2.6 STORMWATER QUANTITY
2.6.1 Site Hydrology
The drainage system within the development will consist of underground pipe systems
and surface overland flow. With the completed development, the locations of the
discharges to the national park will be maintained across the western and northern
boundaries of Lots 1 and 6, respectively.
The development will result in a significant increase in the site impervious area. The
undeveloped site has been assumed to have no impervious area, while the developed
site has been assumed to have a fraction impervious of 0.9.
Catchments within the developed site will consist of paved areas, roads, carparks and
roof areas.
The site, prior to development, had an estimated time of concentration of 18 minutes for
Lot 6 and 22 minutes for Lot 1. The estimated times of concentration for the developed
site are 8 minutes, for both catchments.
The reshaping of the site for the development will also result in runoff from an additional
catchment area of 0.626ha at the north-eastern corner of Lot 1 being redirected to the
west through Lot 1. Currently, runoff from this area discharges to the east, to Ben
Lexcen Drive.
Attenuation of peak discharges from the developed site is necessary to comply with
Council’s non-worsening requirements.
For the site in its undeveloped condition, peak discharges have been calculated, using
the Rational Method, for rainfall events with average recurrence intervals of 2, 10, and
100 years. These calculations are summarised in the Tables 2.7 and 2.8.
The catchment areas for Lots 1 and 6, used in the calculations below, represent the
areas of the lots excluding the dedicated buffer strips and fire breaks. No development
works which will affect site runoff characteristics are proposed within these areas and,
therefore, they have not been included in the catchment areas used for the calculation
of the pre-development peak discharges to be used for comparison with those from the
developed site.
Table 2.7, Lot 6 Undeveloped Site – Peak Discharges
ARI C I A Q
years mm/h ha m3/s
2 0.15 99 0.7774 0.033
10 0.18 134 0.7774 0.052
100 0.22 194 0.7774 0.090
Table 2.8, Lot 1and Road Undeveloped Site – Peak Discharges
ARI C I A Q
years mm/h ha m3/s
2 0.15 90 3.65 0.140
10 0.18 122 3.65 0.223
100 0.22 176 3.65 0.385
Blue Care Property Development Unit Version 1.1 24 June 2008
2008 06 24 2383-01 Engineering Report for DA Commercial in Confidence Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
080624 2383-01 FINAL Engineering Report for DA.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.