Sulfate Soil Technical Manual.
b) mobilise acid and/or metals.
Northbrook Corporation Pty Ltd Version 3 11 October 2013
5101-19 PVMP v3.docx Commercial in Confidence Page 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 12- Amended Property Vegetation Management Plan MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 16.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.