08/0064 - Operational Works - Transport Type 5 - Domestic Marine (Jetty) [As Published] · 142008.64

of 21

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

ese

 

NOOSA Checklist - Applications Involving Land

Development & Land Use Sections

{DAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

1.

* FORM 2’- REQUEST TO CHANGE APPROVAL: >) 3) eh OT ae det

wee (me oe. wee Me ae -

 

APPLICATION FORMS” ee as mo on _ a re
1.1. Form PartaA
1.1.1. Ensure that the form is fully completed. V4

 

 

 

1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
1.2 Form1 Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.

1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. [A]
REFERRAL INFORMATION, we a EE?
2.1 Ensure that items 1-23 have been checked and/or completed with regard to referrals. mi

ENVIRONMENTALLY RELEVANT ACTIVITIES’ |" _* . we , ~
3.1. Ensure that Part G is completed if EPA referral is required.

 

 

3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

 

4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.

 

 

 

 

 

 

 

 

PLANS Os RO ON ce Foe rd, Ve

5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operationat &
Works) accompanies the application. In addition ensure that each set is complete.

5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is -
unbound.

SUPPORTING INFORMATION 7 TL AR A
6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction. 7m
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. ia

 

 

    

 

 

FEE ES SRD TT TET rms
7.1 Ensure that the application fee, as determined from the Council's adopted ‘scale of fees, SY
accompanies the application or has been paid. 7

 

 

7.2 Ensure that the fee which has been paid is recorded on the application form.

 

 

 

Receiving Officer

7 . Date sae
Having completed this form and accepted Tnedpoiication please deliver both to the following IDAS Application Receiving
trays:-

    

If the application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.

\f the application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.

If the application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.

In all other circumstances ~ AOP1’s desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

SEP! g:\ant\forms\application checklist.doc

 

 
Full text of the other 20 pages

Page 2

a *

Part A, Version 3.0, 3 September 2007

   
 

Part A

Common details

Identification of the premises the subject of the application

1. Can any part of the premises be identified by a street address or lot on plan description?
[J No - Answer Qi(a)
Yes - Complete Table B and answer Q1(b) and Q1{c)

Table B
@

 

 

Lot on plan description
Unit | Street Official suburb Post (place each description in a separate row)
number | number Street name Rocality name code - Pian ype Plan Local government area

number fe.g. RP. SP) umber

 

 

 

 

 

 

4 Masthead Quay Noosaville 4566 632 RP 883863 Noosa Councit

 

 

 

 

 

 

1(b). Can the address be further described by shop/tenancy number or storey/tevel?
No
(1) Yes - Complete Table C

1(c). _|s any part of the premises strategic port land under the Transport Infrastructure Act 1994?
No
[]_ Yes - Complete Table D

2. Can the premises best be identified by coordinates (e.g. for development proposed in waters, or on a site within a large rural lot)?

@ [x] No

LL Yes - Complete Table €

3. Are the premises within or adjacent to a water body or watercourse?

[No

Yes - Complete Table F and answer Q3(a)

Table F RECEIVED

Name of water body or watercourse -~& ‘AX Zul

 

 

1 Noosa Waters Canal

 

 

 

may (guint
Sosa snl CGlnte
Poreoe” Coun tee

 

3(a). 1s any part of the development proposed in tidal waters (ie. below high water mark)?
No
(CI Yes

 

Page 3

INTEGRATED PLANNING ACT 1997

Part A, Version 3.0, 3 September 2007

 

 

 

 

 

 

 

 

4. Whatis the total area of land that makes up the premises (ie. the area covered by the application}?
Area of jand above high water mark/outside watercourse Area in a water body or watercourse

734.00 [x]m? [hectares {Tick applicable unit) (1m? []hectares (Tick applicable unit)
Existing use of the premises
5. Are the premises currently used for any purpose?

No

(1 Yes - Ensure details of any existing use of the premises are provided in plans and documentation submitted with this application, e.g. location

and nature of existing uses, buildings, structures and services

6. Are there any existing easements on the premises (e.g. for vehicular access, electricity, overland flow)?

No

(1 Yes - Complete Table H and ensure the location and dimensions of each easement are included in plans, submitted with the application
Proposal details — ~ ~
7. Are new uses proposed on the premises?

[x] No

[1 Yes - Provide details in Table |
8. Are new buildings or structures proposed to be erected on the premises?

LJ No

Yes - Ensure the nature, location and dimensions of the proposed new buildings, structures or services are included in plans, submitted with the

application

‘Applicant details
9. Whois the applicant for the application?

 

 

Company/organisation name |, CrEXCCA OCA Cf
(if applicable) Noga Jetty Builders

 

[ndividual/ contact person details

 

Title [Mrs Firstname |Emma Last name

 

 

 

 

Postal address [Po Box 299, Noosaville. QLD 4566

 

 

Contact telephone number lo7 5474 3480

 

 

 

 

 

 

 

Mobile phone number 40408 137 526
Facsimile number |o7 5474 3480
e-mail address [email protected]

 

 

‘Owner’ '$ consent and resource ‘entitlement

10. Does the application involve a State-owned resource prescribed by schedule 10 of the integrated Planning Regulation 1998 (IP Reg) or

any other regulation?

[x] No

([] Yes - Complete a new Table J for each State-owned resource and submit, with the application evidence of resource allocation or entitlement

 

Page 4

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007
11. Does the application involve land other than State-owned land (ie. privately owned land) and require owner's consent?

[CJ No

Yes - Complete Table K and submit, with the application, written documentation of all owner's consent

 

 

Table K
i Date written consent
Owner name/s Street address or lot on plan description was obtained
1 Gerald Goodridge 4 Masthead Quay, Noosaville. QLD 4566 7112/2007

 

 

 

 

 

 

12. What are the other parts of IDAS Application Form 1 submitted with this application, and the other mandatory attachments and
supporting information accompanying this application, not identified in those other form parts?

 

 

 

 

 

 

legen’ Otome \onone odore of | es. General Autor aes Steere Date Method of delivery to

resource allocation/entitlement, plans, drawings, reports) Report) assessment manager
1 Part E over the counter
2 Checklist . over the counter
3 4 x copies engineers plans over the counter
4 Owners consent letter : over the counter

 

 

 

 

 

 

Portable Long Service Leave (PLSL) levy for building and construction work

13. {s payment of a Portable Long Service Leave (PLSL) levy required for building and construction work before a development permit for
the application can be given?

(X] No
CI Yes

13(a). indicate the reason PLSL is not applicable

{1 The application is not for building and construction work under the Building and Construction Industry (Portable Long
Service Leave) Act 1997, section 3AA (e.g. the application is only for a change of use or for the following types of work carried
out solely for farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching
vegetation, clearing of regrowth, thinning vegetation or controlling weeds or pests): or

[K] Allcosts, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or

(1 The work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority
Act 1991- Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number
stated). The receipted form must be sighted by the assessment manager before a development permit can be given

 

 

 

 

 

 

OFFICE USE ONLY
Date Received \\ \ od Reference Numbers | os] eo hy
[ FOR COMPLETION BY ASSESS#ENT MANAGER

Is a QLeave Notification and Payment Form required for this application?

(No

CJ Yes - Complete Table M

Page 5

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007

NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER

 

 

To Council

 

 

 

[have been engaged as the private certifier for the building work referred to in this application

 

Cate of

engagement Accreditation number Name BSA Certification number Buitding classification

 

 

 

 

 

 

 

 

Page 6

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007
Advice for completing Part A

 

Genera! advice

Under IPA, section 3.2.1{7) mandatory requirements must be correctly completed for a development application to be a ‘properly made application’.
The assessment manger may refuse to receive an application that is not properly made.

Completion of Part A of Form 1 is required for all development applications. Other mandatory requirements, applicable to certain types of applications,
are stated in other Parts of Form 1.

The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the Building
Act 1975 only.

For further information about completing this form go to IDAS Guide 14 (Making and IDAS application)

 

Qi

The premises, the subject of the application, may be identified in a number of ways. Street address and lot on plan are most common.
Lot on plan details can be obtained from title documents or through the local government.

. The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or
other structure is situated on the land). The term ‘land! is also defined to include the estate in, on, over or under the land.

. A description of the land is not required if the application relates to a mobile and temporary Environmentally Relevant Activity (ERA)
only. Instead complete Q1(a).

. StrategicPortLand is within a local government area but a local government's planning scheme does not apply on Strategic Port Land.
StrategicPortLandis declared under the Transport infrastructure Act 1994. For further information go to IDAS Guide 11 (Development
on strategic port land) and the Queensland Transport (Ports) website.

 

Q2

Coordinates often provide the best means of accurately identifying the location of development proposed in waters, or on a relatively
small development site distant from property boundaries. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application.

. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum may be provided.

 

Q3

A single development application may involve land both within and outside waters.

. A watercourse’ is defined by the Water Act 2000, schedule 4 and generally means a river, creek or stream upstream of the point to
which high spring tide ordinarily flows and reflows (unless a regulation has declared a limit for the watercourse). Generally, a
watercourse is in the jurisdiction of the Department of Natural Resources and Water.

. ‘Tidal water is defined in the Coastal Protection Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic port land
is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Protection Act in relation to
high water mark at spring tides) establishes the boundary of a tidal area.

° Land below high water mark is not within a local govemment's area unless provided for under the Local Government Act 1993,

Unless otherwise provided for by legislation, a local government has no jurisdiction below high water mark. A tidal area for strategic
port land is within the jurisdiction of the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for
a focal government tidal area. However, the IPA gives local governments jurisdiction for assessing and deciding applications for
prescribed tidal works within the tidal area for a local government, and the planning scheme may be applied to that assessment (to the
extent provided for in the code for prescribed tidal work).

 

The applicant need not be the owner of the land. However, the applicant is responsible for ensuring the information provided on the
Form 1 Application Form (including this Part and any other relevant Part) is correct.

. If the applicant is a company or organisation, a contact person must be nominated.

. Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment
Manager, during the processes of the application or in the event of an appeal about the outcome of the application.

 

Qi10

 

Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications involving a prescribed State resource.
Schedule 10 of the Integrated Planning Requlation 1998 (IPR) prescribes the State resources, including State-owned land, where
evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning Regulation

. Section 3.2.1(10)(a)(ii) states an application cannot be taken to be properly made without the required evidence..

. Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental
Protection Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the
State-owned land above high water mark.

. In the case of applications involving the taking or interfering with water under the Water Act, the development application may be
made at the same time as the request for resource entitlement.
. In the case of State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or

encroachment (identified by gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to
the Department of Main Roads.

 

 

Page 7

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007

 

Qi . Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if
the application involves any of the following:
i) a material change of use;
(ii) reconfiguration of a lot;
(ii) work on land below high-water mark and not within a canal as defined under the Coastal Protection and Management
Act 1995; or
{iv} work on rail corridor land defined under the Transport infrastructure Act 1994.
° “Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the
application, entitled to receive the rent for the land (or would be entitled to receive the rent for it if it were tet to a tenant at a rent).
. Owner's consent is not required for a mobile and temporary ERA.

 

Q12 Only information not identified in other Parts of Form 1 needs to be listed in this section of Part A.

 

Q13 : The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in
the building and construction industry who would be unlikely to accrue enough service with one employer to qualify for jong service
leave. To fund the scheme, a levy is collected on all building and construction work carried out in Queensland where the total cost of
the work, whether direct or indirect, is $80,000 or more inclusive of GST. This amount and other prescribed percentages and rates for
calculating the levy are stated in the Building and Construction industry (Portable Long Service Leave) Regulation 2002. Included in
the amount collected by QLeave is the Workplace Health and Safety Fee and the Building and Construction IndustryTrainingLevy.
The Building and Construction industry (Portable Long Service Leave) Act 1997 (PLSL Act) defines the building and construction
industry for the purposes of the levy and includes, for example, renovating, relocating, constructing, altering, demolishing, maintaining
or repairing buildings, pools, roads, jetties, pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.
The PLSL Act requires the portable long service leave levy (PLSL levy) be paid before the assessment manager may give a
development permit for certain building or operational work. The assessment manager must sight an approved form issued by
QLeave advising of the status of the payment of the levy.
« Building and Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on
request from QLeave, or can be completed on the GLeave website at www.qleave.aid.gov.au
For further information contact QLeave (Tel: 1800 803 481 Web: www.qleave.qid.gov.au )

 

 

 

Privacy Statement
The information collected on Form 1 will be used by the Department of Local Government, Planning, Sport and Recreation in
accordance with the processing and assessment of your Application. Your personal details will not be disclosed for a purpose outside
of the IDAS process, except where required by legislation (including the Freedom of information Act 1992) or as required
by Parliament. This information may be stored in a Department of Local Government, Planning, Sport and Recreation database. The
information collected will be retained as required by the Public Records Act 2002. For further information on your privacy, contact the
Privacy Contact Officer for the Department of Local Government, Planning, Sport and Recreation at (07) 3237 1860.

 

 

 

 

 

 

 

Proposal ID

 

 

 

 

 

 

 

 

 

ne =

Click here to submit your DA

 

 

 

Page 8

PILE-IT Pty Ltd PLEASE

Trading as

7
Noosa Jetty Builders TURN

 

LETTER ABN: 55099036736
No: 0001 BSA: 1111115
DATE:6/12/2007

FROM: Noosa Jetty Builders

PO Box 299 Phone: (07) 5474 3480

Noosaville Fax: (07) 5474 3480

QLD, 4566 Mobile: 0408 137 526
To Whom It May Concern, ,

. ~sawer Coopaole +:
1 GERALO GOODRIDGE , give Pile-It Pty Ltd t/a
Noosa Jetty Builders permission to submit an application for prescribed title works on
e@ my behalf.

Address: Véw7 fe pyR SucePensyow S$ S Awe Golem S- .

 

cH Bréeton MbweKILe 6 TS VFO Post Code: _:
Phone: O/ 7 SZ S64 776 Mobile: © 19 Tee 609 596 ;
Email: Wen tecliairs sperisions @ bt. con

Yours Sincerely, LIE aE ,

 

 

 
    

OOSA SHIRE COUNCIL E]
i ROT COUNTER

4

    

 

Page 9

red

ys}
INTEGRATED PLANNING ACT 1997 Part E, Version 3.0, 3 September 2007

ah

»__Form_1 Development Application idas

Part E

Building &/or operational works assessable against a planning scheme

 
     
  
 

 

 

Nature of the works 2 : . I
1. 1s the application seeking approval of building work assessable against the local government planning scheme?
No
LI Yes
@ 2. Is the application seeking approval of operational work assessable against a planning scheme?
[1 No
Yes

2(a) _|s the application seeking approval for more that one type of operational work?

[x] No - Complete Table B
[1 Yes - Complete a new Table B for each type of operational work

 

Table B
(i) What is the nature of the operational work?
[DD Roadworks LD Stormwater [) Water infrastructure (1 Sewerage infrastructure
(F] Landscaping (CD Clearing vegetation under the planning scheme (CD Earthworks

[J Drainage Works = —[X] Other - Specify below

 

New timber jetty

 

 

 

(ii) |s the application for operational work involving the creation of new lots?

e@ [X] No

LD Yes - Specify number below

(iii) What type of approval is being sought?
(J Preliminary approval
Development Permit

 

(iv) Is there a current Preliminary Approval for this operational work on the premises?

No
[1 Yes - Complete Table Bla)

{v) Are the works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development?

No
CO Yes - Compicte Table B(b)

 

 

 

‘Mandatory information |

3. Confirm that the following mandatory information accompanies this application

 

Confrmation of | Wethod of todgement|

lodgement

 

 

 

 

 

Plans showing the nature and location of the proposed works (inauding the extent of any cut and fit} [x] Confirmed over the counter

 

Page 10

of

INTEGRATED PLANNING ACT 1997

Part E, Version 3 0, 3 September 2007

 

 

OFFICE USE ONLY

 

Date Received

 

 

 

Reference Numbers

 

|

Page 11

INTEGRATED PLANNING ACT 1997 Pant E, Version 3 0, 3 September 2007

Advice for completing Part E

 

Generat advice
le Part A must also be completed jor all IDAS development applications.
+ All questions must be answered unless, following a response, there is a statement to go directly to a particular question.

 

Q1&2 Adevelopment permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise
development to occur.

 

 

 

 

 

 

 

Proposal ID

 

 

 

 

 

 

 

Page 12

y yw

“

   
 
   

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

_Form 1 Development Application ..._-_

IDAS

Assessment Checklist

 

hoas Development Application Form 1 is the approved form for all development applications under the Integrated Planning Act
1997. Form 1 is made up of various Parts. Part A (Common details) of Form 1 tmust be completed for ail apptications. The
relevance of other Parts of Form 1 depends on the nature of the application.

Form 1 aso includes the (DAS Assessment Checklist, which is used to assist in determining State assessment and referral
requirements, and the Parts af Farm 1 retevant to the application.

@ Section 1 and all other relevant sections of the IDAS Assessment Checklist must be completed for all development applications
except those for building werk requiring assessment against the Building Act 1975 only. Fer more advice refer to Part 8 of the
(DAS Application Form.

Answering the following questions will assist you in determining which sections of the checklist must be completed for your application.
If unsure, phone or visit your local government or log on to the IPA website for help.

Does the application seek approval to materially change use of the premises? Cres |pa1No
if yes - complete Section 2 of this checklist

 

 

 

 

Does the application seek approval to reconfigure a lot?
if yes - complete Section 3 of this checklist and Part F of (DAS Application Form 1 Yes |{x]No
Assessment is by the local government

Does the application seek approval to carry out operational work?
if yes - complete Section 4 of this checklist (J Yes |[]No

 

 

Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994?
if yes - complete Section 5 of this checklist

Does the application seek approval to carry out building work requiring assessment against a local government planning
scheme?

/f yes - complete Part E of IDAS Application Form 7 ba Yes |D)No
@ Assessment is by the local government

O1Yes |{x]No

 

 

Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?

ff yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1 (Yes j|[x]No
Assessment is by a building certifier

 

 

 

 

 

 

Se TECHS | sestion 4 must be completed for all applications that require completion of the IDAS Assessment Checklist,

HERITAGE |

11 Is any part of the proposal intended to be carried out on a registered place under the Queensland Heritage Act 1992?

BI No
Yes
IPA, schedule 8 part 1, table 5, item 2

IP Reguistion, schedule 2. table 2, tem 18
IPA section 13.5 (Definitions for terms used in development)

 

 

JREMOVING QUARRY MATERIAL; WILD RIVER AREA a |

an ene ee te ene cee cele ne ween ee he ed bee eee eee

eee ele ee ee ee ek AM

Page 13

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkhst, Version 21.0, 3 September 2007
IPA, schedule 8 part 1. fable 2 fem }
IP Requiation schedule 2 iable 2 lem 7)
IP Regutation schedule 1 iabie 5 fem 2 (wild river area}
Water Act 2996, secion 960
Wild Rivers Act 2005 secuori 43A

 

 

“ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA

 

1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

XY] No
(I Yes

IPA, scheduie @ part} table 2. item 7

IPA, schedule &, pert) fable 5 items 3ana 4

IP Regulation, schedule 2. table 2, tems } and 23

Environmental Protection Act 1994, section 73AA (wild river area)
Wild Rivers Act 2005, section 434

 

WITHIN THE LIMITS OF A PORT

 

1.4 Is any part of the premises within the limits of a port under the Transport infrastructure Act 1994?

KI No
C) Yes

IP Regulation, schedule 2, table 2, toms 15 and 16

 

IDECLARED FISH HABITAT AREA |

 

15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?

kk] No

(11s Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA,
schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

IP Requiation, schudule 2, table 2, dem 26
ICOMMUNITY INFRASTRUCTURE _ oe 4
1.6 ls any part of the premises designated for community infrastructure?
No
Yes

IP Regulation, schedule 2. tabke 3, tem 7

 

 

 

 

 

 

 

 

 

{WASTE WATER MANAGEMENT ; |
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
Ki) No
C Yes
JP Regulation, scheduie 2, bible 3, ten 5
meet
Tilt td PLWe. ©: Section 4 must be completed when the application seeks approval to cary cut operational work.
IPLANNING SCHEME . " * - ——
41 |s any of the proposed operational work assessable under a planning scheme?
[1 No- Go ta Question 4.2 below
Yes - Complete Part E of DAS Application Form 1 and Questions 4.1.1 - 4.1.8 below
[STATE-CONTROLLED ROAD oe ‘ ]

 

4.1.1 |s any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?

[x] No
(1 Yes

Page 14

w

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
If no, is the proposed operational work fisted in Integrated Planning Regulation 1998, schedule 5 and does it exceed
the threshold?

[x] No

(1 Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

IP Regulation schedule 2 table 4 tem 3
IP Regulation schedule 2, table 3. dem 1b)

 

{ACID SULFATE SOILS

4.1.2 {s any of the operational work proposed in a local government area listed? in State Planning Policy 2/02: Planning and
Managing Development Involving Acid Sulfate Soils?

No
Yes
Spuruxun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Campentaria, Cook, Cooloola, Douglas,

Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Rediand, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday

JP Regulation, schedule 2, table 3, item 4
State Planning Policy 2/02" Planning and Managing Development involving Acid Sulfate Soils, section 36

 

 

jEASEMENTS AND SUBSTATIONS |
4.4.3 1s any of the proposed operational work for filling or excavation?

[K] No

1 Yes

IP Regulation, schedule 2, table 3 tem 10(a}
IP Regulation, schedule 2. table 3, tem 10(b)

4.1.4 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?

No
CI Yes

IP Regulation schedule 2, table 3, tem 17

 

PUBLIC PASSENGER TRANSPORT

4.1.5 Is any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
[x] No
(1 Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Regulanon, schedule 2. table 3, item 14

 

IRAILWAY SAFETY AND EFFICENCY

4.1.6 Is any of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
[x] No
DO Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Regulation, schedule 2 lable 3, tem 15

 

 

‘KOALA CONSERVATION —- . __ A. 4 _. |
41.7 ts any part of the premises in a koala conservation area or koala sustainability area?

[x] No

CI Yes

IP Requation schedule 2, table 3. tom 19

Page 15

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkiist, Version 21.0, 3 September 2007

MILD RIVER AREA - Although legislation provides for assessment of operational works for residential, commercial and industrial.
evelopment for the purposes of the Wild Rivers Act 2005, currently no declarations for any of the wild river areas apply the Wild Rivers

; fo that type of development. . i

 

FASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD R
AREA : 4
4.2 ls any of the proposed operational work associated with reconfiguring a lot, if the reconfiguration is also assessable? ."

X] No
[] Yes
IPA, schedule 8 part 1. table 4, item 2

IP Requiation, schedule 1, part 2, table § aem Ie}
Wild Rivers code (Noie” the code does nat currently contain applicable provisions for residential, indusinal or commercial development inside a designated urben

    

 

 

 

area}
\VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA- “ - = |
43 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
[X] No

CO Yes

IPA, schedule 8, part 1, tble 4, tems IA-1G

IP Regulation, schedule 2, table 2, item 5 (vegetation clearing)

IP Regulation, schedule 2, tabie 2, item 34 (koala conservation)

IP Requiation, schedule 1, part 3. fable 4, tem (vegetation clearinghwild river stra)
Vegetation Management Act 1999, section 22A (vegetation clearing\wild river arcat
Wild Rivers Act 2005, sections 31F and 43A

 

 

HTAKING OR INTERFERING WITH WATER>WILD RIVER AREA" . - “ |
44 Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with water from a
watercourse, lake or spring (other than under the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a
watercourse?
[x] No

CI Yes - This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency

IPA, schedule 8, part 1, table 4, tenis 3a)

IP Requiation, schedule 2. table 2, tem &

JP Regulenon, schedule 1, part 3, iable 4 items 3 and 3A
Water Act 2000 secnon 966A (wld river area)

Wild Rivets Act 2005, section 434

45 \s any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with artesian water?

No
1 Yes - (Complete Part K,) This application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA. schedule 8, part 1 table 4, item 3{b)

IP Regulation, schedule: 2, table 2, tem 8

IP Requiaton schedule J, part 3, table 4 item 3

Wild Rivers cade (Nete ihe code dors not currently contann appicable provisions for taking or interfering with artesian water}

4.6 ls any of the proposed operational work to allow, under the Water Act 2000, for taking overland flow water?

[x] No

[1 Yes - Answer (a} and (b) below

IPA, schedule 8 part 7 table 4, tem 3(c}ti)

JP Regulation, schedule 2, table 2, item 8

IP Requiancn scheduie } part 3, iable 4 item 3
Water Act 2000, section 966A {veld river area)
Wild Rivers Act 2003 section 43A

  

Page 16

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkhst, Version 21 0, 3 September 2007

47

48

49

Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?

J No
L] Yes

IPA schedule 8, part 1 rable 4 item cj

IP Requiaion. schedtwe 2 isble 2 sem 8

IP Requiaton scheduit ? pai 2 able 4 gem 3

Water Act 2000. secuan 966A (wid iver area)(Note no current Wad River declaration identifies taking or interfering wah subartesian water as assessable)
Wild River code (Nate the code dues not curently contain appkcable provssions for sub artesian water)

Is any of the proposed operational work to allow, under the Water Act 2000, for interfering with overland flow water?

No
[1 Yes - Answer both (a) and (b) below

 

IPA, schedule 8 pan 1. table 4, items 3(c}{1) and 3{d)
IP Regulation, schedule 2, table 2, item 9

IP Regulation, schedule 1 part 3, table 4, tom 3A
Water Act 2000 section 966B {wild river area}

Is the proposed operational work for the following?
e For the construction of a referable dam as defined under the Water Act 2000 [%) No O Yes
« To increase the storage capacity of a referable dam by more than 10% [x] No (0 Yes

if yes to either or both - (Complete Part Ks) This application requires assessment by the Department of Natural Resources and Water (NRW).
if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, part 1, table 4, tem 4
IP Regulation, schedule 2, table 2, item 10

 

{UDAL WORK; WILD RIVER AREA

4.10

Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?

No
{21 Yes - Answer (a) and (b) below

IPA, schedule 8, part 1, table 4, em 5

IP Regulation, schedule 2, table 2. items 12, 14 and 17

IP Regulation, schedule 1 part 3, table 4, items 4A and §

Coastal Protectian and Management Act 1995, section 104A {witd river area)

 

ICOASTAL MANAGEMENT DISTRICT; WILD RIVER AREA

4.11

ts any of the operational work proposed to be carried out within a coastal management district?

[Xx] No
LC) Yes

IPA, schedule 8 part | table 4 item 3

IP Reguiation scheduk: 2 table 2, tems 12 and 14

IP Regulahon, schedule } part 3, fable 4, tems 4A and 5

Coastal Protection and Management Act 1995 Act 1995, section 104A (wild river area}
Wild Rivers Act 2005, section 43A

 

WATERWAY BARRIER WORKS; WILD RIVER AREA

4.12

Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?

No
(1) Yes

IPA, schedule 8, pari 1 table 4 iem 6

IPA, scheduie & pant 2 table 4 tem 2

{P Regulation schedule 2. table 2, tem 28

IP Regubiton, sched 1, part 3, table 4, tem 6
Fishers Act 1994, section 76D (wild rver area}
Wild Rivers’ Act 2005, section 13A

 

Page 17

n

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21 0, 3 September 2007
[DECLARED FISH HABITAT AREA; WILD RIVER AREA ]

4.43 ls any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 19947

[x] No
OO Yes

IPA. schedule faaitt 1 iable 4 sam /

IPA. schedule & part labic 4 serpy 3

IP Regulation schedule 2 fable 2 item 25

IP Reguianon, schedule 2, part 3, able 4, tem 7
Wild Rivers Act 2008, sections 434

Fishentes Act section 760C (wid river area)

 

 

 

 

 

jREMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA ]
4.44 ts any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?

No

0 Yes

IPA, schedule 8 part 1, table 4, tem 8

WA schedule & part 2 able 4 tem 4

1? Regutition, schedule 2, able 2, tem 29

IP Requkstion, schedule 1, part 3, table 4, dem 8
Fishenes Act 1994, section 76DA (wild ver area)
Wild Rivers Act 2005, section 43A

  
 

 

 

 

WILD RIVER AREA , ]
4.15 ts any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?

[x] No

CO Yes

IPA, schedule 8, part}. iaiile 4. fiom 10
IP Regulation, schedule 2, tuble 2, item 37
Wild Rivers Act 2005, sections 42, 43A

 

 

ISTATE-CONTROLLED ROAD 4
4.16 's any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?

[x] No

[) Yes

IP Regulation, schedule 2, table 2, item 3

 

Disclaimer:

While the Department of Local Government, Planning, Sport and Recreation (DLGPSR) believes that this information contained on this
form and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the information
without first making your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances.

To the full extent permitted by law DLGPSR expressly disclaims all liability (including but not limited to liability for negligence) for errors
or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form

 

 

 

 

 

 

 

Proposal ID

 

 

 

 

 

 

Page 18

 

 

x LAND USE SECTION FEES
nyu MENKOLOSEA 7

RECEIPT TYPE

 

 

 

 

 

 

 

SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 520
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation 111
APPLICATION FEES
Material Change of Use - Code/Impact
Consistent 527
Inconsistent 521
Assessment under Superseded Planning Scheme 521
Modification to a Development Permit 521
@ Extension of a Currency Period : 521
Operational Works - Landscaping . 521
Bldg Work assessable against the Planning Scheme 521
PRE LODGEMENT REVIEW
Half Hour 522
One Hour 522
ADVERTISING
Purchase Advertised Applications 523
JETTIES
Jetty Application Fee {3co 524
Jetty Bond Soo 51
(Category 4)
BONDS
Performance Bond . 51
(Category 9)
Sl
Registration Fee , : : 222
SEARCH FEE .
Search of Land Use Section file 112
Liquor Licensing Request 113
TOTAL $ {Poo
NAME: CR DL Cecdnrtcee
= -
ADDRESS: beac tet pL ptt
Bopastere —ostte fo hex 323
FILENO: O8/coey DATE: 157: /o€ nessa HEAOS UY Slo7
Ta °
RECEIPT NO: SST - Signature of TP Officer: FS Svvex
AUTHORITY NO: fF

 

‘4/ 70=8/ ook

Page 19

CALCULATION OF FEES

 

APPLICATION

FEE

TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

MCU - IMPACT ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

OPERATIONAL WORKS
Details of Development

FEE CALCULATION

 

 

 

 

TOTAL FEES

 

To Lo?
Ties

 

Page 20

 

    
     
  
  

MAXIMUM RECORDED FLOOD LEVEL RL 2.00 AHD

TOP OF WALL
RL 1.0 AHD

 
  
 
  
   
 
  
 
 
 
 
  
  
  

MINIMUM WATER RL 0.44 AHD

PILES:
ALL PILES SHALL BE APPROVED HARDWOOD
AND TREATED TO HAZARD 6.

ALL PILES SHALL BE INSTALLED IN ACCORDANCE
WITH AS 21589 - PILING CODE

 

ELEVATION 1

1:60

CONCRETE RETAINING WALL NOTE: 00 NOT FIX

PILES TO BE CLEAR OF STONE
PITCHING AND ASSOCIATED
GEOTEXILE FABRIC

DECKING:

274815°

38 x 125 F14 HWD ReScRIpTON
FIXED TO BEARERS
WITH TWO STAINLESS Lore32
STEEL SCREWS EACH END LOT ee
PARISH WEYBA
PILES: COUNTY MARCH

@ 200 MIN TREATED
HWD POLES

/A

7000 Oy

s \¥
4
3

3 ES
f

_

{PROPOSED JETTY

 

 

FRAMING LAYOUT © | = pan, SITE PLAN

 

  
   
     
     

  

G. GOODRIDGE

LOT 632
(No.4)

MASTHEAD QUAY
NOOSA WATERS

RABRINK PTY LTD T/A

John Norden
& Associates

ACN 010 263 877
ES
Structural / Civé Design Engineers

 

Page 21

NOTES:

1. UNLESS NOTED OTHERWISE ALL TIMBER SHALL BE
DURABILITY CLASS 1 OF APPROVED SPECIES AND HAVE
A STRESS GRADE OF F14 MIN.

75 x 38 HWD w HWO POLES
1/78 x No14 TYPE 17 cooe 2. UNLESS NOTED OTHERWISE ALL CONSTRUCTION SHALL

COMPLY WITH THE ENVIRONMENTAL PROTECTION AGENCYS'
OPERATIONAL POLICY - "BUILDING AND ENGINEERING
STANDARDS FOR TIDAL WORKS.”

HWD POLES 3. ALL STAINLESS STEEL BOLTS, RODS, ETC., SHALL BE
WITH AB 2159 - PILING CODE APPROVED MARINE GRADE 316. ALL OTHER STEELWORK
INCLUDING NUTS, BOLTS, WASHERS, SCREWS, NAILS, ETC.,
SHALL BE HOT DIPPED GALVANISED OR STAINLESS STEEL.

4. TOP OF PILES SHALL BE SEALED AND FULLY CAP FLASHED
OR RINGED.

5. DIMENSIONS AND LEVELS SHALL NOT BE SCALED FROM

SECTION (A THE DRAWINGS.
™ SD,

0 Fl AMG BRACK I
| | 7 1699 TO EACH MEMBER

 

 
  
 
  

  

G. GOODRIDGE
PROPOSED JETTY
LOT 632

(No.4)

MASTHEAD QUAY
NOOSA WATERS

RABRINK PTY LTD T/A

sy John Norden
& Associates

ACN O10 263 877
SST
Structural / Civil Design Engineers
Sums 16 ‘Tewentn °
Poincans

Praca’
Avenue / PO Box 206
Tewantin Q 4565

 
    
 
   
   
   

  
   
   

 

 
 

JETTY USE:
SINGLE USER, PRIVATE
NO VEHICULAR ACCESS

WALKWAY DECK VERTICAL
DESIGN LIVE LOAD - 2.0 kPa
MAXIMUM MOORED VESSEL - 5m
BERTHING VELOCITY - 0.5 m/sec

   
     

 
 
       

   

        
   

Ph: 07 54407137 Faxc 07 54497172
Emait:

 

WORKING

 

 

"07/2362

 

Used in these records

About this file

File size
980 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0064 - Operational Works - Transport Type 5 - Domestic Marine (Jetty) [As Published].pdf · 980 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.