Council archive · source document
080624 2383-01 FINAL Engineering Report for DA.pdf [As Published] · 132008.1128
BLUE CARE SUNRISE BEACH
ENGINEERING REPORT FOR DEVELOPMENT APPLICATION
3.5 SEWERAGE RETICULATION ASSESSMENT
There is an existing sewage pump station located to the west of the proposed development
site. Excluding the proposed development site, the sewage pump station’s ultimate
catchment includes 630 EP (191 ET) as outlined in Table 3.9.
Table 3.9, Design Peak Wet Weather Flows, External
EP/dwelling
Dwelling Units unit EP
Detached Residential 137 3.3 452.1
Attahced Residential 69 2.6 179.4
Total 631.5
Adopt 630
The ultimate sewage loading (including 470 EP from the proposed development) on the
sewage pump station is 1100 EP (333 ET), which produces a design PWWF = 11.6 L/s.
The post-development design velocity through the existing DN100 rising main would be
1.5m/s which is within acceptable limits for scour velocity (0.75-1.8 m/s) as defined by the
SCRC Planning Scheme Policy 6.
The existing sewerage infrastructure is considered adequate to service the ultimate
development population, including the proposed development.
3.6 SUMMARY
Design criteria for water supply and sewerage were determined in accordance with the
Sunshine Coast Regional Council (Noosa) Planning Scheme.
The existing water supply and sewerage infrastructure was assessed to determine the
level of service provided to the area, post-development.
Modelling analyses have shown that it will be necessary to augment the existing water
supply infrastructure with a DN150 main along Grasstree Court (Approx 230m), however,
the existing sewerage infrastructure is considered to provide an adequate level of service
to the ultimate development.
It is recommended that the proposed water supply reticulation augmentation be adopted to
ensure the post-development standards of service for water supply are maintained.
Blue Care Property Development Unit Version 1.1 24 June 2008
2008 06 24 2383-01 Engineering Report for DA Commercial in Confidence Page 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
080624 2383-01 FINAL Engineering Report for DA.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.