Skip to the record
The only place to find full transcripts.

Council archive · source document

080624 2383-01 FINAL Engineering Report for DA.pdf [As Published] · 132008.1128

of 61

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

BO W LER Spe Telephone: Facsimile:
32 Hi-Tech Drive (07) 5450 1544 (07) 3450 1533
GEOTECHNICAL —KindaFar'Gid asso

 

(SC) Ply Lid Email: [email protected],au
T/A Cardno Bowler Pty Ltd Website: www.bowlergeotechnical.com.au
Geotechnical Engineering Consultants
Soils Laboratory Services Also at:
Tacorp. in Qld. ACN. 113 423.233 Gold Coast, Gesbung, Browns Plains, Gladstone, Rockhampton, Mackay, Townsville, Caims,
ABN -13 113-423 233 Office in Vietnam and Representative Office in Papua New Guinea.
Client: Cardno (Qld) Pty Ltd Report Number: 63155CBR
Client's Address: PO Box 152, Maroochydore Job Number: 3381
Project: Blue Care Aged Care Facility Report Date: 12/05/2008
Location: Grasstree Court, Sunrise Beach Test Method: AS1289.6.1.1

 

 

 

 

Lab Number: 63155
Lot Number: - -
Number: : =
Date |: 2/05/2008 2/05/2008
Date Tested: 10/05/2008 10/05/2008
Location CBR #1 CBR #2
56 J 56J
509901 509926
7078722 7078626
Material Source: On-Site On-Site
For Use As: - =
Maximum 1.57 1.61
imum Moisture Content 17.0 16.5
Field Moisture Content (%): 7.2 47
Oversize on 19mm Sieve (%): 9 0
Oversize Included / Excluded: Excluded Excluded
Effort: Standard Standard
Ratio 100 100
Moisture Content 17.0 16.5
Before ‘tim?): 1.559 1.591
Ratio Before Soaki 99.3 98.8
Moisture Cont. Before 16.9 16.4
Achieved of OMC (%): 99.4 99.4
Test Condition / Period: Soaked /4 Soaked / 4
Mass 7 45 45
‘Swell (%): -0.02 0.04
After 1.573 41.586
MC of After Soak (%): 19.4 18.6
Density Ratio After E 100.2 98.5
Mc. 30mm) After Te 19.1 17.5
MC After Ti 19.4 18.6
CBR at 2.5mm Penetration (%): 12 14
CBR at 5.0mm Penetration (%): 17 16
Minimum - -
CBR Value (%): 17 16
Description: SP, Sand SP, Sand
Pale Pale G

This document is issued in accordance with NATA's NATA Accreditation No: 3747
Sr Form Number:

 

 

accreditalion requirements.

NATA REP CBR-1
WJ Z

SIGNATORY: Dale Norwood

 

 

 

 

Used in these records

About this file

File size
4.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

080624 2383-01 FINAL Engineering Report for DA.pdf [As Published].pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.