Council archive · source document
08/0064 - Operational Works - Transport Type 5 - Domestic Marine (Jetty) [As Published] · 142008.64
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkhst, Version 21 0, 3 September 2007
47
48
49
Is any of the proposed operational work to allow, under the Water Act 2000, for taking or interfering with subartesian water?
J No
L] Yes
IPA schedule 8, part 1 rable 4 item cj
IP Requiaion. schedtwe 2 isble 2 sem 8
IP Requiaton scheduit ? pai 2 able 4 gem 3
Water Act 2000. secuan 966A (wid iver area)(Note no current Wad River declaration identifies taking or interfering wah subartesian water as assessable)
Wild River code (Nate the code dues not curently contain appkcable provssions for sub artesian water)
Is any of the proposed operational work to allow, under the Water Act 2000, for interfering with overland flow water?
No
[1 Yes - Answer both (a) and (b) below
IPA, schedule 8 pan 1. table 4, items 3(c}{1) and 3{d)
IP Regulation, schedule 2, table 2, item 9
IP Regulation, schedule 1 part 3, table 4, tom 3A
Water Act 2000 section 966B {wild river area}
Is the proposed operational work for the following?
e For the construction of a referable dam as defined under the Water Act 2000 [%) No O Yes
« To increase the storage capacity of a referable dam by more than 10% [x] No (0 Yes
if yes to either or both - (Complete Part Ks) This application requires assessment by the Department of Natural Resources and Water (NRW).
if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, tem 4
IP Regulation, schedule 2, table 2, item 10
{UDAL WORK; WILD RIVER AREA
4.10
Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
No
{21 Yes - Answer (a) and (b) below
IPA, schedule 8, part 1, table 4, em 5
IP Regulation, schedule 2, table 2. items 12, 14 and 17
IP Regulation, schedule 1 part 3, table 4, items 4A and §
Coastal Protectian and Management Act 1995, section 104A {witd river area)
ICOASTAL MANAGEMENT DISTRICT; WILD RIVER AREA
4.11
ts any of the operational work proposed to be carried out within a coastal management district?
[Xx] No
LC) Yes
IPA, schedule 8 part | table 4 item 3
IP Reguiation scheduk: 2 table 2, tems 12 and 14
IP Regulahon, schedule } part 3, fable 4, tems 4A and 5
Coastal Protection and Management Act 1995 Act 1995, section 104A (wild river area}
Wild Rivers Act 2005, section 43A
WATERWAY BARRIER WORKS; WILD RIVER AREA
4.12
Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
No
(1) Yes
IPA, schedule 8, pari 1 table 4 iem 6
IPA, scheduie & pant 2 table 4 tem 2
{P Regulation schedule 2. table 2, tem 28
IP Regubiton, sched 1, part 3, table 4, tem 6
Fishers Act 1994, section 76D (wild rver area}
Wild Rivers’ Act 2005, section 13A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0064 - Operational Works - Transport Type 5 - Domestic Marine (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 980 KB (small file)
- File type
No other editions are linked here.