16.4.5. The disposal method for clearing works is to be submitted in conjunction with an
application for a Development Permit for Operational Work. The Applicant is advised
that other methods may be considered provided full details of the method are
submitted.
The Applicant is advised that burning off is an unacceptable method of disposal.
Security Bond
17. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must
be submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
18. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
Relevant Period
19. The Development Permit for a material change of use of premises lapses if the use has not
happened by 17 August 2013, unless an application to extend the relevant period is
approved by Council.
Frontage Works
20. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping Plants
& Guidelines. Grass shall be couch, free of weeds.
21. The applicant shall be responsible for providing an edge-of-road yellow line marking between
the proposed Entry and Exit driveways from the site to indicate “No Parking” area. The line
marking shall be provided in accordance with Manual of Uniform Traffic Control Devices
(MUTCD) Part 3 and shall be indicated on the plans submitted for Development Permit for
Operational Works.
22. All paths, ramps, driveways and parking areas shall be designed and constructed to ensure
pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and
to be in accordance with the Disability Discrimination Act 1992 and Australian Standard
1428.1 Design for Access & Mobility.
23. All redundant vehicular crossings to the site shall be removed and replaced by kerb &
channel, footpath paving and landscaping such as trees and grasses in accordance with
Council’s Standard specifications prior to commencement of the use permitted by this permit.
24. The applicant shall replace the existing length of the kerb line between the proposed
driveways (Entry and Exit).
Roof Water & Stormwater Drainage
25. Roof runoff from any new building shall be directed to a rainwater storage system or tank
that is installed to ensure water from the rainwater storage system or tank is used for external
uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up
swimming pools, outdoor cleaning, etc) and for internal (ground floor) use in washing
machine cold taps and toilet cisterns. All rainwater tanks are to be designed and installed in
accordance with the Queensland Development Code (QDC) current at the time of building
approval, and shall be part of the plumbing application for approval. The location and
capacity of the tanks shall be clearly shown on the plans submitted for Building Works and
Operational Works approval and any overflow shall be directed to the road frontage/the
stormwater drainage system/etc located in Pacific Avenue.
Page 4 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix A - Decision Notice & Approved Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.