08/0383 Operational Works - Prescribed Tidal Works - Access Jetty, Coastal Development, Pumping Facility [As Published] · 142008.383

of 22

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

£< NOOSA Checklist - Applications Involving Land

La Development & Land Use Secticns

 

IDAS APPLICATION

This checklist should be used for any [DAS application. Please check each of the following items before accepting an
application at the counter.

1. APPLICATION FORMS oo . uo ‘ / nh
11 Form 1 PartA

 

1.1.1 Ensure that the form is fully completed.

 

 

ay

4.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is. required.

 

1.1.2.1 If there are multiple owners, the consent of each owner is tequired.
4.1.2.2 Ifthe owner of the land is a company, either ACN No. or Company See! required.
4.2 Form1 Part B-O Supporting Information
4.1.2. Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.

4.1.2.4 Ensure that each of Forms B-O which are attached are fully completed.
2.° REFERRAL INFORMATION aoe a Lo . oO UT
2.4. Ensure that items 1-23 have been checked and/or completed with regard to referrals. Ly]

3, ENVIRONMENTALLY RELEVANT ACTIVITIES
3.1 Ensure that Part G is completed if EPA referral is required.

 

 

3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct apptication
fee is paid and recorded on the application.

4. ° FORM 2 - REQUEST TO CHANGE APPROVAL oe ‘,

4.1. Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.

5. PLANS , . . .
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational
Works) accompanies the application. In addition ensure that each set is complete.
§.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound.

6. SUPPORTING INFORMATION .~ . ae . .
6.1 Ensure that at teast 6 copies of any report accompanies the application (5 for Reconfiguration

and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.

6.2 _ In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.

 

 

 

 

 

 

C FE] nw (

 

 

Se:

me: ee we . «

7 FREY OTT ee we . r
7.4 Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.
7.2. Ensure that the fee which has been paid is recorded on the application form.

 

 

 

 

 

 

 

Receiving Officer eS sees I

Having completed this form and accepted thea

trays:-

«Ifthe application is for a Material Change of Use exclusively -AOP1's desk in the Land Use Section.

« Ifthe application is for an Material Change of Use & Reconfiguration - AOP1's desk in the Land Use Section.

«Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exciusively - AOD2 in the
Land Development Section.

* {nall other circumstances ~ AOP1's desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 
 
  

fication, please deliver both to the following IDAS Application Receiving

SEP g:\ant\Vorms\application checklist.doc

 
Full text of the other 21 pages

Page 2

Kris Boody (07) 5449 5173
Subject:

<

Email: [email protected]

20" February 2008
Ze reg mp

NOOSA COUNCIL
Land Use Department
PO Box 141
TEWANTIN,

QLD 4565.

Dear Sir or Madam:

Please find attached ‘idas’ forms and a Management Plan applicable to the
application sent to the EPA for a DA to construct a permanent Sandshifting
Facility — Noosa Spit. -

Development Application Forms for Ecoaccess assessment under IDAS for ‘Prescribed
tidal works’ & ‘Permit for Construction of a Sand Shifting Facility’ for a development
application under the Coastal Protection and Management Regulations 2003 (Coastal
Regulation).

The nature of the application has two areas to be allocated for —
¢ Construction of a Permanent Sand Shifting Facility &

e Construction of a Seawater Supply Pump Access Jetty for the
Permanent Sand Shifting Facility.

Accompanying this application is the IDAS Assessment Checklist, the Part A and Part
M for the Permanent Sand Shifting Facility and a Part A and Part P for the Seawater
Supply Pump Access Jetty application, also previous correspondence on the
Temporary Sand Shifting Facility in 2005 which has been attached to this application.

Information to follow are the Resource Entitlement from NRW and a Concurrence
Agency response from Maritime Safety Qld before the application and payment is
forwarded on to the EPA for response.

Thankyou for your time

Yours Sincerely,

Kris Boody
ENVIRONMENTAL PROJECT OFFICER

7

Ly

Page 3

o

INTEGRATED PLANNING ACT 1997

Part A, Version 2.4, 29 May 2006

 

Form 1 Development Application

 

Common details

 

 

The completion of all applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed [DAS Assessment Checklist if
required, and by one (1) or more ather completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qid.qov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Description of land 1. Street address: fnctuding house number, street name, suburb/ocality name & postcode) (if applicable)
All land the subject of the application, must be .
identified. However, a description of the land is not | P.O. Box 141 Tewantin, Queensland, 4565 |
required in relation to a mobile or temporary wae . . 7 .
Environmentally Relevant Activity (ERA). 2. Name of water body or watercourse, within which the development is proposed: (if applicable)
Advice for completing Q2 - Q2 applies if | ]
development is proposed within a water body or = = -
walecourse. 3. Lot on plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
Advice for completing Q3 - Most land can be "
identified by a lot on plan description. These details [ Lot 115 MCH 839107 - Noosa Spit |
can be obtained from tile d ts of through thi Peenas
localgoennent 14, The above description is for: (tick applicable box)
However, if the land on which the development is - (i) the land on which the development is proposed; or
ed d have a tot on plan description (i.e. o a a : :
Ee etapa C1 (ii) the tand adjoining the water body or watercourse, within which the development is
watercourse) provide - proposed; or
{i) the tot on pian description for the oO on
agjoiningfadjacent tand; or (iii) the water body or watercourse.
{ii) GPS coordinates where there is no
adjoiningladjacent tand (eg. in Moreton Bay). 5. Shop / tenancy number: 6. Storey / level: 7. Total area of land: (m? or ha):
development is within a water body of watercourse. | NA | NA | NA
Advice for com - Q8 applies if i] i, ie ci . y ”
development is within a local government area 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc.) (if applicable)
rng | (Noosa Counel |
Local Government Act 1993. 9. Port authority for the strategic port land or strategic port land tidal area on which the
Advice fi leting Q3 - Q9 applies if p
Advice for completing Q9 - Q9 appties i i . i ‘tte) [i ,
developments on strategic portland ora strategic development is proposed: (eg. Port of Brisbane, Port of Townsville) {if applicable)
port land tidal area, For more details refer to Guide 11 | NA ‘|
Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.)
rw lncetcon ara ceniemayte | [State Land, Noosa Council as Trustee
11. Proposed use of the land: (eg. 6 unit apartment building, 30 fot residential subdivision, ERA for aquaculture in
ig
ponds with a total area of 7 ha for which wastes are released into waters etc).
| Construction of a Permanent Sandshifting Facility
Other applicable parts of Form 4 42. Other parts of Form 1 completed as part of this application: (eg. Part D, Part I, etc)
Part A must always be accompanied by ather | Part M
completed parts of Form 1. For information about
when a part of Form 1 may apply refer to Guide 1,
Applicant details 13. Applicant's name: 15. Contact person:
Clearly identify who is making the application. The | Noosa Council | | Doug Reynolds
applicant need not be the owner of the land. g y
When siqning and lodging this application 14. Contact number: 16. Facsimile number/e-mail address:
The applicant is responsible for ensuring the
information provided is correct. The assessment [ 07 5449 5255 | 07 5447 1062 |
manager, any referral agency & the Chief Executive
(where applicable) will rely on this information when | 17. Postal address:
id deciding the application. .
hike ang and deciding ine appicalion. [ P.O. Box 141 Tewantin, Queensland, 4565 |
e applicant is a company - a contact person
must be shown. 18. Signature: _ 19, Date:
25

 

 

 

 

 

 

Page 4

INTEGRATED PLANNING ACT 1997

Land owner’s consent {if applicable)

Section 3.2.1{3} of the IPA prescribes that an
application must contain, or be supported by, the
written consent of the land ownerls, if the application
involves:

() a material change of use;

(i) reconfiguration of a lot;

{iti} work on land below high-water mark & not within a
canat as defined under the Coastal Protection and
Management Act 1995;08

iv) work on rail corridor land defined under the
Transport infrastructure Act 1994,

Section 3,8.1(2}(a) of the 1PA provides that

tandowner’s consent is nof required for a mobile or

temporary E

For more information refer to Guide 1.

 

20.

Part A, Version 2.4, 29 May 2006
Land owner's consent to the making of this application:
Name

 

Signature Date

 

  

 

 

 

 

 

 

 

 

Resource entitlement (if applicable)
Section 3.2.1(5) of the IPA requires evidence of
resource entittement be given for applications that
involve a prescribed State resource.

Section 3.2.1(10)(a}{ii) of the IPA prescribes that an
application cannot be taken to be property made
without evidence of the resource entiftement
Advice for completing Q21 & 22

Refer to schedute 10 of the Integrated Planning
Regulation 1998 that prescribes the nature of evidence
required by the State in sappori of the lodging of this
development application.

21.

22.

Does this application involve a State resource prescribed under a regulation (other than involving
quarry material on State coastal land under the Coastal Protection and Management Act 1995)?

CANO - goto a24 YES - go to Q22

This application is accompanied by evidence: (tick applicable box)
(A (i)_ of the allocation of, or entitlement to, the resource - attach evidence and go to 023(vi)

Ci (ii) the chief executive of the department administering the resource is satisfied the
development is consistent with an allocation of, or entitlement to, the resource - go
to Q23

D (iii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go to Q23

 

 

 

 

 

 

 

 

 

Advice for completing Q23 23. Evidence of the resource entitlement:
The information in (i) ~ (v) is mandatory if evid . . . . j: ‘
The format oO) Wis mandatory Hevderce’s | (jy Resource entitlement / authority details (vi) Official stamp of the department
The official stamp of the Department of Natural administering the resource (if
Resources, Mines and Water is mandatory where the . applicable)
application invotves any water or riverine quarry {ii) Name of delegated officer
Section 3.2.1(5A) allows the resource manager to limit
the time the evidence may be used. Q23 (vi) must be (iii) Position of delegated officer
completed if the evidence Is time limited. [
(iv) Signature of delegated officer
(v) Date
(vi) _ date of evidence . =
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?

This checklist does not apply if the application requires
the completion of Parts A and B of the Form only. It
must be completed for all other applications.

&] Yes

O NO - the assessment manager may refuse to accept this application on the
grounds that the application has not been properly made

 

Plans / drawings / reports

An application should be accompanied by details to
support the proposal & enable the assessment
manager, referral agencies and any person viewing
the application during public scrutiny ar public
notification to understand Ihe scope of the proposal
and any potential impact.

 

25.

Plans/drawings/reports accompanying this application:

 

 

Plan / Drawing / Report Number Title Date
. - Noosa Main Beach Permanent
{i) Environmental Management Plan Sand Recycling EMP 2008
Definitive Design Manual for
(i) Design Manual Noosa Beach Nourishment | sent. 2007

Permanent Sand Recycle
System

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.

OFFICE USE ONLY (applicable to assessment manager's)

OATE

FEE (8) _ RECEIVED

RECENING OFFICER’S |

| REFERENCE ~—"
NAMEIS

NUMBERIS

Page 5

 

 

 

 

INTEGRATED PLANNING ACT 1997 _ _ Part A, Version 2.4, 29 May 2006
Notification of Engagement of Private Certifier (Optional format)
To. Council. | have been engaged as the private certifier for the building work referred to in this application.
Date ofengagement / / Accreditation Number. ___ Name: Signature:

 

 

 

Page 6

INTEGRATED PLANNING ACT 1997 Part M, Version 2.2, 27 March 2006

Form 1 Development Application

 

os

Operational work in tidal areas bei
& coastal management districts a

A i
“y

|
js
my Hy

 

Completion of all applicable questions on Part M is mandatory for ail apptications involving assessment against the Coastal Protection and Management Act 1995
for operational work that is tidat work and/or work in a coastal management district.

For further information about coastal development refer to Guide 18 Coastal development or go to www.epa.qld.gov.au.

 

 

Nature of the application 1. This application is for operational work, carried out completely or partly within a ‘coastal

The terms in ‘ilalics' are defined in the Coastal management district’, that is: (tick one (1) or more applicable boxes)

Protection and Management Act 1995 (Coastal . . . . .

Act). (J (i) _ tidal work (e.g. basins, beach nourishment, breakwaters, bridges, boat ramps, decks and boardwalks,

+ MHWS means the level of mean high water at docks, dockyards, embankments, groynes, jetties, marinas, pipelines, pontoons, powerlines, seawalls,
spring tides. slips, small craft facilities, training walls or wharves etc.),

> HAT means the level of high water at the OJ (ii). constructing or installing works in a watercourse between MHWS! and HAT? (ie. other

highest astronomical tide.

. - than those works in tidal water) where the development has been determined not to be
3 Assessment against the Water Act 2000 is

required for development in watercourses assessable against the Water Act 20008;
upstream of tidal waters. However, in some iii i 1 4 ye 1
instances the boundary of the tdal iis C1 (iii) constructing a ‘canaf’ intended to be connected to ‘tidal water’,
unclear and a determination is made by NR&M O (iv) constructing an ‘artificial waterway’,
on a case-by-case basis. .
4 Under s117 of the Coastal Act, an application O {v) _ reclaiming land under ‘tidal water’;
Cae. steal teneay ust (1 (vi) disposing of dredge spoil or other solid waste material in ‘tidal water’,
also include the operational work to construct (J) (vii) interfering with quarry material on ‘State coastal land’ above ‘high-water mark’,
the artificial waterway (i.e. the application will . . . .
need to include Part F and M of the IDAS OD Will) draining or allowing drainage or flow of water or other matter across ‘State coastal

Application Form, as well as any other

applicable pars ofthe form) land’ above ‘high-water mark’.

EX) (ix) removing or interfering with coastal dunes on land, other than ‘State coastal land’,
that is in an ‘erosion prone area’ and above ‘high-water mark’,

(1x) _ constructing a bank or bund wall to establish a ponded pasture on land, other than
‘State coastal land’, above ‘high-water mark’.

 

 

 

 

 

The proposal 2. Written description of the proposal:
@ [ Noosa Main Beach Permanent Sand Recycling Environmental Management Plan
Tidal works details (if applicable) 3. Is the application supported by evidence that the proposed works will not prejudice the access
Advice for completing Q3 tights of adjoining property owners?
Evidence may include the support of the
adjoining property owner to the proposal. O NO
For additionat information refer to the EPA YES - attach evidence
Guideline “Preparing a water allocation area for
fidal works’. 4. Details of other associated/previous approvals on the premises:
dice f pleting Q. - -
the Fees aera Peach Protection Act | IPDC00057004E11 Deelopment permit attached for Temporary Sand Recycling system

 

1968 and Canals Act 1958 have been repealed . ; .
and all approvals are now IDAS development |5. Has the local government provided formal approval or written comment on the proposed tidal

approvals. In Q4, the details of associated / works?

previous approvals include these approvals and

approvals assessed against the Coastal Act. {] NO

Advice for completing Q5 IX YES - attach approval / comment

Tidal works may involve development above and
below high water mark. EPA has jurisdiction for
those elements of the tidal works below high
water mark. The local government for the area
(or the Port Authority for strategic port land) has
jurisdiction to regulate development above high
water mark. if the tidal works require approval
from a local government or Port Authority, itis
recommended that this approval be obtained
prior to todging the necessary application with
the EPA.

 

 

Page 7

INTEGRATED PLANNING ACT 1997

Part M, Version 2.2, 27 March 2006

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Removal of quarry material (if 6. For works involving the removal of quarry material below high water mark, provide details of the
applicable} resource allocation permit number: (i.e. sand or gravel removed and placed above mean high water spring tide)
Advice for completing Q6 Y :
An approval is required for taking quarry material Sand Pumping Permit Number IPDC00057004E 114
(e.g. stone, gravel, sand, rock, clay, mud, sift or
soil} that is the property of the State. Refer to
the EPA Guideline Allocation of quarry material
on the EPA Website
Calculation of application fee 7. The works are for:
The fee for works other than in connection with &X] (i) coastal management purposes involving beach nourishment, dune fencing, revegetation
the construction of an articial waterway of dunal areas with endemic native plants, stinger enclosures or a purpose directly related
depends on the type of work. There is no fee &e p » SUING purpc ally f
for certain works, For works other than a private| to the provision of a lifesaver or rescue service by a volunteer community organisation;
purpose, the fee is calculated in terms of the oO ee . lating t id .
value of the completed works” (ii) a private purpose relating to a residence;
Refer to EPA Information Sheet “Fees and oO (iii) other than (i) or (ii) above
royalties payable under the Coastal Act".

8. Estimated value of the completed works: | $4 509 000

9. Feelodged: | $6 734
mers or consultant's details (f 410. { Name (in full): Alan Sheridan & — Lex Nankervis

Contact details: Noosa Council (54 495 222) & Slurry Systems Marine(0413 007 387)
Portable Long Service Leave levy (if |11. 1s payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
licable|

applicable) ; NO - 012, 13 & 14 do not apply
Prior to issuing a development permit for the
works, the assessment manager Is required by Oo YES - complete Q12
law to "sigh an approved form, issued by -
Qleave, which signifies that the PLSL levy under] 12, Has the PLSL levy been paid?
the Building and Construction industry (Portable . | . .
Long Service Leave) Act 1997 has been paid. O NO - the applicable levy must be paid before a development permit can be given for the works
For further information refer to LI YES - complete Q13 & 14
http://www. qleave.qid.gov.au

13. Amount paid:

14. Receipt number:

 

 

 

PLEASE NOTE:

PART M of this form cannot be accepted by the assessment manager unless accompanied by PART A of the form.

 

The assessment manager may refuse fo accept an application that, at the time of lodgement, fails to provide all applicable information requested by
Part A and any other relevant part of Form 1.

 

@ OFFICE USE ONLY {applicable to assessment manager)

 

 

DATE RECEIVED

 

 

| 4027 / See Q8 on Part A of
COSTCODE Form 1 to determine the
| {Applicable to EPA only) district cost centre

REFERENCE NUMBER/S

 

 

 

 

 

Page 8

INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006

  

 

The completion of all applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www. ipa.qid.gov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Description of land 1. Street address: fncludinghouse number, street name, suburb/ocality name & postcode) (if applicable)
All land the subject of he application, must be 7
identified. However, a description of the land is not P.O, Box 141 Tewantin, Queensland, 4565 |
required in relation to a mobile or temporary Habe . i Lory A
Environmentally Relevant Activity (ERA). 2. Name of water body or watercourse, within which the development is proposed: (if applicable)
Advice for completing Q2 - Q2 applies if [ Noosa River Esturary |
development is proposed within a water body or — =
watecourse. 3. Lot on plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
Advice for completing Q3 - Most land can be 5
identified by alot on plan description, These detaits [ Lot 114 MCH 839107 - Noosa Spit ]
can be obtained fram title documents or through the eae son .
focal goversment. 4. The above description is for: (tick applicable box)
However, if the land on which the development is (1 (i) the land on which the development is proposed; or .
d does not have a lat on plan description (i.e. -. an we .
Mo nccolopmatt nvtcced inanatr baie &] (ii) the tand adjoining the water body or watercourse, within which the development is
watercourse) provide — proposed; or
(i) the tot on plan description for the ae
adjoining/adjacent land; or 0 (ili) the water body or watercourse.

(ii) GPS coordinates where there is no

adjoining/adjacent land (eg. in Moreton Bay) 5. Shop / tenancy number: 6. Storey / level: 7. Total area of land: (m? or ha):
Advice for completing Q7 - 07 does not apply ifthe [NA | [NA NA
evelopment Is within a water body or watercourse.

i - Q8 applies if . + ws . . ;
development's within a local government area, 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc.) (if applicable)
Note: Areas below high water mark are not within a | Noosa Council |
focal government's area unless provided for under the -

Local Government Act 1993. 9. Port authority for the strategic port land or strategic port land tidal area on which the

Advice for completing Q9 - Q9 applies if i . je if ie

developments on sratogic port land ora strategic development is proposed: (eg. Port of Brisbane, Port of Townsville) {if applicable)

port land tidat area. For more detaits refer to Guide 11 | Port of Brisbane |
Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.)

I there is insufficient room available, details may be [ State Land, Noosa Council as Trustee |
provided in an attachment to the application.

 

11. Proposed use of the land: (eg. 6 unit apartment building, 30 fot residential subdivision, ERA for aquaculture in
ponds with a total area of 7 ha for which wastes are released into waters etc).

Construction of a Seawater Supply Pump Access Jetty for a permanent Sandshifting

 

 

 

 

 

 

 

 

 

 

 

Facility
Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part f, etc)
Part A must afways be accompanied by other [ Part P |
completed parts of Form 1. Far information about
when a part of Form 1 may apply refer to Guide 1.
Applicant details 13. Applicant's name: 15. Contact person:
Clearly identity who is making the application. The A
applicant need not be the owner of the land. | Noosa Council | [ Doug Reynolds
When signing and lodging this application 14. Contact number: 16. Facsimile number/e-mail address:
‘The applicant is responsible for ensuring the
information provided is correct. The assessment | 07 $449 5255 ‘| | 07 5447 1062 |

 

manager, any referral agency & the Chief Executive
(where applicable) will rely on this information when 17. Postal address:

 

 

assessing and deciding the application. T
ifthe applicant is a company - a contact person | P.O. Box 141 Tewantin, Queensland, 4565 |
‘must be shown. 18. Signature: _, 19. Date:

 

L2sfeles ||

 

 

 

 

 

Page 9

INTEGRATED PLANNING ACT 1997

Part A, Version 2.4, 29 May 2006

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Land owner's consent {if applicable) 20. Land owner's consent to the making of this application:
Section 3.2.1(3) of the IPA prescribes that an
application must contain, or be supported by, the Name Signature Date
written consent of the land owner/s, if the application
involves:
{i} a material change of use;
(i) reconfiguration of a lot; ;
(ii) work on land below high-water mark & not within a (ii)
canal as defined under the Coastal Protectionand| = |e ee eee
Management Act 1995;0r -
(iv) work on rait corridar land defined under the (ii)
Transport Infrastructure Act 1994. Lee eee diene ee eee eee
Section 3.8.1(2}{a) of the IPA provides that .
landowner’s consent is not required for a mobile or (iv)
temporayERA, 2 a ee ne eee eee eee +--+ ----------- 4------ - ~~ -- ee ee eee eee eee eee eee ee eee eee
For more information refer to Guide 4. (v) -
Resource entitlement (if applicable} 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2.1(5) of the IPA requires evidence of quarry material on State coastal land under the Coastal Protection and Management Act 1995)?
resource entitlement de given for applications that
involve a prescribed State resource. oO NO - go to 024 &) YES - go to Q22
Section 3.2.1{10}(a}(li) of the IPA prescribes that an . ee . .
application hei of te to be propery made 22. This application is accompanied by evidence: (tick applicable box)
west sence oe resource enblement (1 (i) of the allocation of, or entitlement to, the resource ~ attach evidence and go to Q23(vi)
vice for completing Q: om ° ~ . . , .
Refer to schedule 10 of the Integrated Planning C1 (ii) the chief executive of the department administering the resource is satisfied the
Regulation 1998 that prescribes the nature of evidence development is consistent with an allocation of, or entitlement to, the resource ~ go
required by the State in support of the lodging of this es 7
development application. to Q23
C1 (iii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go to Q23
hice for com i Jaton 23. Evidence of the resource entitlement:
12 information in {i) - (v) is mandatory if evidence is . , . . i :.
reauited under 022 (i) or (i) above. (i) Resource entitlement / authority details (vil) Official stamp of the department
The official stamp of the Department of Natural administering the resource (if
Resources, Mines and Water is mandatory where the . applicable)
application involves any water or riverine quarry (ii) Name of delegated officer
material under tne Water Act 2000.
Seclion 3.2, 1(5A) allows the resource manager to limit
the lime the evidence may be used, Q23 (vi) must be (iii) Position of delegated officer
completed if the evidence is time limited. Co
(iv) Signature of delegated officer
(v) Date
(vi) pe date of evidence (if applicable)
Assessment triggers 24, Is the IDAS Assessment Checklist completed and attached to this application?
hhocampbton Pn a Butereen oni tt &] Yes (INO - the assessment manager may refuse to accept this application on the
must be completed for all other applications. grounds that the application has not been properly made
Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:

An application should be accompanied by details to
‘support the proposal & enable the assessment
manager, referral agencies and any person viewing
the application during public scrutiny or public
notification to understand the scope of the proposal
and any potential impact

 

 

 

Plan / Drawing / Report Number Title Date
. - Noosa Main Beach Permanent
(i) Environmental Management Plan Sand Recycling EMP 2008
Definitive Design Manual for
(ii) Design Manual Noosa Beach Nourishment Sept. 2007

Permanent Sand Recycle
System

 

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.

OFFICE USE ONLY (applicable to assessment manager's)

: FEE ($} DATE

RECEIVED

REFERENCE |

RECEIVING OFFICER'S
NUMBERIS |

NAME/S

Page 10

INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
Notification of Engagement of Private Certifier (Optional format)

To. Council. | have been engaged as the private certifter for the building work referred to in this application.

Date ofengagement / / Accreditation Number. __ Name: Signature:

 

 

Page 11

INTEGRATED PLANNING ACT 1997 (IPA)

Part P, Version 1.1, 27 March 2006

Form 1 Development Application

 

Prescribed tidal work

 

 

Completion of all a,

 

ficable questions on Part P is mandatory for all applications involving assessment against ihe Prescribed Tidal Work Code contained in the

Coastal Protection and Management Regulation 2003 for operational work that is prescribed tidal work within a local government tidal area.
For further information refer to Guide 24 Prescribed tidal work, and the Guideline for making an apptication for prescribed tidal work on the EPA Website.

 

 

 

 

 

 

 

 

 

 

 

 

 

Nature of the application 1. This application is for operational work for the following prescribed tidal work, carried out
Tidal work is defined in the schedule to the completely or partly within a loca! government tidal area: (tick one (1) or more applicable boxes)
Coastal Protection and Management Act 1995. . . . .
° a“ Bd (i) jetty, pier or wharf;
All tidal works, completely or partly within a local . .
government tidal area, other than tidal works (J (ii) _ boat ramp or slipway;
mentioned below, are prescribed tidal work. oO a) mooring pile: .
The following tidal works are not prescribed tidal . 9 pile,
work: (J (iv) deck or boardwalk;
a) tidal works for a new or existing structure that .
is used for the operation of any of the 5 A pontoon, 1 '
following— vi} revetment, sea wall or retaining wall; . .
i) a port authority; .
th a pubic thonty facility constructed by or CO (wii) other (e.g. abutment, basin, bridge, breakwater, dam, dock, dockyard, embankment, groyne, pipeline or
for Queensland Transport or a port other underground service etc) — provide details below.
authority; | ]
b) tidal works for any of the following—
(i) creating or changing the configuration or 2. This application is for prescribed tidal work, that is for:
characteristics of a navigational channel, . .
(i) an intet or outet for aquaculture carried C1 (i) _ private purposes; or
gui on Tend the aquaculture is made (ii) other than private purposes.
govemment's planning scheme, + .
Part M should be completed for applications for Estimated value of the completed works:
tidal work that is not prescribed tidal work. | $160,000
The fee for works may depend an the type of
work, E.g. For works other than a private
purpose, EPA's concurrence fee is calculated in
terms of the vatue of the completed works.
Local government tidal area 4. The local government tidal area in which the works are proposed is: (e.g. Caims, Gold Coast, Mackay)
Tidal area for a local government is defined in Noosa
schedule 10 of the Integrated Planning Act 1997
(IPA).
Access to adjoining properties 5. ts the application supported by evidence that the proposed works will not prejudice the access
Evidence may include the support of the rights of adjoining property owners?
adjoining property owner for the proposal and a oO NO
water allocation area illustrated on the ptans.
Refer to the Guideline for preparing a water [IX] YES - attach evidence
allocation area on the EPA Website.
Navigational safety 6. Is the application within a cul-de-sac or a bend in a waterway or other location where the side
Maritime Safety Queensland {MSQ) and the boundaries of the lot connected to the work and neighbouring lots are not at right angles to the
assessment manager require information on waterway?
neighbouring structures to ensure the proposal
does not impact on navigational safety or the ] NO
waltantpropartes. Applcatens na ate wo O YES - attach photographs of, or approval information far constructed or unconstructed neighbouring structures
approved if they interfere with access rights of
abutting waterfront properties or with navigation
in the waterway.
Maritime Safety Queensland (MSQ) |7. — Is the application supported by a pre-application concurrence agency response from the chief

response

A pre-application concurrence response from
MSQ can only be provided on applicant request.
Note: A pre-application concurrence agency

response is of no effect if an application triggers
referral coordination.

 

executive under the Transport Operations (Maritime Safety) Act 1994?

CNo

Dt YES - attach response

 

Page 12

INTEGRATED PLANNING ACT 1997 (IPA)

Part P, Version 1.1, 27 March 2006

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Details of the application 8. Confirm, by ticking the applicable box(es), that the following details are provided in plans
Advice for completing Q8 supporting this application:
Fae eet taney the ommaton fete (714i) the location and dimensions of the proposed tidal works in relation to the lot/s abutting
may involve either or both plan view and the proposed works and the tidal land on which the works are proposed to be
elevation). constructed;
A ina ' , (i) allother structures on the water frontage and within 20 metres of the proposed works;
Al is ited for taki larry material ee . . . . . .
fe sone gravel sand, rock, ce: mud, silt or & (iii) the current location of Lowest Astronomical Tide (LAT), Highest Astronomical Tide
Soil) that is the property of the State. Refer to the (HAT), and Mean High Water Spring (MHWS);
EPA Guideline Allocation of quarry material on . .
the EPA Website wey (2 (iv) the slope angles of the beds and banks of the tidal area;
Advice for completing Q10 &X] (v) the structural components of the proposed work;
Hihe works are propased sews tee me [XJ (vi) the engineering design standards of the proposed works;
and the application does not require evidence of L (wii) the physical appearance of the structure including the materials used to construct the
rae ore aaa work and the proposed colour of the work;
Note: "Abutting” means having a common (viii) the engineering design specifications of the proposed works including references to the
boundary or edge; touching. relevant Australian Standards;
C1 (ix) the finished levels of the proposed works;
(1 (x) details of the largest vessel to be moored at the structure;
C1 (xi). if dredging or excavation is required, the volume and type of material to be removed
and the disposal area for the material being removed.
9. For works involving the removal of quarry material below high water mark, provide details of the
resource allocation permit number: (i.e. sand or gravel removed and placed above mean high water spring tide)
10. Is the application within a canal as defined in the Coastal Protection and Management Act 1995?
JNO
DYes
Certification by a Registered 11. Have the design and safety provisions stated in the Prescribed Tidal Work Code contained in the
Professional Engineer Coastal Protection and Management Regulation 2003 been certified by a Registered
A Registered Professional Engineer of Professional Engineer of Queensland (RPEQ), or interstate equivalent?
Queensland (RPEQ), or the interstate equivalent
can certify that the proposed works comply with Oo NO
the design and safety provisions of the & YES .
Prescribed Tidal Work Coda. ~ provide the details below
Note: Tho provision of the certification may Name of RPEQ or equivalent {in ful) Alan Sheridan
race apatite aentcaln eee Contact mailing address P.O. Box 141 Tewantin, Qld, 4565
regarding the applicable fee. Contact telephone/facsimile number 07) 5449 5222
RPEQ No. or equivalent RPEQ 5967
This is to certify that each plan, lodged in support of this application, has been appropriately certified by
the above mentioned Registered Professional Engineer of Queensland (RPEQ), or interstate equivalent.
Portable Long Service Leave levy (if | 12. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable) / KINO - 013, 148 15 do not apply
Prior to issuing a development permit for the
works, the assessment manager is required by O YES - complete 013
law to “sighf’ an approved form, issued by .
ich signi 13, Has the PLSL levy been paid?
Qleave, which signifies that the PLSL levy under
the Building and Construction Industry (Portable _ ie i if ‘
Long Service Leave) Act 1991 has been paid. oO NO - the applicable levy must be paid before a development permit can be given for the works
For further information refer to (1 YES - complete 014 & 15
hitovAvww.qleave.qid.gov.au 14. Amount paid:
15. Receipt number:

 

 

| |

PLEASE NOTE

PART P of this form cannot be accepted by the assessment manager unless accompanied by PART A of the form. The assessment manager may refuse
to accept an application that, at the time of lodgement, fails to provide all applicable information requested by Part A and any other relevant part of Form 1.

 

OFFICE USE ONLY {applicable to assessment manager)

 

 

DATE RECEIVED

 

 

COST CODE
(Applicable to EPA ently)

REFERENCE NUMBER/S

 

 

 

 

 

Page 13

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007

Form 1 Development Application

IDAS Assessment
Checklist

(Formerly the “Referrals Checklist”)

 
   

 

 

IMPORTANT NOTE FOR ALL APPLICANTS:

1. This checklist was formerty referred to as the “Referrals Checklist”. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist". The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Hentage Council etc.).

3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to

determine the assessment manager’ for the application.

Therefore, the completion of all questions in section 4 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only}.

Itis the responsibility of the applicant to accurately complete this checklist.

Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.

Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

The assessment manager for the application will rely on the information provided in this checklist (as wel! as any material lodged in support of the application) to identify

any applicable referrat agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the

application triggers referral coordination?,

9.  Toassist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qid.gov.au, Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.

10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www ipa.qid.gov.au.

11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.

SN OOS

 

 

SECTION 1 - STATE ASSESSMENT (completion mandatory)

Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006.

 

Environmentally relevant activity 1. The application involves: (tick applicable box/es)

For more information refer to Guide. 4, (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
econlesien lates eceesmentby the. at, has not been made - complete Part G of Form 1

administering authority>. Odi) a mobile or temporary ERA for which a code of environmental compliance has not been
If an entity, other than the administering Made - complete Part G of Form 1

authority, is the assessment manager for the Fe] {iii) none of the above

application, the administering authority is a
concurrence agency for the application in relation
to this matter.

Note: An application involving ERA 19 and/or 20
will also require completion of Part Ky of Form 1
for approval where an allocation under the Water|
Act 2000 is required,

 

 

Continued overleaf

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed iDAS Assessment Checklist (if applicable).

 

OFFICE USE ONLY (appticabie to assessment manager)
DATE RECEIVED : REFERENCE NUMBER/S

1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.

2 For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?"

3 The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries (for a delegated ERA).

Page 1

Page 14

INTEGRATED PLANNING ACT 1997

State-controled road matters

For more information refer to Guide 3.

Unless you answered “none of the above" to 02,
the application triggers referral to the Department)
of Main Roads (OMR) as a referral agency.

In certain circumstances DMR will be an advice
agency, white in other circumstances DMR will
be a concurrence agency.

Schedule 2 of the IP Requiation will assist you to
determine where DMR is an advice or
concurrence agency for the application.

2.

IDAS Assessment Checklist, Version 20, 2 Apri! 2007
The application involves: (tick appiicable box/es)
C1 (i) development on land contiguous* to a State controlled road and for -
LJ (a) material change of use assessable against the planning scheme;

LA (b) reconfiguring a fot unless -
+ the total number of lots is not increased; and
« the total number of lots abutting the State-controlled road is not increased;

C1 () operational work (not associated with a material change of use assessable against the

planning scheme or reconfiguring a lot mentioned in {b) above}-

« associated with access to a State-controlled road; or

+ for filling or excavation; or

« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.

(1 (i) development on land not contiguous to a State-controlled road and -

(1 (a) material change of use -
* assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
thai schedule;
U (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
C1 (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)—
+ assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the 1P Regulation arid exceeding the thresholds set by
that schedule.

wf (iii) none of the above

 

 

Clearing vegetation 3. The application involves: (tick applicable box/es)

For more Information refer to Guide 12. oO {i)_ material change of use —

Unless you answered “none of the above" ta Q3, + . .

the application requires assessment by the (a) assessable against the planning scheme,

Department of Natural Resources and Water ining —

(NRW), {b) on alot containing

if-an agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRW is a ; « if there is no property map of assessable vegetation for the lot - remnant vegetation;
one mates for the application in relation (c) where the existing use of the land is a rural or environmental use; and

If ou ticked 034) or @, your application cequires (d} where the size of the land is 2 hectares or larger - complete Part J of Form 1

referral to NRW for assessment regardless of oO (ii) reconfiguring a lot —

whether vegetation clearing is proposed or not. .

(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;

(b) where the size of the lot before the reconfiguration is 2 hectares or larger;

(c) where 2 or more lots are created; and

(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1

LD fii) operational work -

(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and

{b} not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form4

{iv) none of the above.
Strategic port land 4. The application involves:

For more information refer to Guide 11.

If you ticked {i) - the relevant Port Authority is the
assessment manager for the application.

ff you ticked (li) Queensland Transport is a
concurrence agency for the application.

 

 

1 ()) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part | of Form 1

LD (i) a material change of use that is inconsistent with the jand use plan approved under the
TI Act for the strategic port land - complete Part ! of Form 1

{Xd (iii) none of the above

 

4 Land contiguous to a State-contro!led road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlied road; or that is part of a future State-

controlled road.

Page 2

Page 15

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

Acid sulfate soils
For more information refer to Guide 10.

Untess you answered “none of the above" to Q5,
the application requires assessment by
Department of Natural Resources and Water
(NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is an advice
agency for the application in retation to this
matter.

The application involves development on land situated in an identified’ local government area

and where the surface of the land is: (tick applicable box)

C1 (i) below 20m AHDé and the development will involve the excavation of 1000m? or more of
soil or sediment at or below 5m AHD, or

LD (ii) at or below Sm AHD and the development will involve filling the site with 1000m3 or more
of material

{iil) none of the above

 

Major hazard facilities or possible
major hazard facilities

For more information refer to Guide 17.

tf you answered “YES" to Q6, the application
requires assessment by the Department of
Emergency Services (DES).

Ht an agency other than DES is the assessment
manager for the application, DES is a
concurrence agency far the application in
relation to this matter.

Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

NO
(1 YES - complete Part t of Form 1

 

Water related development under the
Water Act 2000

For mora information about items (a) - (f), refer
to Guide 15. For more information about item
(g), refer to Guide 14 Does my application
involve assessment of a referable dam?

Unless you answered “none of the above" to Q7,
the application requires assessment by the
Department of Natural Resources and Water
(NRW). .

If an agency other than NRW is the assessment
manager for the apptication, NRW is a
concurrence agency for the application in
relation to this matter.

The application involves:

0 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es)

| (a) ina watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Kz, Ks, Ke, Ks, or Ko of Form 1 whichever is applicable;

(C1 (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
Ks of Form 1; .

(2) (c) for a subartesian bore, in declared subartesian area’, or in a certain area
covered by a water resource plan, for use for purposes other than stock and/or
domestic use - complete Part Ks of Form 1;

(1d) fora subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part K: of Form 1;

(1 (e) for taking overland flow water in certain areas covered by a water resource plan
— complete Part Ks of Form 1,

(1 (f) for interfering with overland flow water in a drainage and embankment area -
complete Part Kio of Form 4

(1g) for constructing a referable dam? or works that will increase the storage capacity
of areferable dam by more than 10% - complete Part Ks of Form 1; or
[4] (ii) none of the above.

 

Removal of quarry material froma 8.

watercourse
For more information refer to Guide 16.

If you answered “YES” to Q8, the application
Tequires assessment by the Department of
Natura! Resources and Water (NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.

Note: Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse is also an
Environmentally Relevant Activity (ERA).

 

Does the application involve development for the removal of quarry material from a watercourse?
requiring an allocation notice under the Water Act 2000?

Ed No

(J YES - complete Parts Kr and G of Form 1

 

5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumeti, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Coobola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres. Townsville, Whitsunday.

Australian Height Datum (AHD).

Referable dam is defined under the Water Act 2000.
Watercourse is defined in sch 10 of the IPA.

wane

The declared ground water areas are listed in Guide 13 Development in a declared catchment area.

Page 3

Page 16

INTEGRATED PLANNING ACT 1997

Operational work that is tidal work or
work in coastal management district
For more information refer to Guide 18. For
more information about prescribed tidal work in
local goverment tidal areas refer to Guide 24.
Uniess you answered “none of the above" to Q9,
the application requires assessment by the
Environmental Protection Agency {EPA).

If an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
felation to this matter.

Local government is ihe assessment manager
for all prescribed tidal work,

9.

IDAS Assessment Checklist, Version 20, 2 April 2007

The application involves operational work that is: ( tick the applicable bowes)

Of)
& ii
Diiii

Ov)

tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; OF

tidal work that is prescribed tidal work"' other than in a canal’? -complete Part P of Form 1;
or

carted out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a) to (i) below are ticked.

C1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;

constructing a canal intended to be connected to tidal waters;

constructing an artificial waterway:

reclaiming tand under tidal water;

disposing of dredge spoil or other solid waste material in tidal water,
interfering with quarry material on State coastal land above high-water mark;

draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;

removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or

none of the above.

Oo
Oo
O@
Oe
OM
Ol)

Cth)
ma)

 

Operational work below high water
mark
For more information refer to Guide 18. For
more information about prescribed tidal work in
local government tidal areas refer 1o Guide 24.
Unless you answered “none of the above” to
010, the application triggers referral to

‘Mariti
Qld) as a concurrence agency.
Locat government is the assessment manager
for all prescribed tidal work.

10. The application involves operational work that is: ( tick the applicable box/es)

ii

(ii
D iii)

Ov)

tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or

tidal work that is prescribed tidal work"4 - complete Part P of Form 1; OF
carried out within a coastal management district's under the Coastal Act and for -

(a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Mof Form 1;
(1 (b) reclaiming land under tidal water - complete Part M of Form 1; oF
(J (c)_ constructing a canal, if the canal is associated with reconfiguring a tot - complete
Part M of Form 7;
none of the above.

 

Coastal management
For mare information refer to Guide 18.

Unless you answered “none of the above" to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).

If an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
relation to this matter.

 

The application involves: (tick the applicable box/es)

Oi)
Oil)

O fill)
Ow
[dl (v)

a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district

a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -

« the construction of a new premises with a GFA‘ of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m2

reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

reconfiguring a lot'’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal — complete Part M of Form 1

none of the above

 

10 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidat area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA

44 Prescribed lidal work is defined in the Coastai Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a iocal government tidal area.

15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.

16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.

17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificiat waterway.

Page 4

Page 17

INTEGRATED PLANNING ACT 1997

Development within the limits of a

port

For more information refer to Guide 18. For

information about prescribed tidal work refer to

Guide 24.

{f you answered “YES” to 012, the application

triggers referral to the Port Authority.

The Port Authority is a concurrence agency if the

development is -

¢ within 200m of a shipping channel or an entry
and exil shipping corridor for the port

* within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;

* within 1000m of a planned port facility
identified in a land use plan approved under
the Transport Infrastructure Act 1994,

In all other situation the Port Authority is an

advice agency.

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve development below high water mark’? and within the limits of a port
under the Transport infrastructure Act 1994?
NO

(DYES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work

 

Marinas

For more information refer to Guide 18. For
information about whether a marina is prescribed
tidal work refer to Guidg 24. The local
government is the assessment manager for all
prescribed tidal work,

If you answered "YES" to Q13, the application
triggers referral to Queensland Fire and Rescue
Service as an advice agency.

 

13.

Does the application involve operational work that is tidal work for a marina'® with more than 6
vessel berths?

{J NO

(1 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

 

Tidal works in strategic port fand tidal
areas

For more information refer to Guide 18. -

Untess you answered “NO” to Q14, the relevant
Port Authority is the assessment manager for the
application and the Environmental Protection
Agency (EPA) and Queensland Transport (QT)

are concurrence agencies for the apptication.

Heritage
For further information refer to Guide 19.

if you answered “YES" to Q15, the application
triggers referral to the Queensland Heritage
Council as concurrence agency for the
application.

Untess you answered “none of lhe above" to
Q18{b}, the application involves referral to the
Environmental Protection Agency as an advice
agency for the application

15,

4.

Does the application involve tidal works within a strategic port land tidal area20?
CNno

YES - complete Part M of Form 1

Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?

[XJ No

[YES - complete Part C of Form 1

15(b)The application involves: (tick applicable boxes)

(i) amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;

D1 (ii) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
(M4 {ili) none of the above.

 

Declared catchment areas

For more information, including a list of the
declared catchment areas within Queensland,
refer to Guide 13.

Unless you answered “none of the above” to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).

Mf an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.

 

16.

The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)

Li) reconfiguring a Iot if any lot resulting from the reconfiguration is less than 16 hectares;
C1 (i) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;
[1 (iii) none of the above

 

18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Poltution) Reguiation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page 5

Page 18

INTEGRATED PLANNING ACT 1997
Contaminated tand

Applications involving materiat change of use
and? of reconfiguring a lot may trigger this,
referral,

For more information refer to Guide 5.
Unless you answered “none of the above" to
Q17, the application requires assessment by the
Environmental Protection Agency {EPA). If an
agency other than EPA is the assessment
manager for the application, EPA will be a
concurrence agency for the application in
relation to this matter.

17.

IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves: (tick the applicable box/es}

(i) reconfiguring a fot for which all of part of the premises are -
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
« item 5, including the exemption otherwise provided for by paragraph (d);
+ item 6, including the exemption otherwise provided for by paragraph (e); or
« item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
(b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
LO (ii) a material change of use -
{a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if ail or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1

[ei (ili) none of the above

 

Electricity infrastructure

For more information refer to schedule 2of the (P
Reaqulation.

Unless you answered “none of the above" to
Q18, the application triggers referral to the
agency to which the easement is granted ia
favour of as advice agency,

18,

The application involves: (tick the applicable box/es)

DC (i)_ reconfiguring a lot where any part of the lot is -
* subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or . .
« situated within 100m of a substation site;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if -

» any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

« any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if any part of the premises is situated within 100m of a substation

site;

operational work that is filling or excavation assessable against the planning scheme,

not associated with reconfiguring a lot, if -

* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;

« the work is located wholly or partly within 10m of a substation site;

fd (v)_none of the above.

Hii)

D iii

Ov)

 

Land designated for community
infrastructure

Applications involving development on tand
designated for community infrastructure may
trigger this referral.

Far more information refer to schedule 2 of the
IP. Requlation,

if you answered “YES" to 019, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.
If an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter.

 

. Does the application involve development assessable against the planning scheme and on land

designated for community infrastructure?
{i) intended to be supplied by a public sector entity; and
{ii)_ on tand not owned by or on behalf of the State; and
(ili) other than development ~

{a) for the designated purpose; or

(b) carried out by, or on behalf of, the designator.
[A No
OO YEs

 

Page 6

Page 19

INTEGRATED PLANNING ACT 1997

SEQ Regional Plan

For more information refer to schedule 2 of the
IP Requtation.

Refer to Chapter 2, part SA and schedule 10 of
the integrated Planning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions.

Untess you answered “none of the above" to
Q20, the application requires assessment by the

Office of Urban Management {QUM).

IDAS Assessment Checklist, Version 20, 2 Apnit 2007
20. The application involves (tick applicable bowes) -
[A @ a material change of use of premises -
(a) ina Major Development Area in the Urban Footprint for -
1 (i) anurban activity -
(sin an area included in a structure plan where the IPA, section 3.1.6
applies;
(1 inanarea not included in a structure plan where -
» the IPA, section 3.1.6 applies to the application for the material change
of use; or
« the premises exceeds 10,000m2; or
+ the gross floor area (GFA) on the premises will exceed 10,000m2; or
* impact assessment is required under the relevant planning scheme
OO (i) intensive animal husbandry; or
CO (ii) residential development involving a rural residential purpose

(b) in the Regional Landscape and Rural Production Area for -
1 (i) anurban activity and not specified in section 2.4(2); or
1 (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);

(d) in the investigation Area for -
O (i) anurban activity and not specified in section 2.10(2);

- & (i) residential development involving a rural residential purpose and not -

specified in section 2.12(2); or
OO (iii) intensive animal husbandry
C1 (ii) reconfiguring a fot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).

RX] (iii) none of the above

 

Fisheries matters

For more information refer to schedule 2of the IP
Requiation.

Unless you answered “none of the above" to
Q21, lhe application requires assessment by the
Cepariment of Primary Industries and Fisheries
(DPI8F).

If an agency olher than DPI&F is the assessment
manager for the application, OPI&F is a
concurrence agency for the apptication in
ralation to items (i) - (iv) and an advice agency
in retation to item {v}.

21. The application involves: {tick the applicable box/es)
Ci() anassessable material change of use for aquaculture - complete Part O; of Form 1;

CA (i) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1,
Diiii

assessable operational work completely or partly within a declared fish habitat area-
campiete Part O2 of Form 1;

C1 (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
Ow)

declared fish habitat area;
none of the above.

 

development assessable under the IPA, schedule 8, part 1, on land that adjoins a
fal (vi)

Page7

Page 20

INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport

For more information refer to Guide 23, schedute
BA of the IPA, & schedule 2 of the IP Reaulation.
Uniess you answered “none of the above’, the

application triggers referral to QT as a
concurrence agency.

 

IDAS Assessment Checklist, Version 20, 2 April 2007

22. The application involves: (tick the applicable box/es)—

(CC (i) a materia! change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.

D (ii) reconfiguring a tot—

C1 (a) onland that is completely or partly within a public transport corridor, and the
total number of lots increases;

(1) (b) on !and that is completely or partly within a future public transport corridor or
an airport's public safety area;

(1) _ onland that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;

(11d) _ for aresidential purpose within the 25 ANEF contour for an airport;

(Je) for aresidential purpose resulting in 100 or more allotments.

LA ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—

1 (a) _ is completely or partly within a public transport corridor or a future public
transport corridor,
(J (b) will result in work that encroaches into an airport's operational airspace.
[X41 (iv) none of the above.

 

Railway safety and efficiency

For more information sefer to Guide 23, schedule
8A of he IPA & schedule 2 of the IP Regulation.
Unless you answered “none of the above’, the
application triggers referral to QT as a
concurrence agency

23.

The application involves: {tick the applicable box/es}—

(CO (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.

U1 fii} reconfiguring a fot—

C1 (a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;

(1 (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;

C1 (©) _ onland that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;

(1 @) _— onland that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;

(Ce) _ onland that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;

(1 (f) for a residential purpose resulting in 100 or more allotments.

C1 (il) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—

C1 (a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;

(J (b} is completely or partly within future railway land, or a railway tunnel easement;

[1 (c) abuts rail corridor land, commercial corridor land or future railway land, and

the work is within 25m of the railway boundary.
M1 (iv) none of the above.

 

Moonie to Brisbane pipeline

For more information refer to schedule 2of the IP
Regulation.

Unless you answered "none of the above", the
application triggers referral to the holder of
pipeline licence No 1 issued under the Petroleum
Act 1923, currently Santos QNT Pty Ltd, for
advice.

 

24.

The application involves the easement for the construction or operation of the Moonie to

Brisbane strategic pipeline, and involves: (tick the applicable box/es)—

(i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.

LD (il) reconfiguring a fot

0 (ii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.

DX] (iv) none of the above.

 

Page 8

Page 21

INTEGRATED PLANNING ACT 1997

Koala habitat area

For more information, refer to Guide 26 and
schedule 2 of the IP Requtation.

Untess you answered “none of the above’, the
application requires referral to the Environmental
Protection Agency as a concurrence agency.

25. The application involves: (tick the applicable boxwes)—

(DAS Assessment Checklist, Version 20, 2 April 2007

CO (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic

activity and will result in -
Oe
Oo)

Le

greater than 1000m?;

clearing of native vegetation over an area greater than 2500m2,
a new building and any reasonably associated structure with a total footprint

an extension to an existing building and any reasonably associated structure if

the extension has a total footprint greater than 1000m2,

Od)
Oe)
OW

extracting gravel, rock or sand from an area greater than 5000m?,
excavating or filling an area greater than 5000m?,
additional traffic in a koala conservation area or koala sustainability area,

between 6p.m. on a day and 6a.m. on the following day.
(C1 (i) reconfiguring a fot in a koala conservation area or koala sustainability area that will

result in -
(1 (a) an increased number of lots;

(1 (b) clearing of native vegetation over an area greater than 2500m?.

C1 (iii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation

over an area greater than 2500m?.

C (v) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with @ material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity

and will result in -

CJ (a) clearing of native vegetation over an area greater than 2500m2,
LD (b) extracting gravel, rock or sand from an area greater than 5000m2,
C1 (c) excavating or filling an area greater than 5000m2.

[Xd (v) none of the above.

 

 

 

Wild river area 26. Does the application involve development in a wild river area declared under the Wild Rivers Act
For more information, refer lo Guide 27 2005?
If you answered YES to Q26, you must also A] N
complete section 2 of this checklist. This wilt 0
enable you to determine if your application can (Yes
proceed in a wild river area and which referral
agency will assess your application against the
Wild Rivers Code, or if the proposed
development is “prohibited” in a wild river area.
Note: Development can be ‘prohibited’ in a wild
river area because the application cannot be
accepted by the assessment manager.
Preliminary Approval 27. Does the application involve a development for which preliminary approval is sought under
I you answered YES to 027, the application Section 3.1.6 of the Integrated Planning Act 1997?
Iriggars referral to the Department of Local
Government, Planning, Spor and Recreation as NO
an advice agency. oO YES
Wetlands 28. The application involves: (tick the applicable boxes) -
D svi h ' C1 (i) a material change of use, other than for a domestic activity, assessable against the
omestic activity means the construction or use ‘ ie j aL .
of a single residence on a lt and any reasonably - planning scheme that is in or within 100m of a wetland;
associated building or structure. Examples of a O (ii) reconfiguring a lot -
building or structure that could be reasonanly In or within 100m of a wetland that will result in
associated with a single residence include: ‘, .
caretaker's residence, granny flat, building or L] (a) more than 10 tots being created; or
structure used for a home business. O (b) lots less than 5 hectares;
bd] (iil) none of the above

Note: Wetland is defined in the tntegrated
Planning Regulation 1998.

Unless you answered “none of the above’ to
Q28, the application involves referrat to the
Environmental Protection Agency as an advice
agency for the application

 

 

Page 9

Page 22

INTEGRATED PLANNING ACT 1997
Conservation Estate

Urban purposes is defined in the Integrated
Planning Act 1997 as ‘purposes far which land is
used in cities or towns, inctuding residential,
industrial, sporting, recreation and commercial
purposes, but not including environmental,
conservation, rural, natucal or wilderness area
purposes”.

Unless you answered "none of the above” to
029, the application involves referral to the
Environmental Protection Agency as an advice
agency for the application.

 

IDAS Assessment Checklist, Version 20, 2 April 2007
29. The application involves: (tick the applicable box/es)—
O (i) a material change of use for urban purposes that is in or within 100m of any of the
following -
LJ (a) a protected area, forest reserve, critical habitat or area of major interest under
the Nature Conservation Act 1992;;
LO (b) a State forest or timber reserve under the Forestry Act 1959;
C1 (©) amarine park under the Marine Parks Act 2004;
(Cd) arecreation area under the Recreation Area Management Act 1988;
C1 (e) a world heritage area listed under the World Heritage Convention;
1 (f) Brisbane forest park under the Brisbane Forest Park Act 1977.
D1 (ii) reconfiguring a lot if -
CO (a) any part of the lot is situated in, or within 100m of, any of the following -
LI) a protected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;
Li (ii) a State forest or timber reserve under the Forestry Act 1959;
OO (iti) a marine park under the Marine Parks Act 2004;
C1 (v)  arecreation area under the Recreation Area Management Act 1988;
(Lv) a world heritage area listed under the World Heritage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
C1 (b) the reconfiguration involves more than 10 lots being created, or any lot ~
resulting from the reconfiguring is less than Sha;
{iii) none of the above.

 

Page 10

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0383 Operational Works - Prescribed Tidal Works - Access Jetty, Coastal Development, Pumping Facility [As Published].pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.