                          BLUE CARE SUNRISE BEACH



         Engineering Report for Development Application




24 June 2008
Job No. 2383-01          Blue Care Property Development Unit
Full text of the other 60 pages

Page 2

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION




                                                                                             Cardno (Qld) Pty Ltd
                                                                                                   ABN 57 051 074 992
                                                                                                         Cardno Centre
                                                                                                  Level 1, 9 Maud Street
                                                                                              Maroochydore Qld 4558
                                                                                            PO Box 152, Maroochydore
                                                                                            Queensland 4558 Australia
                                                                                             Telephone: 07 5443 2555
                                                                                               Facsimile: 07 5443 5642
                                                                                         International: +61 7 5443 2555
                                                                                                   [email protected]
                                                                                                    www.cardno.com.au




 Document Control
                                                        Author                                Reviewer
       Version                      Date
                                                    Name                Initials           Name                 Initials
         Draft                 23 May 2008      Anthony Morris                          Tony Howard
          1.0                 20 June 2008      Anthony Morris                          Tony Howard
          1.1                 24 June 2008      Anthony Morris                          Tony Howard


         "© 2008 Cardno (Qld) Pty Ltd All Rights Reserved. Copyright in the whole and every part of this
         document belongs to Cardno (Qld) Pty Ltd and may not be used, sold, transferred, copied or
         reproduced in whole or in part in any manner or form or in or on any media to any person without the
         prior written consent of Cardno (Qld) Pty Ltd.”




Blue Care Property Development Unit                    Version 1.1                                         24 June 2008
2008 06 24 2383-01 Engineering Report for DA      Commercial in Confidence                                       Page i

Page 3

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION



                                               BLUE CARE SUNRISE BEACH
           ENGINEERING REPORT FOR DEVELOPMENT APPLICATION

                                                 TABLE OF CONTENTS

1.       INTRODUCTION ............................................................................................................... 4

2.       STORMWATER MANAGEMENT PLAN ........................................................................... 5
         2.1       Site Characteristics................................................................................................... 5
         2.2       Catchment Areas ...................................................................................................... 5
         2.3       Re-use of Stored Non-Potable Water ....................................................................... 5
         2.4       Stormwater Quality and Quantity Objectives............................................................. 6
         2.5       Stormwater Quality ................................................................................................... 7
                   2.5.1 MUSIC Water Quality Model ......................................................................... 7
                   2.5.2 Model Parameters ........................................................................................ 8
                   2.5.3 Pollutant Removal Parameters ..................................................................... 8
                   2.5.4 MUSIC Model Results – Predicted Water Quality ......................................... 9
         2.6       Stormwater Quantity ............................................................................................... 10
                   2.6.1 Site Hydrology ............................................................................................ 10
                   2.6.2 Proposed Detention Storages ..................................................................... 11
                   2.6.3 System Performance .................................................................................. 12
                   2.6.4 Summary .................................................................................................... 13

3.       WATER SUPPLY & SEWERAGE INFRASTRUCTURE ASSESSMENT ........................ 14
         3.1       Site Characteristics................................................................................................. 14
         3.2       Design Criteria........................................................................................................ 14
                   3.2.1 Water .......................................................................................................... 14
                   3.2.2 Sewerage ................................................................................................... 15
         3.3       Development Population and Flows ....................................................................... 16
                   3.3.1 Water .......................................................................................................... 16
                   3.3.2 Sewerage ................................................................................................... 16
         3.4       Water Supply Reticulation Assessment .................................................................. 16
         3.5       Sewerage Reticulation Assessment ....................................................................... 18
         3.6       Summary ................................................................................................................ 18

4.       GEOTECHNICAL INVESTIGATION ............................................................................... 19


APPENDICES

APPENDIX A                   Figures 2383-01 SK01 to SK04
APPENDIX B                   MUSIC Model Input Data
APPENDIX C                   Preliminary Geotechnical Site Investigation




Blue Care Property Development Unit                              Version 1.1                                                   24 June 2008
2008 06 24 2383-01 Engineering Report for DA                Commercial in Confidence                                                 Page ii

Page 4

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION




1.            INTRODUCTION

Blue Care Property Development Unit (Blue Care) proposes to develop two parcels of land
(Lot 1 RP177650 and Lot 6 RP901384) located adjacent to Grasstree Ct, Sunrise Beach,
Noosa, for residential retirement and aged care purposes (Figure 1.1 gives locality,
proposed development site outlined in red). The master planned development would
include a 96 bed aged care facility, a number of semi-attached units, and community
facilities.

The proposed development sites would be acquired by Blue Care subject to the
Development Application (DA) for Material Change of Use (MCU) being granted.

Cardno was commissioned by Blue Care, to provide an engineering report to support the
DA. This document serves to present the:

-    Stormwater Management Plan;
-    Water Supply and Sewerage Infrastructure Planning Report;
-    Preliminary Geotechnical Site Investigation;
-    Concept Infrastructure Plans for drainage works, water and sewerage infrastructure

Figure 1.1, Locality Plan




Blue Care Property Development Unit                 Version 1.1                           24 June 2008
2008 06 24 2383-01 Engineering Report for DA   Commercial in Confidence                         Page 4

Page 5

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION



2.            STORMWATER MANAGEMENT PLAN

2.1 SITE CHARACTERISTICS
The site of the proposed development has an area of 5.535ha. The site is vegetated and
currently undeveloped. Both lots have slopes of approximately 5% and drain to the Noosa
National Park. Lot 6 drains to the north and, Lot 1, to the west. Surface runoff, from the
site to the national park, occurs as sheet flow.

Lots 1 and 6 are separated by the Grass Tree Court road reserve.               This road is
constructed and provides access to the Uniting Church site, adjacent to Lot 6.

2.2 CATCHMENT AREAS
The site has been divided into two sub-catchments, based on the natural topography. The
post-developed sub-catchment boundaries are shown on Drawing No.2383-01 SK02.

The internal catchment area was further divided into impervious “clean” roof area and non-
roof area, as outlined in Table 2.1. The total roof area was determined from the Area
Schedules, provided by Smith and Tracey Architects. The non-roof area was assigned a
fraction impervious in accordance with the Brisbane City Council MUSIC Guidelines (BCC
Guidelines), and modelled as a separate source.

Table 2.1, Site Catchment Areas

        Internal Urban Area,                   Impervious “Clean”               Internal Urban
    Excluding buffer area (ha)                   Roof Area (ha)               Non-roof Area (ha)

                    4.427                            1.954                          2.473


Stormwater runoff from the site will be treated as follows:

-    “Clean” roof runoff will be harvested by draining to central retention storage for re-use;
-    Paved pedestrian areas and excess runoff from roof areas will drain to a gross pollutant
     trap (GPT) for preliminary treatment;
-    All runoff will be directed to bio-retention / detention basins sized to offset the increase
     in impervious areas; and
-    Runoff from the bio-retention basins will be discharged through spreader trenches to
     provide additional infiltration and decentralisation of flow, prior to it entering the National
     Park.
2.3 RE-USE OF STORED NON-POTABLE WATER
The water re-use criteria for the site aim to comply with the Queensland Development
Code (QDC) requirements enabling the benefits from Sections 5.10, 5.11 and 5.13 of the
Queensland Water Recycling Strategy (QWRS) (EPA, 2001) to be achieved. Based on
this, the criteria used to determine water re-use included the following:

-    ‘Fit for purpose’ uses
-    Source substitution
-    Wastewater minimisation


Blue Care Property Development Unit                     Version 1.1                                24 June 2008
2008 06 24 2383-01 Engineering Report for DA       Commercial in Confidence                              Page 5

Page 6

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION




The storage tanks have been sized in accordance with the requirements of the Noosa
Rainwater Tank Policy and the QDC. Each residential dwelling unit will be required to
incorporate a rainwater storage capacity of at least 3,000L. It is understood that this
requirement will be fulfilled using common storage tanks, located under the internal roads.

Stored non-potable stormwater runoff will be re-used in accordance with the QDC for the
following:

-    External Use
-    Cold Laundry Tap
-    Toilet Flushing


2.4 STORMWATER QUALITY AND QUANTITY OBJECTIVES
The aim of the stormwater management system for the proposed development is to protect
and enhance the natural water systems of the National Park and elsewhere.

Stormwater runoff from the site will be managed in accordance with the principles of Water
Sensitive Urban Design (WSUD) as expressed by the following performance criteria and
objectives (Melbourne Water, 2005):

-    Recycle stormwater for non-potable use (to reduce demand on water resources);
-    Protect and enhance natural water systems within urban developments;
-    Integrate stormwater treatment into the landscape;
-    Use stormwater infrastructure in the landscape to maximise visual and recreational
     amenity;
-    Control and improve the quality of water draining from the urban development;
-    Reduce runoff and peak flows from urban development to be no greater than the pre-
     developed case, by utilising local detention measures and the reduction of impervious
     areas; and
-    Minimise the drainage infrastructure cost of development.

Further stormwater quality objectives have been identified for this site. The Department of
Natural Resources and Water (DNRW) has recommended that the water quality for
discharges from the developed site be ‘not worse’ than for the pre-developed case. The
Healthy Waterways guidelines recommend load based reduction targets which, when met,
are generally considered to surpass the ‘not worsening’ requirement. The Healthy
Waterways load based reduction targets (Table 2.2) were adopted for this analysis.

Table 2.2, Pollutant Load Reduction Targets

    Pollutant                                  Load Reduction
    Total Suspended Solids                     80%
    Total Phosphorous                          60%
    Total Nitrogen                             45%

During the construction phase, the potential exists for significant increases in the amount of
pollutants, particularly sediment, exported from the site. During this period, an Erosion


Blue Care Property Development Unit                       Version 1.1                        24 June 2008
2008 06 24 2383-01 Engineering Report for DA         Commercial in Confidence                      Page 6

Page 7

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION


and Sediment Control Plan will be implemented as part of the overall Environmental
Management Plan prepared for the construction phase.

Erosion and sediment control measures will be implemented in accordance with Council
requirements and the recommendations of “Soil Erosion and Sediment Control,
Engineering Guidelines for Queensland Construction Sites” by Institution of Engineers
Australia, 1996.

2.5 STORMWATER QUALITY

    2.5.1          MUSIC Water Quality Model

    Stormwater quality was modelled using the program MUSIC (Model for Urban
    Stormwater Improvement Conceptualisation – developed by the Cooperative Research
    Centre for Catchment Hydrology) to confirm that the proposed water quality control of
    runoff treatment will meet the desired water quality criteria.

    MUSIC is a conceptual model used to simulate urban stormwater systems and assess
    the effectiveness of stormwater quality treatment devices. Although multiple stormwater
    treatment devices are proposed, the conceptual model is based on total volumes,
    areas, etc. The model schematic is shown in Figure 2.1. Simulations were run using a
    6 minute time step

    Rainfall and potential evapotranspiration (PET) data series for Nambour (1989 to 1998)
    were used in accordance with the Water Sensitive Urban Design Technical Design
    Guidelines for South East Queensland (Healthy Waterways).

    Brisbane City Council (BCC) has carried out an extensive monitoring program, specific
    to the MUSIC model, to determine the rainfall-runoff and pollutant export parameters for
    various land uses.    The findings of the study are detailed in BCC Guidelines for
    Pollutant Export Modelling in Brisbane Version 7 - Draft (2003). In addition to the BCC
    Guidelines the MUSIC Modelling Guidelines prepared by Gold Coast City Council
    (2006) have also been adopted where relevant to improve the quality in the modelling.
    These parameters were adopted for the rainfall-runoff and pollutant export parameters
    from the proposed development.
    Figure 2.1, MUSIC Model Schematic




Blue Care Property Development Unit                 Version 1.1                            24 June 2008
2008 06 24 2383-01 Engineering Report for DA   Commercial in Confidence                          Page 7

Page 8

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION




    2.5.2          Model Parameters

    The land-use parameters for the source nodes in the MUSIC model were adjusted to
    match the values given in Table 2.3 based on the BCC Guidelines (BCC, 2003).

    Table 2.3, MUSIC Source Node Catchment Parameters
           Parameter                                                                        MUSIC Input
                                                                                         Urban Residential
           Impervious                    Rainfall threshold (mm/day)                            1.0
           Area
           Pervious                      Soil Storage Capacity (mm)                             400
           Area                          Field capacity (mm)                                    200
                                         Infiltration capacity coefficient – a                  50
                                         Infiltration capacity exponent – b                     1.0
           Groundwater                   Daily recharge rate (%)                                25.0
                                         Daily drainage rate (%)                                25

    The pollutant export parameters for the MUSIC model were adjusted to be consistent
    with data quoted in BCC Guidelines (Table 2.4, BCC, 2003) and the Gold Coast City
    Council (GCCC) MUSIC Guidelines (Table 7, GCCC, 2006). The source node input
    data for the land uses are shown in Table 2.4.

    Table 2.4, Source Node Event Mean Concentrations and Standard Deviations
       Land Use Type                Parameter                TSS                    TP               TN
         for MUSIC                                       Log10 (mg/L)           Log10 (mg/L)     Log10 (mg/L)
       Source Nodes                                     Base Storm            Base      Storm   Base     Storm
                                                        Flow     Flow         Flow      Flow    Flow     Flow
      Internal (Urban)              Mean                1.00     2.18         -0.97     -0.47   0.20      0.26
                                    Std Deviation       0.34     0.39          0.31      0.31   0.20      0.23
      Roof Areas                    Mean                1.00      1.3         -0.97     -0.89   0.20      0.26
                                    Std Deviation       1.34     0.39          0.31      0.31   0.20      0.23

    The land type ‘split’ was carried out in accordance with the GCCC MUSIC Guidelines to
    effectively account for rainwater harvesting from the roof areas within the model. For
    the initial modelling, the roof node was modelled as being 100% impervious, with the
    urban node modelled as 26% impervious.

    2.5.3          Pollutant Removal Parameters

    Gross Pollutant Trap

    The adopted pollutant removal parameters for the GPT are outlined in Table 2.5. A high
    flow bypass of 0.75m3/s was applied, based on the potential use of a Rocla CL750 unit.
    It is noted that the manufacturer specification provides for a higher removal capacity for
    TSS than shown in the Table 2.5.




Blue Care Property Development Unit                             Version 1.1                                  24 June 2008
2008 06 24 2383-01 Engineering Report for DA               Commercial in Confidence                                Page 8

Page 9

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION


    Table 2.5, Pollutant Removal Rates for GPT

             Pollutant                 Removal Efficiency      Pollutant Removal Ordinates
                                             (%)
                                                                Input                 Output

                 TSS                            0                 75                      75
                                               40.0              175                     105
                  TN                           10                 10                      9
                  TP                           10                 10                      9
       Gross pollutants                        100               100                      0


    Rainwater Tank

    The total volume of the rainwater tanks was based on the 129 dwelling units
    (Independent Living Units, Apartments, Serviced Apartments), plus a factor for external
    use. The total storage volume has been determined to be 442m3.

    Bioretention / Detention Basin

    The filter medium was modelled as 0.4m thick, with 0.4m extended detention depth.
    The basin bottom surface area was input as 700m2 which produced a high-flow bypass
    rate of 0.078m3/s.


    2.5.4          MUSIC Model Results – Predicted Water Quality

    The MUSIC model was run for various combinations of treatment options to achieve the
    required stormwater quality objectives. The results presented in Table 2.6 are for the
    adopted pollutant removal devices, outlined in Section 2.5.3.          These results
    demonstrate that the required pollutant load reduction targets will be met by the
    proposed stormwater treatment infrastructure.

    Table 2.6, Developed Pollutant Load Reductions

                                                                                 Pollutants
                                                              Total             Total            Total
                                                            Suspended        Phosphorous       Nitrogen
                                                              Solids
      Load Based Reduction, post-                             80.1                 64.7          58.0
      developed case

      Pollutant Removal Objective (%)                          80                   60           45




Blue Care Property Development Unit                        Version 1.1                                    24 June 2008
2008 06 24 2383-01 Engineering Report for DA          Commercial in Confidence                                  Page 9

Page 10

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION



2.6 STORMWATER QUANTITY

    2.6.1          Site Hydrology

    The drainage system within the development will consist of underground pipe systems
    and surface overland flow. With the completed development, the locations of the
    discharges to the national park will be maintained across the western and northern
    boundaries of Lots 1 and 6, respectively.

    The development will result in a significant increase in the site impervious area. The
    undeveloped site has been assumed to have no impervious area, while the developed
    site has been assumed to have a fraction impervious of 0.9.

    Catchments within the developed site will consist of paved areas, roads, carparks and
    roof areas.

    The site, prior to development, had an estimated time of concentration of 18 minutes for
    Lot 6 and 22 minutes for Lot 1. The estimated times of concentration for the developed
    site are 8 minutes, for both catchments.

    The reshaping of the site for the development will also result in runoff from an additional
    catchment area of 0.626ha at the north-eastern corner of Lot 1 being redirected to the
    west through Lot 1. Currently, runoff from this area discharges to the east, to Ben
    Lexcen Drive.

    Attenuation of peak discharges from the developed site is necessary to comply with
    Council’s non-worsening requirements.

    For the site in its undeveloped condition, peak discharges have been calculated, using
    the Rational Method, for rainfall events with average recurrence intervals of 2, 10, and
    100 years. These calculations are summarised in the Tables 2.7 and 2.8.

    The catchment areas for Lots 1 and 6, used in the calculations below, represent the
    areas of the lots excluding the dedicated buffer strips and fire breaks. No development
    works which will affect site runoff characteristics are proposed within these areas and,
    therefore, they have not been included in the catchment areas used for the calculation
    of the pre-development peak discharges to be used for comparison with those from the
    developed site.

    Table 2.7, Lot 6 Undeveloped Site – Peak Discharges
                ARI                             C             I                     A       Q
               years                                       mm/h                    ha     m3/s
                 2                             0.15          99                  0.7774   0.033
                 10                            0.18         134                  0.7774   0.052
                100                            0.22         194                  0.7774   0.090

    Table 2.8, Lot 1and Road Undeveloped Site – Peak Discharges
                ARI                             C            I                     A        Q
               years                                       mm/h                    ha     m3/s
                 2                             0.15         90                    3.65    0.140
                10                             0.18         122                   3.65    0.223
                100                            0.22         176                   3.65    0.385




Blue Care Property Development Unit                        Version 1.1                            24 June 2008
2008 06 24 2383-01 Engineering Report for DA          Commercial in Confidence                         Page 10

Page 11

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION


    On-site detention storage is required to reduce the peak discharges from the
    development to values which are less than or equal to those from the undeveloped site.
    This storage is proposed to be provided, within each lot, in conjunction with the
    proposed bio-retention basins required for stormwater quality management.

    2.6.2          Proposed Detention Storages

    The locations and general arrangement details of the proposed bio-retention basins and
    detention storages are shown on Drawing No. 2383-01 SK01. The operation of the bio-
    retention basins is discussed in Section 2.6.3.

    To minimise their footprints and to maximize the storage capacity of the basins, it is
    proposed that they are constructed with rock-filled wire gabion retaining walls, rather
    than with un-retained, excavated batters. The external faces of the walls of the basins
    will be essentially vertical and the internal faces will have an effective slope of
    1(V):0.5(H). These structures are subject to further detailed design, geotechnical and
    hydraulic investigations.
    The bio-retention basins will be constructed within the base of each detention basin, as
    shown on Drawings 2383-01 SK03 and SK04. An overflow grate, at a level 0.4m above
    the surface of the bio-retention basin filter medium, will be provided within each basin.
    The height of the grate above the filter is the proposed extended detention depth of the
    bio-retention basin. The grate will provide the outlet from the detention basin and will
    be connected to discharge pipework extending through the basin wall.

    Concentrated discharges from the detention basin outlets will require respreading as
    sheet flow before entering the national park. This will be accomplished using spreader
    channels, as shown on Drawings 2383-01 SK03 and SK04. The proposed basins and
    spreader channels are located within the site development area boundary or within the
    10m wide fire break adjacent to the buffer area to the national park.

    To assess the required capacities and outlet configurations of the detention basins, a
    dynamic, numerical, hydrological and hydraulic model of the site catchments, the basins
    and discharge pipes was set up using the modelling package XP-SWMM.

    The hydrology in the XP-SWMM model was adjusted, as required, to ensure
    consistency between the catchment peak discharges estimated using the model and
    those calculated using the Rational Method.

    The model was run for rainfall events with average recurrence intervals of 2, 10, and
    100 years with durations of up to 360 minutes to determine the duration which produced
    the peak discharges from the basins.

    The catchment areas allocated to each basin and used for the initial assessment of
    basin performance were set to the areas of the respective lots, with the Grasstree Court
    road catchment discharging to Lot 1. The resulting catchment areas were: Lot 1 and
    road, 4.275ha; Lot 6, 0.7774ha.

    For this arrangement, it was found that the Lot 6 basin was capable of accepting runoff
    from a larger catchment area and the Lot 1 basin could not accept the runoff from the
    assigned catchment area, without peak discharges exceeding those from the
    undeveloped site. A number of trial divisions of the catchments were modelled to
    obtain an arrangement which best utilised the capacity available within each basin. In
    addition to peak discharges, it was also necessary to consider peak water levels within
    each basin.

    The adopted catchment division assumed that runoff from the Grasstree Court road
    catchment (0.235ha) and from 0.8ha from the north-eastern corner of the development,



Blue Care Property Development Unit                 Version 1.1                             24 June 2008
2008 06 24 2383-01 Engineering Report for DA   Commercial in Confidence                          Page 11

Page 12

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION


    within Lot 1, was directed to the Lot 6 basin. The resulting catchment areas for each
    basin were: Lot 1, 3.24ha; Lot 6, road and part of Lot 1, 1.812ha. The proposed
    catchment areas to each basin are shown on Drawing No. 2383-01 SK02.

    Details of the modelled basins are summarised in the Table 2.9.

    Table 2.9, Proposed Detention Basins
                      Basin                                         Lot 1                     Lot 6
      Base Level (mAHD)                                            19.5                       27.0
      Base Area (m2)                                               735                         708
      Top of Walls (m AHD)                                         23.5                       30.0
      Max. Wall Ht above Nat. Surf. (m)                             3.0                        4.0
      Overflow Grate Level (m AHD)                                 19.8                       27.4
      Outlet Pipe Dia. (mm)                                        0.30                       0.15
      Spreader Channel Length (m)                                   60                          40


    2.6.3          System Performance

    The performance of the drainage systems from the developed site, with the above basin
    configurations, is summarised in the Table 2.10.

    Table 2.10, Developed Site – Detention Basin Performance
         Average                      Basin    Basin       Basin               Basin Peak   Undeveloped
        Recurrence                              Max      Max Water             Discharge        Site
         Interval                              Water      Depth                                Peak
                                               Level        m                                Discharge
                                               m AHD                             m3/s
              years                                                                            m3/s

                2                      Lot 1   20.968       1.468                0.173         0.140
                2                      Lot 6   27.792       0.792                0.045         0.033
                10                     Lot 1   21.593       2.093                0.208         0.223
                10                     Lot 6   28.381       1.381                0.047         0.052
               100                     Lot 1   23.160       3.660                0.283         0.385
               100                     Lot 6   28.986       1.986                0.052         0.090

    These results show that, for the 10 year and 100 year ARI events, the proposed basins
    will provide sufficient detention storage to reduce the peak discharges, from the
    developed site, to values which are less than those for the same average recurrence
    intervals from the undeveloped site. For the 2 year ARI event, peak discharges from
    the basins are greater than those for the undeveloped site.

    The model calculations, however, do not consider the flow losses due to infiltration from
    the bio-retention basin filter media into the natural sands underlying the basin or from
    the spreader channels. The adopted water quality treatment flows, through the bio-
    retention basin filter media, are approximately 0.08m3/s for each basin. These flows
    are driven by the head of 0.4m within the extended detention zones of the basins.
    From the data presented above, it can be seen that the water depths, within the basins,
    during significant rainfall events, will, generally, exceed 1 metre. Infiltration through the
    filter media and also into the natural sands underlying the basin will be significantly
    greater than the water quality treatment flows of 0.08m3/s. Infiltration losses into the
    base and batters of the spreader channels will also be significant.



Blue Care Property Development Unit                      Version 1.1                                   24 June 2008
2008 06 24 2383-01 Engineering Report for DA        Commercial in Confidence                                Page 12

Page 13

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION


    Infiltration losses from the systems will, almost certainly, exceed the values of 0.02m3/s
    to 0.03m3/s required for the basin peak discharges, from the developed site, for the 2
    year ARI events, to be reduced to values less than those from the undeveloped site.

     When allowance is made for these losses, the basin peak discharges, for all average
    recurrence intervals, are less than those from the undeveloped site.

    2.6.4          Summary

    Significant attenuation of peak discharges from the proposed development is required to
    ensure that discharges to the Noosa National Park are not worsened, compared to
    those from the current undeveloped site. It is proposed to provide the storage required
    to achieve this attenuation in two separate basins located adjacent to the northern
    boundary of Lot 6 and the western boundary of Lot 1. The detention basins will be
    combined with the bioretention basins required for stormwater runoff quality treatment.

    Discharges from the basins will be converted from concentrated to sheet flows by
    means of spreader channels constructed within the 10m fire break within the buffer
    areas to the national park.

    Modelling, using the XP-SWMM package, has demonstrated that satisfactory
    attenuation of peak discharges from the development can be achieved.




Blue Care Property Development Unit                 Version 1.1                              24 June 2008
2008 06 24 2383-01 Engineering Report for DA   Commercial in Confidence                           Page 13

Page 14

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION




3.            WATER SUPPLY & SEWERAGE INFRASTRUCTURE
              ASSESSMENT

3.1      SITE CHARACTERISTICS
The proposed development has the potential to impact on the reticulated water supply and
sewerage networks and cause the level of service provision to be reduced. This document
outlines the assessment undertaken to ensure that the proposed development does not
cause the level of service provision to fall below the minimum service standards adopted
by the Sunshine Coast Regional Council (SCRC).

3.2 DESIGN CRITERIA
The design criteria for water supply and sewerage were extracted from the Sunshine Coast
Regional Council (Noosa) Planning Scheme Policy 6 – Engineering Design Standards
Water Supply & Sewerage.

     3.2.1         Water

     Maximum Hour Demand
     The Maximum Hour (MH) unit demand is shown in Table 3.1. The land area method,
     when used, considers per hectare of lots only – excluding roads etc.

     Table 3.1, Maximum Hour Demand by Land Use Type
                        Zone                   Maximum Hour Flow
      Detached Housing                              0.0809               L/s/lot
      Commercial                                     4.91                L/s/ha
      All other development
                        Population Density
                                   100 EP/ha          3.3               L/s/ha
                                   160 EP/ha         5.28               L/s/ha
                                   250 EP/ha         8.35               L/s/ha
                                   320 EP/ha         10.56              L/s/ha


     Minimum Reticulation Size
     Water reticulation mains shall be a minimum size of 100mm diameter in residential
     developments and a minimum of 150mm diameter in commercial, industrial, and high
     density residential developments. Commercial and industrial developments shall be
     provided with a main on each side of the road reserve to eliminate the requirement for
     service crossings.

     Table 3.2, The Hazen Williams Coefficient, C
         Nominal Diameter (mm)                        C
                    100 - 300                        110
                     > 300                           120




Blue Care Property Development Unit                       Version 1.1                     24 June 2008
2008 06 24 2383-01 Engineering Report for DA         Commercial in Confidence                  Page 14

Page 15

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION



    3.2.2          Sewerage

    Average Dry Weather Flow (ADWF) = 600 L/ET/day

    Occupancy Ratio = 3.3 Equivalent People/Detached Dwelling = 3.3 EP/ET

    Peak Wet Weather Flow (PWWF) = 5 * ADWF = 3000 L/ET/day

    Table 3.3, Maximum Possible Flow (L/s)
        GRADE            150DIA           225DIA    300DIA
          420                                         43
          400                                         44
          350                                         47
          300                                         51
          290                                  24
          250                                  26     55
          200                                  29     62
          150               11                 33     71
          125               12                 36     78
          100               14                 41     27
           75               16                 47    101
           50               19                 57    124



    Table 3.4, Minimum Allowable Flows (ET)
       PIPE DIA (mm)             MINIMUM            MINIMUM           MINIMUM No OF   MINIMUM PUMPED
                                 GRADE              DEPTH OF          TENEMENTS       FLOW L/S
                                                    FLOW (mm)


        150                       1 in 150                 25                 4               2
         225                       1 in 290                40               170               5
         300                       1 in 420                50               270               8
         375                       1 in 570                70               530              15
         450                       1 in 730                80               690              19
         525                       1 in 900                95               970              27
         600                       1 in 1000               110              1360             36


    Sewer Easements
    Easements shall be equivalent in total width to twice the depth to invert level of sewer at
    the deepest point within the allotment. The minimum setback distance from the
    centreline of the sewer shall be 1.5m regardless of the depth of the sewer main.
    Easements are to be parallel to, and centred over, sewer lines.

    Zone of Influence
    It shall not be permitted to construct sewers in new subdivisions or developments
    whereby adjacent established buildings or existing building envelopes encroach into the
    zone of influence of the new sewer. The zone of influence shall be taken as that area
    within a 45o angle from invert level of the sewer.

    Scour Velocity
    The mains shall be sized such that minimum scour velocity is 0.75m/s in the pressure
    main at maximum head (single pump) and maximum scour velocity is 1.8m/s (double
    pump) at minimum head, ie. well full.




Blue Care Property Development Unit                             Version 1.1                            24 June 2008
2008 06 24 2383-01 Engineering Report for DA               Commercial in Confidence                         Page 15

Page 16

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION



3.3 DEVELOPMENT POPULATION AND FLOWS
    The site was given Equivalent Person (EP) populations in accordance with Planning
    Scheme Policy 16 – Sewerage Headworks Contributions and Planning Scheme Policy
    17 – Water Headworks Contributions.

    Table 3.5, Equivalent Development Population

                                                                                              Water                       Sewerage
                                         Bedrooms                Units             EP/unit            EP          EP/unit         EP
        Independent Living
           Units (ILU’s)                        2       55      dwelling units          2.6       143.0            2.3          126.5
           Apartments                           2       54      dwelling units          2.6       140.4            2.3          124.2
                                                1       11      dwelling units          2.0        22.0            1.7           18.7
       Serviced Apartments
                                                2        9      dwelling units          2.6        23.4            2.3           20.7
      Aged Care Facility                                96      beds                    2.0       192.0            1.7          163.2
                                                                      2
      Community Facilities                             101.7    10m roof area       0.08            8.16           0.17         17.34
                                               Total                                             528.96                        470.64
                                               Adopt                                          530                           470

    3.3.1          Water

    The proposed development has an adopted Equivalent Person water demand of 530
    EP. The total area (excluding buffer zone) of the two allotments is 4.43 hectares.
    Assuming 20% is used for roads etc, the site has 3.54 hectares of developable area.
    Thus, the population density is approximately 150 EP/ha. From Table 3.1 (design
    criteria) the unit demand for water supply of 5.28 L/s/ha was adopted. The total
    Maximum Hour water demand from the proposed development site is thus 18.7 L/s.

    3.3.2          Sewerage

    The proposed development has an adopted Equivalent Person sewage loading of 470
    EP (142 ET), producing an Peak Wet Weather Flow (PWWF) of 4.9 L/s, at 3000
    L/ET/day in accordance with the adopted design criteria.

    Table 3.6, Sewage Loading

          Adopted EP                 Adopted ET                ADWF              ADWF                  PWWF
                                                             L/ET/Day              L/s                     L/s
               510                         154                 600                1.07                     5.35




3.4 WATER SUPPLY RETICULATION ASSESSMENT
The SCRC Planning Scheme Policy 6 – Engineering Design Standards for Water &
Sewerage directs consultants to contact ‘Noosa Council Manager Water Supply’ for
hydraulic grades at proposed connection points. The following Peak Hour (19:00)
boundary conditions were extracted from Council’s Water Supply Reticulation Model.




Blue Care Property Development Unit                               Version 1.1                                               24 June 2008
2008 06 24 2383-01 Engineering Report for DA                 Commercial in Confidence                                            Page 16

Page 17

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION


Table 3.7, Boundary Conditions for Water Supply Reticulation Analysis, Corner of Ben
Lexcen Dr and Grasstree Ct

                                Existing             Proposed
                                               (with nominal 550EP)
 HGL                             74.77m              73.66m
 Pressure                        42.73m              41.62m

The WaterGEMS modelling package was used to assess the existing water supply
reticulation, using the adopted boundary conditions. The proposed 530 EP were input to
the model at the proposed connection point, at the western end of Grasstree Ct. The
model showed that the existing DN100 main along Grasstree Ct was not adequately sized,
and, thus, it is considered necessary to augment the existing infrastructure. A DN150
looped main was modelled as shown on Figure 3.8.

Figure 3.8, Proposed Augmentation to Water Supply Reticulation (Proposed DN150
shown in red).




A fireflow demand of 15 L/s was included at the proposed connection point, with the
Maximum Hour flow background demand. The model showed that the minimum pressure
at the proposed connection point would be 36m, which is above the required minimum fire-
flow residual pressure of 12m as defined by the SCRC Planning Scheme.

The water supply reticulation modelling analysis shows that the proposed augmentation
provides an adequate level of service provision to the proposed development and to
existing connections in the vicinity.




Blue Care Property Development Unit                   Version 1.1                      24 June 2008
2008 06 24 2383-01 Engineering Report for DA     Commercial in Confidence                   Page 17

Page 18

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION



3.5 SEWERAGE RETICULATION ASSESSMENT
There is an existing sewage pump station located to the west of the proposed development
site. Excluding the proposed development site, the sewage pump station’s ultimate
catchment includes 630 EP (191 ET) as outlined in Table 3.9.

Table 3.9, Design Peak Wet Weather Flows, External
                                                          EP/dwelling
                                        Dwelling Units       unit                    EP
 Detached Residential                          137             3.3                  452.1
 Attahced Residential                          69              2.6                  179.4
                                                              Total                 631.5
                                                             Adopt                  630

The ultimate sewage loading (including 470 EP from the proposed development) on the
sewage pump station is 1100 EP (333 ET), which produces a design PWWF = 11.6 L/s.
The post-development design velocity through the existing DN100 rising main would be
1.5m/s which is within acceptable limits for scour velocity (0.75-1.8 m/s) as defined by the
SCRC Planning Scheme Policy 6.

The existing sewerage infrastructure is considered adequate to service the ultimate
development population, including the proposed development.

3.6 SUMMARY
Design criteria for water supply and sewerage were determined in accordance with the
Sunshine Coast Regional Council (Noosa) Planning Scheme.

The existing water supply and sewerage infrastructure was assessed to determine the
level of service provided to the area, post-development.

Modelling analyses have shown that it will be necessary to augment the existing water
supply infrastructure with a DN150 main along Grasstree Court (Approx 230m), however,
the existing sewerage infrastructure is considered to provide an adequate level of service
to the ultimate development.

It is recommended that the proposed water supply reticulation augmentation be adopted to
ensure the post-development standards of service for water supply are maintained.




Blue Care Property Development Unit                           Version 1.1                   24 June 2008
2008 06 24 2383-01 Engineering Report for DA             Commercial in Confidence                Page 18

Page 19

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION



4.            GEOTECHNICAL INVESTIGATION

A preliminary site investigation was undertaken by Cardno Bowler.

Investigative fieldwork was carried out on 7th May 2008 and included the drilling of ten
boreholes at various locations across the site. The material encountered at the ten
boreholes was Sand or Silty Sand, poorly graded. Approximately 70% of the soil particle
size grading is between 0.150 - 0.300 mm in diameter. Soil was generally found to be
moist and loose to medium dense.

The investigation found that the soils on the site generally exhibit good engineering
properties, provided they are adequately compacted and confined.

The full report outlines factual data pertinent to the site and gives an overall indication of
the geotechnical conditions. The report is included in Appendix B.




Blue Care Property Development Unit                 Version 1.1                              24 June 2008
2008 06 24 2383-01 Engineering Report for DA   Commercial in Confidence                           Page 19

Page 20

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION




                                                                          APPENDIX A




                                                          Figures 2383-01 SK01 to SK04




Blue Care Property Development Unit                 Version 1.1                 24 June 2008
2008 06 24 2383-01 Engineering Report for DA   Commercial in Confidence

Page 21

 

REFER INSET

 

      
        
  
  

 

 

 

 

 

 

 

 

 

 

  
    
   
   
  
  

 

 

 

 

 

 

 

 
   

 

eure ai iL RESIDENTIAL AGED CARE’
LL _ ral / 7
/ / — “Ly
/ / j
; / /
\ | \ |
| fi \
| | ' |
| | { |
\ \ \ O
\ \ \
\ \ \ EXISTING CHURCH
\ \ \ \ \ T
\\ \ \ -- LEGEND
\ \ \ \ — 7 == st —swo ——-swo— PROPOSED STORMWATER
\. \ \ \ vt S s PROPOSED SEWER
\ \ \ \ \ t = ” w PROPOSED WATER
\ \ . \ \ i — — — —sr— EXISTING SEWER RISING MAIN
\ N \ \ INDEPENDENT
\ \ , \ LIVING UNITS => OVERLAND FLOW PATH
\ \ \ \
\ \
\ \ \ \
\ \ \ \ \
SOUTHERN DETENTION/ \ Le
BIORETENTION BASIN \ 7 Noe |
\ a a ——_ INDEPENDENT
LIVING UNITS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

+

 

 

 

 

 

 

A
Ww

 

 

 

 

 

 

 

\
\
1 (1 \ I = INDEPENDENT |=“
INDEPENDENT |) \ J .} Living units |]
AW \i) 8
ii d

  
       

 

       

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LIVING UNITS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ww
Ww) —— js wo ———swo ——ah) AK SS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

| $00 ~<a wo — 1 —swo-—swo-—5 Gams
Ww

 

 

p

    
 

NORTHERN DETENTION/“
BIORETENTION BASIN
7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

s
Ww |
\ $
—
\ \
\ [— | if & i
| 4.0m/2.25m/7.0m/7.5m | 3 |
25% 25% =I a | | ‘
TOC S eS re —
3 3
TYPICAL CARRIAGEWAY \ \ INSET
\ — nei
1500 - Al 11000 - A3
ESE Aa oan AHD Card ‘uae [ BLUE CARE PROPERTY DEVELOPMENT UNIT
* VcnecKeD: Tae BLUE CARE SUNRISE BEACH awe *
RECOMMENDED: PROJ. MAN. APPROVED: PROJ. DIR. et
“This documents produood by Cardo (Qc) Py Lid sey for he bone of and use by Cardno (Qld) Ply Ltd
Pep amear baits Sears ies Canty eaee Men ot oes rete

 

and shal nol assume ary fesponsibily olabilly whalsoever to ary third arly srising out of

boo olance by nea pay on tho conn ts ce CAD FILE 2505-01 SKOT GWG SUNSHINE COASTOFRCE: Level 1, 8 Maud Steet Maroochydore, ald 4558 (08) 2881 S015 (08) e0dt 1768
DATE REVISIONS Rec. APR] Eee ; “ RGF: 2389-01-54 BASE Emait sco@suncarsnocomas Ph (07) S843 2555 Far. (7) 54095642 PROPOSED SERVICES LAYOUT
T

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 22

DATE PLOTTED: 06 June, 2008 - 8373

 

Northern detention/
bioretention basin.

 
 
  
  
 
    

 

 

Cathcment area = 18250m°

 

 

 

 
     
 

 

 

 

 

 

 

 

   

 

 

  
     
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

      
 
   

   
  
     
    
   
   
 

 

 

 

LEGEND:

 

 

 

 

859

RPB45926

 

 

 

  
   

  

858
RPBA5926

 

857

RPB45926

  

 

738

S
|
|

‘MCHB05762
740
MCHB05762

 
 

 

741

 

Stormwater catchment boundary

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2 MCHB05762
\
Southern detention/ ~~ 742
bioretention basin. \ MCH605762
Cathcment area = 33634m’° \
‘ MCH805764 768
\ MCH805762
\
Is
MCH805764
—
Hi. = mules 765
X \ fF MCH805764
Nor ol hora Lochs
omega et - . -_ — - 764
YB < 3 a 3 3 MCH805764
\ \
PLAN
SCALE 1750 75 0 = 75 15 225 30 37.5m
> SS
4:750- A1 11500 - A3
© Cardno (Qld) Ply Ltd All Rights Reserved 2008. ‘DESIGNED: TELEPHONE FAK
cineoninrentommioreecrimaarvuine lp At |aTum: AH.D. C: f erases ease | BLUE CARE PROPERTY DEVELOPMENT UNIT _
tear on ny maga tan paren handy agement wih Cadre (04) Pytts | CHECKED: © Esso casa en see? BLUE CARE SUNRISE BEACH ore se 22/05/2008 RV.
RECOMMENDED: PROJ. MAN. APPROVED: PROJ. DIR. & sieaces & sizasies *
Tes oars pos Guar Py doy te ba anny Caran (ale) Fy td Sp ateseee 2 sees | STORMWATER CATCHMENT PLAN 238301-SK02
nar ae, 9 mie Swe aise Ce fo conisusl Colmcme
aE FESONS ee OREO A sie SSS eae meraes PRELIMINARY LAYOUT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 23

 

Proposed development 1 Sm Fire trail buffer Bioretention/detention basin 20m Buffer zone

 

 

 

 

 

 

 

 

 

 

 

 

0.50,0.50,0.50
aibasl 4
Q100 Water level 23.160
| RL. 22.5
| lm
— y RL. 215
Safety fence to be installed ~ —
around the perimeter of the Se es ee
bioretention basin. R205 2 |

 

 

 

 

 

   

Rock filled gabion

 

 

DATE PLOTTED: 19 June, 2008 - 2:44pm

|

 

 

 

 
 

 
 
 

 
 

 

 

 

retaining wall i ° j
[ SECTIONA Cioomm @ slotted upvc @ 1000mm
Impervious membrane to be SCALE 150 centres, Minimum embedment

 

 

 

 

installed within the rock filled
gabion retaining wall.

 

 

 

 

 

 

 

 

 

 

 

\

 

J

 

 

 

 

  

 

|

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

f
\

 

 

 

 

Proposed development

100mm into drainage layer.

5m Fire trail buffer Spreader channel 20m Buffer zone

 

 

 

 

 

OMY

 

 

 

 

 

 

2.00 100, 2.00

 

 

 

 

SECTION B

‘SCALE 150

os Bioretention/detention basin Spreader channel
; S I$
pL. | NE |
. \ | | | | | Q100 Water level 23.160
nT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

——
\ : x \
\ \ ee" surface
\\ \ \ \ \ Zi 300mm @ uPVC [email protected]%
\
WX | ) ee ee TL
\\ \ \ . 600x600 field ML. 18.75 LL, 18.675 Stormwater outlet to be
‘ y intet pit SECTION C concreted and stone pitched
O ‘ , \ ‘SCALE 1:50 as directed by the site
x ‘ \ \ \ superintendent.
\S \ uv 5
\ \ \
wy \\, \ \ \ \ /
: XN \
\ .
PLAN 05 0 65 10 15 20 2.5m 5 0 5 10 15 20 25m
SCALE 1500 4:50 - Al 4:100 - A3 1500-A1 — 1:1000 - A3
© Cardno (Qld) Ply Ld All Rights Reserved 2008, DESIGNED: OFFICES "TELEPHONE FAK
Gace oancsayadabdcngtaanwomaparos: loam A1 | oatum: AH.D. Serene com (07 BD Zags (GP 9 ees BLUE CARE PROPERTY DEVELOPMENT UNIT
travel vied. sid Fantontd cede vprodsra o Oo Ba fy rarer ot Cardno Syeney (ea) 8er6 209 foo) On0 coe DATE: 2210572008 ®
toler on ery Mees 19 ay perton cine tan by agreeinett mit Cardre (Oc Py Lat ‘CHECKED: gee Coast ton snususga (on S508 2647 BLUE CARE SUNRISE BEACH DRGHNG No:
Rl NDED: PROJ. MAN, APPROVED: PROJ. DIR. eer ee a Aiea oa] on pias sie)
elscinnusdcenberare ume oe tne Say sca Crate Feathersen (07 tae 220337 | DETENTION & BIORETENTION 238301-SK03
aE BISONS PeCtiERR| Buse imme rednwiyonnecinheltmacanen PES TAD RLE RTD Gg unsomeconsornce Law! aMou Sea Maven ae Dawe {5 boss sets Gs ses 6 | DETAILS - SOUTHERN BASIN

 

 

 

 

 

 

 

 

 

Page 24

DATE PLOTTED: 19 June, 2008 - 2:44pm

 

Proposed development.

Bioretention basin

5m Fire trail buffer 4

 

 

 

100 Water level 28.986

0.50,0.50,0.50

Typ asus

R.L. 29.0

 

es

 

 

8.0 5

 

 

 

3K

 

 

a
o DS Safety fence to be installed

 

 

around the perimeter of the
bioretention basin.

 

D DSO}

  

 

 

 

   

 

 

 

 

\-——Reck filled gabion
retaining wall

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

oS F ° Cy DRI SRO: oO” 3 o 2 y
SECTION D co 100mm & slotted upvc @ 1000mm
— Impervious membrane to be SCALEISO.SOC~S centres, Minimum embedment
installed within the rock filled la nmynlinteldreinsgedayens
gabion retaining wall.
Proposed development. Spreader channel 5m Fire trail buffer 1 20m Buffer zone
2.00 1.00 _, 2.00
SECTION E
SCALE 150
Spreader channel Bioretention basin
D
0100 Water level 28.986
PS ———J=—
S|
by D
LL 07 p
Stormwater outlet to ve! 300mm @ uPVC [email protected]% “ALL. 25.10
concreted and stone pitched
as directed by the site SECTION F
superintendent. Maen:
PLAN
= 050 05 10 15 20 25m 5 0 5 10 15 20 25m
RSS
4:50 - Al 4:100 - AZ +4500-A1 — 1:1000 - AB
[Se at [oaos. ALD Correia ae ke [BLUE CARE PROPERTY DEVELOPMENT UNTT
‘cocrensy mesa wryenntncre huntyspemerwencaan cy [CHECKED Seiten =} ESSE SENSES | BLUE CARE SUNRISE BEACH ae ___oseeee *
——=> on owner In Arve Teo (00 872 ie ORAWING No:
: PROJ. MAN. | APPROVED: PROJ. Horwey {07 a4245099 (07) 4124 5159
“Ths documents prodvced by Cardo (Ok 2 Ltd Sle ler te beri and us by Cardno (Qld) Pty Ltd | eee
ea niceacatictryemtn, ty Ot emo ore Bera, Sp taraieg fp Setras | DETENTION & BIORETENTION 238301-SK04

 

 

 

 

3 TEVEONS PEC TABpA] 3771520" vetance by Inia party on tre comer: of Ine document

 

 

 

 

 

 

CAD PLE: 2383-01-SK0? dug
XGEF's: hase, X673_ CD _UU-Type D-3826,

 

 

SUNSHINE COAST OFFICE Level 1 9 Maud Sireal Morogehydona kd 4588
Emal scoGsuncasinocomau Ph (O7] $4432555 Fax (07) 54433642

 

 

DETAILS - NORTHERN BASIN

 

 

 

 

 

 

Page 25

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION




                                                                               APPENDIX B




                                                                     MUSIC Model Input Data




Blue Care Property Development Unit                 Version 1.1                      24 June 2008
2008 06 24 2383-01 Engineering Report for DA   Commercial in Confidence

Page 26

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION




Blue Care Property Development Unit                 Version 1.1           24 June 2008
2008 06 24 2383-01 Engineering Report for DA   Commercial in Confidence

Page 27

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION




Blue Care Property Development Unit                 Version 1.1           24 June 2008
2008 06 24 2383-01 Engineering Report for DA   Commercial in Confidence

Page 28

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION




Blue Care Property Development Unit                 Version 1.1           24 June 2008
2008 06 24 2383-01 Engineering Report for DA   Commercial in Confidence

Page 29

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION




Blue Care Property Development Unit                 Version 1.1           24 June 2008
2008 06 24 2383-01 Engineering Report for DA   Commercial in Confidence

Page 30

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION




Blue Care Property Development Unit                 Version 1.1           24 June 2008
2008 06 24 2383-01 Engineering Report for DA   Commercial in Confidence

Page 31

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION




                                                                                 APPENDIX C




                                               Preliminary Geotechnical Site Investigation




Blue Care Property Development Unit                        Version 1.1                24 June 2008
2008 06 24 2383-01 Engineering Report for DA          Commercial in Confidence

Page 32

S B OWLER Address: Telephone: Facsimile:
32 Hi-Tech Drive (07) 5450 1544 (07) 5450 1533
LD GEOTECHNICAL —Kinda Park Gi ass
($C) Phy Lic Exail: [email protected]
T/A Cardno Bowler Pty Ld Website: www.bowlergeotechnical.com.au
ng

Also at:
Gold Coast, Geebung, Browns Plains, Gladstone, Rockhampton, Mackay. = fownsville, Cairns,
Mt Isa. Office in Vietnam and Representative Offic ice in Papua New Guine:

 

Preliminary Site Investigation -
Proposed Aged Care Facility
Grasstree Court, Sunrise Beach

Client - Blue Care
C/-Cardno (Qld) Pty Ltd

Job Number: 3381

Prepared By: EZ \ BSA License No: 1091832

IMatt Courtney
Assoc Dip Civ Eng, GradiEOAust

Date Prepared: 15/5/2008

Page 33

Job Number: 3381 PROPOSED AGED CARE FACILITY, SUNRISE BEACH

1.0

2.0

3.0

4.0

Introduction

As requested a preliminary site investigation has been carried
out, at the above address, in order to collect information
regarding the foundation conditions at the site. Further, more
specific site investigation should be carried out for individual
structures, once a final site layout has been designed.

This report should be read in conjunction with our attached
‘General Notes’.

Site Description

The site is located to the west of Ben Lexen Drive, Sunrise Beach,
and covers blocks on both the north and south side of Grasstree
Court (see Figure 1).

At the time of the investigation, the two blocks sloped to the
west (see Figure 1). Both blocks were densely vegetated with
mature shrubs and trees (see Figure 2).

Proposed Construction

It is understood that the proposed construction at the site is to
comprise one and two storey apartment buildings, detached
residences and central facilities buildings which are to be linked
by service roads.

Investigation Work

Fieldwork for the investigation was carried out on the 7 May
2008, and included the drilling of ten boreholes at the positions
shown on Figure 3. The material encountered at the borehole
locations is described on the attached borehole log sheets, see
Appendix A. Dynamic cone penetrometer tests were also carried
out at each borehole location and these tabulated test results are
included on the borehole logs.

Particle size distribution testing was carried out on four samples
recovered from the boreholes, with a further sample tested for
dispersion percentage via the double hydrometer method. Two
samples were also tested for California Bearing Ratio. All test
certificates are attached in appendix B.

DATE PREPARED: 15/5/2008

Page 34

Job Number: 3381 PROPOSED AGED CARE FACILITY, SUNRISE BEACH

5.0

6.0

7.0

8.0

9.0

10.0

Subsurface Profile

The borehole logs indicate that the subsurface profile at the site
was relatively uniform, with only silty sands and clean sands
encountered at all test locations.

Groundwater

A groundwater level was noted in borehole 4 which is located in
lower area of the site. Dewatering of excavations would be
required below any groundwater level.

Allowable Bearing Capacity

The results of the fieldwork indicate that the near surface
foundations at the site will provide an allowable bearing capacity
of less than 100kPa.

Generally, the test results indicate that an allowable bearing
capacity of 100kPa would be provided by the medium dense
strata shown on the borehole log sheets.

Topsoil Stripping Depth

Based on the results of the fieldwork, it is estimated that
between 300mm and 400mm of topsoil would need to be
removed from the site to expose a suitable subgrade surface for
construction.

Pavements

Two soaked California Bearing Ratio (CBR) tests were performed
on soils sampled from likely positions for pavement
construction, and the soaked CBR results were 16% and 17%.

The subsurface soils at the site were relatively uniform in all
areas tested and it is suggested that a conservative nominal
design soaked CBR value of 12% may be appropriate for
pavement design at the site.

Suitability of On Site Soils for Filling

The subsurface soil at the site is poorly graded dune sand. This
type of soil exhibits desirable engineering properties, provided
that it is adequately compacted and confined.

DATE PREPARED: 15/5/2008

Page 35

Job Number: 3381 PROPOSED AGED CARE FACILITY, SUNRISE BEACH

11.0 Erosion and Sediment Control

Review of the borehole logs (appendix A) and laboratory test
results (appendix B) indicate that the subsurface conditions at
the ten sample locations selected for this preliminary
investigation are relatively uniform. Furthermore, the test
results indicate that the poorly graded sand that dominated the
profile showed very low percentages of clay and silt particle.
These results indicate that the strata encountered and tested at
the site during this investigation, present a low risk from an
erosion and sediment control viewpoint. However, it is
recommended that more site investigation be carried out once
the final design layout of the development has been decided.

If you have any queries please feel free to contact the undersigned.

Yours faithfully,
CARDNO BOWLER

SEE LE

i

MATT COURTNEY

DATE PREPARED: 15/5/2008

Page 36

Figure 1

Page 37

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

dofso/ sz. 23y

Page 38

Figure 2

Page 39

Scale 1:2000@A3

‘
4
£
a
:
Rg
i
z
5
3
<
3
2

 

Page 40

Figure 3

Page 41

BH10

Church CBR1
are Grasstree Court
ots ~BH6
BH7 BHO
CBR2
BHA pie
~BH3
BH2 |

Page 42

BOWLER ST De yas isa (ony snab 533
- 1écl ive
GEOTECHNICAL —Kunda Park Qu 4556

Geyriviid Email: [email protected]
T/A Cardno Bowler Pty Ltd Website: www.bowlergeotechnical.com.au
Geotechnical Engineering Consultants
Soils Laboratory Services Also at:
Incorp. in Qld. ACN. 113 423 233 Gold Coast, Geebung, Browns Plains, Gladstone, Rockhampton, Mackay, Townsville, Caims,
ABN, - 13113 423 233 Mt Isa. Office in Vietnam and Representative Office in Papua New Guinea.

GENERAL NOTES
GENERAL

This report comprises the results of an investigation carried out for a specific purpose and client as
defined in the document. The report should not be used by other parties or for other purposes, as
it may not contain adequate or appropriate information.

TEST HOLE LOGGING

The information on the test hole logs has been based on a visual and tactile assessment, except at
the discrete locations where test information is available (field and/or laboratory results).

GROUNDWATER

Unless otherwise indicated, the water levels given on the test hole logs are the levels of free water
or seepage in the test hole recorded at the given time of measuring. The actual groundwater level
may differ from this recorded level, depending on material permeabilities. Further variations of this
level could occur with time due to such effects as seasonal and tidal fluctuations or construction
activities. Final confirmation of levels can only be made by appropriate instrumentation techniques
and programmes.

INTERPRETATION OF RESULTS

The discussion/recommendations contained in this report are normally based on site evaluation
from discrete test hole data. Generalised or idealised subsurface conditions (including any cross-
sections contained in this report) have been assumed or prepared by interpolation/extrapolation of
these data. As such, these conditions are an interpretation, and must be considered as a guide
only.

CHANGE IN CONDITIONS

Local variations or anomalies in the generalised ground conditions used for this report can occur,
particularly between discreet test hole locations. Furthermore, certain design or construction
procedures may have been assumed in assessing the soil-structure interaction behaviour of the
site.

Any change in design, in construction methods, or in ground conditions as noted during
construction, from those assumed in this report should be referred to this firm for appropriate
assessment and comment.

FOUNDATION DEPTH

Where referred to in the report, the recommended depth of any foundation (piles, caissons,
footings, etc) is an engineering estimate of the depth to which they should be constructed. The
estimate is influenced and perhaps limited by the fieldwork method and testing carried out in
connection with the site investigation, and other pertinent information as has been made available.
The depth remains, however, an estimate and is therefore liable to variations to the final depth
depending on the ground conditions at each point of support.

REPRODUCTION OF REPORTS

Where it is desired to reproduce the information contained in this report for the inclusion in the
contract documents or engineering specification of the subject development, such reproduction
should include at least all of the relevant trial hole and test data, together with the appropriate
standard description sheets and remarks made in the written report of a factual or descriptive
nature.

This report is the subject of copyright, and shall not be reproduced either totally or in part without
the express permission of this firm.

Page 43

Appendix A

Page 44

EXCAVATION LOG GRASSTREE COURT.GPJ BGSC PLOG 00.GPJ 15/5/08

 

BOREHOLE LOG SHEET

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

32 Hi-Tech Drive
BOW I LER Kunda ParkiQid 4556 | Borehole No. BHI
GEOTECHNI CAL Telephone: 07 5450 1544 SHEET 1 of 1
Fax: 07 5450 1533
Client: Cardno (Qld) Pty Ltd Job No.: 3381
Project: Blue Care Aged Care Facility Surface RL: Unknown
Location: Sunrise Beach Rig Type: Dormer Drillmite Power Hand AugerAngle: —90,0°
Position: 56 J 509997 7078538 Contractor: Driller: SS/JC
Date Started: 7/5/08 Date Completed: 7/5/08 Logged by: JC
STRATA DRILLING & TESTING MATERIAL
RL SAMPLE DCP DESCRIPTION ADDITIONAL
(m) | 2 AND Blows per 100mm DATA
B | oo TEST COMMENTS
= 2/ sia DATA
& S128
a 2| 2 egg
e | |2| epee
a fa 9 dul 010 0 30. SOL
0.00 1 SILTY SAND, poorly graded, brown, moist,
| F loose
! b
1
1 5
1
1 b
1
1
& zi 5
| 09 1
3 SAND, poorly graded, very pale grey, moist,
— 1.00 la -— loose to medium dense
Ls 1 5
- 13; | a
4 | i
Le 13) Ez
3 4 .
— 3 ! =
SP 4:
& 7 he
i 4)
— 2.00 ra —
5
5 =
6 &
6 | =
2.60 6
5 SILTY SAND, poorly graded, pale grey/pale
i ap - brown, moist, medium dense
L [et | L
A 5
ened 6 Borehole terminated at 3.0m
s GIT L
| —1— IL
8
r fot] ;
5 5 .
}__4.00

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 45

 

 

 

EXCAVATION LOG GRASSTREE COURT.GPJ BGSC PLOG 00.GPJ 15/5/08

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BOREHOLE LOG SHEET
32 Hi-Tech Drive
BOW I ER Kunda Park/Qld 4556 | Borehole No. BHI0
a aT Telephone: 07 5450 1544 SHEET 1 f 1
GEOTEC SHNICGAL Fax: 07 5450 1533 °
Client: Cardno (Qld) Pty Ltd Job No.: 3381
Project: Blue Care Aged Care Facility Surface RL: — Unknown
Location: Sunrise Beach Rig Type: Dormer Drillmite Power Hand AugerAngle: —90.0°
Position: 56 J 509941 7078538 Contractor: Driller: SS/JC
Date Started: 7/5/08 Date Completed: 7/5/08 Logged by: JC
STRATA DRILLING & TESTING MATERIAL
RL SAMPLE | DCP DESCRIPTION ADDITIONAL
(m) | » AND | __ Blows per 100mm. DATA
5 | oo TEST | COMMENTS
7 2/2] DATA
E 2) 2 LEod |
2 age 1
a 5 | 6 -FFoq
Lu 010 30 40)
0,0 sP 1 SAND, poorly graded sand, very pale grey,
i o 7 moist, loose
a pti 4 SILTY SAND, poorly graded, pale brown,
1 moist, loose
1
i 2
= SM pet 4
2 |
a 2
2
09d 2]
2: SAND, poorly graded, very pale grey, moist,
r— 1.00 3 , loose to medium dense
2
3
4
4
a 3
4
Ty SP.
4
4
2.00
° 5
4,
& &
i 5
ex 3
15 SAND, poorly graded, pale brown/grey,
— 3° moist, medium dense
i sP 15
7
x 8
re 8 Borehole terminated at 3.0m.
i 9
10
i
1M
10
13 \
~ rt
- 1
-
4,00 .

 

 

 

 

 

Page 46

EXCAVATION LOG GRASSTREE COURT.GPJ BGSC PLOG 00.GPJ 15/5/08

 

BOREHOLE LOG SHEET

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

32 Hi-Tech Drive
B OW | IER Kunda Parkiaid 4556 ‘| Borehole No. BH2
CGEOTEC CUNI CAL Telephone: 07 5450 1544 SHEET 1 of 1
Fax: 07 5450 1533
Client: Cardno (Qld) Pty Ltd Job No.: 3381
Project: Blue Care Aged Care Facility Surface RL: = Unknown
Location: Sunrise Beach Rig Type: Dormer Drillmite Power Hand AugerAngle: —90.0°
Position: 56 J 509871 7078587 Contractor: Driller: = SS/JC
Date Started: 7/5/08 Date Completed: 7/5/08 Logged by: JC
STRATA DRILLING & TESTING MATERIAL
RL SAMPLE DCP DESCRIPTION ADDITIONAL
(m) | » AND Blows per 100mm DATA
B | TEST COMMENTS
~ £/ 2] 2 DATA
& z a £8.
a 2
& 3) 5 384
Li 0192030 40)
0.00 0 SILTY SAND, poorly graded, brown, moist,
bu F loose
il
la
3 at -
1 0. a ee =
1 SILTY SAND, poorly graded, grey, moist,
— m4 — loose
1
1
lt
iE
1h a
— * 1 SAND, poorly graded, very pale grey, moist,
te a - loose
1
1
1 ctf L
Lil
— SP fo —
1
1
1
x 1
. 1 SAND, poorly graded, pale brown/pale grey,
a i I moist, loose
L. : L
1
1
= SP =
1
i
bs —— s
12
12
2
— 3 3 Borehole terminated at 3.0m
s 5 5
4
15
& et L
+ - i
4
6
8
4.00

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 47

 

32 Hi-Tech Drive

 

BOREHOLE LOG SHEET

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BOW I ER Kunda Parwid 4556 ‘| Borehole No. BH3
Telephone: 07 5450 1544 SHEET of 1
GEOTECHNICAL Fax: 07 5450 1533
Cardno (Qld) Pty Ltd Job No.: 3381
Blue Care Aged Care Facility Surface RL: = Unknown
Rig Type: Dormer Drillmite Power Hand AugerAngle: —90.0°
56 J 509828 7078601 Contractor: Driller: SS/IC
Date Started: 7/5/08 Date Completed: 7/5/08 Logged by: JC
DRILLING & TESTING MATERIAL
SAMPLE DCP DESCRIPTION ADDITIONAL
2» AND Blows per 100mm DATA
BI] oo TEST COMMENTS
~ =| Sle DATA
g | 2] 2
3 2 | 2 see
S a| &BSss4
a 3D | 6 Fog 5
ji 1
j 1 | SILTY SAND, poorly graded, brown, moist,
a4 - very loose
ay r
1
1
o| 4 | SILTY SAND, poorly graded, pale “|
cw -  brown/pale grey, moist, very loose to loose
oan i
— 5
ul
Ley
1 SAND, poorly graded, very pale grey, moist,
5 - — loose ot medium dense
; L
2
2 be
2
3
3
3 5
4
4
4
4t lp] | | bow
4 SAND, poorly graded, pale brown, moist,
fF medium dense
4
5| |}
4
4
6 PF} J | LEU
6 SAND, poorly graded, very plae grey, moist,
8 medium dense, Borehole terminated at 3.0m
5 L
9
10
10 [
11

 

 

EXCAVATION LOG GRASSTREE COURT.GPJ BGSC PLOG 00.GPJ 15/5/08

 

 

Page 48

EXCAVATION LOG _GRASSTREE COURT.GPJ BGSC PLOG 00.GPJ 15/5/08

 

 

BOREHOLE LOG SHEET

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

32 Hi-Tech Drive
BOW L ER Kunda Parwaid 4556 —‘| Borehole No. BH4
CGEOTECHNI CAL Telephone: 07 5450 1544 SHEET 1 of 1
Fax: 07 5450 1533
Client: Cardno (Qld) Pty Ltd Job No.: 3381
Project: Blue Care Aged Care Facility Surface RL: Unknown
Location: Sunrise Beach Rig Type: Dormer Drillmite Power Hand AugerAngle: —90.0°
Position: 56 J 509839 7078656 Contractor: Driller: SS/JC
Date Started: 7/5/08 Date Completed: 7/5/08 Logged by: JC
STRATA DRILLING & TESTING MATERIAL
RL SAMPLE DCP DESCRIPTION ADDITIONAL
(m) | oo AND Blows per 100mm DATA
Bl wo TEST COMMENTS
> 2] sis DATA
& $ | 21 8oe
4 2) 2 heey
S 2| 8 B34
a D| ois 8q
i 010 20 30 40)
6.00 0 SILTY SAND, poorly graded, brown, moist,
= Fue - loose to medium dense 4
bs : - et
& - 4
1 f
2 |
ao bas a
0.60 3
a . 4
3 SAND, poorly graded, very pale grey, moist,
Zz - medium dense 4
3
a - 4
2 4
3
r— 1.00 — =
SP 2
3 =
3 s
4
i— LS 1.4 Sf
4 SAND, poorly graded, brown/grey, moist,
ig a - medium dense a
r se | : i
7 i |
| 7
2200 - _
9 SAND, poorly graded, very pale grey, moist,
ie - medium dense to dense 4
sP 1
23 Ht A | eee ee 4
24 oy SAND, poorly graded, very pale grey, wet, Water Observed
it SP - dense 4
p50 _
Borehole terminated at 2.5m due to
ES —— § tip refusal 4
-— 3.00 = — =
4,00

 

 

 

 

 

 

Page 49

EXCAVATION LOG GRASSTREE COURT.GPJ BGSC PLOG 00.GPJ 15/5/08

 

 

BOREHOLE LOG SHEET

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

32 Hi-Tech Drive
BOW I i ER Kunda Parkiaid 4556 | Borehole No. BHS
Telephone: 07 5450 1544 SHEET 1 of I
GEOTECHINICAL Fax: 07 5450 1533
Client: Cardno (Qld) Pty Ltd Job No.: 3381
Project: Blue Care Aged Care Facility Surface RL: = Unknown
Location: Sunrise Beach Rig Type: Dormer Drillmite Power Hand AugerAngle: —90.0°
Position: 56 J 509902 7078659 Contractor: Driller: SS/JC
Date Started: 7/5/08 Date Completed: 7/5/08 Logged by: JC
STRATA DRILLING & TESTING MATERIAL
RL SAMPLE DCP DESCRIPTION ADDITIONAL
(m) | » AND Blows per 100mm DATA
5 TEST COMMENTS
> =| 2 8 DATA
€ & i 6
a = 2 kaog
z 5 | 8 BsEq
a 3 | § e584
of Lu O10 20 40}
0.00) SAND, poorly graded, grey, moist, very
= [- loose to medium dense
Ss ep Es
= 09d at Pl Pl TT = SY
SAND, poorly graded, dark grey/dark
— 1.00 k— brown, moist, medium dense
L. 7 lL.
Ls 160 er ie a eee eee et ee sae, ae sae ee er eee se
SAND, poorly graded, dark brown, moist,
& fF medium dense
- SP a
P L
a— 2: Pp — — —
SAND, poorly graded, grey/brown, moist,
= medium dense
— sP —
— 3. Borehole terminated at 3.0m
. my To
j1l \
is r L
& be
bis -—+— L
4.00

 

 

 

 

 

Page 50

EXCAVATION LOG _GRASSTREE COURT.GPJ BGSC PLOG 00.GPJ 15/5/08

 

 

BOREHOLE LOG SHEET

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

32 Hi-Tech Drive
BOW I IER Kunda ParkQid 4556 | Borehole No. BH6
CEOTECHNICAL Telephone: 07 5450 1544 SHEET 1 of 1
Fax: 07 5450 1533
Client: Cardno (Qld) Pty Ltd Job No.: 3381
Project: Blue Care Aged Care Facility Surface RL: = Unknown
Location: Sunrise Beach Rig Type: Dormer Drillmite Power Hand AugerAngle: —90.0°
Position: 56 J 509959 7078637 Contractor: Driller: SS/JC
Date Started: 7/5/08 Date Completed: 7/5/08 Logged by: JC
STRATA DRILLING & TESTING MATERIAL
RL SAMPLE ; DCP DESCRIPTION ADDITIONAL
(m) | » AND Blows per 100mm DATA
Els TEST COMMENTS
= =| 214 DATA
& S12 Lo
é 5 | 2 Bae
8 3) & eeeq
Lu 0102030) 40)
0.00 1 SAND, poorly graded, grey, moist, loose
L 11] 4
2
a SP —|_ L
2|
3
| 0.60 om
21 SILTY SAND, poorly graded, brown, moist,
i 3 | - loose to medium dense
i
a 9
8
r— 1.00 4 =
11
13
1.30 9|
8 | SAND, poorly graded, grey, moist, medium
- sP —— + dense
ae 8 eke ph aminteveenin anti maser
7 SAND, poorly graded, very pale grey, moist,
— + medium dense
6
6
7
7
r— 2.00 SP —
6
6
= 5 &
6
Po 2.5 6 Fe eee se a: seme sin pe ee ee neo
5 SAND, poorly graded, grey/pale brown,
— 6 + moist, medium dense
i sP Ti I
6:
7
— 3 7 : Borehole terminated at 3.0m
_ p—it__| 5
_ 7. L
7
7
7
6
6
7
— 7 &
4,00

 

 

 

 

Page 51

 

 

 

EXCAVATION LOG GRASSTREE COURT.GPJ BGSC PLOG 00.GPJ 15/5/08

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     

   

 

 

 

BOREHOLE LOG SHEET
32 Hi-Tech Drive
BOW I i ER Kunda Parkaid 4556 ~—‘ | Borehole No. BH7
CEOTECHNIC AL Telephone: 07 5450 1544 SHEET il of 1
Fax: 07 5450 1533
Client: Cardno (Qld) Pty Ltd Job No.: 3381
Project: Blue Care Aged Care Facility Surface RL: = Unknown
Location: Sunrise Beach Rig Type: Dormer Drillmite Power Hand AugerAngle: —90.0°
Position: 56 J 509939 7078590 Contractor: Driller: SS/JC
Date Started: 7/5/08 Date Completed: 7/5/08 Logged by: JC
STRATA DRILLING & TESTING MATERIAL
RL SAMPLE DCP DESCRIPTION ADDITIONAL
(m) | » AND Blows per 100mm DATA
5 TEST COMMENTS
7 a] 2] 4 DATA
E 2 a 5
~ 2 bLacd
& 9 | bae4
$8s
° BLOF Li 0_10__20__30 40)
0.00 1 SILTY SAND, poorly graded, dark brown,
tL F moist, loose
1 =
1
p sm | pj J LL
2
1
| 06 —
1 SAND, poorly graded, grey, moist, loose
2
& sp L
2 s
2
— 1! —4
3 S. ), poorly graded, very pale grey,
i 2 [- loose to medium dense
S 5 L
i
3] |
-— SP =
2
3 s
i 3 5
4 5
2 ee ees
i * 4 SAND, poorly graded, grey, moist, medium
— fF dense
5
4 i
6 5
5
Po SP Ls
6
be L
7
7
7 -
8
— 3 7 SSS Se Borehole terminated at 3.0m
| 7 5
9
10
aT
ll t
nt
r= F
4.00

 

 

 

 

 

Page 52

 

BOREHOLE LOG SHEET

 

 

EXCAVATION LOG GRASSTREE COURT.GPJ BGSC PLOG 00.GPJ_ 15/5/08

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

32 Hi-Tech Drive
BOW I j ER Kunda Park/Qid 4556 | Borehole No. BH8
GEOTECHNI e ALL Telephone: 07 5450 1544 SHEET 1 of 1
Fax: 07 5450 1533
Client: Cardno (Qld) Pty Ltd Job No.: 3381
Project: Blue Care Aged Care Facility Surface RL: — Unknown
Location: Sunrise Beach Rig Type: Dormer Drillmite Power Hand AugerAngle: —90.0°
Position: 56 J 509998 7078639 Contractor: Driller: = SS/JC
Date Started: 7/5/08 Date Completed: 7/5/08 Logged by: JC
STRATA DRILLING & TESTING MATERIAL
RL SAMPLE DCP DESCRIPTION ADDITIONAL
(m) | pp AND Blows per 100mm DATA
5 | oo TEST COMMENTS
_ e/ 21, DATA
& z 38.
7a kas”
& 5 | & b3ed
2 2|6 ee 1020 30 40
0.00 SILTY SAND, poorly graded, brown, moist,
i loose
1. 0.6
SAND, poorly graded, grey, moist, loose
5 SP I
- 1 | SAND, poorly graded, very pale grey, moi: 7
— - — loose to medium dense
Las ; I
— SP bs
3 L
= 3 S
4
4
2 3 _— ee ee -Y
“ 4 | SAND, poorly graded, grey/very pale grey,
- F moist, medium dense
sll
4
4
4
= SP u |
5
“it L
5
5
5
— 3 4 Borehole terminated at 3.0m
s ; 5
als
5 Ss
5 +
4
sh
5
4,00

 

 

 

 

 

 

 

 

Page 53

 

BOWLER

 

 

Z

OVECHINICAL

BOREHOLE LOG SHEET

32 Hi-Tech Drive
Kunda Parwald 4556 | Borehole No. BH9

Telephone: 07 5450 1544 SHEET i of 1
Fax: 07 5450 1533

 

 

 

 

 

0.6

 

 

 

 

 

 

2.5

 

 

 

 

N

 

we

 

nv

 

Nv

 

nv

 

we

 

we

 

w

 

we

 

>

 

we

 

we

 

w

 

S

 

>

 

+

 

6

 

w

 

 

a

 

~

 

_

 

oo

 

 

4,00

 

 

 

 

 

ols

 

.

 

10
10
10

 

 

 

LLL

EEEE

 

 

 

 

Client: Cardno (Qld) Pty Ltd Job No,: 3381
Project: Blue Care Aged Care Facility Surface RL: = Unknown
Location: Rig Type: Dormer Drillmite Power Hand AugerAngle: —_90.0°
Position: 56 J 509931 7078762 Contractor: Driller: SS/JC
Date Started: Date Completed: 7/5/08 Logged by: JC
STRATA DRILLING & TESTING MATERIAL
SAMPLE DCP DESCRIPTION ADDITIONAL
2 AND Blows per 100mm DATA
3B] a TEST COMMENTS
a 3| 4 DATA
E 2 3
s =
e a|=
S 1° 010 30.49)
0.00 SILTY SAND, poorly graded, brown, moist,

loose

 

SAND, poorly graded, grey, moist, loose

SAND, poorly graded, very plae grey, moist,
[- loose to medium dense

SAND, poorly graded, grey, moist, medium |
dense

- medium dense

 

Borehole terminated at 3.0m.

 

 

 

 

EXCAVATION LOG GRASSTREE COURT.GPJ BGSC PLOG 00.GPJ 15/5/08

 

 

 

Page 54

Appendix B

Page 55

BO W LER Spe Telephone: Facsimile:
32 Hi-Tech Drive (07) 5450 1544 (07) 3450 1533
GEOTECHNICAL —KindaFar'Gid asso

 

(SC) Ply Lid Email: [email protected],au
T/A Cardno Bowler Pty Ltd Website: www.bowlergeotechnical.com.au
Geotechnical Engineering Consultants
Soils Laboratory Services Also at:
Tacorp. in Qld. ACN. 113 423.233 Gold Coast, Gesbung, Browns Plains, Gladstone, Rockhampton, Mackay, Townsville, Caims,
ABN -13 113-423 233 Office in Vietnam and Representative Office in Papua New Guinea.
Client: Cardno (Qld) Pty Ltd Report Number: 63155CBR
Client's Address: PO Box 152, Maroochydore Job Number: 3381
Project: Blue Care Aged Care Facility Report Date: 12/05/2008
Location: Grasstree Court, Sunrise Beach Test Method: AS1289.6.1.1

 

 

 

 

Lab Number: 63155
Lot Number: - -
Number: : =
Date |: 2/05/2008 2/05/2008
Date Tested: 10/05/2008 10/05/2008
Location CBR #1 CBR #2
56 J 56J
509901 509926
7078722 7078626
Material Source: On-Site On-Site
For Use As: - =
Maximum 1.57 1.61
imum Moisture Content 17.0 16.5
Field Moisture Content (%): 7.2 47
Oversize on 19mm Sieve (%): 9 0
Oversize Included / Excluded: Excluded Excluded
Effort: Standard Standard
Ratio 100 100
Moisture Content 17.0 16.5
Before ‘tim?): 1.559 1.591
Ratio Before Soaki 99.3 98.8
Moisture Cont. Before 16.9 16.4
Achieved of OMC (%): 99.4 99.4
Test Condition / Period: Soaked /4 Soaked / 4
Mass 7 45 45
‘Swell (%): -0.02 0.04
After 1.573 41.586
MC of After Soak (%): 19.4 18.6
Density Ratio After E 100.2 98.5
Mc. 30mm) After Te 19.1 17.5
MC After Ti 19.4 18.6
CBR at 2.5mm Penetration (%): 12 14
CBR at 5.0mm Penetration (%): 17 16
Minimum - -
CBR Value (%): 17 16
Description: SP, Sand SP, Sand
Pale Pale G

This document is issued in accordance with NATA's NATA Accreditation No: 3747
Sr Form Number:

 

 

accreditalion requirements.

NATA REP CBR-1
WJ Z

SIGNATORY: Dale Norwood

 

 

 

 

Page 56

BOWLER Address: Telephone: aon
GEOTECHNICAL Riles Boone a (07) 5450 1544 (07) 5450 1533

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

‘T/A Cardno Bowler Pty Ltd soryes Webaties np ergootechnieal.com.et
Soils Laboratory Services Also at:
ERAS Sia StiSc in ts tad Reprtateee Oke Bape Ne Gate es
Particle Size Distribution Report
Client: Cardno (Qid) Pty Ltd Report Number: 63209PSD
Client's Address: PO Box 152, Maroochydore Job Number: 3831
Project: Blue Care Aged Care Facility Report Date: 9/05/2008
Location: Grasstree Court, Sunrise Beach Order Number: :
Lab No: 63209 Sample Location
Date Sampled: 07/05/2008 Borehole 1 - 0.0-1.0m
Date Tested: 08/05/2008
Sampled By: Jc/iss
Sample Method: Drillmite
Material Source: -
For Use As: : Lot Number: -
Remarks Spec Number: -
Test Method: Q103 Specification Percent Specification
AS Sieve Sizes Minimum Passing Maximum
75.00mm
53.00mm
37.50mm
26.50mm
19.00mm
13.20mm
9.50mm
6.70mm
4.75mm
2.36mm 100
1.18mm 100
0.600mm 97
0.425mm 95
0.300mm 70
0.150mm 5
0.075mm 2
This document is issued in accordance with
ran NATA‘s accreditation requirements. Form Number:
NATA Accreditation No: 3747
VY REP PSD-1
SIGNATORY: Dale Norwood

 

 

 

 

Page 57

BOWLER SoiieIeen De (onyeso i544 Gy $450 1533
GEOTECHNICAL —_ Ranta a Gi ass .
<SC) Pty Lid

Email: [email protected]

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cee ae Com Sanat Website: www.bowlergeotechnical.com.au
Soils Laboratory Services Also at:
mgenanueae == Site abs Seat Ries inom ea rover Caw
Particle Size Distribution Report
Client: Cardno (Qld) Pty Ltd Report Number: 63210PSD
Client's Address: PO Box 152, Maroochydore Job Number: 3831
Project: Blue Care Aged Care Facility Report Date: 9/05/2008
Location: Grasstree Court, Sunrise Beach Order Number: :
Lab No: 63210 Sample Location
Date Sampled: 07/05/2008 Borehole 3 - 1.0-2.0m
Date Tested: 08/05/2008
Sampled By: Jc/ss
Sample Method: Drillmite
Material Source: -
For Use As: - Lot Number: -
Remarks Spec Number: :
Test Method: Q103 Specification Percent Specification
AS Sieve Sizes Minimum Passing Maximum
75.00mm
53.00mm
37.50mm
26.50mm
19.00mm
13.20mm
9.50mm
6.70mm
4.75mm
2.36mm 100
1.18mm 100
0.600mm 99
0.425mm 98
0.300mm 73
0.150mm 4
0.075mm 3
This document is issued in accordance with
mn NATA's accreditation requirements, Form Number:
NATA Accreditation No: 3747 .
Y REP PSD-1
SIGNATORY: Dale Norwood

 

 

 

 

Page 58

BOWLER Set De Cn i544 (or $030 1533
ee
GEOTECHNICAL —inla art G1 as .

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SC) Pty Ltd Email: [email protected]
TA Cardo | Bowler Ply Ld scans Website: www.bowlergeotechnical.com.au
Soils Laboratory Services Also at:
aRARHABEP DS Sa Sent Ris yee Mey, Torsile, sis,
Particle Size Distribution Report
Client: Cardno (QId) Pty Ltd Report Number: 63211PSD
Client's Address: PO Box 152, Maroochydore Job Number: 3831
Project: Blue Care Aged Care Facility Report Date: 9/05/2008
Location: Grasstree Court, Sunrise Beach Order Number: -
Lab No: 63211 Sample Location
Date Sampled: 07/05/2008 Borehole 7 - 1.0-2.0m
Date Tested: 08/05/2008
Sampled By: JC/SS
Sample Method: Drillmite
Material Source: -
For Use As: - Lot Number: -
Remarks Spec Number: :
Test Method: Q103 Specification Percent Specification
AS Sieve Sizes Minimum Passing Maximum
75.00mm
53.00mm
37.50mm
26.50mm
19.00mm
13.20mm
9.50mm
6.70mm
4.75mm
2.36mm 100
1.18mm 100
0.600mm 99
0.425mm 98
0.300mm 76
0.150mm
0.075mm 3
This document is issued in accordance with
IN. NATA's accreditation requirements Form Number:
NATA Accreditation No: 3747,
wa REP PSD-1
SIGNATORY: Dale Norwood

 

 

 

 

Page 59

BOWLER

Address:

Telephone:
32 Hi-Tech Drive

(07) 5450 1544

Facsimile:
(07) 5450 1533

GEOTECHNICAL —KiniaPurk Git asso
(Sc) Pty Ltd Email: [email protected]
‘TVA Cardno Bowler Pty Ltd Website: www.bowlergeotechnical.com.au
Geotechnical Engineering Consultants
Soils Laboratory Services Also at:
Incorp, in Qld, ACN, 113.423 233 Gold Coast, Geebung, Browns Plains, Gladstone, Rockhampton, Mackay, Townsvile, Caims,
ABN. ~ 13 113 423 233 Mt Isa. Office in Vietnam and Representative Office in Papua New Guinea.

Particle Size Distribution Report

 

 

Client: Cardno (Qld) Pty Ltd Report Number: 63212PSD
Client's Address: PO Box 152, Maroochydore Job Number: 3831
Project: Blue Care Aged Care Facility Report Date: 9/05/2008
Location: Grasstree Court, Sunrise Beach Order Number: -

Lab No: 63212 Sample Location
Date Sampled: 07/05/2008 Borehole 10 - 2.0-3.0m
Date Tested: 08/05/2008

Sampled By: JC/SS

Sample Method: Drillmite

Material Source: :

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

For Use As: - Lot Number: -
Remarks Spec Number: -
Test Method: Q103 Specification Percent Specification
AS Sieve Sizes Minimum Passing Maximum
75.00mm
53.00mm
37.50mm
26.50mm
19.00mm
13.20mm
9.50mm
6.70mm
4.75mm
2.36mm 100
1.18mm 100
0.600mm 100
0.425mm 96
0.300mm 69
0.150mm 3
0.075mm
This document is issued in accordance with
IN NATA’s accreditation requirements. Form Number:
NATA Accreditation No: 3747
ora : REP PSD-1
SIGNATORY: Dale Norwood

 

 

 

 

Page 60

 

BOWLER
GEOTECHNICAL

‘IVA Cardno Bowler Pty Ltd.
Geotechnical Engincering Consultants
Soils Laboratory Services

Tncorp. in Qld. A.C.N. 113 423 233
ABN. - 13 113 423 233

 

Address:
32 Hi-Tech Drive
Kunda Park Qld 4556

Email: [email protected]

Telephone:

(07) 5450 1544

Website: www.bowlergeotechnical.com.au

Also at:

Facsimile:

(07) 5450 1533

Gold Coast, Geebung, Browns Plains, Gladstone, Rockhampton, Mackay, Townsville, Cairns,
Mt Isa. Office in Vietnam and Representative Office in Papua New Guinea.

 

 

 

 

 

 

article Size Distribution-Hyd Sg
Client: Cardno (Qld) Pty Ltd Report Number: 63213Hyd
Project: Blue Care Aged Care Facility Job Number: 3381
Location: Grasstree Court, Sunrise Beach Report Date: 13/05/2008
Sample Number: 63213 Test Methods: AS1289.3.6.3
Sample Identification: BH5 0.0-1.0m AS1289.3.6.2
Date Sampled: 7105/2008 Pre-treatment Loss: n/a
Dispersion Method: mechanical
Hydrometer Type: grams/Litre
Particle Size (mm) Cummulative Particle Size (mm) Cummulative Particle Size (mm) Cummulative
Percent Passing Percent Passing Percent Passing
100 100 1.180 100 0.0134 1
7 100 0.600 100 0.0095 1
53 100 0.425 98 0.0068 1
37.5 100 0.300 68 0.0048 1
26.5 100 0.150 4 0.0034 0
19.0 100 0.075 3 0.0024 0
13.2 100 0.062 3 0.0014 0
9.5 100 0.047 2
6.7 100 0.034 2
4.75 100 0.024 2
2.36 100 0.018 1

 

0.075

 

|

= =

  

wee
0.002 0.06

CLAY FRACTION SILT FRACTION

PARTICLE SIZE DISTRIBUTION - HYDROMETER

AUSTRALIAN STANDARD SIEVE APERTURES
042s 2m ATS
. ome
oe as — =

‘5

  

‘SAND FRACTION

Particie Size (mm)

2 GRAVEL FRACTION

 
 

60

 

 

% Finer than 0.02mm:’

 

 

% Finer than 0.005mm:

 

 

This document is issued in accordance wilh
NATA's accreditation requirements.

NATA Accredilation No: 3747

SIGNATORY:

 

42——>

Sr
Matt Courtney

Form Number

REP HYD-1

 

 

 

Page 61

 

B OWLER Solr Dl Telephone: Facsimile:
3 Hi-Tech Drive (07) $480 1544 (07) $450 1533
GEOTECHNICAL —‘Kanda rat Oid asso
(SC) Pty Ltd

Email; [email protected]

 

 

 

T/A Cardno Bowler Pty Ltd Website: www.bowlergeotechnical.com.au
Geotechnical Engineering Consultants
Soils Laboratory Services Also at:
Incorp, in Qld. A.C.N. 113 423 233 Gold Coast, Geebung, Browns Plains, Gladstone, Rockhampton, Mackay, Townsville, Caims,
ABN, - 13 113 423 233 Mt Isa. Office in Vietam and Representative Office in Papua New Guinea.
ercent Dispersion
Client: Cardno (Qld) Pty Ltd Report Number: 63213PD
Project: Blue Care Aged Care Facility Job Number: 3381
Location: Grasstree Court, Sunrise Beach Report Date: 13/05/2008
Sample Number: 63213 Test Method: AS1289.3.8.2
Sample Identification: BH5 0.0-1.0m
Date Sampled: 7105/2008 Pre-treatment Loss: n/a
Dispersion Method: mechanical
Hydrometer Type: grams/Litre
Particle Size (mm) Cummulative Particle Size (mm) Cummulative Particle Size (mm) Cummulative
Percent Passing Percent Passing Percent Passing
100 100 1.180 100
75 100 0.600 100
53 100 0.425 98
37.5 100 0.300 68
26.5 100 0.150 4
19 100 0.075 3
13.2 100
9.5 100
6.7 100
4.75 100
2.36 100

 

 

 

PARTICLE SIZE DISTRIBUTION - HYDROMETER

Percent Passing / Finer Than

 

0,002 0.06 2 60

Particle Size (mmm)

 

Form Number

mm % Finer than 0.02mm: 0
0 REP PD-1

% Finer than 0.005mm:

NATA Percent Dispersion: n/a

This document is issued in accordance with
NATA's accreditation requirements.

NATA Accreditation No: 3747

 

 

 

 

 

 

       

<———

SIGNATORY: Matt Courtney

 

 

 

 

Used in these records

About this file

File size
4.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

080624 2383-01 FINAL Engineering Report for DA.pdf [As Published].pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.