Council archive · source document
08/0383 Operational Works - Prescribed Tidal Works - Access Jetty, Coastal Development, Pumping Facility [As Published] · 142008.383
INTEGRATED PLANNING ACT 1997 (IPA)
Part P, Version 1.1, 27 March 2006
Details of the application 8. Confirm, by ticking the applicable box(es), that the following details are provided in plans
Advice for completing Q8 supporting this application:
Fae eet taney the ommaton fete (714i) the location and dimensions of the proposed tidal works in relation to the lot/s abutting
may involve either or both plan view and the proposed works and the tidal land on which the works are proposed to be
elevation). constructed;
A ina ' , (i) allother structures on the water frontage and within 20 metres of the proposed works;
Al is ited for taki larry material ee . . . . . .
fe sone gravel sand, rock, ce: mud, silt or & (iii) the current location of Lowest Astronomical Tide (LAT), Highest Astronomical Tide
Soil) that is the property of the State. Refer to the (HAT), and Mean High Water Spring (MHWS);
EPA Guideline Allocation of quarry material on . .
the EPA Website wey (2 (iv) the slope angles of the beds and banks of the tidal area;
Advice for completing Q10 &X] (v) the structural components of the proposed work;
Hihe works are propased sews tee me [XJ (vi) the engineering design standards of the proposed works;
and the application does not require evidence of L (wii) the physical appearance of the structure including the materials used to construct the
rae ore aaa work and the proposed colour of the work;
Note: "Abutting” means having a common (viii) the engineering design specifications of the proposed works including references to the
boundary or edge; touching. relevant Australian Standards;
C1 (ix) the finished levels of the proposed works;
(1 (x) details of the largest vessel to be moored at the structure;
C1 (xi). if dredging or excavation is required, the volume and type of material to be removed
and the disposal area for the material being removed.
9. For works involving the removal of quarry material below high water mark, provide details of the
resource allocation permit number: (i.e. sand or gravel removed and placed above mean high water spring tide)
10. Is the application within a canal as defined in the Coastal Protection and Management Act 1995?
JNO
DYes
Certification by a Registered 11. Have the design and safety provisions stated in the Prescribed Tidal Work Code contained in the
Professional Engineer Coastal Protection and Management Regulation 2003 been certified by a Registered
A Registered Professional Engineer of Professional Engineer of Queensland (RPEQ), or interstate equivalent?
Queensland (RPEQ), or the interstate equivalent
can certify that the proposed works comply with Oo NO
the design and safety provisions of the & YES .
Prescribed Tidal Work Coda. ~ provide the details below
Note: Tho provision of the certification may Name of RPEQ or equivalent {in ful) Alan Sheridan
race apatite aentcaln eee Contact mailing address P.O. Box 141 Tewantin, Qld, 4565
regarding the applicable fee. Contact telephone/facsimile number 07) 5449 5222
RPEQ No. or equivalent RPEQ 5967
This is to certify that each plan, lodged in support of this application, has been appropriately certified by
the above mentioned Registered Professional Engineer of Queensland (RPEQ), or interstate equivalent.
Portable Long Service Leave levy (if | 12. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable) / KINO - 013, 148 15 do not apply
Prior to issuing a development permit for the
works, the assessment manager is required by O YES - complete 013
law to “sighf’ an approved form, issued by .
ich signi 13, Has the PLSL levy been paid?
Qleave, which signifies that the PLSL levy under
the Building and Construction Industry (Portable _ ie i if ‘
Long Service Leave) Act 1991 has been paid. oO NO - the applicable levy must be paid before a development permit can be given for the works
For further information refer to (1 YES - complete 014 & 15
hitovAvww.qleave.qid.gov.au 14. Amount paid:
15. Receipt number:
| |
PLEASE NOTE
PART P of this form cannot be accepted by the assessment manager unless accompanied by PART A of the form. The assessment manager may refuse
to accept an application that, at the time of lodgement, fails to provide all applicable information requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY {applicable to assessment manager)
DATE RECEIVED
COST CODE
(Applicable to EPA ently)
REFERENCE NUMBER/S
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0383 Operational Works - Prescribed Tidal Works - Access Jetty, Coastal Development, Pumping Facility [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.