Council archive · source document
08/0064 - Operational Works - Transport Type 5 - Domestic Marine (Jetty) [As Published] · 142008.64
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkhst, Version 21.0, 3 September 2007
IPA, schedule 8 part 1. fable 2 fem }
IP Requiation schedule 2 iable 2 lem 7)
IP Regutation schedule 1 iabie 5 fem 2 (wild river area}
Water Act 2996, secion 960
Wild Rivers Act 2005 secuori 43A
“ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
XY] No
(I Yes
IPA, scheduie @ part} table 2. item 7
IPA, schedule &, pert) fable 5 items 3ana 4
IP Regulation, schedule 2. table 2, tems } and 23
Environmental Protection Act 1994, section 73AA (wild river area)
Wild Rivers Act 2005, section 434
WITHIN THE LIMITS OF A PORT
1.4 Is any part of the premises within the limits of a port under the Transport infrastructure Act 1994?
KI No
C) Yes
IP Regulation, schedule 2, table 2, toms 15 and 16
IDECLARED FISH HABITAT AREA |
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
kk] No
(11s Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA,
schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Requiation, schudule 2, table 2, dem 26
ICOMMUNITY INFRASTRUCTURE _ oe 4
1.6 ls any part of the premises designated for community infrastructure?
No
Yes
IP Regulation, schedule 2. tabke 3, tem 7
{WASTE WATER MANAGEMENT ; |
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
Ki) No
C Yes
JP Regulation, scheduie 2, bible 3, ten 5
meet
Tilt td PLWe. ©: Section 4 must be completed when the application seeks approval to cary cut operational work.
IPLANNING SCHEME . " * - ——
41 |s any of the proposed operational work assessable under a planning scheme?
[1 No- Go ta Question 4.2 below
Yes - Complete Part E of DAS Application Form 1 and Questions 4.1.1 - 4.1.8 below
[STATE-CONTROLLED ROAD oe ‘ ]
4.1.1 |s any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?
[x] No
(1 Yes
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0064 - Operational Works - Transport Type 5 - Domestic Marine (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 980 KB (small file)
- File type
No other editions are linked here.