080624 2383-01 FINAL Engineering Report for DA.pdf [As Published] · 132008.1128
BOWLER ST De yas isa (ony snab 533 - 1écl ive GEOTECHNICAL —Kunda Park Qu 4556 Geyriviid Email: [email protected] T/A Cardno Bowler Pty Ltd Website: www.bowlergeotechnical.com.au Geotechnical Engineering Consultants Soils Laboratory Services Also at: Incorp. in Qld. ACN. 113 423 233 Gold Coast, Geebung, Browns Plains, Gladstone, Rockhampton, Mackay, Townsville, Caims, ABN, - 13113 423 233 Mt Isa. Office in Vietnam and Representative Office in Papua New Guinea. GENERAL NOTES GENERAL This report comprises the results of an investigation carried out for a specific purpose and client as defined in the document. The report should not be used by other parties or for other purposes, as it may not contain adequate or appropriate information. TEST HOLE LOGGING The information on the test hole logs has been based on a visual and tactile assessment, except at the discrete locations where test information is available (field and/or laboratory results). GROUNDWATER Unless otherwise indicated, the water levels given on the test hole logs are the levels of free water or seepage in the test hole recorded at the given time of measuring. The actual groundwater level may differ from this recorded level, depending on material permeabilities. Further variations of this level could occur with time due to such effects as seasonal and tidal fluctuations or construction activities. Final confirmation of levels can only be made by appropriate instrumentation techniques and programmes. INTERPRETATION OF RESULTS The discussion/recommendations contained in this report are normally based on site evaluation from discrete test hole data. Generalised or idealised subsurface conditions (including any cross- sections contained in this report) have been assumed or prepared by interpolation/extrapolation of these data. As such, these conditions are an interpretation, and must be considered as a guide only. CHANGE IN CONDITIONS Local variations or anomalies in the generalised ground conditions used for this report can occur, particularly between discreet test hole locations. Furthermore, certain design or construction procedures may have been assumed in assessing the soil-structure interaction behaviour of the site. Any change in design, in construction methods, or in ground conditions as noted during construction, from those assumed in this report should be referred to this firm for appropriate assessment and comment. FOUNDATION DEPTH Where referred to in the report, the recommended depth of any foundation (piles, caissons, footings, etc) is an engineering estimate of the depth to which they should be constructed. The estimate is influenced and perhaps limited by the fieldwork method and testing carried out in connection with the site investigation, and other pertinent information as has been made available. The depth remains, however, an estimate and is therefore liable to variations to the final depth depending on the ground conditions at each point of support. REPRODUCTION OF REPORTS Where it is desired to reproduce the information contained in this report for the inclusion in the contract documents or engineering specification of the subject development, such reproduction should include at least all of the relevant trial hole and test data, together with the appropriate standard description sheets and remarks made in the written report of a factual or descriptive nature. This report is the subject of copyright, and shall not be reproduced either totally or in part without the express permission of this firm.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
080624 2383-01 FINAL Engineering Report for DA.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.