Council archive · source document
09/1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published] · 142009.1508
mes ASSESSMENT NO: 2009/0919 Windows Type Single glazed Tinted o Double glazed oO Reflective Oo Other CD hak eececsecececeeeceeeeeuee enone Total U-value of Glass to be installed 7.9 (obtained from manufacturer) Solar Heat Gain Coefficient of glass to be installed 0.81 (obtained from manufacturer) Frame Timber or PVC Oo Aluminium 4 Other Doe eeceteeeeeeseeeeeceeeeenenes Ext.Shading —_ Louvres oO Awning @eorr Type Metal Concrete Tiles oO Colour Light Medium QO Dark Oo Ventilated No Yes O Type o......cccceceeeeeeee es Insulation No O Yes Type Anticon R. Value 2.5 Skylights No M Yes O Type Single glazed clear 0 Single glazed opal O Double glazed clear O Double glazed opal O Ventilated No O Yes O Air Conditioning No O Yes 4 @ Room only w Central i] Power of motor .......... kW To the best of my knowledge the above information is true and correct, in line with the plan (Job No. 07- 011 — sheets 5 to 7, 21, 22 and 34 dated 24/09/09) and the original checklist provided. 8" October, 2009. Marianne (Mim) Leece Accreditation No. BA 71 4 Lillypilly Court, Kawana Forest Phone: (07) 5493 2981 2 Fax: (07) 5493 3867
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.