FOUNDATION DESIGN [5 BASED ON REPORT No. 09/0517 BY GLOBAL I, REFER TO APPENDIX A FOR SITE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                                                

TESTING, REFER TO THIS REPORT FOR SOIL CONDITIONS EXPECTEO ON ORAINAGE REQUIREMENTS AND APPENDIX B
SITE. IF ACTUAL SOIL CONDITIONS VART SIGNIFICANTLY FROM THOSE FOR SITE PREPARATION ¢ EARTHWORKS
IN THE REPORT. CONTACT ENGINEER FOR RE-APPRAISAL OF FOOTING DETAILS.
NOTE. DESIGN, j .
re THE SOIL TEST INDICATES APPROX. I700mm DEPTH OF LOOSE SAND 2, THE MINIMUM ALLOWABLE BEARING
zr MATERIAL IS PRESENT ON THIS SITE, BORED PIERS SHOWN ON FOOTING ALL FOOTINGS TO BE FOUNDED IN MATERIAL OF MINIMUM SAFE CAPACITY AT UNDERSIDE OF FOOTING
ae ey PLAN ARE TO EXTEND THROUGH THIS MATERIAL AND A MINIMUM OF BEARING CAPACITY W0kPo, ANY FILL MATERIAL BENEATH SLABS IS BEAMS SHALL BE IO0kPo, UNLESS NOTED
4500 CONCRETE PERS I 300mm INTO MEDIUM OENSE SAND OF MINIMUM SAFE BEARING TO BE COMPACTED IN LAYERS TO ACHIEVE A MINIMUM UNIFORM OTHERWISE,
AS DETAILED ts 192 CAPACITY WOkPo, A LINER IS LIKELY TO BE REQUIRED TO CONSTRUCT DENSITY OF 98% STANDARD COMPACTION,
| THESE PIERS. (F DIFFICULTY iS ENCOUNTEDE DURING CONSTRUCTION ; 3, THE ENGINEER IS TO S& NOTIFIED IF
L OT THE PIERS THEY MAYBE CONSTRUCTED WITH SCREW PIERS OF EARTHWORKS: \ VARIATION OCCURS BETWEEN SOiL
-- Wee Ww TUNIMUM SWL-ISOKN, SUBMIT DETAILS TO ENGINEER FOR APPROVAL, DEMOLISH ALL EXISTING SLABS AND FOOTINGS ON SITE, CONDITIONS DURING CONSTRUCTION AND
ergs Fer 7 - FOLLOWING SITE STRIPPING, THE BUILDING AREA, DRIVEWAY AND THAT NOTEO ON BORELOGS. ADVISE
Ht 5 CARPARKING AREAS ARE TO BE SATURATED AND COMPACTED WITH A ENGINEER IF ROCK IS ENCOUNTERED IN
bz rari FIN, a) FOOTING EXCAVATIONS.
‘a mt (0 TONNE ROLLER TO A MINIMUM OF 98% STANDARD COMPACTION, ANY
At i FURTHER FILL MATERIAL PLACED BENEATH SLABS TO BE COMPACTED 4, SLABS TO BE CAST ON SOmm (£20mm)
It ' IN LAYERS TO ACHIEVE A MINIMUM UNIFORM DENSITY OF (8% LAYER OF COARSE SAND,
ig ‘te STANDARD COMPACTION, i
an t $. MEMBRANE TO BE 0.2m POLYTHENE
a rm THE BASE OF ALL STRIP AND PAD FOOTINGS IS TO BE SATURATED (or EQUIVALENT) LAPPEO 200 AT JOINTS,
a ' AND COMPACTED WITH A VIBRATING PLATE COMPAL TOR. CARRY DORN 200mm OOWN FACES DEEP
BEAMS,
at SB sw C1 = FULL HEIGHT CONTROR JOINT TO MASONRY.
retard ircia baornh GALL REINFORCEMENT TO BE IN
-----.- Fees aoe ACCORDANCE WITH ASI302 AND ASI304.

 

 

  

Bl - 17iu3% Fla Cont SPAN, 1
Ca Tear 5 COUN,

 

! 7, ALL CONCRETE WORK TO BE IN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ACCORDANCE WITH AS300, Fie = 25MPa,
ea a OO ae
B._ ALTERATION TO SITE CONDITIONS
3+ ROWHO FLA SHETS © 480 CRS MX. AFTER THE HOUSE IS COMPLETED BY WAY
PP - (OtN80 FIA POLE PLATE, rita ov cea, OF LANDSCAPING, HOUSE EXTENSIONS OR
CHEMICAL ANCHORS TO BLOCEMALL AT cron, TREE REMOVAL CAN EFFECT THE STABILITY
DDS AND 8 600 CRS PAX, LAYER P02 MESH 30 TOP COVER, OF THE FLOOR SLAB, THE GHNER SHALL
eRonor GRAMICAN BACGTLt Mika REFER TO THE BUILDER BEFORE MAKING
Bean ALL RFTANGNG MALL SUCH CHANGES,
PROVIDE PF3 PAD FOOTING -~ $ 4. ALL WORK NOT OTHERWISE SPECIFIED
UNDER EACH C4, PE 1S TO BE IN ACCORDANCE WITH THE
lon om F AUSTRALIAN DOMESTIC CONSTRICTION
FIX BEARER TO BLOCKWALL A woo {IE _| WOERE RETANDMG HECHT EXCEEDS (00mm,
via ANGLE, TO WPLTIPII TILA Ab e “ TCKEN SLAB ON GROUKD 10 Bo TH MANUAL, OLD EDITION,
BEARER, 2/12 CHEMICAL COPPACTED ALL, AS SHOW, EXTRA LAYER FIZ M fo, WHERE BRITTLE FLOOR COVERINGS
ANCHORS TO BLOCKWALL, Barton covtR (TUES, ETC) ARE TO BE USED. SLAB
CONCRE) BLotK MESH 1S TO BE INCREASE TO F942 FOR THE
fe muen we AFFECTED AREA OR DELAY FOR MINIMUM
avpnoven watenpncor OF THREE (3) MONTHS THE PLACEMENT OF
MEMBRANE THE FLOOR COVERINGS.
eae riztry Top 8 BTM
Wo Ties 9 coo ens, ws cover NOTES
PROP WALL UNTIL REINFORCEMENT LAPS, U.N.O. 1
RIC = 2 CROSS WIRES (750mm,
SLAB OVER (5 CAST, Fay APR > 2 EROES FIRES (3eommd

 

 

 

CONCRETE WORK SHALL BE IN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pty ACCORDANCE WITH AS 3600
AININ Fe = 25 MPO
= - SLAB FABRIC SHALL BE SUPPORTED
Rarer mene | O vone oF ingrectiCn
ROUN D F OO AB, N AN Ase aa REIFORCEMENT SHALL BE PLACED
LOOR SLAB/FOOTING PL firme | Reba aa
(00 2448 OM GRouNO
Playa rez nese
” Tor Coven
40 sano oe.
WATERPROOF
MEYGRANE - TTPICAL,
AS PER FB)
RID TIES @ 600 CRS.
WIZ VER BARS @ 400
B TAILS TAP S00 WITH td
@ 400 CRS, LAP 450 to Aa OF CREO.
WHERE REG'D @ AT (ATER #7) MESH 10 Tap covER,
g PROVIDE GRAMAAR BACKFILL 6 AGG,
g DRAIN COMMECTED TO Se LONE
TiMWER DECKING ON GEUNO ALL RETADING MALLS
So cron oh kao
NNN

 

 

  

Nt2_VER BARS @ 400 CR
CENTRALLY Of MALL. LaP 800 ||
HATH STARTERS «460 WITH

‘SLAB HIESH

  

 

  
     

 

 

 

 

oF bes 10. $02 HORTONTAL BARS @ 400 E Bombe coxraok JoxTs
PATCH FOOT REDE. SF2 DETAILS
|xTRA 2-m12 BARS (OR 3 BAR APPROVED WATERPROOF
a3 SOS EN? ONES Sur comnees ig STARTERS © 400.cRS to/ orenane
OF RECESSES aNO VOXDS, —

 

 

 

 

 

 

 

 

 

 

 

fez rapa TOP
i} RO CORR. aw
8 i
}_2 4 8

EOOTING STEP STEP_IN SLAB DETAI
CORNER == DETAILS

   
 

CORNER DETAIL

TYPICAL FOR ALL CORNERS OF ALL RECESSES 4ND woIDS

 

 

 

 

 

 

 

 

 

 

 

 

Soe ALES, TOO, V8
PROPOSED BUDGET ACCOMODATION b pa RIENMAC PIV uD erat "ge ta | SLAB/FOOTING PLAN Bean AA _]oate SEPT
log PACIFIC AVENUE, | Cn ce ee won wom # DETAILS 521A

A. P1Rv04 SLAB CHANGED To TIRER DECK - ORIGINAL sequ@PUNSHINE BEACH k " paid advens PO ton Wer Picea ee, ap oy aoa consi ortee. crane} wae

Pt [4v0"] PRELIMDLARY ISGUE. for TAMOBROJO PTY LTD Jeahoce GF 508 B00 Fast OT eate | tore OM aE a .

tio. [Data “AMENDMENT 7 (S5UE PROJECT MAME Hobiler- 0404 685 43 fe Saat Eeteratpecrepsoma: | Same) ON THs ORANG [Tas PLAN 6 COPY PROTECTED or epee PI eT, [cour scar ar owoxs. | Al [SHEET 2 Ds

 

 

 

 

 

 

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published].pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.