Council archive · source document
09/1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published] · 142009.1508
INTEGRATED PLANNING ACT 1997 . (DAS Assessment Checklist, Version 22
ov!
ee ve >
SECTION 4 -Section 4 must be Sompleidd ‘when the application Seeks approval to carry out operational work. os
PLANNING SCHEME” “2. ge se = Pa ao ee |
44 is the proposed operational work assessable under any State planning regulatory provisions?
(J No Yes
If yes, is the proposed operational work assessable under the planning scheme?
[] No - Answer Q4.1.1- 4.1.7 Yes - Complete Form 1, Part E and answer Q4.1.1- 4.1.7 below
ISTATE-CONTROLLED ROAD" ar ra |
4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
[No Yes
If yes, is all of the proposed operational work associated with either -
A material change of use that is assessable under the planning scheme, or 0 No (& Yes
Reconfiguring a lot that increases the total number of lots, or increases the total
number of lots abutting the State-controlled road
If no - Answer (a) - (c) befow
IP Regulation, schedule 2, table 3, item 3; IP Regulation, schedule 2, table 3, item 1(b)
‘ACID SULFATE SOILS:
4.1.2 Is any of the operational work proposed in a local goverment area listed*' in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils :
[X] No -Go1004.1.3 LC Yes
4. | ,urukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
-Fitzroy, Gladstone, Gold Coast, Heivey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
IP Regulation, schedule 2, table 3, item 4; ‘State Planning Policy 2/02; Planning and Managing Development involving Acid Sulfate Soils, section 3.6
[EASEMENTS AND SUBSTATIONS: idee 7
4.1.3 Is any of the proposed operational work for filling or excavation?
, No - Goto 04.1.4 ,
Yes
IP Regulation, schedule 2. table 3 item 10{a): IP Regulation, schedule 2, table 3, item 10(b)
wo me
4.1.4 \s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number t issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
[X] No -Gotoa41.5 (_] Yes
JP Regulation, schedule 2, table 3, item 17
|PUBLIC- PASSENGER TRANSPORT. : :
4.1.5 Is any of the proposed operational work listed i in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
x] [X] No- Go to 04.1.6 oO Yes - This application must be referred to QueenslanidTransport (QT) as Concurrence Agency.
IP Reguiation, schedule 2. lable 3, item 14 .
(RAILWAY SAFETY: AND EFFICIENCY: : ge 8
4.1.6 1s any of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
No- Go to 04.1.7 O Yes - This application must be referred to QueensiandTransport (QT) as Concurrence Agency.
IP Regulation, schedule 2, fable 3, item 15
IKOALA CONSERVATION (outside SEQ urban footprint).4:..”
4.1.7 Is any part of the premises in a koala conservation area or koala sustainability area, other than in an SEQ urban footprint area?
No -Gotoo42 [_] Yes :
IP Regulation, schedule 2, table 3, item 19 -
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1508 - Operational Works - Landscaping. Stormwater, S&E Control, Carparking & Acess, Frontage Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.