09/1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published] · 142009.1508

of 69

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

49 Is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Supply (Safety and Reliability)
O1No LT Yes
Act 2008
(ii) To increase the storage capacity of a referable dam by more than 10% (J No LD Yes

If yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks) This appication requires assessment by the Department of Natural Resources and
Water (NRW). If NRWis not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency. 7s

IPA, schedule 8. part 1, table 4. item 4: IP Regulation. schedule 2, table 2. item 10

     

 

‘TIDAL WORK; WILD RIVER AREA _

 

4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?

No -Gotoa4.11 {_] Yes - Answer (a) and (b) below /
IPA, schedule 8, part 1, table 4, item 5; IP Regulation, schedule 2, table 2, items 12, 14 and 17; IP Regulation, schedule 1, part 3, table 4. items 4A and 5
Coastal Protection and Management Act 1995, section 1044 (wild river area)

 

(COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA

 

 

4.11 Is any of the operational work proposed to be carried out within a coastal management district?

No - Go to 04.12 ag Yes

IPA, schedule 8. part 1, table 4, item 5; IP Regulation, schedule 2, table 2, items 12 and 14; IP Regulation, schedule 1, part 3, table 4, items 4A and 5
Coastal Protection and Management Act 1995 Act 1995, section 104A (wild river area); Wild Rivers Act 2005, section 43A

WATERWAY BARRIER WORKS; WILD RIVER AREAS".

 

 

 

4.12" |s any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
No -Gotoa4.13 (_] Yes

JPA, schedule 8, part |. table 4, item 6: IPA, schedule 8, part 2, table 4, item 2; Fisheries Regulation 1995 $113A (self-assessable codes); 1P Reguiation, schedule 2, table 2, item 28; IP
Regulation, schedule 1, part 3, table 4, item 6; Fisheries Act, 1994, section 76D (wild river area); Wild Rivers Act 2005, section 434.

 
   

 

DECLARED FISH \ : :

4.13 (s any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
No '- Go to 04.14
[1 Yes

IPA, schedule 8, part 1. table 4, item 7; IPA, schedule 8, part 2, table 4, tem 3: Fisherles Regulation 1995 113A (self-assessable codes): 1P Regulation, schedute 2. table 2, item 25; 1P
Regulation, schedule 1, part 3, table 4, item 7; Wild Rivers Act 2005. sections 43A; Fisheries Act,.section 760C (wild river area).

 

IREMOVAL; DESTRUCTION OR DAMAGE OF A:-MARINE PLANT; WILD-RIVER AREA‘: ;
4.14. Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994? °

No -Gotoo415 (_] Yes

IPA, schedule 8, part |, table 4, item 8, IPA. schedule 8, part 2, table 4, item 4: Fisheries Reguiation 1995 $113A (self-assessable Codes): IP Reguiation, schedule 2, table 2. item 29: IP
Regulation, schedule 1. part 3, table 4, item 8; Fisheries Act 1994, section 76DB (wild river area); Wild Rivers Act 2005, section 43A; relevant wild river deciaration; Wild Rivers Code.

enn

 

 

 

    

 

WILD RIVER ARE

  

Press
4.15 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?

[XK] No -Gotoa416 (_] Yes
IPA, schedule 8, part 1. table 4, item 10: IP Regulation, schedule 2, table 2, item 37, Wild Rivers Act 2005, sections 42, 43A

 

ISTATE-CONTROLLED ROAD i

 

4.16 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controfled road?
No -Endofsection4 (] Yes

IP Regulation, schedule 2, table 2, item 3

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published].pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.