GENERAL COMMITTEE MEETING AGENDA 17 FEBRUARY 2020
As the proposal seeks to preserve the 5 metre landscaped buffer within the setback area, this is
likely to provide added stability and therefore the cantilevered design is considered appropriate in
this instance.
No further issues have been raised as a result of the internal referrals noted above.
6. CONCLUSION & REASONS FOR DECISION
The proposed development to construct a detached house consisting of a basement level,
ground level and upper level seeks a boundary relaxation to the rear, coastal boundary. The
encroaching elements of the building include ground floor deck, upper balcony and upper level
roof overhang resulting in a minimum setback of 4.1m to the OMP on the roof overhang and 5m
to the face of the deck and balcony. The basement level is set back the required 6 metres from
the boundary. The Natural Resources Overlay applies to the development and requires in a
Specific Outcome of the code, a minimum 6 metre setback. The purpose of the overlay code is to
protect the coastal processes and dunal systems and mitigate the impact of erosion in the
coastal zone. Draft coastal hazard mapping demonstrates that current modelling excludes this
site from the potential erosion prone area. With the cantilevered design, the proposal is
considered to have little or no detrimental effect on the natural coastal processes as the building
elements do not touch the ground.
The application is recommended to the Council for approval.
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer Community Development Financial Services
Executive Support Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
Executive Services x Environment & Sustainable Development Infrastructure Services
Community Engagement Building & Plumbing Services Asset Management
Customer Service X Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
X
Design and Delivery
Page 14 of 47
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.