                      AGENDA


         General Committee
              Meeting


             Monday, 17 February 2020

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Jess Glasgow, Ingrid Jackson,
             Joe Jurisevic, Brian Stockwell, Tony Wellington



                   “Noosa Shire – different by nature”
Log in to download the original file

2020-02-17 General Committee Agenda(PDF, 3MB).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 46 sections

Section 2

GENERAL COMMITTEE MEETING AGENDA                                               17 FEBRUARY 2020


TABLE OF CONTENTS

ITEM                                                                                        PAGE


ATTENDANCE & APOLOGIES                                                                           -
PRESENTATIONS                                                                                    -
DEPUTATIONS                                                                                      -
ITEMS REFERRED FROM PLANNING & ENVIRONMENT COMMITTEE                                             -
1      MCU18/0166 - DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE
       SERVICE AND UTILITY - TYPE 3 TOWER, SITUATED AT 244 TABLELANDS
       ROAD, COORAN
       (Planning & Environment Committee Agenda, 11 February 2020, Item 1, Page 3)
       Reason for referral – Significance of the issue

2      OVERVIEW OF PLANNING APPEALS
       (Planning & Environment Committee Agenda, 11 February 2020, Item 3, Page 57)
       Reason for referral – Significance of the issue

3      ADOPTION OF CONSOLIDATED VERSIONS OF NOOSA SHIRE COUNCIL
       LOCAL LAW NO. 1 (ADMINISTRATION) 2015, SUBORDINATE LOCAL LAW NO.
       1 (ADMINISTRATION) 2015 AND SUBORDINATE LOCAL LAW NO. 4 (LOCAL
       GOVERNMENT CONTROLLED AREAS, FACILITIES AND ROADS) 2015
       (Planning & Environment Committee Agenda, 11 February 2020, Item 4, Page 66)
       Reason for referral – Significance of the issue


ITEMS REFERRED FROM SERVICES & ORGANISATION COMMITTEE                                            -
4      NOOSA COMMUNITY HEALTH AND WELLBEING PLAN 2019-2024
       (Services & Organisation Committee Agenda, 11 February 2020, Item 1, Page 3)
       Reason for referral – For further consideration


REPORTS DIRECT TO GENERAL COMMITTEE                                                             3

5      DBW19/0031 - DEVELOPMENT PERMIT FOR BUILDING WORKS ASSESSABLE
       AGAINST THE PLANNING SCHEME - DETACHED HOUSE (COASTAL
       PROTECTION), SITUATED AT 102 LORIKEET DRIVE, PEREGIAN BEACH                               3

6      FINANCIAL PERFORMANCE REPORT - JANUARY 2020                                             15

7      FURTHER REPORT - RAL18/0023 DEVELOPMENT APPLICATION FOR
       RECONFIGURATION OF A LOT (1 LOT INTO 23 LOTS) AT 28 EENIE CREEK
       ROAD, NOOSAVILLE                                                                        28


CLOSED SESSION                                                                             -




                                                                                      Page 2 of 47

Section 3

GENERAL COMMITTEE MEETING AGENDA                                                             17 FEBRUARY 2020


REPORTS DIRECT TO GENERAL COMMITTEE


5                        DBW19/0031 - DEVELOPMENT PERMIT FOR BUILDING WORKS ASSESSABLE
                         AGAINST THE PLANNING SCHEME - DETACHED HOUSE (COASTAL PROTECTION),
                         SITUATED AT 102 LORIKEET DRIVE, PEREGIAN BEACH
DOCUMENT INFORM AT ION




Author                           Development Planner, Nadine Kirley
                                 Environment and Sustainable Development Department

Index                            ECM/Application/DBW19/0031

Attachments                      1.   Proposal Plans (Note: Attachment has been provided separately to this report)



         APPLICATION DETAILS

         Applicant                            Ahisma Nominees Pty Ltd

         Proposal                             Building Work - Detached House (Coastal Protection)

         Properly Made Date                   15 November 2019

         Information Request Date             25 November 2019

         Information Response Date            12 December 2019

         Decision Due Date                    06/March 2020

         Number of Submissions                Not Applicable



         PROPERTY DETAILS

         Property Address                     102 Lorikeet Dr Peregian Beach Qld 4573

         RP Description                       Lot 524 P 93121

         Land Area                            513 m²

         Existing Use of Land                 Detached House



         STATUTORY DETAILS

         SEQRP Designation                    Urban

         Locality                             Eastern Beaches

         Zone                                 Detached Housing

         Overlays                             Natural Resources Overlay

         Assessment Type                      Code




                                                                                                     Page 3 of 47

Section 4

GENERAL COMMITTEE MEETING AGENDA                                            17 FEBRUARY 2020


RECOMMENDATION
That Council note the report by the Development Planner to the General Committee Meeting
dated 17 February 2020 regarding Application No. DBW19/0031 for a Development Permit for
Building Work - Detached House (Coastal Protection) situated at 102 Lorikeet Drive, Peregian
Beach and:
A.   Approve the application in accordance with the following conditions:
     PLANNING
           When Conditions must be Complied With
     1.    Unless otherwise stated, all conditions of this Decision Notice must be complied with
           prior to the use commencing, and then compliance maintained at all times while the
           use continues.
           Approved Plans
     2.    Development undertaken in accordance with this approval must generally comply
           with the approved plans of development. The approved plans are listed in the
           following table unless otherwise amended by these conditions.

          Plan No.      Rev.   Plan/Document Name                                Date

          SD 1.00       E      Schematic Design Site Plan (as amended by         24/10/2019
                               Council)

          SD 1.01       E      Schematic Design Basement Floor Plan              24/10/2019

          SD 1.02       E      Schematic Design Ground Floor Plan                24/10/2019

          SD 1.03       E      Schematic Design First Floor Plan                 24/10/2019

          SD 1.04       E      Schematic Design Roof Plan                        24/10/2019

          SD 2.00       E      Schematic Design North and South Elevations (as   24/10/2019
                               amended by Council)

          SD 2.01       E      Schematic Design East & West Elevations           24/10/2019

          SD 4.00       F      Schematic Design Section A & B (as amended by     09/12/2019
                               Council)<

          SD 4.01       E      Schematic Design Section C & D (as amended by     24/10/2019
                               Council)

          SD 4.02       E      Schematic Design Sections 1 & 2 (as amended by    24/10/2019
                               Council)

          SD 4.03       E      Schematic Design Sections 3 & 4 (as amended by    24/10/2019
                               Council)

          SD 5.01       E      Schematic Design Concept Images                   24/10/2019

          SD 5.02       E      Schematic Design Concept Images                   24/10/2019

          SD 5.04       E      Schematic Design Concept Images                   24/10/2019

          SD 5.05       E      Schematic Design Concept Images                   24/10/2019



                                                                                  Page 4 of 47

Section 5

GENERAL COMMITTEE MEETING AGENDA                                         17 FEBRUARY 2020


         Setback
   3.    The setback to the rear boundary must be a minimum of 6.0m to the building wall.
   4.    Only cantilevered building elements may be built within the reduced rear setback
         area in accordance with amendments by Council shown on the approved plans.
         Building Height
   5.    The maximum height of the development must not exceed 8 metres above the
         finished ground level and the natural ground surface.
   6.    Certification must be submitted to Council from a Licensed Surveyor prior to issue of
         a certificate of classification which certifies that the building does not exceed the
         maximum height requirement of this Decision Notice.
   7.    No part of the Class 10a storeroom on the southern boundary of the site is to exceed
         3.5 metres above natural ground level within the 1.5m side boundary setback area.
         Currency Period
   8.    The Currency Period for this development approval lapses if the development has not
         commenced and all conditions have not been complied with within 4 years of the
         commencement of the approval, unless an application to extend the currency period
         is approved by Council.
         Performance Bond
   9.    Security in the form of a cash bond or trading bank guarantee to the sum of
         $10,000.00 must be submitted to Council prior to the issue of a Development Permit
         for Building Works to secure performance of all conditions of this approval. The cash
         bond or trading bank guarantee will be returned on performance of the conditions of
         approval less any costs incurred by Council in respect of enforcing performance of
         this permit. Council reserves the right to call upon the bond or guaranteed sum to
         effect compliance with conditions.
         Landscaping
   10.   A minimum of 20% of the site must be retained as soft landscaping.
   11.   A minimum 5 metre wide soft landscape buffer must be provided along the eastern
         site boundary with no more than 5m2 of paved or impervious area located in the 5
         metre setback as annotated by Council on the approved plans.
   12.   Native trees and shrubs selected from the preferred plant species list for Coastal
         Beachfront Areas in Planning Scheme Policy PSP03 Landscaping Plants and
         Guidelines are to be planted in the 5 metre landscape buffer. Vegetation must be
         planted to cover at least 50% of the 5 metre setback area between the proposed
         detached house and the eastern boundary of the site in accordance with Council’s
         Planning Scheme Policy PSP3 Landscaping Plants and Guidelines. The remaining
         50% may be planted turf species capable of withstanding coastal environment
         otherwise must be planted out with native trees and shrubs. The planted vegetation
         must have a minimum pot size of 140 mm and consist of native, endemic species
         with a mature over-storey height of not less than 1.5 metres and a maximum spacing
         of 3.0 metre centres.
   13.   All landscape works must be maintained generally in accordance with the approved
         design for the life of the development.
         Site Access and Driveways
   14.   A sealed access driveway must be provided from Lorikeet Dr to the proposed garage
         of the development. The works must be undertaken generally in accordance with the
         approved plans and must be undertaken under a Road Reserve permit.


                                                                                Page 5 of 47

Section 6

GENERAL COMMITTEE MEETING AGENDA                                             17 FEBRUARY 2020


           Stormwater Drainage
     15.   Stormwater runoff from the development must be disposed of on-site without causing
           scour or damage to the subject site or any adjoining property. The works must be
           undertaken in accordance with a site specific Stormwater Management Plan
           (SWMP), prepared by a suitably qualified person. The SWMP must include an onsite
           infiltration system without the need for pumps.
     16.   The site specific SWMP must be approved as part of the subsequent Building Permit.
           Easements
     17.   Unless otherwise agreed in writing by the relevant service provider, any public or third
           party infrastructure located on the subject site must be placed within an easement
           registered against the title of the property.
     18.   All easements must be designed in accordance with the planning scheme and
           granted at no cost to the Grantee. Where the Grantee is Council or a service
           authority, the easement documentation must be in accordance with the Grantee’s
           standard easement terms. Draft easement documentation must be submitted to
           Council for endorsement.
     19.   All works must be kept clear of any existing or proposed easements on the subject
           land, unless agreed otherwise in writing by the Grantee.
           Geotechnical Stability
     20.   All works must be carried out in accordance with a Geotechnical Report (or part
           thereof) prepared by a qualified person* and endorsed through the Building Permit.
           *(Refer to Advisory Notes)
           Earthworks and Retaining Walls
     21.   All earthworks must be contained entirely within the subject site unless written
           permission from the respective landowner(s) is provided to Council. All earthworks
           must be undertaken in accordance with the provisions of Australian Standard
           AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
     22.   Where the development involves excavation or filling over, or adjacent to, drainage,
           water supply or sewerage infrastructure, all access chamber surface levels must be
           adjusted to provide a freeboard of 100mm above the finished ground surface level.
     23.   All retaining walls must be designed and constructed in accordance with the planning
           scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
           retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
           with a commercial grade safety fence.
     24.   All earthworks must be undertaken in accordance with the recommendations of
           report: “Site Investigation Data and Indicative Potential Acid Sulfate Soil Report”,
           prepared by CSI Soil Testing Pty Ltd, dated 29/01/2020
           Coastal Protection
     25.   Gates must not be installed along the eastern property boundary to gain direct
           access to the beachfront.
     26.   External colours and finishes of the building must comprise of muted/environmental
           tones that blend with the natural environment.
B.   Find the following matters relevant to the assessment and sufficient reason to approve the
     application:
     1.    The cantilevered design of the building results in no significant impact to the natural
           coastal processes of the dunal system.


                                                                                     Page 6 of 47

Section 7

GENERAL COMMITTEE MEETING AGENDA                                              17 FEBRUARY 2020


     2.    The reduced setback of the building does not encroach into the area of the 2100
           coastal erosion mapping prepared in conjunction with Council’s Draft Coastal
           Hazards Adaptation Plan.
     3.    The proposal includes soft landscaping within the 5 metre setback area including
           native planting and turf and a small area of impervious paving up to approximately 5
           metres in area.
C.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


REPORT
1.   PROPOSAL
The applicant seeks a reduced setback to the rear boundary of the lot adjoining the coastal dune
area of Peregian Beach. The proposed detached house is proposed to be constructed on the
site to include basement parking and two upper levels of living area. The overall height of the
proposed building is within the maximum 8 metre height limit. The applicant seeks approval for a
reduction in the setback to the building on the rear, coastal boundary. Ground floor deck and
upper level balcony elements are proposed to cantilever into the 6 metre setback area by 1 metre
for the full width of the building. The eave overhang on the upper level extends a further 900mm
into the setback area at approximately 7.26m above ground level. The setback to the wall of the
basement is consistent with the 6 metre setback sought by the Natural Hazards Overlay Code.
Resulting setback variations would be 5.0 metres to the face of the balcony and deck, and 4.1
metres to the outermost projection of the roof overhang.
Artist impressions of the proposed building show perspective views from the west and east in
Figure 1, Figure 2 and Figure 3 below. Figure 4 illustrates the floor plan of the ground level
and the proposed setbacks to the basement wall (6.0 metres), cantilevered deck and balcony
(5.0 metres) and the upper level roof overhang (4.1 metres).




                          Figure 1: Western perspective from Lorikeet Drive




                                                                                   Page 7 of 47

Section 8

GENERAL COMMITTEE MEETING AGENDA                                                      17 FEBRUARY 2020




                Figure 2: Perspective from rear illustrating cantilevered building elements.




  Figure 3: Perspective from rear illustrating 6 metre setback to basement wall beneath cantilevered deck.




                                                                                               Page 8 of 47

Section 9

GENERAL COMMITTEE MEETING AGENDA                                                  17 FEBRUARY 2020




             Figure 4: Ground Floor Plan showing cantilever and landscaped area in setback.


2.    SITE DETAILS
2.1. Background
An existing dwelling was established on the site and recently demolished with the approval of a
prior development application for a new detached house. The applicant is seeking approval for a
new building design on the property.
2.2. Site Description
The subject site is an irregular shaped lot which is currently vacant residential land following the
recent removal of the existing house. The land is gently sloping to the east with a fall of
approximately 1.5m. Existing fencing is located along the side and front boundaries. The rear
boundary is unfenced. An existing sewer gravity main and house connection are located in the
rear setback area for the full width of the site. he site contains no significant vegetation. Figure 5
below shows the current vacant site location.




                                                                                              Page 9 of 47

Section 10

GENERAL COMMITTEE MEETING AGENDA                                             17 FEBRUARY 2020




                                       Figure 5: Site Location


2.3. Surrounding Land Uses
The site is located within a residential area with premises to the north, south and opposite on the
western side of Lorikeet Drive being existing detached dwellings. The eastern boundary of the
site abuts the dune area of the coastal zone which is predominantly vegetated.
3.   ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against the assessment
benchmarks in the Noosa Plan and having regard to any matters prescribed by regulation.
3.2. State and Other Statutory Instruments
State Planning Policy
The Noosa Plan is generally consistent with the State Planning Policy July 2017 (SPP) and the
SPP raises no further issues relevant to the proposed development.
South East Queensland (SEQ) Regional Plan
The site is located within the Urban area of the SEQ Regional Plan. The proposal is consistent
with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The proposal is for urban activity within the Urban Footprint and is consistent with the
assessment benchmarks contained in the Planning Regulation 2017 for the SEQ Region.
3.3. Statutory Instruments – Planning Scheme
The application must be assessed against each of the following codes to the extent they are
relevant to the development:
   Building Works Code
   Natural Resources Overlay Code



                                                                                    Page 10 of 47

Section 11

GENERAL COMMITTEE MEETING AGENDA                                                    17 FEBRUARY 2020


Locality Provisions
The subject site is located in the Eastern Beaches Locality and is zoned Detached Housing. The
proposed use is identified as a consistent use within the zone.
Land Use & Works Provisions


Building Works Code
The application has been assessed against the building works code. The pertinent issues arising
out of the assessment against the code are discussed below:

Code Outcome                             Discussion

Setbacks                                 The probable solution for this Specific Outcome requires
                                         development to meet the minimum setbacks stated in
O1 Buildings and other structures are
                                         Schedule 1 – Minimum Boundary Setbacks.
appropriately designed and sited to—
                                         Schedule 1 provides that premises in the Eastern Beaches
a) provide amenity for users of the
                                         Coastal Protection Area have a minimum setback no further
   premises as well as preserve the
                                         seaward than the coastal building line or in accordance with
   visual and acoustic privacy of
                                         the Coastal Protection Area provisions of the Natural
   adjoining and nearby land uses;
                                         Resources Overlay Code (which requires a 6m setback from
b) preserve any existing vegetation      the rear boundary), whichever is the greater.
   that will buffer the proposed
                                         The proposed development is seeking approval for a 4.1
   building from adjoining uses;
                                         metre minimum setback to the outermost projection (OMP) of
c) allow for landscaping to        be    the building. The proposed upper level balcony and ground
   provided between buildings;           level deck are cantilevered into the setback area to a setback
                                         of 5 metres to the face of these building elements. The roof
d) maintain the visual continuity and
                                         overhang on the upper level extends a further 900mm to result
   pattern    of    buildings     and
                                         in the 4.1 metre setback to the OMP. The basement wall
   landscape elements within the
                                         setback remains consistent with the 6.0 metre setback.
   street;
                                         Consequently, no part of the building structure touches the
e) for class 10a buildings, do not       ground within the setback area.
   visually dominate the street;
                                         The cantilevered building design is unlikely to result in any
f) avoid any significant adverse         significant adverse impacts on the natural values of the
   impacts on the natural values of      foreshore or the natural cycles of erosion and accretion in the
   watercourses        and      their    dune areas. The lower deck extends for the full width of the
   foreshores, including those of the    building with a finished floor level approximately 900mm above
   Noosa River and its lakes; and        the ground. The upper balcony is approximately 4.05 metres
                                         above ground level and the roof overhang another 3.2 metres
g) do not interrupt the natural cycles   higher again. Visual continuity will be maintained as adjacent
   of erosion and accretion of           premises are setback similar distances from the rear
   watercourses      and    foreshore    boundary.
   areas.
                                         No significant vegetation exists on the site. The applicant is
                                         proposing a combination of turf and native planting in the
                                         reduced 5 metre setback area.           Planting will assist in
                                         stabilising the sandy soils, minimising potential erosion.
                                         The proposal is considered to comply with O1 of the code.




                                                                                            Page 11 of 47

Section 12

GENERAL COMMITTEE MEETING AGENDA                                                       17 FEBRUARY 2020


Natural Resources Overlay Code
The application has been assessed against the Natural Resources Overlay Code. The pertinent
issues arising out of the assessment against the code are discussed below:

Code Outcome                              Discussion

Coastal Protection Areas                  The Probable Solution for this Specific Outcome seeks to
                                          maintain a minimum 5 metre width of native landscaping
O18 The siting and design of
                                          including groundcovers, shrubs and trees in the setback area
development and materials used
                                          seaward of the proposed building to protect the coastal dune
within the Coastal Protection Area, as
                                          system.
identified on the Natural Resources
Overlay Maps, do not cause any            The applicant proposes to include a landscaped area of 5
significant adverse impacts on the        metres which includes turf and native planting in accordance
coastal resources of the location nor     with PSP03 Landscaping Plants & Guidelines. A concrete
interrupt the natural cycles of erosion   bench seat and paved area is proposed in the north-eastern
and accretion of foreshore areas and      corner of the site. Figure 6 below this table, is an extract from
beaches.                                  the site plan which illustrates the proposed hard landscaping
                                          in the rear setback area.         The small section of hard
                                          landscaping in this instance is considered acceptable provided
                                          the remainder of the setback area is soft landscaping
                                          comprising 50% of the remaining area as planted trees and
                                          shrubs and 50% turf. A condition requiring no more than 4m2
                                          of hard landscape can be applied to the decision notice if
                                          approved to ensure that the predominant landscaped area is
                                          pervious, soft landscape treatment.
                                          The cantilevered building design is unlikely to result in any
                                          significant adverse impacts on the natural values of the
                                          foreshore or the natural cycles of erosion and accretion in the
                                          dune areas as the encroachment into the setback area is
                                          above ground level.
                                          The proposal is considered to comply with O18 of the code.

O21 Where a coastal building line         No coastal building line exists on this property. The proposed
does not exist on properties fronting     cantilevered elements of the building will encroach by 1 metre
the beachfront or a reserve adjoining     to the lower deck and upper balcony with the roof overhang on
the beachfront– buildings, other          the upper level encroaching a further 900mm.
structures and retaining walls are
                                          The proposal does not comply with Specific Outcome O21.
setback a minimum of 6m from the
seaward boundary of the site.             The Natural Resources Overlay Code Overall Outcomes
                                          require that in coastal protection areas, development:-
                                          i    does not adversely       impact    upon   natural   coastal
                                               processes; and
                                          ii   is designed and sited to protect the natural beach
                                               experience and visual amenity enjoyed by residents and
                                               others.
                                          Building foundations and basement excavation is proposed to
                                          be setback in accordance with the code requirements and only
                                          cantilevered elements encroach into the setback area. With
                                          no physical connection to the ground, little or no impact on the
                                          natural processes of the coastal area is likely. The reduced
                                          setback of the cantilevered elements are also unlikely to result
                                          in the natural beach experience and visual amenity of the area
                                          being compromised in this instance.




                                                                                              Page 12 of 47

Section 13

GENERAL COMMITTEE MEETING AGENDA                                                   17 FEBRUARY 2020


                                                             Hard landscaping in the 5 metre
                                                             setback area roughly 4-5m2 is
                                                             minor in the overall landscaping




                        Applicant proposes planting in this
                        area in accordance with Planning
                        Scheme Policy PSP03



                                                            Proposed turf


                  Figure 6: Extent of hard landscaping proposed in 5 metre setback area



4.    DRAFT PLANNING SCHEME
The Draft New Noosa Plan identifies the site within the Low Density Residential Zone. The site is
subject to the Coastal Protection and Scenic Amenity Overlay in the draft scheme. The minimum
rear boundary setback in the draft planning scheme is identified as 6 metres in the Coastal
Protection and Scenic Amenity Overlay which is consistent with the current scheme
requirements.
5.    CONSULTATION
5.1. Referral Agencies
No external referral was required in relation to this application.
5.2. Other Referrals
The application was forwarded to the following internal Council officers:
    Principal Strategic Planner
    Environmental Officer
The application was referred to Council’s Principal Strategic Planner for comment on the rear
boundary relaxation in respect of the building’s proximity to the draft coastal protection overlay
and draft erosion hazard mapping. The Principal Strategic Planner has advised that draft erosion
hazard mapping is currently being refined and is likely to have less of an impact on this particular
site than initially modelled.



                                                                                          Page 13 of 47

Section 14

GENERAL COMMITTEE MEETING AGENDA                                               17 FEBRUARY 2020


As the proposal seeks to preserve the 5 metre landscaped buffer within the setback area, this is
likely to provide added stability and therefore the cantilevered design is considered appropriate in
this instance.
No further issues have been raised as a result of the internal referrals noted above.
6.     CONCLUSION & REASONS FOR DECISION
The proposed development to construct a detached house consisting of a basement level,
ground level and upper level seeks a boundary relaxation to the rear, coastal boundary. The
encroaching elements of the building include ground floor deck, upper balcony and upper level
roof overhang resulting in a minimum setback of 4.1m to the OMP on the roof overhang and 5m
to the face of the deck and balcony. The basement level is set back the required 6 metres from
the boundary. The Natural Resources Overlay applies to the development and requires in a
Specific Outcome of the code, a minimum 6 metre setback. The purpose of the overlay code is to
protect the coastal processes and dunal systems and mitigate the impact of erosion in the
coastal zone. Draft coastal hazard mapping demonstrates that current modelling excludes this
site from the potential erosion prone area. With the cantilevered design, the proposal is
considered to have little or no detrimental effect on the natural coastal processes as the building
elements do not touch the ground.
The application is recommended to the Council for approval.
Departments/Sections Consulted:
     Chief Executive Officer       Community Services                      Corporate Services
     Executive Officer             Community Development                   Financial Services
     Executive Support             Community Facilities                    ICT
                                   Libraries & Galleries                   Procurement & Fleet
                                   Local Laws                              Property
                                   Waste & Environmental Health            Revenue Services

     Executive Services        x   Environment & Sustainable Development   Infrastructure Services
     Community Engagement          Building & Plumbing Services            Asset Management
     Customer Service          X   Development Assessment                  Buildings and Facilities
     Governance                    Economic Development                    Civil Operations
     People and Culture            Environmental Services                  Disaster Management
                                   Strategic Land Use Planning             Infrastructure Planning,
                               X
                                                                           Design and Delivery




                                                                                        Page 14 of 47

Section 15

GENERAL COMMITTEE MEETING AGENDA                                                                   17 FEBRUARY 2020


6                          FINANCIAL PERFORMANCE REPORT - JANUARY 2020
DOCUMENT INFORM AT ION




Author                             Manager Financial Services, Trent Grauf
                                   Corporate Services Department

Index                              ECM/ Subject/ 22.09 – Monthly Financial Performance Report

Attachments                        1.      Statement of Income and Expenditure (Profit & Loss and Capital)
                                   2.      Statement of Financial Position
                                   3.      Statement of Cash Flows


EXECUTIVE SUMMARY
Year to date (YTD) operating performance against current budget as at 31 January 2020 is
positive, with operating revenue continuing to track above budget and operating expenditure
below budget. The YTD operating position, both budget and actual, is significant reflecting the
recognition of revenue associated with rates and charges levied in January. This position will
degrade over the next five months as services funded by rates and charges are delivered.

YTD Financial Performance Summary
                             Budget                          Actual      Variance       Variance
                                                                                                        Status
                                $m                              $m             $m              %
Operating Revenue             $86.8                           $87.8           $1.0          1.2%       On Track
Operating Expense             $55.5                           $53.8           $1.8          3.2%       On Track
Operating Position            $31.2                           $34.0           $2.8          8.9%
Capital Revenue                $3.3                            $4.4           $1.1        32.2%      Above Budget
Capital Expenditure*          $12.7                           $12.5           $0.2          1.5%       On Track
* Reflects constructed assets and intangibles only (excludes contributed)


Financial statements including Statement of Income & Expenditure, Statement of Financial
Position (balance sheet), and Statement of Cash Flows are included as attachments for
information for Council.

Figure 1: Actual Performance Compared to Budget

               $100
                                        $86.8                         YTD Budget ($m)
                         $90                     $87.8
                                                                      YTD Actual ($m)
                         $80
                         $70
                         $60                                                $55.5       $53.8

                         $50
                         $40
                         $30
                         $20
                         $10
                          $-
                                    Operating Revenue                   Operating Expenditure




                                                                                                        Page 15 of 47

Section 16

GENERAL COMMITTEE MEETING AGENDA                                                       17 FEBRUARY 2020


YTD performance against Council’s key measures of financial sustainability have been calculated
as at January 2020. These indicators enable the reader to assess Council’s success in managing
its budget, cash and debt as well as undertaking sustainable asset management. The table
below contains a snapshot of a number of key measures, with full detail included in the report.

YTD Measures of Financial Sustainability
                                  Target          Target           Current         Actual          Status
                                  Value            Date            Budget           YTD
Operating Surplus Ratio           0-10%       30 June 2020          0.0%           38.7%          On Track
Net Financial Liabilities Ratio   <60%           Ongoing            -9.4%          -51.1%       Above Target
Cash Cover Ratio                  3 months       Ongoing         6.6 months      9.4 months     Above Target
Asset Sustainability Ratio        > 90%       30 June 2020          108%           43.1%          On Track


RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee
Meeting dated 17 February 2020 outlining January 2020 year to date financial performance
against budget, including key financial sustainability indicators.


REPORT
Operating Revenue (YTD Benchmark 58.3%)
Council has received 88% ($87.8 million) of its operating revenue budget ($99.9 million).
Commentary on each revenue category is provided below.

Category              Summary                          Comments
Rates and Levies      $70.0 million (102%) of the         General rates $145k above YTD budget (100%
                      annual budget of $68.7                or $51.1 million of $51.0 million budget earned)
                      million has been earned             Waste utility charges $333k above YTD budget
                                                            (100% or $13.1 million of $12.8 million budget
                                                            earned)
Fees and              $4.8 million (72%) of the $6.7      Development related fees $37k above YTD
Charges               million annual budget has             budget (81% or $1.3 million of $1.6 million
                      been earned                           budget earned)
                                                          Cemetery fees $51k above YTD budget (81%
                                                            or $185k of $229k budget earned)
                                                          Community land use permits $37k above YTD
                                                            budget (69% or $284k of $410k budget
                                                            earned)
                                                          Plumbing application fees $27k above YTD
                                                            budget (69% or $671k of $971k budget
                                                            earned)
                                                          Building application fees $40k below YTD
                                                            budget (53% or $340k of $730k budget spent)
Sale of Goods         $5.6 million (55%) of the           Noosa Leisure Centre $45k above YTD budget
and Services          $10.1 million budget has              (64% or $365k of $575k budget earned)
                      been received                       Holiday Park sales $69k below YTD budget
                                                            (54% or $1.7 million of $3.9 million budget
                                                            earned) – 1 month delay in planned opening of
                                                            North Shore Campground offset by lower
                                                            expenditure



                                                                                              Page 16 of 47

Section 17

GENERAL COMMITTEE MEETING AGENDA                                                                17 FEBRUARY 2020


Category                 Summary                               Comments
                                                                Noosa Aquatic Centre admission and other
                                                                  revenue $22k below YTD budget (53% or
                                                                  $798k of $1.5 million budget earned)
                                                                Waste disposal fees $136k below YTD budget
                                                                  (55% or $2.3 million of $4.3 million budget
                                                                  earned)
Interest                 $928k (66%) of the $1.4                  Interest on overdue rates and charges $54k
Received                 million annual budget has                  above YTD budget (64% or $254k of $400k
                         been earned                                budget earned)
                                                                  Investment revenue $50k above YTD budget
                                                                    (67% or $674k of $1.0 million budget earned)
                                                                  Recent downward movements in interest rates
                                                                    will be monitored over the next few months for
                                                                    any negative impact on overall interest
                                                                    revenue budget
Other Revenue            $1.5 million (65%) of the $2.3           On track
                         million budget has been
                         earned
Operating                $2.8 million (57%) of the $5.0           50% or $1.1 million of the financial assistance
Grants,                  million budget has been                    grant was again prepaid in June 2019 and may
Subsidies                received                                   impact on Council’s 2019/20 final operating
                                                                    position if the prepayment approach is
                                                                    discontinued by the Australian government
                                                                  All other operating grants are in line with
                                                                    budget forecasts at this stage
Unitywater               On track                                 Unitywater distributions are fixed each year so
Distributions                                                       little budget variance risk

Figure 2: Operating Revenue Position by Type (Excluding Rates)

  $7.0
                                        $5.7 $5.6                        YTD Budget ($m)
  $6.0
                                                                         YTD Actual ($m)
                  $4.8
  $5.0
           $4.3

  $4.0

  $3.0                                                                          $2.7 $2.8
                                                                                            $2.1 $2.1
  $2.0
                          $0.8 $0.9                 $0.9 $0.8       $0.6 $0.7
  $1.0

  $0.0
             Charges




                                                                        Other
                                         Goods &




                                                     Income




                                                                                  Grants




                                                                                              Unitywater
                                         Services
                                         Sales of




                                                      Rental
                             Interest
             Fees &




                                                                                               Share of




                                                                                                           Page 17 of 47

Section 18

GENERAL COMMITTEE MEETING AGENDA                                                 17 FEBRUARY 2020


Operating Expenditure (YTD Benchmark 58.3%)
Actual operating expenditure is currently 54% ($53.8 million) of full year budget ($99.8 million).
Detailed commentary for each expenditure category is provided below.
Category           Summary                       Comments
Employee Costs     $18.4 million (55%) of the        Under expenditure for permanent staff salaries
                   annual budget of $33.5              and wages ($1.9 million) partially offset by
                   million has been expended           additional spend on casual staff and external
                                                       labour hire ($633k)
                                                     Employee overtime and allowances $290k
                                                       above YTD budget (90% or $855k of $953k
                                                       budget spent) in part due to recent fire events
                                                     Staff training $39k below budget (25% or $86k
                                                       of $337k budget spent)
Materials and      $23.4 million (45%) of the        Waste Management materials and services
Services           $45.8 million annual budget         $338k below YTD budget (52% or $5.5 million of
                   has been expended.                  $10.6 million budget spent)
                                                     Library services $124k below YTD budget (43%
                                                       or $462k of $1.1 million budget spent) – timing
                                                       of library collection purchases and programs
                                                     Parks & Gardens operations and maintenance
                                                       programs $108k below YTD budget (50% or
                                                       $2.2 million of $4.3 million budget spent) –
                                                       timing of arborist work and park maintenance
                                                       pending wet weather events
                                                     Holiday Parks $90k below YTD budget (52% or
                                                       $712k of $1.4 million budget spent) – delay in
                                                       planned opening of North Shore Campground
                                                       offset by lower revenue
                                                     Community Properties $75k below YTD budget
                                                       (32% or $143k of $444k budget spent) – timing
                                                       of maintenance and utility charges
                                                     Public Amenity materials and services $68k
                                                       below YTD budget (49% or $241k of $495k
                                                       budget spent)
                                                     Public Utility costs $67k above YTD budget
                                                       (128% or $122k of $95k spent) – emergent
                                                       lighting works on David Low Way and at Noosa
                                                       Woods
                                                     Disaster Management $100k above YTD budget
                                                       (419% or $100k of $27k budget spent) – staff,
                                                       traffic control and other contract costs
                                                       associated with recent fire events. QRA grant
                                                       claim has been submitted to partially recover
                                                       costs.
                                                     Hasting Street Maintenance Levy $162k above
                                                       YTD budget (171% or $384k of $225k budget
                                                       spent) – tree lighting replacement program to be
                                                       funded from reserve in BR3
                                                     Development assessment legal appeals costs
                                                       $249k above YTD budget (76% or $836k of $1.1
                                                       million budget spent) – slightly offset by
                                                       increased revenue
Finance Costs      On track                      Nil
Depreciation       On track                      Nil
Other Expenses     On track                      Nil

                                                                                        Page 18 of 47

Section 19

GENERAL COMMITTEE MEETING AGENDA                                                                                                                      17 FEBRUARY 2020


Figure 3: Operating Expenditure Position by Type

$30.0
                                                                                                    YTD Budget ($m)
                                                  $24.5 $23.4
$25.0                                                                                               YTD Actual ($m)
           $19.1 $18.4
$20.0

$15.0
                                                                                                      $10.9 $10.9
$10.0

 $5.0
                                                                    $0.9 $0.9                                                                 $0.1 $0.1
 $0.0



                                                                             Finance Costs
                                                      Materials




                                                                                                          Depreciation
               Employees




                                                                                                                                                     Other
Capital Revenue
YTD capital revenue of $4.4 million received comprises cash contributions from developers ($1.4
million) and capital grants ($2.9 million). Included in the capital grants is an additional amount of
$1 million received to fund bushfire disaster recovery activities.

Note that the timing of capital grant receipts are generally dependent on the timing of grant
conditions and also capital delivery performance, and that the timing of the receipt of developer
contributions (both cash and contributed) is unpredictable.

Figure 4: Capital Revenue by Type

 $3.5
                                                                                             $2.9
 $3.0
                                                                                                         YTD Budget ($m)
 $2.5                                                                                                    YTD Actual ($m)

 $2.0                                                             $1.8

 $1.5            $1.4                      $1.4

 $1.0

 $0.5
                                                                                                                         $0.1                 $0.1
 $0.0
                                                                         Subsidies
                           Contributions




                                                                                                                                Contributed
                                                                          Grants /




                                                                                                                                  Assets
                              Cash




                                                                                                                                                             Page 19 of 47

Section 20

GENERAL COMMITTEE MEETING AGENDA                                                     17 FEBRUARY 2020


Capital Program
Actual capital expenditure (excluding contractual commitments) is $12.5 million (YTD budget
$12.7 million). Detailed discussion of progress in the delivery of the capital works program is
provided through a separate report by the Asset Planning Manager.

Figure 5: Capital Program Delivery Performance

$12.0              $11.3        $11.1


$10.0                                         YTD Budget ($m)
                                              YTD Actual ($m)
 $8.0

 $6.0

 $4.0

 $2.0                                                      $1.4             $1.4


 $0.0
                     Capital works                              Other capital




Cash Management and Investment Performance
Total cash on hand at the end of January was $62 million, including funds held in trust and for
restricted purposes (e.g. unexpended levy and grant funds), the prepaid financial assistance
grant, January rate levy funds beginning to flow in, and unspent monies committed for funding
capital projects which are underway and will continue during the financial year.

The following pie charts present the mix of cash held at January 2020 by agency (graph on the
left) and by credit risk rating (graph on the right). All funds have been invested in accordance with
the Investment Policy and in consideration of the principles of ethical investment, preservation of
capital, return on investment and counterparty thresholds.

Figure 6: Closing Cash Held by Agency and Credit Rating


                   Bendigo                                                   A3
                     3%                                                  (Bendigo)
         CBA                                                        A1 +     3%
         16%                                                    (CBA + NAB +
                                                                  Wpac)…




                                                                                         A1 +
                                        QTC                                             (QTC)
                                        81%                                              81%




                                                                                          Page 20 of 47

Section 21

GENERAL COMMITTEE MEETING AGENDA                                                                        17 FEBRUARY 2020


The following chart monitors the 12-month trend on total cash and the agencies invested. Bi-
annual rates were levied again in January. While the bulk of cash from the rates levy is forecast
to be received in February, early payments during January provided for in increase in cash
overall of $7 million. This will reinvested in February in line with Council’s Investment Policy.

Figure 7: 12 Month Trend of Cash Invested by Agency
 90,000,000


 80,000,000


 70,000,000


 60,000,000


 50,000,000


 40,000,000


 30,000,000


 20,000,000


 10,000,000


         -
             Feb-19 Mar-19   Apr-19   May-19   Jun-19   Jul-19   Aug-19   Sep-19   Oct-19   Nov-19   Dec-19    Jan-20


              Bendigo TD       Westpac TD        NAB TD          Suncorp TD        CBA TD       QTC           CBA Operating




Measures of Financial Sustainability
The following table incorporates a set of financial sustainability indicators to further assist in
managing Council financial performance. There are no current material emerging risks regarding
performance for the first half of the financial year.

Category                                                                               Comments
Operating Surplus Ratio                                                                   Intent: Identifies the extent to
                                                                                            which       revenues        cover
                                                                                            operational expenses, to ensure
                                                                                            community      equity    is   not
                                                                                            degraded
                                                                                          Target: 0 – 10%
                                                                                          Target Date: 30 June
                                                                                          Result: 38.7%
                                                                                          Comment: The ratio is at the
                                                                                            second peak for the year with
                                                                                            the levying of January rates.




                                                                                                                  Page 21 of 47

Section 22

GENERAL COMMITTEE MEETING AGENDA                 17 FEBRUARY 2020


Category                           Comments
Cash Expense Cover                    Intent: Indicates how long
                                        council can continue paying its
                                        day-to-day expenses from cash
                                        at    bank      without   needing
                                        additional cash flows
                                      Target: > 3 months
                                      Target Date: Ongoing
                                      Result: 9.4 months
                                      Comment: Council is forecast
                                        to remain above target for the
                                        financial year and remain
                                        fiscally flexible to accommodate
                                        unforeseen events. Peaks will
                                        occur following rating periods
Asset Sustainability Ratio            Intent: Measures the extent to
                                        which assets are being replaced
                                        as their condition degrades to
                                        ensure service potential is
                                        maintained
                                      Target: 90% of depreciation
                                        budget spent on renewals
                                        annually
                                      Target Date: 30 June
                                      Result: In line with budget
                                      Comment: The ratio has been
                                        revised at Budget Review 2 with
                                        the revised capital budget. The
                                        actual result will progressively
                                        increase     each     month  as
                                        expenditure on renewal projects
                                        occurs.
Net Financial Liabilities Ratio       Intent: Outlines the level that
                                        net Council debt can be
                                        serviced by operating revenues.
                                        A ratio below zero implies that
                                        liabilities are less than cash
                                        (and other current assets) and
                                        there is adequate borrowing
                                        capacity available if needed.
                                      Target: less than 60%
                                      Target Date: Ongoing
                                      Result: (51.1%)
                                      Comment: Council has low
                                        debt levels and strong cash
                                        holdings reflected in the YTD
                                        result.




                                                        Page 22 of 47

Section 23

GENERAL COMMITTEE MEETING AGENDA                                              17 FEBRUARY 2020


Category                                                        Comments
Investment Return                                                  Intent:   Ensure      appropriate
                                                                     return on investment yield for
                                                                     cash at bank.
                                                                   Target: 0.25% above current
                                                                     Bloomberg commonwealth 10
                                                                     year bond rate yield (February =
                                                                     0.97%)
                                                                   Target Date: Ongoing
                                                                   Result: 1.55%
                                                                   Comment: Regardless of the
                                                                     steady decline in long term
                                                                     bond rates (due to international
                                                                     market     factors),    Council’s
                                                                     investment return still remains
                                                                     above target
Rates in Arrears                                                   Intent: Ensuring that the
                                                                     amount of unpaid rates remains
                                                                     sustainable and does not
                                                                     negatively impact cash flows
                                                                   Target: 5% industry benchmark
                                                                   Target Date: Ongoing
                                                                   Result: 5.6%
                                                                   Comment: Arrears % slightly
                                                                     above target. Debt recovery
                                                                     measures are continuing.




Previous Council Consideration
Nil.

Finance
As above.

Risks & Opportunities
Council’s risk register includes a number of risks that could impact on ongoing financial
sustainability. Effective budget management and reporting is an important risk mitigation tool.

Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.




                                                                                     Page 23 of 47

Section 24

GENERAL COMMITTEE MEETING AGENDA                                                  17 FEBRUARY 2020


Departments/Sections Consulted:

X   Chief Executive Officer   X   Community Services                      X   Corporate Services
    Executive Officer             Director                                X   Director
    Executive Support             Community Development                   X   Financial Services
                                  Community Facilities                        ICT
                                  Libraries & Galleries                       Procurement & Fleet
                                  Local Laws                                  Property
                                  Waste & Environmental Health                Revenue Services

X   Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
    Director                      Director                                    Director
    Community Engagement          Building & Plumbing Services                Asset Management
    Customer Service              Development Assessment                      Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
    People and Culture            Environmental Services                      Disaster Management
                                  Strategic Land Use Planning                 Infrastructure Planning,
                                                                              Design and Delivery




                                                                                           Page 24 of 47

Section 25

GENERAL COMMITTEE MEETING AGENDA   17 FEBRUARY 2020




                                       Page 25 of 47

GENERAL COMMITTEE MEETING AGENDA                                                                   17 FEBRUARY 2020

 Noosa Council                                                                                                  ATTACHMENT 1
Statement of Income and Expenditure
For the Year Ended 30 June 2020
As at 31 January 2020
                                                            Current          Current
                                                            Budget           Budget           Actual          Variance       Annual
                                                               2020             YTD              YTD               YTD        Budget
                                                             ($'000)          ($'000)          ($000)           ($'000)         %
Profit and Loss Statement

Revenue
    Recurrent Revenue
    Rates, levies and charges                                 68,702           69,569           70,012              443        102%
    Fees and charges                                           6,642            4,313            4,780              467        72%
    Interest received                                          1,410             824               928              104        66%
    Sale of Goods and major services                          10,127            5,735            5,573            (162)        55%
    Sale of contract and recoverable works                       23                 -                1                1         2%
    Rental & lease income                                      1,296             857               807              (50)       62%
    Other income                                                985              638               705               67        72%
    Grants, subsidies, contributions and donations             4,999            2,686            2,830              144        57%
    Unitywater Distributions                                   5,650            2,133            2,133                -        38%
                                                              99,833           86,755           87,769            1,014        88%
Expenses
    Recurrent Expenses
    Employee benefits                                         33,517           19,106           18,432            (675)        55%
    Materials and services                                   45,863            24,472           23,362           (1,111)       51%
    Finance costs                                              1,528             891               916               24        60%
    Depreciation                                              18,713           10,916           10,916                0        58%
    Other expenses                                              188               138              135               (2)       72%
                                                              99,809           55,524           53,760           (1,764)       54%
Operating Result                                                 24            31,231           34,009            2,778

Summary of Capital Revenue and Expenditure

Capital Funding
    Capital cash contributions and infrastructure charges      2,134            1,354            1,351               (3)       63%
    Contributed assets                                         2,000              112              112                -         6%
    Capital grants and subsidies                               5,281            1,830            2,895            1,065        55%
    Cash / revenue                                            27,337           11,407           11,351              (56)       42%
    New loan borrowings                                            -                -                -                -         0%
    Other capital revenue                                          -                -                -                -         0%
Total Capital Revenue                                         36,753           14,703           15,709            1,007

Capital Expenditure
    Contributed assets                                         2,000              112              112                -         6%
    Capital works - constructed assets                        26,091           11,298           11,072            (226)        42%
    Capital works - other capital                              4,781            1,352            1,383               31        29%
    Loan repayments                                            3,880            1,940            2,069              129        53%
    Other capital expenses                                         -                -            1,073            1,073         0%
Total Capital Expenditure                                     36,753           14,703           15,709            1,007

                                                                                                                   Page 25 of 47

Section 26

GENERAL COMMITTEE MEETING AGENDA   17 FEBRUARY 2020




                                       Page 26 of 47

GENERAL COMMITTEE MEETING AGENDA                                                          17 FEBRUARY 2020

 Noosa Council                                                                                     ATTACHMENT 2
Statement of Financial Position
For the Year Ended 30 June 2020
As at 31 January 2020
                                                                    Current                 Actual                  Actual
                                                                    Budget                     YTD                Full Year
                                                                       2020                   2020                    2019
                                                                     ($'000)                ($'000)                 ($'000)
Current Assets
      Cash and cash equivalents                                       43,942                 62,360                  55,981
      Trade and other receivables                                      9,290                 36,089                   6,666
      Inventories                                                        198                    201                     198
      Other current assets                                             2,466                  3,362                   4,541
                                                                      55,897                102,012                  67,386
      Non Current Assets held for sale                                     -                      -                       -
Total Current Assets                                                  55,897                102,012                  67,386

Non Current Assets
      Trade and other receivables                                     49,718                 49,718                  49,718
      Other non current Assets                                             -                      -                       -
      Investments                                                     60,978                 60,978                  60,978
      Investment property                                              3,300                  3,300                   3,300
      Property, plant and equipment                                  916,382                886,107                 885,912
      Intangible assets                                                7,170                  6,397                   5,953
Total Non Current Assets                                           1,037,548              1,006,499               1,005,861
Total Assets                                                       1,093,445              1,108,511               1,073,247
Current Liabilities
      Trade and other payables                                         5,078                 11,800                   9,594
      Borrowings                                                       2,414                  1,786                   3,112
      Provisions                                                       4,630                  3,075                   4,918
      Other                                                            2,778                  1,701                   2,768
Total Current Liabilities                                             14,900                 18,362                  20,392

Non Current Liabilities
      Trade and other payables                                             -                      -                       -
      Borrowings                                                      19,555                 21,120                  21,120
     Provisions                                                       12,054                 11,523                  11,523
Total Non Current Liabilities                                         31,608                 32,643                  32,643

Total Liabilities                                                     46,508                 51,006                  53,035

Net Community Assets                                              1,046,937              1,057,505               1,020,212

Community Equity
     Asset Revaluation Surplus                                        68 337                 50,809                  50,809
      Retained Surplus / (Defeciency)                                      -                      -                       -
      Shire Capital                                                  978,600                969,402                 951,918
      Current Year Net Earnings                                            -                 37,294                  17,485
Total Community Equity                                            1,046,937              1,057,505               1,020,212

                                                                                                       Page 26 of 47

Section 27

GENERAL COMMITTEE MEETING AGENDA   17 FEBRUARY 2020




                                       Page 27 of 47

GENERAL COMMITTEE MEETING AGENDA                                                             17 FEBRUARY 2020

 Noosa Council                                                                                        ATTACHMENT 3
Statement of Cash Flows
For the Year Ended 30 June 2020
As at 31 January 2020
                                                                               Current             Actual               Actual
                                                                               Budget                 YTD             Full Year
                                                                                  2020                2020                2019
                                                                                ($'000)             ($'000)             ($000)

Cash flows from operating activities

     Cash Flows from Operating Activities

      Receipts from Customers                                                   85,969              55,463              92,597
      Payments to Suppliers and Employees                                      (84,340)            (45,499)             (78,821)
                                                                                 1,629               9,964              13,776
      Receipts:
      Investment and Interest Revenue Received                                   4,010               2,124               4,763
      Rental Income                                                              1,290                807                1,281
      Non Capital Grants and Contributions                                       4,976               2,830               5,447
      Income Tax Equivalent Received                                             1,200                937                1,754
      Income from Equity Investments                                             1,850                   -               1,487
     Payments:
      Borrowing Costs                                                                -                   -                    -
      Interest Expense                                                          (1,282)                (69)               (133)

     Net Cash Inflow/(Outflow) from Operating Activities                        13,673              16,594              28,375

Cash Flows from Investing Activities

      Receipts:
      Proceeds of Sale of Property, Plant and Equipment                             10                  38                 383
     Grants, Subsidies, Contributions and Donations                              7,415               4,246               5,140
     Payments:
      Payments of Property, Plant and Equipment                                (28,809)            (11,617)             (24,848)
      Payments for Intangible Assets                                            (2,063)               (938)              (1,347)
      Net Movement in Loans and Advances                                             -                 125                (625)

     Net Cash Inflow/(Outflow) from Investing Activities                       (23,447)             (8,146)            (21,297)

Cash Flows from Financing Activities

      Receipts:
      Proceeds from Borrowings                                                       -                   -                    -
     Payments:
      Repayment of Borrowings                                                   (2,264)             (2,069)             (15,290)

     Net Cash Inflow/(Outflow) from Financing Activities                        (2,264)             (2,069)            (15,290)

     Net Increase/(Decrease) in Cash and Cash Equivalents held                 (12,038)              6,379               (8,212)

     Cash and Cash Equivalents at the beginning of the reporting period         55,981              55,981              64,193

     Cash and Cash Equivalents at the end of the reporting period               43,943              62,360              55,981

                                                                                                            Page 27 of 47

Section 28

GENERAL COMMITTEE MEETING AGENDA                                                                  17 FEBRUARY 2020


7                        FURTHER REPORT     -  RAL18/0023 DEVELOPMENT        APPLICATION FOR
                         RECONFIGURATION OF A LOT (1 LOT INTO 23 LOTS) AT 28 EENIE CREEK ROAD,
                         NOOSAVILLE
DOCUMENT INFORM AT ION




Author                               Coordinator Planning, Patrick Murphy
                                     Environment and Sustainable Development Department

Index                                ECM / Application / RAL18/0023

Attachments                          1.    Plan of Survey submitted 22 January 2020



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Coordinator Planning to the Special Meeting dated 28
October 2019 and the further report to the General Committee Meeting dated 17 February 2020
regarding Application No. RAL18/0023 for a Development Permit for Reconfiguring a Lot – (1 Lot
in 23 Lots) situated at 28 Eenie Creek Road, Noosaville and:
A.                       Refuse the application for the following reasons:
                         1.   The proposal is contrary to schedule 11, part 2, section 7 of the Planning Regulation
                              2017 as the development is situated in a koala assessable development area and
                              does not avoid clearing non-juvenile koala habitat trees in circumstances in which
                              any significant residual impact of the clearing is unable to be offset.
                         2.   The proposal is contrary to the State Planning Policy as the proposed development
                              will adversely impact on koala habitat, with koala populations recognised as being
                              matters of both national and state environmental significance.
                         3.   The proposal is contrary to the State Planning Policy as the proposed development
                              does not facilitate an appropriate disaster management response and recovery
                              capacity and capabilities as the emergency access points are unable to be
                              implemented.
                         4.   The proposed development is contrary to the Overall and Specific Outcomes of the
                              Noosaville Locality Code as:
                              i.     The proposal does not provide a satisfactory pedestrian and cycle network for
                                     the future development of the area and fails to provide satisfactory linkages with
                                     the existing development in the Shire Business Centre as these are unable to
                                     be implemented.
                              ii.    The proposal fails to ensure a high level of residential amenity as it does not
                                     provide for acoustic fencing to lots 17, 18 and 19 or provide any noise
                                     mitigation measures to existing plant equipment and loading dock areas. The
                                     proposal also fails to address the future amenity of Lot 21.
                              iii.   The proposal fails to provide for suitable retention of existing vegetation to allow
                                     for future development to be within a park like setting.
                              iv.    The proposal will adversely impact on the site’s environmental values.




                                                                                                         Page 28 of 47

Section 29

GENERAL COMMITTEE MEETING AGENDA                                            17 FEBRUARY 2020


     5.    The proposed development is contrary to the Biodiversity Overlay Code as the
           proposal will adversely impact on koala habitat, does not maximise the retention of
           existing vegetation, and proposes to prematurely clear significant vegetation
           inconsistent with the needs of the community.
     6.    The proposed subdivision is contrary to the Reconfiguring a Lot Code as:
           i.    Insufficient provision has been made for walking and cycling linkages with the
                 existing development in the Shire Business Centre as the proposed network
                 and linkages are unable to be implemented.
           ii.   The proposed lot will have a significant adverse impact on the natural
                 environment and will not retain the sites natural environmental values.
     7.    The proposed development is contrary to the Natural Hazards Overlay Code as
           bushfire mitigation measures do not satisfactorily address the risk of bushfire as they
           are not envisaged by the Shire Business Centre Map and are unable to be
           implemented.
     8.    The proposed development is contrary to the draft Noosa Plan provisions, which
           reinforce the current Noosa Plan’s requirements for pedestrian/cycle links, an
           appropriate response to the site’s natural hazards and protection of the site’s
           environmental values including vegetation retention.
B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.



REPORT
1.   BACKGROUND
A report on this application was prepared for the Special Meeting on 28 October 2019
recommending that the application be refused. At the meeting a deferral motion was considered
by Council and it was agreed that a decision on the application would be deferred until 22
November 2019 to provide the applicant with the opportunity to amend the proposal to address
the grounds of refusal raised in the Special Meeting report. The grounds of refusal within the
Special Meeting report generally relate to the application’s non-compliance with the following:
   Planning Regulation 2017; (Koala Habitat)
   State Planning Policy (koala habitat and disaster management);
   Overall and Specific Outcomes of the Noosaville Locality Code;
   Biodiversity Overlay Code;
   Reconfiguring a Lot Code;
   Natural Hazards Overlay Code (bushfire);
   Traffic Management;
   Stormwater Management; and the
   Draft Noosa Plan
An on-site meeting was held with the applicant on 30 October 2019 and on 1 November 2019 the
applicant provided amended documentation to address the issues raised in the report. The
documentation included an amended plan of survey which resulted in the net loss of 1 lot. On 8
November 2019 the applicant submitted an amended version of the Bushfire Management Plan
(BMP) which was based on a further amended subdivision plan. On 11 November the applicant
submitted an amended subdivision plan to match the plan included in the Bushfire Management
Plan.




                                                                                   Page 29 of 47

Section 30

GENERAL COMMITTEE MEETING AGENDA                                            17 FEBRUARY 2020


In a letter accompanying the amended documentation the applicant summarised the changes as
follows:
   We are no longer seeking to subdivide Lots 23-25. This is reflected in the attached revised
     plan of subdivision;
   We have provided for a 4 metre wide emergency services access road in single ownership
     at the rear of lots 12-15, within the rear bushfire setback from Hofmann Drive to OS3 at
     Walter Hay Drive;
   We have extended the width of the private road servicing Lots 10-16 to provide a 10 metre
     pavement width. This delivers a 3.5 metre lane in each direction along with a 3 metre
     parking lane along the southern side of the road. It has already been agreed that there will
     not be parking alongside the northern side of the road to maintain sight lines for access to
     Lot 16;
   We have provided for a separate lot for a future transit centre in accordance with Council's
     request; we have also provided for access to this lot by way of public road with the
     dedication of the access road into the site up to and including the internal roundabout;
   We have provided for a 6 metre wide pedestrian thoroughfare easement in accordance
     with the Noosa Business Centre Character and Framework Plan in the draft planning
     scheme. This easement is situated adjacent to the eastern boundary of Lot 1 and the
     western boundary of Lots 3 and 4, and extends across open space covenant J to provide
     for future connectivity into Noosa Civic;
   We have provided for a 25 metre easement for the new north-south private road that will be
     the main street of the Village Mixed Use precinct.
A report was completed in preparation of the 21 November Ordinary Meeting. When preparing
the report it was evident that a number of outstanding issues remained and accordingly the
applicant was advised the amendments had not satisfactorily addressed the issues raised and
the application would be recommended for refusal. In response to this advice on 14 November
2019 the applicant stopped the assessment period until 29 November 2019 to hold a working
session with relevant Stockwell and Noosa Council stakeholders at Noosa Council.
Further meetings were held with the applicant on 15, 21 and 26 November 2019 to review
outstanding issues including traffic management and vehicle access, vegetation removal, koala
offsets, bushfire management, pedestrian and bicycle network and the inter-regional transit
facility.
The applicant committed to providing the updated information by 2 December 2019. At the
meeting officers advised that a minimum of 3 weeks would be required to undertake the
assessment of the new material, and a further 10 business days to allow the matter to be
reported to Council. On 2 December 2019 the applicant stopped the assessment period for 10
business days requiring a decision to be made on the application by 20 December 2019.
The additional information was provided on 3 December 2019 and did not include, as agreed,
supporting documentation to the deed of variation to the Infrastructure Agreement. This only
allowed 13 business days for the additional information to be reviewed by Council officers and
external consultants and for a report to be written and considered by Council.
The updated information included a further amended survey plan and accompanying reports for:
   Civil engineering;
   Stormwater Management;
   Bushfire Management;
   Working draft deed of variation to the existing Infrastructure Agreement; and
   Revised clearing plan



                                                                                     Page 30 of 47

Section 31

GENERAL COMMITTEE MEETING AGENDA                                            17 FEBRUARY 2020


Further correspondence was received from the applicant on 6 December 2019 regarding bushfire
management. Material supporting the proposed deed of variation was submitted on 13 December
2019.
At the time a Further Report was completed in preparation for the 20 December 2019 Ordinary
Meeting with Council’s consultants for the matter, including traffic, bushfire and stormwater
engineering, not able to undertake a full assessment of the new information and plans and
provide detailed comments to Council. Council officers were also only able to undertake a
preliminary review of the matter. There was also insufficient time to receive legal advice
regarding the proposed deed of variation to the Infrastructure Agreement.
The recommendation of the Further Report was for the application to be refused, primarily on the
same grounds as detailed in the report originally prepared for the Special Meeting on 28 October
2019. The applicant was advised of the proposed recommendation and that additional time was
required to enable full assessment of the material submitted on 3 December 2019. Accordingly
on 14 December 2019 the applicant extended the Decision Making Period until 31 January 2020.
On 10 January a further meeting was held with the applicant. Also in attendance at the meeting
were the applicant’s engineer and Council’s consulting traffic engineer. The meeting addressed
the material submitted on 3 December and primarily related to:
   Traffic/car parking management associated with a 350 metre long 20 metre wide hardstand
     area for the purpose of bushfire protection to the rear of lots 12 -15;
   The functionality of proposed emergency access from lot 23 to Eenie Creek Road;
   Stormwater management,
   Vegetation removal and the maintenance of a parklike setting;
   The acoustic impacts of existing plant equipment adjacent to proposed lots 17, 18 and 19;
   Amendments required to the plan of survey; and
   General feedback on the proposed deed of variation
On 17 January the applicant extended the decision making period until 21 February 2020. On 22
January 2020 the applicant provided further updated plans and reports allowing 14 business
days for the material to be reviewed by Council’s external consultants and for a Further Report to
be written.
Due to the changing nature of the material and concerns with the limited time to review the
material a request was made to the applicant on 24 January requesting that the decision making
period be extended until 20 March 2020. The applicant did not agree to extend the decision
making period and a decision on the application is now due on 21 February 2020.
2.   PROPOSAL
The revised information provided on 22 January 2020 details a 23 lot reconfiguration generally
consistent with the original layout with the exception of:
   Lots 17 -20 being amalgamated into 3 lots (lots 17 - 19);
   Lots 23 -25 being amalgamated into 1 lot (lot 23);
   The inclusion of lot 24 for a future transit facility;
   The inclusion of a 20 metre wide easement to the rear of lots 11 - 15 for the purpose of a
     fire buffer, stormwater, access for vehicles and emergency firefighting appliances and car
     parking; and
   4 metre wide thoroughfare easements to the west of lots 3 and 4 and adjacent to Covenant
     J and traversing Covenant J to provide connection with the existing shopping centre.




                                                                                   Page 31 of 47

Section 32

GENERAL COMMITTEE MEETING AGENDA                                             17 FEBRUARY 2020


The following information was also provided by the applicant:
   Revised engineering plans addressing lot access, road construction and reduced
     earthworks;
   Revised vegetation clearing plan;
   Acoustic report addressing the impacts of plant associated with Noosa Civic on future
     residential development of lot 17, 18, 19 and 21; and
   An amended deed of variation to the current Infrastructure Agreement
The updated survey plan is detailed below and included as Attachment 1:




                         Figure 1: Amended layout provided 22 January 2020




                                                                                 Page 32 of 47

Section 33

GENERAL COMMITTEE MEETING AGENDA                                                 17 FEBRUARY 2020


3.    ASSESSMENT

Koala Habitat – Planning Regulation and State Planning Policy
The applicant acknowledges that Council’s assessment will necessarily address the Planning
Regulation and State Planning Policy requirements for koala habitat however they remain of the
view that there is no significant residual impact resulting from vegetation clearing works on the
site. This view is based on the previous dedication of land for the purpose of open space and
recreation at the time that Stage 1 was developed.
Council officers maintain that the application does not comply with both the Planning Regulation
2017 and the State Planning Policy. These are new state requirements that address the decline
in the koala population and habitat and the previous dedication of land does not fully address the
residual impact of the new development. Given the size of the land and location of suitable non-
juvenile koala food trees, koalas are likely to utilise the area for feeding purposes. The Planning
Regulation 2017 requires development to avoid clearing non-juvenile koala habitat trees, and
where clearing cannot be avoided, the clearing is minimised with unavoidable clearing offset.
The koala habitat offset has now been assessed as being $1,149,428, after further refinement by
officers of the area requiring to be assessed.
As a consequence of the existing Infrastructure Agreement conditions cannot be included for a
monetary offset to koala habitat, therefore the proposal is unable to comply with the relevant
koala habitat assessment benchmarks. To comply with the state requirements the current
infrastructure agreement would need to be varied through a deed of variation.
Bushfire Management
The applicant has amended the survey and bushfire management plans in response to concerns
regarding bushfire management.
The area previously identified as lots 23 - 25 is now a single lot and it is proposed that a
secondary emergency access be provided via the existing Energex easement to travel north and
connect with Eenie Creek Road. A letter of support from Queensland Parks and Wildlife Services
(QPWS) was provided however made no reference to specific plans or types of works supported.
Engineering plans detailing the access were provided on 29 January 2020 and provided to
QPWS who expressed concern with the proposed alignment of the emergency access track and
associated earthworks. Further concerns relate to practical issues associated with connecting the
emergency access track with the Eenie Creek Road and the proposed route of the track running
adjacent to vegetation which has the potential to be subject to bushfire.
However, an alternative solution has been identified which is supported by Council’s consulting
traffic engineer and bushfire expert. The alternate route provides a second emergency access in
the south-west of the site to Walter Hay Drive. The access requires removal of vegetation within
the Open Space Precinct at the site’s frontage and modification of the central median strip within
the internal road to allow vehicles to exit the site in a westerly direction, away from potential fires.
The alternative solution has been raised with the applicant who has advised that they are
supportive of conditions to this effect. Notably though Council is stopped from conditioning these
works by the current Infrastructure Agreement as the works are external to the site. This could be
overcome by a deed of variation to the Infrastructure Agreement.
The applicant has also modified the survey plan in response to concerns with the proposed
covenant for bushfire management purposes to the rear of proposed lots 12 -15 by constructing a
20 metre wide hard surface to the rear of these lots. The 20 metre wide hard surface will operate
as a fire buffer and an emergency access road to be accessed by locked gates at both Hofmann
Drive and Walter Hay Drive. This area will also include car parking situated on either side of the
emergency access road to service the related lot in which the parking is situated and will only be
accessible to vehicles via access from lot frontages. Easements will govern access and car
parking arrangements. The following images detail the proposed 20 metre wide area and
associated emergency access track and vehicle parking.

                                                                                        Page 33 of 47

Section 34

GENERAL COMMITTEE MEETING AGENDA                                                17 FEBRUARY 2020




        Figure 2: Survey plan detailing 20 metre wide easements to the rear of lots 11 -15




                                                                                        Page 34 of 47

Section 35

GENERAL COMMITTEE MEETING AGENDA                                                     17 FEBRUARY 2020




                Figures 3 and 4: 20 metre wide hard surface to rear of lots 11 -15 (yellow)



The proposed emergency easement to the rear of lots 11 -15 is generally supported and will
result in works to connect the emergency access road to Walter Hay Drive noting that there is a
significant difference in levels between Walter Hay Drive and the boundary of lot 11. These works
are external to the site and would require amendment to the Infrastructure Agreement.
It is also noted that the applicant has amended the extent of fill to the rear of lots 11 – 15 and
reduces the extent of fill from approximately 5 metres to approximately 1.8 metres at its highest
point.
Road layout and lot access
A number of concerns were raised in the original report regarding road layout and access to lots.
The applicant has provided amended engineering drawings which have been reviewed by
Council’s traffic consultant. In summary Council’s traffic consultant advises that the outstanding
matters regarding the road layout and traffic access have been resolved, subject to conditions.
Lot for Inter-Regional Transit Facility
The amended plan of survey provides for a separate lot (lot 24) for the future transit use, with an
area of 4912m2. The applicant also proposes to dedicate the new road to the east of lot 24 to
Council to facilitate access to this lot, which would be sufficient to accommodate bus and
pedestrian access to the future transit centre. The issues raised in the original report regarding
the transit facility are considered to be resolved by this amended plan.
Pedestrian and Cycle Network
The amended survey plan provides for a 4 metre wide pedestrian thoroughfare easement
adjacent to the full extent of lots 3 and 4 and across Covenant J. The applicant has proposed 2
separate easements across Covenant J, but only 1 x 6 metre easement is required.
The applicant has identified that suitable pedestrian connectivity is available via an existing
pathway to the west of lot 23 to Noosa Civic. The applicant has proposed connectivity from lot 23
to the existing pathway.


                                                                                              Page 35 of 47

Section 36

GENERAL COMMITTEE MEETING AGENDA                                               17 FEBRUARY 2020


The applicant has also agreed to improve pedestrian connectivity between the existing
commercial building and Hofmann Drive by constructing a small link section between the existing
building pathway and the Hofmann Drive pathway. This includes works external to the site
therefore variation to the existing Infrastructure Agreement is required.
Vegetation Removal
The proposed extent of vegetation removal has been amended and reduced to now only include
the areas required to be filled to facilitate road construction and services.
The revised clearing plan demonstrates that vegetation is proposed to be cleared from lots 4 -6,
8 – 16 with some vegetation removed to the front of lots 17 -19 and within lots 2 and 23. The
applicant had proposed to maintain a 6 metre wide strip of vegetation to the frontage of all lots
however due to stormwater management is now proposing to retain a vegetated strip to the
frontage of lots 6, 9 and 10 and 6 metres wide of replanting to the frontages of lots 4, 5, 6, 15 and
16. A copy of this plan is detailed in the figure below:




                                   Figure 5: Amended clearing plan

                                                                                     Page 36 of 47

Section 37

GENERAL COMMITTEE MEETING AGENDA                                                17 FEBRUARY 2020


Six metres of retained and replanted vegetation is intended to facilitate the parkland setting
envisaged by the planning scheme to an extent.
Acoustic impacts
The applicant has prepared an acoustic report assessing the noise impacts of the existing Noosa
Civic loading docks and traffic noise from Hofmann Drive on lots 17 – 19. The draft planning
scheme identifies these lots as being suitable for high density residential development. The
report identifies that noise generation in the loading dock will come from trolley collection,
delivery trucks, mechanical plant and the compactor. The report recommends that future
development carry out detailed assessment to ensure that the identified noise sources are
adequately addressed and acoustic treatment to facades applied to ensure compliance with
indoor noise levels. The report does not recommend noise mitigation works be carried out as part
of the subdivision of the land.
The report has been reviewed by Council’s Environmental Health Coordinator who has
recommended that if an approval were to be issued a condition should be included requiring all
existing noise generating equipment within Lot 1, such as mechanical plant or equipment, air
conditioning units, garbage collection areas or similar, trolleys, delivery trucks, and vehicle traffic
be modified in such a way so as to protect the acoustic privacy of future residents of lots 17 -19.
The condition would require that noise levels generated by any of these activities or equipment
not exceed a LAeq 15mins 5dB above background noise at the closest sensitive receptor point.
The applicant’s position that acoustic treatment to future buildings be addressed at the time of
future development is not supported as it is not appropriate to only require future development to
incorporate sound reduction construction methodologies. It is recommended that noise mitigation
occur at the time new lots are created and in this regard it is recommended that a condition be
included on any approval requiring the construction of a 3 metre high acoustic wall to the
boundaries of lots 17 – 19 and 21 where they abut lot 1.
Further noise mitigation measures may also be required as part of future construction of the
residential development.
It has also been identified that noise generation from lots 10 -16 which are zoned Innovation
Zone in the draft planning scheme is likely to impact on the current and future residential uses on
Hofmann Drive. To mitigate this noise an acoustic fence may be required to the western
boundary of lot 15, but as the noise mitigation device is limited to one lot this could be part of a
future application over this lot.
Stormwater
The extent of earthworks has been amended and results in the maximum extent of fill reducing
from approximately 5 metres to approximately 1.8 metres. The change in levels has required
amendment to how stormwater is managed and accordingly a revised Site Based Stormwater
Management Plan (SBSWP) has been provided and reviewed by Council’s consulting hydrology
engineer. The amended SBSWP addresses the concerns raised in the original report including
the removal of all devices from covenant areas, detailing stub connections and removing flows
from lot 7 into a bio-retention basin and also satisfactorily responds to the changes in surface
levels.
Lot sizes
The original report raised concern with the size of proposed lots 6, 9 and 23. As lots 23 -25 have
been replaced with one lot the concern regarding the size of lot 23 has been addressed. The
applicant has also provided further information on the developable areas within lots 6 and 9 and it
is acknowledged that sufficient area is provided within these lots to accommodate future
development. It is noted that 11 of the proposed lots do not comply with the minimum lot size of
the current scheme however these lots comply with the lot size provisions within the draft
scheme.



                                                                                       Page 37 of 47

Section 38

GENERAL COMMITTEE MEETING AGENDA                                               17 FEBRUARY 2020


Infrastructure Agreement
In 2003, the applicant entered into an Infrastructure Agreement which in part provided for
infrastructure items to be provided by the applicant. The applicant notes that these items
included:
    Dedication of approximately 11ha of public open space
    Duplication of Eenie Creek Road Stage 1
    Construction of Walter Hay Drive extending the Sunshine Coast Motorway from Emu
      Mountain Road to Eenie Creek Road (by the applicant and the State Government)
    Dedication of 6ha of land for the construction of Walter Hay Drive
    Construction of bike and pathway network linking the NBC to the local network (by the
      applicant and Council)
The agreement provided that there would be no requirement for contributions to be paid (by way
of conditions imposed on any application) nor pay infrastructure charges associated with the
future development of the land provided that the intensity of development of a future stage did
not exceed that envisaged by MasterPlan 2 (MP2). Furthermore, the Infrastructure Agreement
prohibits Council including conditions on any future application requiring further dedication of land
or works external to the site.
The applicant has provided a deed of variation which proposes to vary the existing Infrastructure
Agreement by:
    Insertion of a new clause stating that the intensity of development contemplated by the
      Draft Framework and Character Plan in the draft Noosa Plan does not exceed the intensity
      of development contemplated by Master Plan 2. The implication of this clause is that
      infrastructure charges could not be levied against future development of the land which
      complies with the Draft Framework and Character Plan, noting that the draft Framework
      plan is at a scale that provides overall intent however no detail regarding the scale of
      development permitted.
    Insertion of a new clause stating that previous dedications of Open Space fully offsets the
      residual impact of any clearing of koala habitat trees to undertake development of the Shire
      Business Centre as contemplated by MP2 (and where, to the extent relevant, amended by
      the Draft Framework and Character Plan);
    Dedication of lot 24 for the transit facility and dedication of the new public road to provide
      access to the lot at no cost to Council; and
    Insertion of new clauses to facilitate the dedication of land and conditioning of the
      subdivision to undertake works prohibited by the current Infrastructure Agreement,
      specifically:
      o     Design, construction and dedication of a small section of land as a public road to
            provide access to the transit centre lot at no cost to Council;
      o     Design, construction and dedication of the Hofmann Drive extension as a public road
            at no cost to Council;
      o     Provision of a 4 metre wide pedestrian thoroughfare easement adjacent Covenant J;
      o     Facilitation of emergency access to Walter Hay Drive from lot 11;
      o     Facilitation of emergency access to Walter Hay Drive from lot 23;




                                                                                      Page 38 of 47

Section 39

GENERAL COMMITTEE MEETING AGENDA                                                17 FEBRUARY 2020


Intensity
It is the applicant’s position, based on their own traffic assumptions, that the intensity of the
development contemplated by the Draft Framework and Character Plan in the draft Noosa Plan
is comparable to the intensity of development contemplated by Master Plan 2. The applicant’s
position is not agreed with as the draft scheme currently envisages a greater level of intensity of
development than MP2.
Council’s Infrastructure Assessment Coordinator has undertaken a review of the intensity
envisaged by MP2 and compared it with the intensity permitted by the draft planning scheme
based on gross floor area and impervious area differences. The Coordinator has then calculated
the difference in infrastructure charges payable under MP2 and the draft planning scheme using
the applicant’s assumption of how the site might develop in the future. Based on the applicant
assumptions the difference in infrastructure charges payable would amount to approximately $4
million. However, if the highest and best use for the lots is assumed the future Infrastructure
Charges payable could amount to approximately $10 million. Signing the current deed of
variation would mean that Council would forego these Infrastructure Charges with future
development of the land.
Dedication of Lot 24 for Transit facility/Koala offsets
The proposed dedication of lot 24 for a transit facility satisfies the long term planning for the Shire
Business Centre to include such a facility to support public transport in the Shire. The dedication
of this land offers significant benefit to the community and in the absence of the proposed
dedication of the land through the deed of variation, Council may be required to purchase this
land in the future for the purposes of a transit centre.

Required Works to support the proposed subdivision layout and bushfire management
requirements
The deed of variation includes all relevant matters that Council is stopped from conditioning
under the current Infrastructure Agreement with the exception of one of the emergency bushfire
access points to Walter Hay Drive and footpath connection from Hofmann Drive. The deed of
variation also refers to the unsupported Eenie Creek Road emergency access point. The
proposed wording in the deed of variation around the works required is also on the basis of the
works being satisfactory to both parties and in accordance with the conditions imposed on any
approval. For clarity reasons, it is preferred that the wording be amended to include the actual
conditions to ensure that the deed encapsulates the specific works required.
Other
The ‘Background’ section of the deed of variation includes statements to the effect that the
proposed development is consistent with the draft Noosa Plan. These statements are detailed
below:
E.      Stockwell’s development application for reconfiguration of a lot responds to the Draft New
        Noosa Plan and has been designed to accommodate development in accordance with the
        Draft New Noosa Plan.
F.      The parties have agreed to amend the Infrastructure Agreement to align with the
        development intent for The Land as set out in the Draft New Noosa Plan, in accordance
        with the terms and conditions set out in the deed.
As the application does not satisfactorily address the draft scheme’s objectives with regard to
vegetation protection and minimising adverse impacts on koalas and their habitat it is not agreed
that the application in its entirety is consistent with the draft planning scheme. Further, Council’s
planning solicitor has advised that this wording would be problematic for Council in the event the
applicant appealed any conditions of approval. Therefore these proposed clauses are not
acceptable and should be deleted.



                                                                                       Page 39 of 47

Section 40

GENERAL COMMITTEE MEETING AGENDA                                           17 FEBRUARY 2020


The matters of concern have been relayed to the applicant and a request was made to extend
the decision making period to provide sufficient time for the issues associated with the deed of
variation to be resolved. On 3 February 2020 the applicant advised that they were not agreeable
to a further extension however sought to continue to work with Council officers to rectify the
issues associated with the deed of variation. In order to meet the decision making timeframe set
by the applicant it was not possible to satisfactorily resolve the issues around the deed of
variation at the time of writing this report.
In the absence of a deed of variation Council is unable to issue an approval that includes
conditions addressing works external to the land and resolve the koala habitat offset
requirements, given the current limiting Infrastructure Agreement provisions.
Changes to planning framework – South East Queensland Koala Conservation Strategy
2019 - 2024
The Nature Conservation (Koala) Conservation Plan 2017 was amended by the Nature
Conservation and Other Legislation (Koala Protection) Amendment Regulation 2020 SL No. 9
and commenced on 7 February 2020. The amendments included changes to the Environmental
Offsets Act 2014, Nature Conservation Act 1992, Planning Regulation 2017 and Vegetation
Management Act 1999. The purpose for these amendments was to bring into effect the South
East Queensland Koala Conservation Strategy 2019-2024 and the associated statutory mapping.
The new planning framework implements new clearing restrictions, prohibiting clearing of koala
habitat areas (KHA) within Koala Priority Areas (KPA). The State Government will assume
responsibility for assessing development proposing clearing of koala habitat areas outside Koala
Priority Areas, against a new State code for Development in South East Queensland Koala
Habitat Areas. For developments that don’t involve clearing of koala habitat but are within Koala
Priority Areas, the Local Government is required to assess the proposal against new assessment
benchmarks. A number of exemptions apply to clearing of KHA in KPA including a one off
clearing of 500m2 for residential use, essential management including bushfire, native forestry
harvesting and access tracks.
Under the new South East Queensland Koala Conservation Strategy 2019-2024 mapping, the
Shire Business Centre site has no mapped koala habitat areas but the north eastern portion of
the lot is within a Koala Priority Area. As such, if an application was lodged today, the mapping
excludes any requirements for the proponent to provide environmental offsets in accordance the
Environmental Offsets Act 2014. The assessment benchmarks which would apply if an
application were made under the new framework would require the proponent to ensure a safe
koala movement measure, and includes providing opportunities for koalas to feed, disperse and
seek refuge; or reducing threats to koalas.
The current State Planning Regulatory Provisions for Koala Conservation still apply as the
application was properly made prior to the commencement of the Nature Conservation and Other
Legislation (Koala Protection) Amendment Regulation 2020 SL No. 9 (Section 29).
Whilst the State planning framework for koala habitat protection has changed it is important to
note that the provisions of the Noosa Plan’s Biodiversity Overlay also apply to the site and
includes outcomes which seek to protect koala habitat but where clearing is unavoidable
minimise the clearing and provide a biodiversity offset.
The entire site is subject to the Biodiversity Overlay, with the site’s vegetation identified as
Environmental Enhancement. The Biodiversity Overlay seeks to protect vegetation from the
impacts of development and includes the following outcomes:
Specific Outcome O1
Vegetation of local origin on premises identified as—
…….
b)  Environmental Enhancement Area on Biodiversity Overlay Maps OM1.1 – OM9.1, is
    protected from the impacts of development by—
    i.    avoiding edge effects;

                                                                                  Page 40 of 47

Section 41

GENERAL COMMITTEE MEETING AGENDA                                              17 FEBRUARY 2020


     ii.    avoiding fragmentation; and
     iii.   maintaining vegetation in manageable and viable configurations.
Specific Outcome O2
For the purpose of Reconfiguring a Lot new lots are only created where they minimise the
fragmentation and maximise the retention of existing vegetation.
Specific Outcome O7:
Development is designed, constructed and operated to—
a)   avoid adverse impacts on koalas and koala habitat;
b)   provide measures to assist the survival of koala populations in the area to mitigate any
     potential threats or risks to koalas;
c)   provide for safe and appropriate koala movement across the landscape; and
d)   provide for a net gain in mature and actively regenerating koala habitat.
Specific Outcome O11:
Habitat trees (including dead trees) and recruitment habitat trees are protected for native fauna
habitat, where practicable.
The application has not demonstrated that these outcomes are achieved as it is proposed to
completely clear lots 4 - 6 and 8 – 16, with the exception of 6 metres of vegetation to the front of
lots 6, 9 and 10. Clearing will also occur on the remaining areas of the site when the lots are
developed and/or further subdivided. As such, the proposal will adversely impact on koala
habitat, does not maximise the retention of existing vegetation and proposes to prematurely clear
significant vegetation.
The site is covered by the Biodiversity, Waterways and Wetlands Overlay in the draft Noosa
Plan. The Biodiversity, Waterways and Wetlands Overlay Code in the draft Noosa Plan also
reinforces the outcomes sought under the current scheme and includes outcomes which seek to
minimise adverse impacts on koalas and their habitat.
4.   COMMUNITY INTEREST
The application is subject to code assessment and therefore is not subject to public notification.
The Planning Act 2016 limits the assessment to the assessment benchmarks within the planning
scheme and matters prescribed by regulation (i.e. State Planning Policy). There is no opportunity
for Council to consider any other relevant matter, including submissions.
Nevertheless due to the significance of the application and visibility within the media
communication has been received raising the following issues:
   Impact of the development on existing residential development within Hofmann Drive;
   The proposed development will result in the loss of a significant amount of native
     vegetation and will impact on wildlife, particularly koala habitat;
   A decision on the application should not be made whilst legislation and policy reform are
     likely in Queensland;
   Not appropriate for residential development adjacent to noisy loading dock which contains
     powerful industrial lighting;
   Hofmann Drive is a No-Through Road and it is not appropriate to direct traffic from a major
     arterial road down a quiet residential street. Heavy and commercial vehicles will use the
     extended Hofmann Drive as will vehicles using it as a short cut;
   Council should purchase the land for conservation purposes;
   Laws will be changing regarding residential development in bushfire hazard zones;
   Lots too small and not enough car parking



                                                                                     Page 41 of 47

Section 42

GENERAL COMMITTEE MEETING AGENDA                                            17 FEBRUARY 2020


5.   CONSULTATION
The application was forwarded to the following internal Council officers:
   Strategic Planning
   Environment Officer
   Coordinator Engineering
   Asset Infrastructure
   Environmental Health
The application was also reviewed by external consultants with regards to traffic management,
stormwater and bushfire management. Their assessment forms part of this report.
6.   CONCLUSION
Consideration of this application was originally set down for a Special Meeting on 28 October
2019. At the meeting a deferral motion, which was requested by the applicant, was considered
and agreed to by Councillors. The motion deferred consideration of the application to 22
November 2019 to allow Council staff to undertake further discussions with the applicant in order
for the matter to be considered at the 21 November Ordinary Meeting. On 1 November 2019 the
applicant provided an amended survey plan and supporting documentation to Council.
Prior to the 21 November Ordinary Meeting the applicant was advised that the amendments had
not satisfactorily addressed the issues raised and the application would be recommended for
refusal.
Over the following months the applicant provided additional information which was reviewed by
Council’s officers. Despite numerous meetings and discussions with the applicant the additional
information failed to fully resolve all of the issues identified by Council officers. These issues
primarily related to koala offsets, bushfire management, vehicle access and the deed of variation
to the Infrastructure Agreement. Incremental extensions to the decision making period
accompanied the amended information provided by the applicant.
The updated information provided by the applicant on 22 January 2020 has now resolved a
number of the outstanding issues in relation to the proposed subdivision layout, with the
exception of addressing the sites significant koala habitat. However, due to the existing
Infrastructure Agreement Council is prohibited from including conditions relating to dedication of
land and works external to the site and payment of a monetary contribution to offset koala
habitat.
The applicant prepared a deed of variation to the Infrastructure Agreement however the deed
includes provisions which are not supported based on the following:
   The deed includes provisions stating that the intensity of the development permitted under
     the draft planning scheme is not greater than that envisaged by MP2. This position is not
     supported, noting that calculations by Council’s Infrastructure Assessment Coordinator has
     identified that development under the draft planning scheme would be of a great intensity
     than envisaged by MP2. Accepting that applicant’s position would result in Council
     foregoing approximately $4 – 10 million in Infrastructure Charges.
   The deed proposes a clause which seeks to acknowledge that previous dedications of
     Open Space fully offset the residual impact of any clearing of koala habitat trees to
     undertake development of the Shire Business Centre as contemplated by Master Plan 2.
     This position is not supported as previous land dedications are insufficient to satisfy the
     current offset requirements.
   The deed includes statements to the effect that the proposed development is consistent
     with the current and draft planning scheme. This is not agreed with.
   The deed does not adequately detail required works for the subdivision and the provisions
     should include the actual conditions.


                                                                                   Page 42 of 47

Section 43

GENERAL COMMITTEE MEETING AGENDA                                                   17 FEBRUARY 2020


     The deed does not include all works which Council is prohibited from conditioning under
       the current Infrastructure Agreement.
     The deed annexes an outdated survey plan.
In the absence of a suitable resolution of issues it is therefore recommended that the application
be refused.

Departments/Sections Consulted:

     Chief Executive Officer   x   Community Services                          Corporate Services
     Executive Officer             Director                                    Director
     Executive Support             Community Development                       Financial Services
                                   Community Facilities                        ICT
                                   Libraries & Galleries                       Procurement & Fleet
                                   Local Laws                                  Property
                               x   Waste & Environmental Health                Revenue Services

     Executive Services        X   Environment & Sustainable Development   x   Infrastructure Services
     Director                  x   Director                                    Director
     Community Engagement          Building & Plumbing Services                Asset Management
     Customer Service          x   Development Assessment                      Buildings and Facilities
     Governance                    Economic Development                        Civil Operations
     People and Culture            Environmental Services                      Disaster Management
                               x   Strategic Land Use Planning             x   Infrastructure Planning,
                                                                               Design and Delivery




                                                                                            Page 43 of 47

Section 44

Page 44 of 47

I .                                                                                   ATTACHMENT 1           = 9
     Fe                                                                                                      e|   | >
     bas                                                                                                     SJo}   2
     fae                                                                                                     Sia    w
gm] 52                                                                                                       2    _         oo
zeit                                                                                                           7K! oO}
                                                                                                                NEMS!       S
                                     Scale 1:4000 — Lengths are in Metres.                                               7  3
                      Lol        l     |     Poop ff                                                                    —|  3
                     50    0    SO     OO   so   200   250   xO    350  400   450   500   550                     2\|oli—
                                      I     I                                                                a}   jaja    uO
                                                                                                             3      *     a
                                                                                                                     vt   ee:
                                                                                                             _            rs
                                  yy,                                                                        Shu   Je I
                                  as                EMT AB                                                      3.
                      22                   Rey      Pa ge emt                                                    =
                                Bee,      OJ         745m?                                                         &
                   nz                   §  &   +             ac   RRS             D                             = E          2
              See Diggram D [,          : Boo 70         £989?      i        goa      —                            °         5
                   Sheet a         /   ss  Rize.  Q                 [            —_—               (47             2?     yt é
                   —_——         4  { Wy}     Bp    2k,              i       —_—                                    F2     Se
                           SP246584 iS s      ©    a          oe                                  NPWEED        wae TER TLS
                                 INS                   4   omnes    oe                                          ems ten ccd
                             ——    Q 4                  VS SP16 7978 NN          See E26)                          338 gins
                          a“       9g   Sy               ¢ G18m?      ”                   _——.,                    oO stcs
                       —      otcr,      a  f-          _           ‘,                                             £ea8 2605
                            ot  SS,      + _<              aa                   é   =             ~                 BEG EES
                           g <S       pon   fs                           ~~     See Diagram C|                     g $2 sa:
                           a>}    Sooo   a     ao                                              |                   5  Got7ds
                   /     gil ™         /         >                          a        Sheet 3   3]y .               Rat SSlE
                  i ke?    JVS-    Aes            Ss                °           3      23     [® | (Emt.D
                 / | Sy  i, fa — 4                \. m3   >             Oe EMT.               FS    55L5m*)
          CovAb } i=    if,    A   \ \_ EmtP         S}    =               Op                 ;    a
                      mee ff!      ~      r                SS              .    ”             ie  fe
        szze9e2 4
5	1	1	1	37	3	462	1319	3	20	92	|
5	1	1	1	37	4	483	1304	30	46	52	By
5	1	1	1	37	5	556	1313	12	33	41	|
5	1	1	1	37	6	718	1337	19	3	50	os
5	1	1	1	37	7	838	1305	42	46	5	SP
5	1	1	1	37	8	880	1305	87	46	0	(R2880
5	1	1	1	37	9	1034	1304	42	46	27	So
5	1	1	1	37	10	1217	1318	41	18	53	SS
5	1	1	1	37	11	1412	1327	6	10	88	}
5	1	1	1	37	12	1766	1316	104	18	0	hp
4	1	1	1	38	0	425	1328	1528	45	-1	
5	1	1	1	38	1	425	1354	14	14	29	L
5	1	1	1	38	2	503	1353	6	17	29	fag
5	1	1	1	38	3	516	1335	55	46	5	Vs
5	1	1	1	38	4	585	1341	122	27	5	———_
5	1	1	1	38	5	882	1340	3	6	66	‘
5	1	1	1	38	6	1070	1334	41	28	0	Se
5	1	1	1	38	7	1141	1333	32	24	0	P
5	1	1	1	38	8	1205	1340	35	25	48	SS
5	1	1	1	38	9	1425	1338	4	4	0	,
5	1	1	1	38	10	1544	1340	5	6	0	:
5	1	1	1	38	11	1681	1337	16	26	79	\
5	1	1	1	38	12	1760	1328	79	45	0	Sh
5	1	1	1	38	13	1933	1345	20	19	13	S
4	1	1	1	39	0	454	1341	1494	99	-1	
5	1	1	1	39	1	454	1341	28	99	0	sg
5	1	1	1	39	2	554	1368	37	43	27	Sh
5	1	1	1	39	3	618	1368	139	38	59	EmtO
5	1	1	1	39	4	787	1364	45	23	23	~~
5	1	1	1	39	5	856	1371	105	19	24	teaser
5	1	1	1	39	6	1022	1358	17	73	81	|
5	1	1	1	39	7	1110	1348	32	63	37	te
5	1	1	1	39	8	1181	1356	93	53	19	Sgt
5	1	1	1	39	9	1277	1366	49	50	37	gs
5	1	1	1	39	10	1354	1371	48	34	61	V4
5	1	1	1	39	11	1571	1375	6	7	34
                                                                                        1,   Jefe     8
            on     AWA    Cour.                                      es             pr      XS        S|       a8
              —      ‘4 il) SP eppaas  Nea 7981233            “Ue  tend                 }    .  &     gs        on
          aaa      1 3    iy  ov.                   ces            f                                   .       a5
         SPO6EBE? -) Qt |": coimoags           12-302 ha          amy  A\ >        P       —*  |               ec .
           6 —\       44,  2009 m=                    emt am |        4, }        oo  tmtV                      un
         spats      Le    ec                                 .           7        bee      “|e                 22    4       a
        sezéesey  it) & Url. Oy                    —   9m              4%,            SP 18286               wtt     H-      =
       5         rey   OOO ooq |               EMT AM            K                i                          Z6§8    AD      5
   SPLE4E47  17          o        8    EmtN     206 m? ip          “~      fF       ~         .              = a8    &S      é
        —__||        _   &          nase                               4,  d          ,     4,               ew        Ss.   5
               /    -.    }      Liye  SP 192396                                      }      Ap-.,           5        c= 2
                                                0                                     i         \
5	1	1	1	51	4	2044	1693	24	8	32	=
5	1	1	1	51	5	2098	1684	38	13	23	70
5	1	1	1	51	6	2254	1688	20	16	93	=
5	1	1	1	51	7	2320	1681	20	18	70	a
4	1	1	1	52	0	333	1681	2008	57	-1	
5	1	1	1	52	1	333	1700	17	24	68	a
5	1	1	1	52	2	415	1695	6	39	43	|
5	1	1	1	52	3	744	1704	34	27	38	Se
5	1	1	1	52	4	1000	1687	168	51	0	LOSS
5	1	1	1	52	5	1190	1679	69	63	0	EMT
5	1	1	1	52	6	1258	1679	62	63	67	AL
5	1	1	1	52	7	1831	1699	8	8	0	.
5	1	1	1	52	8	2044	1699	92	36	49	Sve
5	1	1	1	52	9	2183	1690	158	42	0	S$bet.
4	1	1	1	53	0	277	1710	2063	54	-1	
5	1	1	1	53	1	277	1716	120	48	0	SP244573
5	1	1	1	53	2	412	1736	3	17	78	|
5	1	1	1	53	3	421	1716	38	48	53	,_|
5	1	1	1	53	4	612	1736	5	5	0
                                 =    Se           S.   We   i0rm:             7             :    %e         ays     5522
                ho}   63    ‘           >,      oN"         Port                            h      =         A-N      BNEBE
                rd     ~          oe      Sehr’ 69 2                       ?         |     ine                    au“ J4vess
               | ge) SP222982 \ A Re    >       Voit                       %         ;     Wo                Gaines oes
               les}             ’      2g         5                        3     wy |   wy)     >            mera cts ss
               } jimté       ?    :         P                              ,        |   S/!       2°         OLiee2eck
               | | eezis933         eg                   4.191 ha                yf}    S|                   giv 7 5eSsas
                 ;      “   a                               ‘or           é         |                             —rmveassZe
              |e}             CP               fi EMT AO    Total               &l |    Q)/:                 agleoGacS
              | |       A, eoamememe    2     d            50) Ar                yy        |
          —   |  ho ey     \secesese Ny       ff  ts9me £59) hao                          ih     .
         Emt F    A” PTT           i |    b  f=                   4         , 2    |      Hi     3
                ww     iI          i    P  Lf     O               C      0         f     {|
               3   A         Emt 4]   ¥ >}                   a a                 /       i        7            =          2
         SP222GBI      |           /i   A, @                   oy   fs   we       id     ip
              saegny       sp28saae |      ;               $y eee               Hd.      fl
                                             Ny                 4                                                         =
            RP2IS9II               ,        »  %,        soa     Chk  €       sao        } *   RPIG7EZ                    a
             Sret                  i>            -      sf    q       :      /      ~    |
             Emt &                  &               ro        b               “     £    |
                   .               {Sy      fi                 2                   05                           a
            SP222983                4       8 £   -c00             p      ~    ys    |  | -———_                2
                                            :           be        ee               x     :        —             D
                                            That         ap              hs)                                    g.,|      2
                              val {Ua                eit                   te       If                         83)
                                            %           Q       Ss         -         ,iy                           _       =
                              ga!   }         a   OX    “         ©           2   . jays         2             _          2
                             Se     | MIB        peer’            Pome,           BF            |              sz}        6
                                ey    XM                                 Bs        1G}         RPOGRS          g a        §
                                   l                         -    “ee              | s/s                           a
                                           ap                    25  thts          | §}                         8 6    ls
                                     5050     J                 “Sig>              NG]       ©               r2Ol:
                                         sr                                     ay]          &               zNO|-
                                      9:50"             fm                      c/   fs      é               o        £
                                     eT  en           y       + op             ey    |       S
                                   Cov.k      >        Ro %      “29             eho |      Qo
                                  seizes |     WON   LE AF                                                          c
                                               3        A                                                           5
                                            sp1a2845 | * |              3                                           &
                                                    /                                                               »
                                                   i      /                                                             E
                                                   '    /            SPE s                                       5  5   £3
                                                   /                                                             o
                                                                                                                i        o
                                                                                                                 5  Pain
                                                                                                                -   Sean
                                                                                                                 &    Ser
                                                                                                                es bRse
                                                                                                                2F Go .23
                                                                                                                 are, 5a
                                                                                                                oH Snr:
                                                                                                                 oMneees
                                                                                                                5sEL ass
                                                                                                                 epee Pe
                                                                                                                2 pete
                                                                                                                 SSEEst
                                                                                                                TEecauv
                                                                                                                 SESESS
                                                                                                                aoseoa

                                                                                                        Page 44 of 47

Section 45

Page 45 of 47

™             m                                                                        Sheet lot
                    mo                 a=      Se s =                             =~                                    .       ae
                  ~ = Q                D> +      4 ay                                                          t,   Re Be       ABW 09 446 65) 598
                  =     S 4           bee      ma                                                              Rh   Ge  ah
                  is                                 I>                                      =       ae hi
                  %&    3 >            3 -     I>    °o             3            eae     SE            oN ab, = .       a. Brcvare
                  3 >     N “a a tony     .    ve         3         3 9          we      ——   yg >»   «Ss ba      4        .    gl
                  % =      :    Em} Cc =f.       i         \          v           . B-i    ak 7 We Sea  _ a se         ey     PF ett
                    e\\        “41.2                    _~\         Soho | Bera                   Seer”
                rT      \   4                |               5      G            “ es      fie \ .  .    Py   \  :   hb     pars ae),
                           ‘          .                               \           a                   we    2, Gane   Suny te)
             : z    ; a) 1             >                    ack       e          oF   we    ‘s NA         (    oe ¢ nD        2510"
                -         ‘         A=                         1                        (+   gly”    amen    aie ween   nt ~.5e,
             x            4             Hh                   ,                    ay         =      DS VO nn tagtig:    1) ia  ee
                          j            ~ p}               Q        ws             N        p        JO      ee oN Ne »,_ Sp, t0-
             32>                       3°;              '                        ih    “2, We   2         em SN           Aes”      CS
              ~ ~< *s  5             &     ?           $7 °  eo                  x d   a"      :   “ CoN: katy. j  wa   oO   *
                    s                  Post                            85         a 2   igh     f   683 Ns    hy          ny ca
              ~     \                  propos                      —i>      |           eee                       ws   tee.
   g           o™!                  a            x                 mR  8S        OREN                    .    ¥ 3    eee
   g.     / 8       N             (grow              y            VN.             Ben?” Se                    af LR                 >
   &           e                 .             Pf                 ae             +        Lo        ORNs 8                          .
                /   i=          g                              faa               aa WKY                                   U :          g
Sa a       :          YN        :  j         fy 3                 3 >             e ae eS Se ¥         iy f   e           Zz ; >    a é.
             K             c eR              5* § }   - oa          G)                   sok RS. iy Ne                     A           s
                 ty        Rem    +      eT        b                                ,    ge Foes vo >                D’   £         gE”
                 aS        y=      De      oF    ey                                     Oe owt Ae Re      ~ *   :    i?  d             |
                           3          :     rN        eS                         fe            ao.                       OE         5
        .        So     \ %       A      Ay  SO@e    >                            iS   Ye     : @ os: we           iP    =          o 5
       m         He 3     »       Q    —_ } S     _    : rn        m                                                                -_
                 DIS       ’      &          RY                  ‘                                                                  5
    » =          338"     \       SO,        >     AL       =                                            ,                             :
    i            ‘Ea        NLA                 fo           eee                              Bo        SS                          st 3
    I>             »       VAS) Ua            ts         ,   Lb                               &2            i                       =F
     ““          Way           ae              © O/\          wo”                             Sade         See         me           Ye
                      Sp
5	1	1	1	38	2	979	1536	26	32	0	G
5	1	1	1	38	3	1296	1534	79	28	10	pM
5	1	1	1	38	4	1495	1506	57	44	23	o
5	1	1	1	38	5	1618	1556	4	5	0	2
5	1	1	1	38	6	2520	1547	5	6	0	,
5	1	1	1	38	7	2635	1541	101	38	1	~§
5	1	1	1	38	8	2880	1564	7	21	0	:
5	1	1	1	38	9	3032	1541	31	28	1	i
5	1	1	1	38	10	3083	1537	40	60	46	nf
5	1	1	1	38	11	3208	1539	81	48	45	Ba
4	1	1	1	39	0	916	1547	2369	80	-1	
5	1	1	1	39	1	916	1551	43	56	21	Py
5	1	1	1	39	2	981	1564	8	27	38	So
5	1	1	1	39	3	1013	1572	23	34	45	3
5	1	1	1	39	4	1173	1580	23	21	35	5
5	1	1	1	39	5	1262	1562	16	27	24	cf
5	1	1	1	39	6	1313	1569	9	34	88	\
5	1	1	1	39	7	1341	1586	21	38	75	3
5	1	1	1	39	8	1466	1561	34	65	36	is
5	1	1	1	39	9	1640	1576	30	22	17	a
5	1	1	1	39	10	1791	1547	86	49	58	~
5	1	1	1	39	11	2912	1597	43	22	50	i
5	1	1	1	39	12	3021	1566	46	37	27	ww
5	1	1	1	39	13	3212	1623	11	4	0	;
5	1	1	1	39	14	3266	1589	19	23	76	&
4	1	1	1	40	0	932	1589	2295	87	-1	
5	1	1	1	40	1	932	1601	27	29	59	©
5	1	1	1	40	2	979	1589	50	50	60	88
5	1	1	1	40	3	1121	1596	109	53	43	Say
5	1	1	1	40	4	1322	1604	161	47	0	\'i/O
5	1	1	1	40	5	1939	1597	35	68	42	se
5	1	1	1	40	6	2511	1636	89	14	14	oy
5	1	1	1	40	7	2747	1601	54	45	82	>
5	1	1	1	40	8	2944	1617	67	59	53	/Y
5	1	1	1	40	9	3033	1623	90	38	42	I>
5	1	1	1	40	10	3208	1647	19	16	0	f
4	1	1	1	41	0	930	1635	2289	98	-1	
5	1	1	1	41	1	930	1648	19	32	69	a
5	1	1	1	41	2	979	1635	50	57	85	38
5	1	1	1	41	3	1122	1648	31	28	54	%
5	1	1	1	41	4	1173	1638	93	63	53	38.
5	1	1	1	41	5	1335	1653	9	34	93	\
5	1	1	1	41	6	1423	1635	45	68	16	®
5	1	1	1	41	7	1975	1649	126	84	48	SS
5	1	1	1	41	8	2702	1665	30	59	37	bs
5	1	1	1	41	9	2830	1676	5	5	0	_
5	1	1	1	41	10	2919	1667	72	43	26	em
5	1	1	1	41	11	3064	1657	49	32	19	im
5	1	1	1	41	12	3204	1685	15	30	35	rn
4	1	1	1	42	0	937	1685	2290	44	-1	
5	1	1	1	42	1	937	1685	21	19	0	%
5	1	1	1	42	2	1205	1691	18	16	61	&
5	1	1	1	42	3	1344	1688	6	22	91	\
5	1	1	1	42	4	2416	1703	6	6	0	¥
5	1	1	1	42	5	2719	1704	5	5	0	:
5	1	1	1	42	6	2844	1719	36	10	13	=
5	1	1	1	42	7	3209	1713	18	13	77	>
4	1	1	1	43	0	436	1692	2791	84	-1	
5	1	1	1	43	1	436	1711	198	41	0	owosysoo0
5	1	1	1	43	2	979	1692	50	43	6	a
5	1	1	1	43	3	1051	1692	99	56	43	gt
5	1	1	1	43	4	1173	1706	55	38	18	38
5	1	1	1	43	5	1357	1735	2	5	10	’
5	1	1	1	43	6	1394	1707	28	41	0	»
5	1	1	1	43	7	2544	1734	41	42	0	*
5	1	1	1	43	8	2663	1729	180	39	35	Leen
5	1	1	1	43	9	3070	1722	46	45	38	SS
5	1	1	1	43	10	3183	1728	44	30	0	e
4	1	1	1	44	0	436	1741	2791	70	-1	
5	1	1	1	44	1	436	1741	199	40	5	S$Srase
5	1	1	1	44	2	1080	1744	56	47	15	wy
5	1	1	1	44	3	1323	1771	5	4	0	Yi
5	1	1	1	44	4	1363	1750	46	31	0	4
5	1	1	1	44	5	2001	1775	5	4	5	°
5	1	1	1	44	6	2559	1777	33	29	61	=
5	1	1	1	44	7	2625	1775	24	24	56	7
5	1	1	1	44	8	3075	1771	57	28	39	=
5	1	1	1	44	9	3199	1756	28	55	74	ty
4	1	1	1	45	0	436	1774	2791	66	-1	
5	1	1	1	45	1	436	1774	205	45	20	sagoata
5	1	1	1	45	2	1369	1782	9	36	92	\
5	1	1	1	45	3	2091	1809	77	14	0	toa
5	1	1	1	45	4	2428	1784	128	46	10	SS
5	1	1	1	45	5	2625	1805	13	30	41	i
5	1	1	1	45	6	2831	1790	23	46	4	8
5	1	1	1	45	7	2895	1808	36	32	65	&
5	1	1	1	45	8	3113	1801	114	28	56	Vere
4	1	1	1	46	0	436	1776	2495	126	-1	
5	1	1	1	46	1	436	1776	193	118	0	ceeeitl
5	1	1	1	46	2	1355	1818	26	51	49	‘
5	1	1	1	46	3	2492	1833	145	69	0	S2B\
5	1	1	1	46	4	2730	1830	12	19	28	°
5	1	1	1	46	5	2797	1833	134	54	0	28
4	1	1	1	47	0	436	1851	2674	94	-1	
5	1	1	1	47	1	436	1851	199	66	0	g7ee29¢
5	1	1	1	47	2	1181	1867	46	42	12	fo
5	1	1	1	47	3	1248	1864	56	45	46	ey
5	1	1	1	47	4	1798	1878	15	21	10	%
5	1	1	1	47	5	1938	1858	39	47	43	%
5	1	1	1	47	6	2421	1875	12	20	59	8
5	1	1	1	47	7	2556	1877	14	12	23	=
5	1	1	1	47	8	2598	1880	52	44	16	BY
5	1	1	1	47	9	2797	1883	50	53	0	g°
5	1	1	1	47	10	2865	1868	128	62	32	22N
5	1	1	1	47	11	3072	1869	38	76	32	J
4	1	1	1	48	0	436	1891	2694	88	-1	
5	1	1	1	48	1	436	1891	205	54	0	asicaic
5	1	1	1	48	2	1196	1904	102	53	42	S33
5	1	1	1	48	3	1439	1914	16	22	91	\
5	1	1	1	48	4	1938	1910	32	50	43	©
5	1	1	1	48	5	2136	1935	30	28	78	t
5	1	1	1	48	6	2186	1924	23	36	75	2
5	1	1	1	48	7	2662	1920	56	56	40	AY,
5	1	1	1	48	8	2798	1913	120	66	65	7283
5	1	1	1	48	9	3125	1937	5	5	32	F
4	1	1	1	49	0	163	1925	3055	91	-1	
5	1	1	1	49	1	163	1932	27	52	0	v0
5	1	1	1	49	2	436	1925	199	61	2	1eeaeka
5	1	1	1	49	3	1248	1947	42	46	0	§e°
5	1	1	1	49	4	1456	1936	33	46	90	\
5	1	1	1	49	5	2056	1950	17	40	49	|
5	1	1	1	49	6	2138	1960	25	29	30	©
5	1	1	1	49	7	2186	1947	56	66	34	39
5	1	1	1	49	8	2662	1958	59	58	37	'\\
5	1	1	1	49	9	2804	1956	77	44	12	3s
5	1	1	1	49	10	2906	1985	23	21	27	%
5	1	1	1	49	11	3023	1953	32	63	47	Me
5	1	1	1	49	12	3173	1954	45	52	57	N
4	1	1	1	50	0	144	1960	3158	103	-1	
5	1	1	1	50	1	144	1960	40	60	70	9)
5	1	1	1	50	2	436	1975	54	38	45	Ob
5	1	1	1	50	3	505	1972	136	44	31	sass
5	1	1	1	50	4	1197	1975	107	52	44	238
5	1	1	1	50	5	1490	1982	70	36	35	>
5	1	1	1	50	6	1939	2009	37	28	95	>
5	1	1	1	50	7	2135	1983	101	71	13	83s
5	1	1	1	50	8	2680	1974	174	89	45	M8
5	1	1	1	50	9	2952	2007	125	30	20	af
5	1	1	1	50	10	3211	2005	91	39	42	ye
4	1	1	1	51	0	149	2009	3153	73	-1	
5	1	1	1	51	1	149	2009	35	23	47	©
5	1	1	1	51	2	436	2009	140	47	12	J2se3
5	1	1	1	51	3	590	2016	50	34	58	Sa
5	1	1	1	51	4	1205	2013	65	37	0	“é
5	1	1	1	51	5	1575	2025	64	34	35	Te
5	1	1	1	51	6	2186	2033	50	33	49	a8
5	1	1	1	51	7	2568	2047	4	5	10	\
5	1	1	1	51	8	2640	2026	18	37	0	\,
5	1	1	1	51	9	2740	2058	5	6	19	,
5	1	1	1	51	10	2869	2029	32	31	35	mm
5	1	1	1	51	11	3002	2060	5	5	40	A
5	1	1	1	51	12	3090	2031	32	43	78	in
5	1	1	1	51	13	3121	2031	41	43	0	fS
5	1	1	1	51	14	3211	2040	91	42	22	nz
4	1	1	1	52	0	158	2024	3076	91	-1	
5	1	1	1	52	1	158	2036	26	23	61	O
5	1	1	1	52	2	467	2024	127	48	0	og'3>
5	1	1	1	52	3	619	2042	22	27	0	&
5	1	1	1	52	4	1640	2059	124	24	31	ee
5	1	1	1	52	5	1938	2043	28	29	61	8
5	1	1	1	52	6	2137	2058	18	32	70	3
5	1	1	1	52	7	2186	2067	55	20	57	2a
5	1	1	1	52	8	2798	2087	5	4	0	.
5	1	1	1	52	9	2908	2087	4	5	21	’
5	1	1	1	52	10	3090	2065	26	41	0	a
5	1	1	1	52	11	3213	2078	21	37	95	3
4	1	1	1	53	0	158	2065	3144	86	-1	
5	1	1	1	53	1	158	2074	34	49	60	a
5	1	1	1	53	2	467	2065	115	53	42	Seer
5	1	1	1	53	3	618	2080	23	35	45	3
5	1	1	1	53	4	868	2072	22	70	0	g
5	1	1	1	53	5	1634	2099	5	5	27	'
5	1	1	1	53	6	1765	2084	177	30	35	=.
5	1	1	1	53	7	1959	2115	92	18	22	ae
5	1	1	1	53	8	2143	2095	19	19	0	<
5	1	1	1	53	9	2458	2109	69	33	20	aa
5	1	1	1	53	10	2534	2096	26	12	73	I
5	1	1	1	53	11	3086	2096	27	53	52	eo
5	1	1	1	53	12	3208	2098	35	53	40	ny
5	1	1	1	53	13	3260	2086	42	32	0	“
4	1	1	1	54	0	158	2114	3144	82	-1	
5	1	1	1	54	1	158	2138	26	25	77	°
5	1	1	1	54	2	467	2114	54	47	64	oe
5	1	1	1	54	3	560	2129	20	19	0	S
5	1	1	1	54	4	618	2120	23	38	19	2
5	1	1	1	54	5	869	2152	21	18	57	=
5	1	1	1	54	6	2053	2132	288	53	37	See
5	1	1	1	54	7	2452	2151	52	34	0	_/
5	1	1	1	54	8	3077	2144	44	52	37	Kas
5	1	1	1	54	9	3260	2151	42	32	87	>
4	1	1	1	55	0	148	2151	3154	83	-1	
5	1	1	1	55	1	148	2151	45	42	0	=r
5	1	1	1	55	2	467	2160	47	39	0	©$
5	1	1	1	55	3	559	2151	76	39	76	$a
5	1	1	1	55	4	868	2166	23	68	54	3
5	1	1	1	55	5	2343	2185	102	12	22	———
5	1	1	1	55	6	2526	2207	5	4	67	J
5	1	1	1	55	7	3260	2184	42	35	69	o
4	1	1	1	56	0	159	2194	3006	72	-1	
5	1	1	1	56	1	159	2194	33	49	0	§
5	1	1	1	56	2	559	2201	23	46	0	¢
5	1	1	1	56	3	1853	2198	95	50	72	ORI
5	1	1	1	56	4	1949	2213	67	46	72	VE
5	1	1	1	56	5	3094	2253	71	13	79	—
4	1	1	1	57	0	553	2250	2775	63	-1	
5	1	1	1	57	1	553	2250	28	35	0	$
5	1	1	1	57	2	3072	2268	256	45	80	034389.59 fx 1 ‘ — my

Section 46

Page 46 of 47

59 6BEVEO
                       ag &                                                                                                       <
                       eis             |                                                                                           8
                                                                                                                                  —
                       sES                                                                                        i               ¢
                  p      4/9                                                                                    # E E              ®
                                                                                                                8 g £6             >
                    —                  Son                                                                      3 asi
                         as                                                                                     5.2
                                ae                            740                                               iii
                                 .                                                                              an see eu
                                                                                                                eu Sees
                   |                    “Vv     \                                                               usihe!
     oe       of  (RS                            \                                E                             aUEEREE
     x                 ;     r 4                                                 nel —
    Sa                se                          \                              aj                          ff
    E38            0          REE
     g™          |              5 a       ye                                     —   Ot   ey:   a   ons          =        ~*~
                               8 N     ot                                          A Pi ee               Y       =         b
                                   P\g                                          /    7               a fa   Ss . FS       oF
               | Ls                                                            able
5	1	1	1	21	4	2215	1261	55	51	25	eh
5	1	1	1	21	5	2322	1321	9	5	49	;
5	1	1	1	21	6	2369	1279	33	14	2	&)
5	1	1	1	21	7	2525	1269	12	71	93	|
5	1	1	1	21	8	2637	1273	31	52	54	/,
5	1	1	1	21	9	2769	1267	125	63	31	oS.
5	1	1	1	21	10	2909	1292	36	34	0	E
5	1	1	1	21	11	3003	1282	16	20	0	~
4	1	1	1	22	0	311	1364	2831	23	-1	
5	1	1	1	22	1	311	1370	47	17	28	ow
5	1	1	1	22	2	516	1364	22	16	47	7
5	1	1	1	22	3	2190	1367	5	9	0	,
5	1	1	1	22	4	2828	1370	17	12	0	n
5	1	1	1	22	5	3033	1364	34	19	28	se
4	1	1	1	23	0	267	1363	2812	94	-1	
5	1	1	1	23	1	267	1373	28	31	88	=
5	1	1	1	23	2	311	1385	21	60	30	3
5	1	1	1	23	3	347	1388	16	24	22	€
5	1	1	1	23	4	938	1363	36	45	74	A
5	1	1	1	23	5	1418	1414	6	3	0	,
5	1	1	1	23	6	1563	1406	9	9	35	:
5	1	1	1	23	7	2055	1380	17	35	22	i
5	1	1	1	23	8	2131	1364	66	93	65	V4
5	1	1	1	23	9	2944	1370	103	80	37	Ya
5	1	1	1	23	10	3071	1380	70	31	0	‘ee
4	1	1	1	24	0	267	1437	2852	93	-1	
5	1	1	1	24	1	267	1444	65	50	78	we
5	1	1	1	24	2	571	1498	11	14	56	1
5	1	1	1	24	3	601	1460	4	3	0	.
5	1	1	1	24	4	883	1453	35	70	60	xX
5	1	1	1	24	5	1220	1449	56	61	17	A,
5	1	1	1	24	6	1290	1459	52	49	7	ca
5	1	1	1	24	7	1359	1481	18	35	13	rr
5	1	1	1	24	8	1407	1457	80	66	47	(sg
5	1	1	1	24	9	1617	1460	48	45	11	=
5	1	1	1	24	10	1672	1454	107	48	16	segs
5	1	1	1	24	11	2055	1437	161	93	18	Bed
5	1	1	1	24	12	2438	1494	2	4	0	'
5	1	1	1	24	13	2627	1458	125	32	34	>.
5	1	1	1	24	14	2761	1490	21	9	42	a
5	1	1	1	24	15	2919	1460	54	43	24	aed
5	1	1	1	24	16	3021	1480	3	4	14	,
5	1	1	1	24	17	3055	1455	64	54	34	rio
4	1	1	1	25	0	574	1502	2569	41	-1	
5	1	1	1	25	1	574	1514	14	29	37	3
5	1	1	1	25	2	1327	1509	36	34	58	A
5	1	1	1	25	3	1365	1508	22	25	49	>
5	1	1	1	25	4	1425	1505	32	24	31	alae
5	1	1	1	25	5	1523	1508	127	33	14	kD
5	1	1	1	25	6	1656	1503	74	36	27	ts
5	1	1	1	25	7	1698	1499	28	55	32	ap
5	1	1	1	25	8	2111	1516	6	11	29	of.
5	1	1	1	25	9	2145	1513	27	25	51	]
5	1	1	1	25	10	2791	1505	26	14	5	~S
5	1	1	1	25	11	2889	1502	173	41	2	&80U//7
5	1	1	1	25	12	3068	1505	75	35	15	F
4	1	1	1	26	0	574	1519	2544	61	-1	
5	1	1	1	26	1	574	1548	75	32	57	wks
5	1	1	1	26	2	1266	1556	25	23	0	Se
5	1	1	1	26	3	1336	1539	10	40	49	|
5	1	1	1	26	4	1354	1537	312	38	42	en
5	1	1	1	26	5	1686	1537	56	35	25	ar
5	1	1	1	26	6	2099	1535	61	35	45	a
5	1	1	1	26	7	2595	1546	5	5	0	-
5	1	1	1	26	8	2853	1519	186	56	0	NRL
4	1	1	1	27	0	577	1553	2493	105	-1	
5	1	1	1	27	1	577	1553	51	105	56	ets
5	1	1	1	27	2	1238	1574	99	35	0	‘cM
5	1	1	1	27	3	1469	1577	65	45	40	ES
5	1	1	1	27	4	1553	1570	193	52	19	05°
5	1	1	1	27	5	2063	1573	36	38	63	if
5	1	1	1	27	6	2365	1587	110	26	43	Tae
5	1	1	1	27	7	2581	1574	194	57	19	os
5	1	1	1	27	8	2838	1574	232	50	40	SA

                                               Z         ae     ,               ef                   8 P        yy?)     \
                                            + ows he TT  oe,    :                                 Ne           = a      | ~
                                      g               NG      be  {              :                 n     ;    v   he :  r E
               8                      =      Ay   >          ae) -4   38             Fz     7      eS       fo      yy co
               3                      j    WwW       St UNNS          &             De         age                 >
                                               y             fee      4.|   i                 mm      >,      Bod
                                             ~               ee       eK &         o               aos ~ on       \ =   e
                                                                      zx                                            .
  Rule me sree                                                        wy
Penaets te IR © Sa

Section 47

Page 47 of 47

|}                                                                                                                                                         m
   ote                                                                                                                                                               n
          ihe                                                                                                                                                       ©
   S      ats                                                                                                                                                       .
   5      sh                                                                                                                                                         =
                                                                                                                                                                   <9
                                                                                                                                                                     o
       | Prapaied Easements                                                  —=~=~*~“‘*~*”!!”!”!”!”!!!” CR repesed Covenants                                SCS
                       Easement AA |s a vehicular access easement over the existing private road and will benefit Nil
                       proposed Lots 2 and 22
                       Easement AC is a vehicular access easement providing service vehicle access over the
                       existing driveway and will benefit proposed Lots 2 and 22
                       Easement AE is vehicular access easement providing service vehicle access and will benefit
                       proposed Lots 2 and 22
                       Easement AM is 4 pedestrian access easement and will benefit proposed lot 3 and 4
                       Easement AN is a pedestrian access easement and will benefit proposed lot 3 and 4
|? \Mittercttpapesedesind2 ne
                       will benefit proposed lots 1 and 22
                       Easement Al is a 4 metre wide pedestrian access easement burdening Lot 3. and will benefit Nil
                       proposed lots 1, 4 and Noosa Shire Council
                       Easement AK is a vehicular access easernent over the new North-South Link Road and will
                       benefit proposed lots 6,7, 8 and &.
                       Easement AP is a vehicular access easement and will benefit proposed lots 10, 11, 12, 13,
                       14, 15 and 16                                                                    |
                       Easement AO is a pedestrian access easement for new private road 8 and will benefit Nil
                       proposed lots 3, 1 and Noosa Shire Council
    a
       I
                                                                                                          preservation of visual amenity*
                                                                                                          ree
                                                                                                          preservation of visual amenity*
       = Eee
       SS                             _                                                                   preservation of visual amenity*
                                                                                                          preservation of visual amenity*
     | 1H            | Uibeneteproposedlot 1 1213,4andis ond wilbemanaged byLotgresenatonctvsualamenty” |
                       fasement AY |s a venicutar access easement for emergency fire vehicle access only, and Proposed Covenant AR |s Open Space for the purpose of
                       Easement AX is a stormwater and vehicular access easement for cars, emergency      Nil
                       firefighting appliances and car parking benefiting proposed Lots 1, 11, 13, 14 and 15 and
                      will be   managed by Lot 1
                       fasement AW is a stormwater and vehicular access easement for cars, ermergency     Nil
                       firefighting appliances and car parking benefiting proposed Lots 1,11,12, 14,15 and will be
                       managed by lot 1
                       Easement AZ is a stormwater easement and will benefit proposed Lot 14
       eee
                       Easement AV is a stormwater and vehicular access easement for cars and emergency   Nil
                       managed by Lot 1
                       Easement AQ is a stormwater and vehicular access easement for cars and ermergency  Nil
                       firefighting appliances and car parking benefiting proposed Lots 1, 11,12,13,14 and will be
                       managed by Lot 1.

           ee

                       Easement AB \s a vehicular access easement over the existing access driveway and will Nil
                       benefit proposed Lots 1 and 2.                                                   |
                       Nal                                                                                Covenant AG is for the purpose of a building exclusion zone
                                                                                                          to mitigate bushfire risk
                                                                                                          Covenant AH is Open Space for the purpose of visual
                                                                                                          amenity*
             ot

       As per terms of existing Covenant | on Lot 2 on SP182845 *

                                                                                                                                              Page 47 of 47

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.