Skip to the record
Search everything, all in one place.

Original source · versioned page text

Planning Report

Attached to the e-mail MCU15/0108 & REC15/0028 Development Application.

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

KHA DEVELOPMENT MANAGERS – 15354                                                                      November 2015



Part E of the SPP details the interim development assessment requirements for the following state
interests:

 State Interest                                                Comment
 Mining and extractive resources                               Not applicable
                                                               The site is not within a key resource area (KRA),
                                                               the separation area of a KRA or the transport route
                                                               separation area of a KRA.
 Biodiversity                                                  Not applicable
                                                               The site does not include land that relates to a
                                                               matter of state environmental significance.
 Coastal environment                                           Not applicable
                                                               The site is not located       within   the   coastal
                                                               management district.
 Water quality                                                 Not applicable
                                                               The site is within an urban area but does not
                                                               exceed 2500m2 and is not at or below 5m AHD.
 Emissions and hazardous activities                            Not applicable
                                                               The site is not located within a management area.
 Natural hazards, risk and resilience                          Applicable
                                                               The site is within a flood hazard and potential
                                                               impact buffer area. The site is not however
                                                               mapped as flood hazard under the planning
                                                               scheme nor known to be flood prone. No flood
                                                               hazard assessment is considered relevant.
 State transport infrastructure                                Not applicable
                                                               The site is not located within 400m of a public
                                                               passenger transport facility or future public
                                                               passenger transport facility.
 Strategic airports and aviation facilities                    Not applicable
                                                               The site is not located within proximity of a
                                                               strategic airport or aviation facility.



5.3 REFERRAL

No referral is triggered by the application.

5.4 STATE DEVELOPMENT ASSESSMENT PROVISIONS

The State Development Assessment Provisions (SDAP) set out the matters of interest to the state for
development assessment, where the state assessment and referral agency (SARA) is responsible for
assessing or deciding development applications as assessment manager or as a referral agency. The SDAP
is not applied by local government in the assessment of development applications.
As no referral is triggered by the application the SDAP are not applicable.




Development Assessment Report                                                                           Page 11 of 16
Material Change of Use (2x Multiple Housing Type 2 Duplexes)
Boundary Realignment (2 Lots into 2 Lots)
33 & 35 Grant Street, Noosa Heads (Lots 1 & 2 on SP230068)
Log in to download the original file

Planning Report.pdf · 2.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.