Skip to the record
The gold standard in government transparency.

Council archive · source document

080624 2383-01 FINAL Engineering Report for DA.pdf [As Published] · 132008.1128

of 61

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION



3.3 DEVELOPMENT POPULATION AND FLOWS
    The site was given Equivalent Person (EP) populations in accordance with Planning
    Scheme Policy 16 – Sewerage Headworks Contributions and Planning Scheme Policy
    17 – Water Headworks Contributions.

    Table 3.5, Equivalent Development Population

                                                                                              Water                       Sewerage
                                         Bedrooms                Units             EP/unit            EP          EP/unit         EP
        Independent Living
           Units (ILU’s)                        2       55      dwelling units          2.6       143.0            2.3          126.5
           Apartments                           2       54      dwelling units          2.6       140.4            2.3          124.2
                                                1       11      dwelling units          2.0        22.0            1.7           18.7
       Serviced Apartments
                                                2        9      dwelling units          2.6        23.4            2.3           20.7
      Aged Care Facility                                96      beds                    2.0       192.0            1.7          163.2
                                                                      2
      Community Facilities                             101.7    10m roof area       0.08            8.16           0.17         17.34
                                               Total                                             528.96                        470.64
                                               Adopt                                          530                           470

    3.3.1          Water

    The proposed development has an adopted Equivalent Person water demand of 530
    EP. The total area (excluding buffer zone) of the two allotments is 4.43 hectares.
    Assuming 20% is used for roads etc, the site has 3.54 hectares of developable area.
    Thus, the population density is approximately 150 EP/ha. From Table 3.1 (design
    criteria) the unit demand for water supply of 5.28 L/s/ha was adopted. The total
    Maximum Hour water demand from the proposed development site is thus 18.7 L/s.

    3.3.2          Sewerage

    The proposed development has an adopted Equivalent Person sewage loading of 470
    EP (142 ET), producing an Peak Wet Weather Flow (PWWF) of 4.9 L/s, at 3000
    L/ET/day in accordance with the adopted design criteria.

    Table 3.6, Sewage Loading

          Adopted EP                 Adopted ET                ADWF              ADWF                  PWWF
                                                             L/ET/Day              L/s                     L/s
               510                         154                 600                1.07                     5.35




3.4 WATER SUPPLY RETICULATION ASSESSMENT
The SCRC Planning Scheme Policy 6 – Engineering Design Standards for Water &
Sewerage directs consultants to contact ‘Noosa Council Manager Water Supply’ for
hydraulic grades at proposed connection points. The following Peak Hour (19:00)
boundary conditions were extracted from Council’s Water Supply Reticulation Model.




Blue Care Property Development Unit                               Version 1.1                                               24 June 2008
2008 06 24 2383-01 Engineering Report for DA                 Commercial in Confidence                                            Page 16

Used in these records

About this file

File size
4.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

080624 2383-01 FINAL Engineering Report for DA.pdf [As Published].pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.