Council archive · source document
09/1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published] · 142009.1508
9,
Be {
“
oO %
Le Oe
3 ALL WORKMEN ARE RESPONSIBLE FOR REPORTING OF EQUIPMENT DAMAGED
OR WW NEED OF REPAIR
4 ARRANGE FOR CLEANING AND MANTENANCE OF ALL EGUPMENT AS REQUIXED.
Ss) PROWDE ADOMIONAL SLT FENCES AS REQUIRED TO ENSURE ALL SEDAMENT 1S
COLECTED OW SITE.
6 SIE SUPERVISOR SHALL BE RESPONSIBLE FOR ALL WSPECTIONS, EXTENSIONS &
MAINTENANCE AS. REGLARED.
TASKS / ACTIONS
PERFORMANCE UCKCATORS,
FREQUENCY / DEADIKE
°0%
ca BrEReY boundary
MN
——,_ []\_ a samc
|
>. 4 “
4 e f i SEDUENT CONTROL FARRIC a
“PROPEX OR SRILA AP ROD, cL oe
$ i & j————— TOP EDGE 10 BE Ma. eh
FO 260, wana cu-OFF ony =~ GERM (300MM MIN HEIGHT)
I q ~~ FALL =
| ¢ pte
J é wm Sorat EXCAVATION GEOTEXTLE vane”
| SUN. consstauenon extey / Gur MATERA, woes.
J f ur BAER stommtca nun-orr Anat
2, I i> TEMPORARY SILTATION CONTROL FENCE eae ae if
Bean Sai
OS | a concneTe sonny CONSTRUCTION ENTRY / EXIT
rors . DETAIL
Oey \ > 2 =a RTA Wie wer ro
, 3 TON
| = O cob bron J
; 2 i
1 3 NG
1 = ellie
| e :
t t aie FIELD INLET
T H ie WITH SEDIMENT BARRIER
| H : Be .
i oF - an - ee ee
\
] } . on
ra | | w ail in Kb NS
HG Lis L 50.467 “
DS, 4s ‘“
oe PP
§ ew CONSTRUCTION ENTRY / EXIT
| : e (REFER DETAIL)
ce %, 1 gee ao
eso, | 4 so
Sal | + \ . 00.5% —
oF » H 7 a, 7
> , . ow
& Ot gg gg gg SEE I as} y A
| Urzzz777727 272 727ZZZZZZ I at tT TI SE I
t ,00. Ptoperty boundary
|
t
&
&.
xe
Oo %,
2 i {
ONTROL LEGEND
EROSION CONTROL NOTES ENVIRONMENTAL ISSUE___| ACTION EROSION © : r
1 CONSTRUCTION OF ALL SEDOIENT MANAGEMENT OCMGES SHALL BE COMPLETED AND OBIECINE / TARGET COMPLY WeTDh ALL STATYTORY REGARATIONS AND SLTATION CONTROL FENCE III I 9 : |
EFFECTIVE PRIOR TD; MADTAIN THEM DURING EARTHWORKS. AND 2875 1 A epee PUTER, WOES, Ret Spice
A STRIPPING OF TOPSOL AND GRASS EOHESTRCTION, COMPLY Tn THE EROSION Ss Be LT eon | aust galt ee San
T Sbces wetaianon STF eae WOOE, CSE sont (FELD BEET SEDOMENT GANRER) ry SPICE CONSULTING L
2 PERODICALLY CHECK FENCES, GARRIERS AND GULUIES FOR CONDITION MAWAGEMENT STRATEGY Scion OF SORGHATER toes owes AS CONSTRUCTION HYDRAULICS CONSULTANTS
OF EQUIPMENT ‘SHOWN ON THIS PLAN, PROVIDE BARRIERS AND PO BOX 1406 BUDERIM O 4556 Cc
wer
AHSCA
fy
“hh
ose
11424616 Emad - randal@firepok comau
GARY WILBRAHAM
} ASSOGATED CONSULTANT
DRANG = :
SEDIMENT & EROSION CONTROL ve
. ‘SCALE:
L DETARS Al~ 1:00 + r
A3-_ 1: 200 |
“ | PROMECT NOS i
4 PROPOSED VISITOR HOSTEL Ops, L
4 102 PACIFIC AVE
SUNSHINE BEACH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.