Council archive · source document
09/1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published] · 142009.1508
ASSESSMENT NO:2009/ 0919 CLASS 2 TO 9 BUILDINGS Deemed-to-satisfy Provisions Where a Building Solution is proposed to comply with the Deemed-to-Satisfy Provisions, Performance Requirement JP1 is satisfied by complying with- Ji for the building fabric, and J2 for external glazing, and J3 for building sealing, and J4 for air movement, and 0 J5 air-conditioning and ventilating systems, and J6 artificial lighting and power, and J7 hot water supply, and J8 access for maintenance. Definitions J1 to J8 The following definitions are used in these Parts: Common wall means a wall that is common to adjoining buildings. Conditioned space means a space within a building where the environment is likely, by the intended use of the space, to be controlled by air-conditioning, but does not include- (a) anon-habitable room in which a heater with a capacity of not more than 1.2kW provides the air-conditioning, or (b) a space in a Class 7, 8 or 9b building where the input power to an air conditioning system is not more that 15 W/m? Envelope for the purpose of Section J, means the parts of a building’s fabric that separate a conditioned space or habitable room from- (a) the exterior of the building: or (b) a non-conditioned space including- (a) the floor of a rooftop plant room, lift machine room or the like; and (ii) the floor above a carpark or warehouse; and (ii) — the common wall with a carpark, warehouse or the like. External wall means an outer wall of a building which is not a common wall. Fabric means the basic building structural elements and components of a building including the roof, ceiling, walls and floors. 4 Lillypilly Court, Page No. 2 Phone: (07) 5493 2981 KAWANA FOREST.....4551. Fax: (07) 5493 3867
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.